ML20078G488: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
OPERATING DATA REPORT DOCKET NO | OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-1-83 COMPLETED DY DAPeterson TELEPHONE (616)764-8913 OPERATING STATUS Notes 1. | ||
Unit Name: Palisades 2. | |||
Reporting Period: | |||
830901-830930 3.' | |||
Licensed Thermal Power (MWt): | |||
805 | 2530 | ||
,4 Nameplate Rating (Gross MWe): | |||
811.7 | |||
- 5. | |||
: 9. - | Design Electrical Rating (Net MWa): | ||
805 6. | |||
This Month | Maximum Dependable Capacity (Gross MWe): *675 | ||
: 11. Hours In Reporting Period | '7.: | ||
: 12. Number of Hours Reactor Was Critical | Maximum Dependable Capacity (Net MWe): | ||
*635 8. | |||
: 14. Hours Generator On-Line | If Changes Occur.in Capacity Ratings (Items Number 3 through 7) since last report, give reasons: | ||
: 9. - | |||
: 16. Gross Thermal Energy Generated (MWH) | Power Level to Which Restricted, if any (Net MWe): | ||
: 17. -Gross Electrical Energy Generated (MWH) | - 10.. Reasons for Restrictions, if any: | ||
This Month Yr-to-Date Cumulative | |||
: 19. Unit Service Factor | : 11. Hours In Reporting Period 720 6551 103,286 | ||
: 20. . Unit Availability Factor | : 12. Number of Hours Reactor Was Critical 0 | ||
21.: Unit Capacity Factor (Using MDC Net) | 5336.7 59,259.7 13. | ||
Reactor Reserve Shutdown Hours | |||
40.4- | : 14. Hours Generator On-Line 0 | ||
: 23. Unit Forced Outage Rate | 5283.6 56,278.5 | ||
-15. ' Unit Reserve Shutdown Hours | |||
25,- If Shut Down at End of Report Period, Esciamted Date of | : 16. Gross Thermal Energy Generated (MWH) 0 12,723,432 115,360,224 | ||
: 26. Units in-Test Status (Prior to Commercial Operation): | : 17. -Gross Electrical Energy Generated (MWH) 0 3,980,520 35,750,440 | ||
- 18. | |||
INITIAL ELECTRICITY | Net Electrical Energy _ Generated (MWH) 0 __ | ||
COMMERCIAL OPERATION CB2:ed'on condenser backpressure. | 3,769,958 33,628,014 | ||
MR0883-0001A-TC01 83101R0254 831001 PDR ADOCK 05000255 R | : 19. Unit Service Factor 0 | ||
80.6 54.5 | |||
: 20.. Unit Availability Factor 0 | |||
80.6 54.5 ~~~ | |||
21.: Unit Capacity Factor (Using MDC Net) 0 90.6 51.3 22. | |||
Unit Capacity Factor (Using DER het) 0 71.5 40.4- | |||
: 23. Unit Forced Outage Rate 0 | |||
1.7 32.4 24. | |||
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each): | |||
25,- | |||
If Shut Down at End of Report Period, Esciamted Date of Start Up: | |||
12/01/83 | |||
: 26. Units in-Test Status (Prior to Commercial Operation): | |||
Forecast Achieved | |||
-INITIAL CRITICALITY | |||
<^\\ | |||
INITIAL ELECTRICITY s | |||
s COMMERCIAL OPERATION CB2:ed'on condenser backpressure. | |||
MR0883-0001A-TC01 | |||
[ J' T | |||
83101R0254 831001 PDR ADOCK 05000255 R | |||
PDR m | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH SEPTEMBER, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
(MWe-Net) 1 17 2 | |||
18 3 | |||
19 4 | |||
20 5 | |||
21 6 | |||
22 7 | |||
23 8 | |||
24 9 | |||
25 10 26 11 27 N | |||
12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
MIO883-0002A-TC01 | MIO883-0002A-TC01 | ||
| Line 59: | Line 89: | ||
MR0883-0001B-TC01 | MR0883-0001B-TC01 | ||
Consumets Power 1 | |||
Company Polisados Nuclear Plant: Route 2, Box 154, Covert, MI 49043 October 3, 1983 US Nuclear Regulatory Comr ission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1983. | |||
&auo'cf/77 Mr sd~j< | |||
David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades | David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades | ||
-JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Pelisades DLHackett, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr,. Palisades Records Center, INPO, Atlanta, CA PSepcenko, CE, Palisades RLRosenfeld, P26-204B Document Control, 950*22*35*10/L DV:83*061 | |||
/// | |||
-.}} | |||
Latest revision as of 00:38, 15 December 2024
| ML20078G488 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/01/1983 |
| From: | Kennedy D, Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| References | |
| NUDOCS 8310120254 | |
| Download: ML20078G488 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-1-83 COMPLETED DY DAPeterson TELEPHONE (616)764-8913 OPERATING STATUS Notes 1.
Unit Name: Palisades 2.
Reporting Period:
830901-830930 3.'
Licensed Thermal Power (MWt):
2530
,4 Nameplate Rating (Gross MWe):
811.7
- 5.
Design Electrical Rating (Net MWa):
805 6.
Maximum Dependable Capacity (Gross MWe): *675
'7.:
Maximum Dependable Capacity (Net MWe):
- 635 8.
If Changes Occur.in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
- 9. -
Power Level to Which Restricted, if any (Net MWe):
- 10.. Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 6551 103,286
- 12. Number of Hours Reactor Was Critical 0
5336.7 59,259.7 13.
Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
5283.6 56,278.5
-15. ' Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0 12,723,432 115,360,224
- 17. -Gross Electrical Energy Generated (MWH) 0 3,980,520 35,750,440
- 18.
Net Electrical Energy _ Generated (MWH) 0 __
3,769,958 33,628,014
- 19. Unit Service Factor 0
80.6 54.5
- 20.. Unit Availability Factor 0
80.6 54.5 ~~~
21.: Unit Capacity Factor (Using MDC Net) 0 90.6 51.3 22.
Unit Capacity Factor (Using DER het) 0 71.5 40.4-
- 23. Unit Forced Outage Rate 0
1.7 32.4 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
25,-
If Shut Down at End of Report Period, Esciamted Date of Start Up:
12/01/83
- 26. Units in-Test Status (Prior to Commercial Operation):
Forecast Achieved
-INITIAL CRITICALITY
<^\\
INITIAL ELECTRICITY s
s COMMERCIAL OPERATION CB2:ed'on condenser backpressure.
MR0883-0001A-TC01
[ J' T
83101R0254 831001 PDR ADOCK 05000255 R
PDR m
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH SEPTEMBER, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 17 2
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 11 27 N
12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
MIO883-0002A-TC01
SUMMARY
Oh' OPERATING EXPERIENCE FOR SEPTEMBER 1983 The Plant remained shutdown for refueling.
MR0883-0001B-TC01
Consumets Power 1
Company Polisados Nuclear Plant: Route 2, Box 154, Covert, MI 49043 October 3, 1983 US Nuclear Regulatory Comr ission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1983.
&auo'cf/77 Mr sd~j<
David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades
-JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Pelisades DLHackett, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr,. Palisades Records Center, INPO, Atlanta, CA PSepcenko, CE, Palisades RLRosenfeld, P26-204B Document Control, 950*22*35*10/L DV:83*061
///
-.