Wisconsin
Wisconsin
                              ' Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd.. Two Ruers, WI 54241                                   (414) 755-2321 PBL 94-0344 December 6, 1994 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, DC 20555 Gentlement DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November, 1994.
' Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd.. Two Ruers, WI 54241 (414) 755-2321 PBL 94-0344 December 6, 1994 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, DC 20555 Gentlement DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November, 1994.
Sincerely, G. J.         field PBNP Manager dje Attachments cc       L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector V
Sincerely, G.
140012 9412140044 941130 ADOCK 05000266 PDR R                             PDR                                                       1h a suwwwutsmauwwca;waam                           qg
J.
field PBNP Manager dje Attachments cc L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector V
140012 9412140044 941130 PDR ADOCK 05000266 1h R
PDR a suwwwutsmauwwca;waam qg


OPERATING DATA REPORT                                                                                       -
OPERATING DATA REPORT DOCKET NO. 50-266 s
3                                                                                DOCKET NO. 50-266                                               s DATE: 12/06/94                                     ,
3 DATE:
COMPLETED BY:       LI. B. Koudelka TELEPHONE:   414 755-6480 OPERATING STATUS
12/06/94 COMPLETED BY:
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1       . NOTES                                                                 .
LI.
(   2. REPORTING PERIOD: November - 1994                   .                                                                        .
B. Koudelka TELEPHONE:
: 3. LICENSED THERMM, POWER (MWT) :     1518.5           .                                                                        .
414 755-6480 OPERATING STATUS
: 4. NAMEPLATE RATING (GROSS MWE) : 523.8             .                                                                        .
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
: 5. DESIGN ELECTRICAL RATING (NET MWE):       497.0     .                                                                        .
. NOTES
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 .                                                                            .
(
: 7. MAXItCJM DEPENDABLE CAPACITY (NET MWE): 485.0       .  .  .  .  .  .  .  .  .  .  .      .  .  .  .    .  .        .
: 2. REPORTING PERIOD: November - 1994
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (I'fEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 3. LICENSED THERMM, POWER (MWT) :
NA
1518.5 4.
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA l 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NAMEPLATE RATING (GROSS MWE) :
NA
523.8
!                                                              THIS MONTH           YEAR TO DATE               CUMULATIVE i
: 5. DESIGN ELECTRICAL RATING (NET MWE):
: 11. HOURS IN REPORTING PERIOD                                         720.0             8,016.0                 210,984.0
497.0
: 12. NUMBER OF HOURS REACIOR WAS CRITICAL                               720.0             7,390.6                 176,109.5
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
: 13. REACTOR RESERVE SHUTDOWN HOURS                                       0.0                     0.0                 667.3
509.0.
: 14. HOURS GENERATOR ON LINE                                           720.0             7,342.1                 172,982.3
: 7. MAXItCJM DEPENDABLE CAPACITY (NET MWE):
: 15. UNIT RESERVE SHUTDOWN HOURS                                           0.0                     0.0                 846.9
485.0 8.
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                         1,093,320           10,966,795               244,448,565
IF CHANGES OCCUR IN CAPACITY RATINGS (I'fEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 17. GROSS ELECTRICAL ENERGY GEIERATED                               371,560             3,712,760               82,566,890
NA 9.
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                           355,510             3,508,907               78,704,497
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA l
: 19. UNIT SERVICE FACTOR                                               100.0%                 91.6%                     82.0%
: 10. REASONS FOR RESTRICTIONS, (IF ANY) :
: 20. UNIT AVAILABILITY FACTOR                                           100.01               91.6%-                     82.4%
NA THIS MONTH YEAR TO DATE CUMULATIVE i
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                               101.8%                 91.3%                     76.6%
: 11. HOURS IN REPORTING PERIOD 720.0 8,016.0 210,984.0
: 22. UNIT CAPACITY FACTOR (USING DER NET)                               99.3%                 89.1%                     75.1%
: 12. NUMBER OF HOURS REACIOR WAS CRITICAL 720.0 7,390.6 176,109.5
: 23. UNIT FORCED OUTAGE RATE                                               O.Ot                   0.O%                       1.5%
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
: 14. HOURS GENERATOR ON LINE 720.0 7,342.1 172,982.3
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,093,320 10,966,795 244,448,565
: 17. GROSS ELECTRICAL ENERGY GEIERATED 371,560 3,712,760 82,566,890
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 355,510 3,508,907 78,704,497
: 19. UNIT SERVICE FACTOR 100.0%
91.6%
82.0%
: 20. UNIT AVAILABILITY FACTOR 100.01 91.6%-
82.4%
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.8%
91.3%
76.6%
: 22. UNIT CAPACITY FACTOR (USING DER NET) 99.3%
89.1%
75.1%
: 23. UNIT FORCED OUTAGE RATE O.Ot 0.O%
1.5%
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
Refueling, 03/11/95, 39 days
Refueling, 03/11/95, 39 days
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 o
                                                                                                  -          -      __    _ _ _ _ _    ______o


