W3P84-0278, Confirms Agreement W/Nrc Re Revised Submittal Schedule for Toxic Chemical Survey Results.Entire Survey & Subsequent Analyses Will Be Completed Prior to Fuel Load.New Survey Will Be Conducted Every 4 Yrs
| ML20080H618 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/07/1984 |
| From: | Cook K LOUISIANA POWER & LIGHT CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| W3P84-0278, W3P84-278, NUDOCS 8402140261 | |
| Download: ML20080H618 (1) | |
Text
LOUISiAN A f $42 ouAnonOc smm POWE A & L1GHT/ P o sox 6000
- NEW OHLE ANS LOUISIANA 70174 * (504) 3G6 234S MIODLE SOuYH unutit s srsitM February 7, 1984 W3P84-0278 Q-3-A29.02 3-A1.01.04 Director of Nuc1 car Reactor Kcgulation Attention:
Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Reguintory Commission Washington, D.C.
20555
SUBJECT:
Waterford 3 SES Docket No. 50-382 Toxic Chemient Surveys
REFERENCES:
- 1) LP&L Letter W3P83-2540 dated 8/3/83
- 2) LP&L Letter W3P83-3596 dated 11/9/83
Dear Sir:
The referenced letters discussed LP&L's plans for conducting surveys of major industries in the vicinity of Waterford 3 which could have significant inventories of toxic chemicals onsite. The purpose of this letter is to confirm agreements reached with the NRC reviewer regarding a revised subnittal schedule for the survey results.
LP&L will complete the entire oirvey and subsequent analyses (with one possible exception) prior to fuel load. The possible exception concerns General American Transportation Company (CATX), with whom negotiations thus frir have failed to produce the desired information, linwever, GATX is not a large facility and review of the type and quantity of chemical inventories previously reported by GATX suggests that it is unlikely that the information currently being sought from them would change the conclusions presented in the FSAR.
Analyses will be on file prior to fuel load demonatrating that the toxic chemical inventories represented by the survey results will not cause a safety problem exceeding the bounds of what has been previously considered acceptable.
In the event that the analyses do uncover a potentici problem, the NRC will be notified prior ti-fuel load.
Subsequent to this survey, a new survey will be conducted every four years.
Yours very truly, g6 aa K. W. Cook Nuclear Support & Licensing Manager KWC/RMF/cb cc:
E. L. Blake, W. M. Stevenson, J. Wilson, K. M. Ca.upe, C. L. Constable
\\
8402140261 340207 PDR ADOCK 05000382 O
A PDR
\\