ML20080R542: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
      'x                                                                                 wq Arizona Public Service Company P.O. BOX 21666 e PHOENIX, ARIZONA 85036 i
'x wq Arizona Public Service Company P.O. BOX 21666 e PHOENIX, ARIZONA 85036 i
February 15, 1984               l ANPP-28884-BSK/TRB             ,
February 15, 1984 ANPP-28884-BSK/TRB U. S. Nuclear Regulatory Commission
I U. S. Nuclear Regulatory Commission
_ Region V Creekside Oaks Office Park
_ Region V Creekside Oaks Office Park
        -1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
-1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs


==Subject:==
==Subject:==
Line 33: Line 32:
(D) ANPP-23641 dated, May 3,1983 (Time Extension)
(D) ANPP-23641 dated, May 3,1983 (Time Extension)
(E) ANPP-27523 dated, August 5,1983 (Time Extension)
(E) ANPP-27523 dated, August 5,1983 (Time Extension)
                    -(F) ANPP-28247 dated, November 17, 1983 (Time Extension)
-(F) ANPP-28247 dated, November 17, 1983 (Time Extension)
(G) ANPP-28608 dated, January 12,'1984 (Time Extension)
(G) ANPP-28608 dated, January 12,'1984 (Time Extension)


==Dear Sir:==
==Dear Sir:==
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a time extension was requested by Reference (C), (D), (E), (F) and (G).
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a time extension was requested by Reference (C), (D), (E), (F) and (G).
At that time, it was estimated that a Final Report would be available by February 23, 1984.
At that time, it was estimated that a Final Report would be available by February 23, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 13, 1984, at which time a complete report will be submitted.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 13, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
There is no new information or change to the Interim Report at this time.
Very truly yours, (C         -  CM,     oLUL_
Very truly yours,
e402280324 840215                                 E. E. Van Brunt, Jr.
(
PDR ADOCK 05000529 PDR 3                                                  APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: See Page Two
C CM, oLUL_
e402280324 840215 PDR ADOCK 05000529 E. E. Van Brunt, Jr.
PDR APS Vice President, Nuclear 3
ANPP Project Director EEVB/TRB:db cc: See Page Two


s       f s
f s
            ,        ;,      . ~.       ..        .  .    ,
s
      -(          7;k       7,                 ,                .
. ~.
                        ' ~ 'Mr. Ti-W. Bishop DER 82-76                         ,
7;k
Page Two cc:       1 Richard DeYoung; Director Office of Inspection and Enforcement-U.LS. Nuclear Regulatory-Commission
- (
                                            . Washington; D. C. 20555 T. G. Woods; Jr.
7,
        ~                                      W. E. Ide D. B. Fasnacht A.-C. Rogers
' ~ 'Mr. Ti-W. Bishop DER 82-76 Page Two cc:
: B . - S . Ka plan J. Vorees
1 Richard DeYoung; Director Office of Inspection and Enforcement-U.LS. Nuclear Regulatory-Commission
                                            'J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G.-Bingham R. L. Patterson Ri W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self
. Washington; D. C. 20555 T. G. Woods; Jr.
                                            . D. Canady Records Center
W. E. Ide
                                            . Institute of' Nuclear Power Operations 1100 Circle 75 Parkway;-Suite-1500 Atlanta; GA 30339-b l-l-
~
D. B. Fasnacht A.-C. Rogers
: B. - S. Ka plan J. Vorees
'J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G.-Bingham R. L. Patterson Ri W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self
. D. Canady Records Center
. Institute of' Nuclear Power Operations 1100 Circle 75 Parkway;-Suite-1500 Atlanta; GA 30339-b l-l-
L o}}
L o}}

Latest revision as of 08:37, 14 December 2024

Interim Deficiency Rept DER 82-76 Re Target Rock Valves Not Meeting Spec/Test Requirements.Initially Reported on 821124. Next Rept Will Be Submitted by 840413
ML20080R542
Person / Time
Site: Palo Verde  
Issue date: 02/15/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-2884-BSK, DER-82-76, NUDOCS 8402280324
Download: ML20080R542 (2)


Text

-

'x wq Arizona Public Service Company P.O. BOX 21666 e PHOENIX, ARIZONA 85036 i

February 15, 1984 ANPP-28884-BSK/TRB U. S. Nuclear Regulatory Commission

_ Region V Creekside Oaks Office Park

-1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 82-76 A 50.55(e) Potentially Reportable Deficiency Relating To Target Rock Valves Do Not Meet Specification / Test Requirements.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and G. Duckworth on November 24, 1982.

(B) ANPP-22590 dated, December 23, 1982 (Interim Report)

(C) ANPP-23223 dated, March 10, 1983 (Time Extension)

(D) ANPP-23641 dated, May 3,1983 (Time Extension)

(E) ANPP-27523 dated, August 5,1983 (Time Extension)

-(F) ANPP-28247 dated, November 17, 1983 (Time Extension)

(G) ANPP-28608 dated, January 12,'1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a time extension was requested by Reference (C), (D), (E), (F) and (G).

At that time, it was estimated that a Final Report would be available by February 23, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 13, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

(

C CM, oLUL_

e402280324 840215 PDR ADOCK 05000529 E. E. Van Brunt, Jr.

PDR APS Vice President, Nuclear 3

ANPP Project Director EEVB/TRB:db cc: See Page Two

f s

s

. ~.

7;k

- (

7,

' ~ 'Mr. Ti-W. Bishop DER 82-76 Page Two cc:

1 Richard DeYoung; Director Office of Inspection and Enforcement-U.LS. Nuclear Regulatory-Commission

. Washington; D. C. 20555 T. G. Woods; Jr.

W. E. Ide

~

D. B. Fasnacht A.-C. Rogers

B. - S. Ka plan J. Vorees

'J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G.-Bingham R. L. Patterson Ri W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self

. D. Canady Records Center

. Institute of' Nuclear Power Operations 1100 Circle 75 Parkway;-Suite-1500 Atlanta; GA 30339-b l-l-

L o