POINT BEACH NUCLEAR PLANT -             Docket No.             50-266             ,
POINT BEACH NUCLEAR PLANT -
Unit Name             Point Beach, Unit 1 UNrr SlitTrDOWNS AND POWER REDUCTIONS             Date                   December 6.1994           ,.
Docket No.
Completed By-         M. B. Koudelka       ,
50-266 Unit Name Point Beach, Unit 1 UNrr SlitTrDOWNS AND POWER REDUCTIONS Date December 6.1994 Completed By-M. B. Koudelka REPORT MONTH NOVEMBER - 1994 Telephone No.
REPORT MONTH NOVEMBER - 1994               Telephone No.         414n55-6480 Method of Shumng                                                                                                                     4-Darmten                   Down             Licensee Event System   Component             Cause arki Conective Action No.     Date     Type'                                             01ours)   Reason
414n55-6480 Method of Shumng 4-Darmten Down Licensee Event System Component Cause arki Conective Action No.
* Reactora             Report No     Code
Date Type' 01ours)
* Code'                   To Prevent Recurrence 1
Reason
NA       NA             NA                                             NA         NA         NA                   NA         NA         NA       NA i
* Reactora Report No Code
* Code' To Prevent Recurrence 1
NA NA NA NA NA NA NA NA NA NA i
t
t
              'F: Forced                                                   2 Reason:                                                           ' Method:                 ' Exhibit G - Instructions S: Scheduled                                                     A - Equipment Failure (explain)                                   1 - Manual               for preparation of                                             -
'F: Forced 2 Reason:
B - Maintenance or Testing                                       2 - Manual Scram         data entry sheets C - Refueling                                                   3 - Automatic Scram       LER file (NUREG-0161)
' Method:
D - Regulatory Restriction                                     4 - Continuation of E - Operator Training &                                             Previous Shutdown Licensing Exam                                         5 - Reduced Lead F - Administrative                                             6 - Other (explain)     ' Exhibit 1 - Same Source G - Operational Error (explain)
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)
' Exhibit 1 - Same Source G - Operational Error (explain)
H - Other (explain)
H - Other (explain)
PBF-CD28b (03-50)
PBF-CD28b (03-50)


POINT BEACH NUCLEAR PLANT               DOCKET NO. 50-266               -
POINT BEACH NUCLEAR PLANT DOCKET NO.
* AVERAGE DAILY UNIT POWER LEVEL             UNIT NAME   Point Beach, Unit 1 MONTH     NOVEMBER -     1994           DATE         December 6,1994 COMPLETED BY M. B. Koudeika i
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH NOVEMBER -
TELEPHONE   (414)755-6480 AVERAGE                                       AVERAGE                     AVERAGE I
1994 DATE December 6,1994 COMPLETED BY M. B. Koudeika i
DAILY                                         DAILY                         DAILY POWER LEVEL                                   POWER LEVEL                 POWER LEVEL DAY       MWe NET             DAY                       MWe NET     DAY             MWe NET 1       494                 11                         494         21               494 2         494                 12                         494         22               493 3         494                 13                         495         23               493 4         494                 14                         494         24               494 5         494                 15                         493         25               493 6         495                 16                         494         26               497                     .
TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE I
7         496                 17                         494         27               490 8         493                 18                         494         28               493 9         494                 19                 ,
DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
494         29               493 10       494                 20                         494         30               492 M
494 11 494 21 494 2
  '"w     ,          w - er                                           o                   -          n
494 12 494 22 493 3
494 13 495 23 493 4
494 14 494 24 494 5
494 15 493 25 493 6
495 16 494 26 497 L
7 496 17 494 27 490 8
493 18 494 28 493 9
494 19 494 29 493 10 494 20 494 30 492 M
'"w w
er o
n


