W3P84-0278, Confirms Agreement W/Nrc Re Revised Submittal Schedule for Toxic Chemical Survey Results.Entire Survey & Subsequent Analyses Will Be Completed Prior to Fuel Load.New Survey Will Be Conducted Every 4 Yrs: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:LOUISiAN A f $42 ouAnonOc smm POWE A & L1GHT/ P o sox 6000
{{#Wiki_filter:LOUISiAN A f $42 ouAnonOc smm POWE A & L1GHT/ P o sox 6000
* NEW OHLE ANS LOUISIANA 70174 * (504) 3G6 234S MIODLE SOuYH unutit s srsitM                       February 7, 1984 W3P84-0278 Q-3-A29.02 3-A1.01.04 Director of Nuc1 car Reactor Kcgulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Reguintory Commission Washington, D.C. 20555
* NEW OHLE ANS LOUISIANA 70174 * (504) 3G6 234S MIODLE SOuYH unutit s srsitM February 7, 1984 W3P84-0278 Q-3-A29.02 3-A1.01.04 Director of Nuc1 car Reactor Kcgulation Attention:
Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Reguintory Commission Washington, D.C.
20555


==SUBJECT:==
==SUBJECT:==
Line 27: Line 29:


==Dear Sir:==
==Dear Sir:==
The referenced letters discussed LP&L's plans for conducting surveys of major industries in the vicinity of Waterford 3 which could have significant inventories of toxic chemicals onsite. The purpose of this letter is to confirm agreements reached with the NRC reviewer regarding a revised subnittal schedule for the survey results.
The referenced letters discussed LP&L's plans for conducting surveys of major industries in the vicinity of Waterford 3 which could have significant inventories of toxic chemicals onsite. The purpose of this letter is to confirm agreements reached with the NRC reviewer regarding a revised subnittal schedule for the survey results.
LP&L will complete the entire oirvey and subsequent analyses (with one possible exception) prior to fuel load. The possible exception concerns General American Transportation Company (CATX), with whom negotiations thus frir have failed to produce the desired information, linwever, GATX is not a large facility and review of the type and quantity of chemical inventories previously reported by GATX suggests that it is unlikely that the information currently being sought from them would change the conclusions presented in the FSAR.
LP&L will complete the entire oirvey and subsequent analyses (with one possible exception) prior to fuel load. The possible exception concerns General American Transportation Company (CATX), with whom negotiations thus frir have failed to produce the desired information, linwever, GATX is not a large facility and review of the type and quantity of chemical inventories previously reported by GATX suggests that it is unlikely that the information currently being sought from them would change the conclusions presented in the FSAR.
Analyses will be on file prior to fuel load demonatrating that the toxic chemical inventories represented by the survey results will not cause a safety problem exceeding the bounds of what has been previously considered acceptable.                   In the event that the analyses do uncover a potentici problem, the NRC will be notified prior ti- fuel load.       Subsequent to this survey, a new survey will be conducted every four years.
Analyses will be on file prior to fuel load demonatrating that the toxic chemical inventories represented by the survey results will not cause a safety problem exceeding the bounds of what has been previously considered acceptable.
Yours very truly, g6 aa K. W. Cook Nuclear Support & Licensing Manager KWC/RMF/cb cc:   E. L. Blake, W. M. Stevenson, J. Wilson, K. M. Ca.upe, C. L. Constable                     \
In the event that the analyses do uncover a potentici problem, the NRC will be notified prior ti-fuel load.
8402140261 340207 PDR ADOCK 05000382                                                         O A                     PDR                                               \}}
Subsequent to this survey, a new survey will be conducted every four years.
Yours very truly, g6 aa K. W. Cook Nuclear Support & Licensing Manager KWC/RMF/cb cc:
E. L. Blake, W. M. Stevenson, J. Wilson, K. M. Ca.upe, C. L. Constable
\\
8402140261 340207 PDR ADOCK 05000382 O
A PDR
\\}}

Latest revision as of 22:01, 14 December 2024

Confirms Agreement W/Nrc Re Revised Submittal Schedule for Toxic Chemical Survey Results.Entire Survey & Subsequent Analyses Will Be Completed Prior to Fuel Load.New Survey Will Be Conducted Every 4 Yrs
ML20080H618
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/07/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
W3P84-0278, W3P84-278, NUDOCS 8402140261
Download: ML20080H618 (1)


Text

LOUISiAN A f $42 ouAnonOc smm POWE A & L1GHT/ P o sox 6000

  • NEW OHLE ANS LOUISIANA 70174 * (504) 3G6 234S MIODLE SOuYH unutit s srsitM February 7, 1984 W3P84-0278 Q-3-A29.02 3-A1.01.04 Director of Nuc1 car Reactor Kcgulation Attention:

Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Reguintory Commission Washington, D.C.

20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 Toxic Chemient Surveys

REFERENCES:

1) LP&L Letter W3P83-2540 dated 8/3/83
2) LP&L Letter W3P83-3596 dated 11/9/83

Dear Sir:

The referenced letters discussed LP&L's plans for conducting surveys of major industries in the vicinity of Waterford 3 which could have significant inventories of toxic chemicals onsite. The purpose of this letter is to confirm agreements reached with the NRC reviewer regarding a revised subnittal schedule for the survey results.

LP&L will complete the entire oirvey and subsequent analyses (with one possible exception) prior to fuel load. The possible exception concerns General American Transportation Company (CATX), with whom negotiations thus frir have failed to produce the desired information, linwever, GATX is not a large facility and review of the type and quantity of chemical inventories previously reported by GATX suggests that it is unlikely that the information currently being sought from them would change the conclusions presented in the FSAR.

Analyses will be on file prior to fuel load demonatrating that the toxic chemical inventories represented by the survey results will not cause a safety problem exceeding the bounds of what has been previously considered acceptable.

In the event that the analyses do uncover a potentici problem, the NRC will be notified prior ti-fuel load.

Subsequent to this survey, a new survey will be conducted every four years.

Yours very truly, g6 aa K. W. Cook Nuclear Support & Licensing Manager KWC/RMF/cb cc:

E. L. Blake, W. M. Stevenson, J. Wilson, K. M. Ca.upe, C. L. Constable

\\

8402140261 340207 PDR ADOCK 05000382 O

A PDR

\\