    /LLINO/S POWER COMPANY                   U-10079 ff]  CLINTON POWER STATION P.O. BOX 678 CLINTON. ILLINOIS 61727 August 3, Rma Docket No. 50-461                                    1981_____J                         +% [W 7;c 7
/LLINO/S POWER COMPANY ff]
U-10079 CLINTON POWER STATION P.O. BOX 678 CLINTON. ILLINOIS 61727 August 3, 1981_____J [W 7;c 7 Rma
{Li:{
{Li:{
m-9+
+%
Mr. James G. Keppler Regional Administrator F
Docket No. 50-461 9+
2bi~ W 2fA i IN Region III U.S. Nuclear Regulatory Commission E8Ml.]
m-2bi~
Jf~~;I
IN Mr. James G. Keppler F
                                                                                                  . -/
Regional Administrator 2fA i W
                                                                  ?c-799 Roosevelt Road Glen Ellyn, Illinois    60137                          '-
Region III E8Ml.]
fl l__L,_('~~$                   ~
. -/
lH Uf                   .i
U.S. Nuclear Regulatory Commission
?c-Jf~~;I 799 Roosevelt Road fl l__L,_('~~$
Glen Ellyn, Illinois 60137 lH Uf
~
.i


==Reference:==
==Reference:==
A)   D. P. Hall to J. G. Keppler letter U-10062, Corrective Action Program dated May 31, 1983.
A)
D. P. Hall to J. G. Keppler letter U-10062, Corrective Action Program dated May 31, 1983.


==Subject:==
==Subject:==
Line 35: Line 41:


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
The purpose of this letter is to advise you of actions taken in addition to those noted in Reference A to complete the resolu-tion of NRC concerns regarding the Corrective Action Program.
The purpose of this letter is to advise you of actions taken in addition to those noted in Reference A to complete the resolu-tion of NRC concerns regarding the Corrective Action Program.
i All applicable IP and BA departmental procedures have been revised and issued to reflect the additional requirements of Corporate Nuclear Procedure 3.02, Corrective Action.
All applicable IP and BA departmental procedures have been i
revised and issued to reflect the additional requirements of Corporate Nuclear Procedure 3.02, Corrective Action.
Departmental training to these procedures has been completed.
Departmental training to these procedures has been completed.
A lesson plan, Corrective Action Report Writing, was devel-oped and presented to all site personnel involved in the ini-
A lesson plan, Corrective Action Report Writing, was devel-oped and presented to all site personnel involved in the ini-tiation and/or resolution of CA documents.
,      tiation and/or resolution of CA documents. This lesson plan emphasized the correct method of describing and documenting an adverse condition and the analytical method of determining root cause and generic corrective action to prevent repetition.
This lesson plan emphasized the correct method of describing and documenting an adverse condition and the analytical method of determining root cause and generic corrective action to prevent repetition.
IP has addressed and completed action on all NRC concerns regarding the Corrective Action Program.
IP has addressed and completed action on all NRC concerns regarding the Corrective Action Program.
Sincerely yours ,
Sincerely yours,
D. P. Hall Vice President                                                       l CAS/j f cc:   NRC Resident Inspector Manager - Quality Assurance Director - Office of I&E, USNRC, Washington, DC                                 20555 Illinois Department of Nuclear Safety                                               @
D. P. Hall Vice President CAS/j f cc:
8300180370 830803                                                          D                            ((CP go gDRADOCK05000}}
NRC Resident Inspector Manager - Quality Assurance Director - Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety D
((CP 8300180370 830803 go gDRADOCK05000}}

Latest revision as of 03:07, 15 December 2024

Advises of Addl Actions Taken to Complete Resolution of NRC Concerns Re Corrective Action Program.Applicable Departmental Procedures Revised Reflecting Addl Requirements of Corporate Nuclear Procedure 3.02
ML20076A878
Person / Time
Site: Clinton 
Issue date: 08/03/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1605-1, U-10079, NUDOCS 8308180370
Download: ML20076A878 (1)


Text

r 1605-L

/LLINO/S POWER COMPANY ff]

U-10079 CLINTON POWER STATION P.O. BOX 678 CLINTON. ILLINOIS 61727 August 3, 1981_____J [W 7;c 7 Rma

{Li:{

+%

Docket No. 50-461 9+

m-2bi~

IN Mr. James G. Keppler F

Regional Administrator 2fA i W

Region III E8Ml.]

. -/

U.S. Nuclear Regulatory Commission

?c-Jf~~;I 799 Roosevelt Road fl l__L,_('~~$

Glen Ellyn, Illinois 60137 lH Uf

~

.i

Reference:

A)

D. P. Hall to J. G. Keppler letter U-10062, Corrective Action Program dated May 31, 1983.

Subject:

Corrective Action Program

Dear Mr. Keppler:

The purpose of this letter is to advise you of actions taken in addition to those noted in Reference A to complete the resolu-tion of NRC concerns regarding the Corrective Action Program.

All applicable IP and BA departmental procedures have been i

revised and issued to reflect the additional requirements of Corporate Nuclear Procedure 3.02, Corrective Action.

Departmental training to these procedures has been completed.

A lesson plan, Corrective Action Report Writing, was devel-oped and presented to all site personnel involved in the ini-tiation and/or resolution of CA documents.

This lesson plan emphasized the correct method of describing and documenting an adverse condition and the analytical method of determining root cause and generic corrective action to prevent repetition.

IP has addressed and completed action on all NRC concerns regarding the Corrective Action Program.

Sincerely yours,

D. P. Hall Vice President CAS/j f cc:

NRC Resident Inspector Manager - Quality Assurance Director - Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety D

((CP 8300180370 830803 go gDRADOCK05000