DOCKET NO.       50-266 UNIT NAME       Point Beach Unit 1 DATE             December 6, 1994 COMPLETED BY     M. B. Koudelka TELEPHONE         414/755-6480 Unit 1 operated at an average of 494 MWe net for the report period.
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE December 6, 1994 COMPLETED BY M.
B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 494 MWe net for the report period.
Licensee Event Report 50-266/94-011-00, Redundant Decay Heat Removal Requirements Not Met During Refueling Shutdown, was submitted.
Licensee Event Report 50-266/94-011-00, Redundant Decay Heat Removal Requirements Not Met During Refueling Shutdown, was submitted.
Safety-related maintenance included:
Safety-related maintenance included:
: 1. AF-51 P38B auxiliary feedwater pump suction header drain valve inspection and cleaning.
1.
: 2. AF-4009-0 and AF-4016-0 P38A&B auxiliary feedwater suction from service water operator 4-rotor limit switch and thermal overload installations.                                                   i
AF-51 P38B auxiliary feedwater pump suction header drain valve inspection and cleaning.
: 3. AF-4020-M, AF-4022-M and AF-4023-M P38A auxiliary feedwater pump discharge to 1&2HX-1A&B steam generator motor relay replacements.
2.
: 4. 1B52-22B spare breaker pole piece replacement.
AF-4009-0 and AF-4016-0 P38A&B auxiliary feedwater suction from service water operator 4-rotor limit switch and thermal overload installations.
: 5. 1DY-02 Blue 125 Vdc/120 Vac inverter pilot light and relay replacements.
i 3.
: 6. FC-189B T6B boric acid tank nitrogen level flow controller rotometer inspection and cleaning.
AF-4020-M, AF-4022-M and AF-4023-M P38A auxiliary feedwater pump discharge to 1&2HX-1A&B steam generator motor relay replacements.
: 7. G05 combustion turbine wattmeter and ammeter connection in CO2 main control board.
4.
: 8. 1MS-5916 P29 turbine-driven auxiliary feedwater pump turbine casing pressure sentinel lockwire installation from nozzle and guide ring set screws to the valve bonnet arms.
1B52-22B spare breaker pole piece replacement.
: 9. P15 spare safety injection pump motor oil was changed.
5.
: 10. SW-114 and SW-136 1&2P29 turbine-driven auxiliary feedwater pump backup suction / supply line vent pipe nipple and plug installation.
1DY-02 Blue 125 Vdc/120 Vac inverter pilot light and relay replacements.
: 11. SW-122 and SU-131 P38A&B auxiliary feedwater pump backup supply line vent pipe nipple and plug installation.
6.
: 12. VA-8 2HX-8B boric acid evaporator valve diaphragm replacement.
FC-189B T6B boric acid tank nitrogen level flow controller rotometer inspection and cleaning.
7.
G05 combustion turbine wattmeter and ammeter connection in CO2 main control board.
8.
1MS-5916 P29 turbine-driven auxiliary feedwater pump turbine casing pressure sentinel lockwire installation from nozzle and guide ring set screws to the valve bonnet arms.
9.
P15 spare safety injection pump motor oil was changed.
10.
SW-114 and SW-136 1&2P29 turbine-driven auxiliary feedwater pump backup suction / supply line vent pipe nipple and plug installation.
11.
SW-122 and SU-131 P38A&B auxiliary feedwater pump backup supply line vent pipe nipple and plug installation.
12.
VA-8 2HX-8B boric acid evaporator valve diaphragm replacement.


OPERATING DATA REPORT
OPERATING DATA REPORT DOCKET NO. 50-301 DATE:
* DOCKET NO. 50-301 DATE: 12/06/94 COMPLETED BY:     M. B. Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS
12/06/94 COMPLETED BY:
: 1.       UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2                 . NOTES                                                                 .
M.
: 2.       REPORTING PERIOD: November - 1994                               .                                                                      .
B.
: 3. LICENSED THERMAL POWER (MWT) :                         1518.5         .                                                                      .
Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS 1.
: 4. NAMEPLATE RATING (GROSS MWE):                         523.8           .                                                                      .
UNIT NAME:
: 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0                             .                                                                      .
POINT BEACH NUCLEAR PLANT - UNIT 2
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 .                                                                                              .
. NOTES
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0                         .  .        . .  .      .  .  . .  .  .    .  . .    .  .  .    .
: 2. REPORTING PERIOD: November - 1994 3.
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE-REASONS:
LICENSED THERMAL POWER (MWT) :
NA
1518.5
: 9.       POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
: 4. NAMEPLATE RATING (GROSS MWE):
523.8
: 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE-REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
: 10. REASONS FOR RESTRICTIONS, (IF ANY) :
: 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH                 YEAR TO DATE         CUMULATIVE
NA THIS MONTH YEAR TO DATE CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                                               720.0                 8,916.0               195,769.0
: 11. HOURS IN REPORTING PERIOD 720.0 8,916.0 195,769.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                   720.0                 7,107.0               171,307.6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,107.0 171,307.6
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                             0.0                     0.0                 233.9
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
: 14. HOURS GENERATOR ON LINE                                                                 698.5                 7,084.0               168,950.7
: 14. HOURS GENERATOR ON LINE 698.5 7,084.0 168,950.7
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                 0.0                     0.0                 302.2
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                 906,928             10,495,321             242,866,505 1~. GROSS ELECTRICAL ENERGY GENERATED                                                     306,480               3,549,640             82,573,900
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 906,928 10,495,321 242,866,505 1~.
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                 290,909               3,388,824             78,719,464
GROSS ELECTRICAL ENERGY GENERATED 306,480 3,549,640 82,573,900
: 19. UNIT SERVICE FACTOR                                                                     97.0%                   88.4%                   86.3%
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 290,909 3,388,824 78,719,464
: 20. UNIT AVAILABILITY FACTOR                                                                 97.0%                   88.4%                   86.5%
: 19. UNIT SERVICE FACTOR 97.0%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                     83.3%                   87.2%                   82.3%
88.4%
: 22. UNIT CAPACITY FAC'IVR (USING DER NET)                                                   81.3%                   85.1%                   80.9%
86.3%
: 23. UNIT FORCED OUTAGE RATE                                                                     0.0%                   0.0%                   1.0%
: 20. UNIT AVAILABILITY FACTOR 97.0%
88.4%
86.5%
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 83.3%
87.2%
82.3%
: 22. UNIT CAPACITY FAC'IVR (USING DER NET) 81.3%
85.1%
80.9%
: 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.0%
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
NONE
Line 127: Line 197:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LErrER DATED SEPTEMBER 22, 1977
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LErrER DATED SEPTEMBER 22, 1977


4 POINT BEACll NUCLEAR PLANT                                     Decket No.             50-301                           .
4 POINT BEACll NUCLEAR PLANT Decket No.
Unit Name               Point Beach, Unit 2         -
50-301 Unit Name Point Beach, Unit 2 UNTT S11tTFDOWNS AND POWER REDUCTIONS Date December 6.1994 Completed By M. B Koudelka REPORT MONTil NOVEMBER - 1994 Telephone No.
UNTT S11tTFDOWNS AND POWER REDUCTIONS                                       Date                   December 6.1994 Completed By             M. B Koudelka                     ,
414/755-6480 Method of Shutting Duration Down Licensee Event Sy: tem Component Cause and Corrective Action No.
REPORT MONTil NOVEMBER - 1994                                       Telephone No.           414/755-6480 Method of Shutting Duration               Down   Licensee Event Sy: tem   Component                                     Cause and Corrective Action No. Date Type'   (llours)   Reason"   Reactnri  Report No. Code'       Code'                                         To Prevent Recurrence 2   9/24 94   5       21.5       C           1         NA           NA         NA     Scheduled refueling and maintenance outage (U2R20). Major work items include amptector upgrades. RIIR pump rotor replacement,4* tor limit switch upgrades, main feedwater check valve replacements, reactor heat shield, SI-854A&B internals replacement, Gai-tronics upgrade.
Date Type' (llours)
Reason" Report No.
Code' Code' To Prevent Recurrence Reactnri 2
9/24 94 5
21.5 C
1 NA NA NA Scheduled refueling and maintenance outage (U2R20). Major work items include amptector upgrades. RIIR pump rotor replacement,4* tor limit switch upgrades, main feedwater check valve replacements, reactor heat shield, SI-854A&B internals replacement, Gai-tronics upgrade.
G04 emergency diesel generator tie-in work, reactor coolant pump seal water flow transrmtter replacement, safeguards sequence timing relay replacements, control red drive mechamsm control current timing modification, degraded grid voltage relay work, steam generator blowdown heat exchanger replacement, and containment service water pipe supports as part of continued Bulletin 79-14 upgrades.
G04 emergency diesel generator tie-in work, reactor coolant pump seal water flow transrmtter replacement, safeguards sequence timing relay replacements, control red drive mechamsm control current timing modification, degraded grid voltage relay work, steam generator blowdown heat exchanger replacement, and containment service water pipe supports as part of continued Bulletin 79-14 upgrades.
4
4
  'F: Forced           2 Reason:                                       ' Method:                                         ' Exhibit G - Instructions S: Scheduled         A - Equipment Failure (explain)                   1 - Manual                                       for preparation of B - Maintenance or Testing                       2 - Manual Scram                                 data entry sheets C - Refueling                                     3 - Automatic Scram                               LER file (NUREG-0161)
'F: Forced 2 Reason:
D - Regulatory Restriction                       4 - Continuation of E - Operator Training &                               Previous Shutdown l                             Licensing Exam                               5 - Reduced bad l                         F - Administrative                               6 - Other (explain)                             ' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) i                                                                                                                                                                                                   s PBF4028b (0340)
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown l
Licensing Exam 5 - Reduced bad l
F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) i s
PBF4028b (0340)


4 a
4 a
POINT BEACH NUCLEAR PLANT           DOCKET NO. 50-301                   .
POINT BEACH NUCLEAR PLANT DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL         UNIT NAME     Point Beach, Unit 2 I                                       MONTH   NOVEMBER -   1994         DATE           December 6,1994 COMPLETED BY   M. B. Koudelka TELEPHONE     (4141755-6480 AVERAGE                                       AVERAGE                       AVERAGE DAILY                                         DAILY                         DAILY POWER LEVEL                                   POWER LEVEL                   POWER LEVEL DAY           MWe NET             DAY                     MWe NET     DAY               MWe NET
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 I
,        1              -10                 11                       439         21                 460 2               64                 12                       439         22                 457 i
MONTH NOVEMBER -
3             186                 13                       440         23                 459 4             315                 14                       440         24                 460 5             297                 15                       443         25                 459 a
1994 DATE December 6,1994 COMPLETED BY M. B. Koudelka TELEPHONE (4141755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
6             413                 16                       443         26
-10 11 439 21 460 2
* 459
64 12 439 22 457 i
.      7              418                 17                       443         27                 460 I
3 186 13 440 23 459 4
8             420                 18                       451         28                 475 9             423                 19                       461         29                 454 10             428                 20                       459         30                 467 f
315 14 440 24 460 5
1
297 15 443 25 459 a
  - -    ' *
6 413 16 443 26 459 7
* N' T N                     7                                                     _
418 17 443 27 460 I
8 420 18 451 28 475 9
423 19 461 29 454 10 428 20 459 30 467 f
1 N'
T N
7


g, L
g, L
DOCKET NO.       50-301
DOCKET NO.
              -UNIT NAME         Point Beach Unit 2 DATE             December 6, 1994 COMPLETED BY     M. B. Koudelka TELEPHONE         414/755-6480 Unit 2 was shutdown for a refueling and maintenance outage since September 24, 1994. The unit went online on November 1, 1994.
50-301
Safety-related maintenance included:                                 ,
-UNIT NAME Point Beach Unit 2 DATE December 6, 1994 COMPLETED BY M.
: 1.     2B52-406D breaker overload block replacement.
B. Koudelka TELEPHONE 414/755-6480 Unit 2 was shutdown for a refueling and maintenance outage since September 24, 1994.
: 2.     Differential pressure transmitters were installed across 2FT-2896, 2FT-2898, 2FT-2900 and 2FT-2902.                   >
The unit went online on November 1, 1994.
: 3.     2HS-601R-93 and 2HS 601R-95B pressurizer safety valve discharge line snubber rebuilts.
Safety-related maintenance included:
4,     2P2A charging pump seals, stuffing box, and oil gauge replacements.
1.
: 5.     2P29 turbine-driven auxiliary feedwater pump oil sample was   -
2B52-406D breaker overload block replacement.
drawn.                                                       4 L
2.
Differential pressure transmitters were installed across 2FT-2896, 2FT-2898, 2FT-2900 and 2FT-2902.
3.
2HS-601R-93 and 2HS 601R-95B pressurizer safety valve discharge line snubber rebuilts.
4, 2P2A charging pump seals, stuffing box, and oil gauge replacements.
5.
2P29 turbine-driven auxiliary feedwater pump oil sample was drawn.
4 L
l t
l t
i
i
                  .,    -}}
..}}

Latest revision as of 02:43, 15 December 2024

Monthly Operating Repts for Nov 1994 for Point Beach Nuclear Plant
ML20077F359
Person / Time
Site: Point Beach  
Issue date: 11/30/1994
From: Koudelka M, Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-94-0344, PBL-94-344, NUDOCS 9412140044
Download: ML20077F359 (9)


Text

r V

,s

-)[

Wisconsin

' Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd.. Two Ruers, WI 54241 (414) 755-2321 PBL 94-0344 December 6, 1994 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, DC 20555 Gentlement DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November, 1994.

Sincerely, G.

J.

field PBNP Manager dje Attachments cc L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector V

140012 9412140044 941130 PDR ADOCK 05000266 1h R

PDR a suwwwutsmauwwca;waam qg

OPERATING DATA REPORT DOCKET NO. 50-266 s

3 DATE:

12/06/94 COMPLETED BY:

LI.

B. Koudelka TELEPHONE:

414 755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

. NOTES

(

2. REPORTING PERIOD: November - 1994
3. LICENSED THERMM, POWER (MWT) :

1518.5 4.

NAMEPLATE RATING (GROSS MWE) :

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

7. MAXItCJM DEPENDABLE CAPACITY (NET MWE):

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (I'fEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA l

10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 720.0 8,016.0 210,984.0
12. NUMBER OF HOURS REACIOR WAS CRITICAL 720.0 7,390.6 176,109.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 720.0 7,342.1 172,982.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,093,320 10,966,795 244,448,565
17. GROSS ELECTRICAL ENERGY GEIERATED 371,560 3,712,760 82,566,890
18. NET ELECTRICAL ENERGY GENERATED (MWH) 355,510 3,508,907 78,704,497
19. UNIT SERVICE FACTOR 100.0%

91.6%

82.0%

20. UNIT AVAILABILITY FACTOR 100.01 91.6%-

82.4%

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.8%

91.3%

76.6%

22. UNIT CAPACITY FACTOR (USING DER NET) 99.3%

89.1%

75.1%

23. UNIT FORCED OUTAGE RATE O.Ot 0.O%

1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

Refueling, 03/11/95, 39 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 o

POINT BEACH NUCLEAR PLANT -

Docket No.

50-266 Unit Name Point Beach, Unit 1 UNrr SlitTrDOWNS AND POWER REDUCTIONS Date December 6.1994 Completed By-M. B. Koudelka REPORT MONTH NOVEMBER - 1994 Telephone No.

414n55-6480 Method of Shumng 4-Darmten Down Licensee Event System Component Cause arki Conective Action No.

Date Type' 01ours)

Reason

  • Reactora Report No Code
  • Code' To Prevent Recurrence 1

NA NA NA NA NA NA NA NA NA NA i

t

'F: Forced 2 Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)

' Exhibit 1 - Same Source G - Operational Error (explain)

H - Other (explain)

PBF-CD28b (03-50)

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH NOVEMBER -

1994 DATE December 6,1994 COMPLETED BY M. B. Koudeika i

TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE I

DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

494 11 494 21 494 2

494 12 494 22 493 3

494 13 495 23 493 4

494 14 494 24 494 5

494 15 493 25 493 6

495 16 494 26 497 L

7 496 17 494 27 490 8

493 18 494 28 493 9

494 19 494 29 493 10 494 20 494 30 492 M

'"w w

er o

n

DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE December 6, 1994 COMPLETED BY M.

B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 494 MWe net for the report period.

Licensee Event Report 50-266/94-011-00, Redundant Decay Heat Removal Requirements Not Met During Refueling Shutdown, was submitted.

Safety-related maintenance included:

1.

AF-51 P38B auxiliary feedwater pump suction header drain valve inspection and cleaning.

2.

AF-4009-0 and AF-4016-0 P38A&B auxiliary feedwater suction from service water operator 4-rotor limit switch and thermal overload installations.

i 3.

AF-4020-M, AF-4022-M and AF-4023-M P38A auxiliary feedwater pump discharge to 1&2HX-1A&B steam generator motor relay replacements.

4.

1B52-22B spare breaker pole piece replacement.

5.

1DY-02 Blue 125 Vdc/120 Vac inverter pilot light and relay replacements.

6.

FC-189B T6B boric acid tank nitrogen level flow controller rotometer inspection and cleaning.

7.

G05 combustion turbine wattmeter and ammeter connection in CO2 main control board.

8.

1MS-5916 P29 turbine-driven auxiliary feedwater pump turbine casing pressure sentinel lockwire installation from nozzle and guide ring set screws to the valve bonnet arms.

9.

P15 spare safety injection pump motor oil was changed.

10.

SW-114 and SW-136 1&2P29 turbine-driven auxiliary feedwater pump backup suction / supply line vent pipe nipple and plug installation.

11.

SW-122 and SU-131 P38A&B auxiliary feedwater pump backup supply line vent pipe nipple and plug installation.

12.

VA-8 2HX-8B boric acid evaporator valve diaphragm replacement.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE:

12/06/94 COMPLETED BY:

M.

B.

Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS 1.

UNIT NAME:

POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: November - 1994 3.

LICENSED THERMAL POWER (MWT) :

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE-REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA

10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720.0 8,916.0 195,769.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,107.0 171,307.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 698.5 7,084.0 168,950.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 906,928 10,495,321 242,866,505 1~.

GROSS ELECTRICAL ENERGY GENERATED 306,480 3,549,640 82,573,900

18. NET ELECTRICAL ENERGY GENERATED (MWH) 290,909 3,388,824 78,719,464
19. UNIT SERVICE FACTOR 97.0%

88.4%

86.3%

20. UNIT AVAILABILITY FACTOR 97.0%

88.4%

86.5%

21. UNIT CAPACITY FACTOR (USING MDC NET) 83.3%

87.2%

82.3%

22. UNIT CAPACITY FAC'IVR (USING DER NET) 81.3%

85.1%

80.9%

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

1.0%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LErrER DATED SEPTEMBER 22, 1977

4 POINT BEACll NUCLEAR PLANT Decket No.

50-301 Unit Name Point Beach, Unit 2 UNTT S11tTFDOWNS AND POWER REDUCTIONS Date December 6.1994 Completed By M. B Koudelka REPORT MONTil NOVEMBER - 1994 Telephone No.

414/755-6480 Method of Shutting Duration Down Licensee Event Sy: tem Component Cause and Corrective Action No.

Date Type' (llours)

Reason" Report No.

Code' Code' To Prevent Recurrence Reactnri 2

9/24 94 5

21.5 C

1 NA NA NA Scheduled refueling and maintenance outage (U2R20). Major work items include amptector upgrades. RIIR pump rotor replacement,4* tor limit switch upgrades, main feedwater check valve replacements, reactor heat shield, SI-854A&B internals replacement, Gai-tronics upgrade.

G04 emergency diesel generator tie-in work, reactor coolant pump seal water flow transrmtter replacement, safeguards sequence timing relay replacements, control red drive mechamsm control current timing modification, degraded grid voltage relay work, steam generator blowdown heat exchanger replacement, and containment service water pipe supports as part of continued Bulletin 79-14 upgrades.

4

'F: Forced 2 Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown l

Licensing Exam 5 - Reduced bad l

F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain) 11 - Other (explain) i s

PBF4028b (0340)

4 a

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 I

MONTH NOVEMBER -

1994 DATE December 6,1994 COMPLETED BY M. B. Koudelka TELEPHONE (4141755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

-10 11 439 21 460 2

64 12 439 22 457 i

3 186 13 440 23 459 4

315 14 440 24 460 5

297 15 443 25 459 a

6 413 16 443 26 459 7

418 17 443 27 460 I

8 420 18 451 28 475 9

423 19 461 29 454 10 428 20 459 30 467 f

1 N'

T N

7

g, L

DOCKET NO.

50-301

-UNIT NAME Point Beach Unit 2 DATE December 6, 1994 COMPLETED BY M.

B. Koudelka TELEPHONE 414/755-6480 Unit 2 was shutdown for a refueling and maintenance outage since September 24, 1994.

The unit went online on November 1, 1994.

Safety-related maintenance included:

1.

2B52-406D breaker overload block replacement.

2.

Differential pressure transmitters were installed across 2FT-2896, 2FT-2898, 2FT-2900 and 2FT-2902.

3.

2HS-601R-93 and 2HS 601R-95B pressurizer safety valve discharge line snubber rebuilts.

4, 2P2A charging pump seals, stuffing box, and oil gauge replacements.

5.

2P29 turbine-driven auxiliary feedwater pump oil sample was drawn.

4 L

l t

i

..