'x wq Arizona Public Service Company P.O. BOX 21666 e PHOENIX, ARIZONA 85036 i
February 15, 1984 ANPP-28884-BSK/TRB U. S. Nuclear Regulatory Commission
_ Region V Creekside Oaks Office Park
-1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 82-76 A 50.55(e) Potentially Reportable Deficiency Relating To Target Rock Valves Do Not Meet Specification / Test Requirements.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and G. Duckworth on November 24, 1982.
(B) ANPP-22590 dated, December 23, 1982 (Interim Report)
(C) ANPP-23223 dated, March 10, 1983 (Time Extension)
(D) ANPP-23641 dated, May 3,1983 (Time Extension)
(E) ANPP-27523 dated, August 5,1983 (Time Extension)
-(F) ANPP-28247 dated, November 17, 1983 (Time Extension)
(G) ANPP-28608 dated, January 12,'1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a time extension was requested by Reference (C), (D), (E), (F) and (G).
At that time, it was estimated that a Final Report would be available by February 23, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by April 13, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours,
(
C CM, oLUL_
e402280324 840215 PDR ADOCK 05000529 E. E. Van Brunt, Jr.
PDR APS Vice President, Nuclear 3
ANPP Project Director EEVB/TRB:db cc: See Page Two
f s
s
. ~.
7;k
- (
7,
' ~ 'Mr. Ti-W. Bishop DER 82-76 Page Two cc:
1 Richard DeYoung; Director Office of Inspection and Enforcement-U.LS. Nuclear Regulatory-Commission
. Washington; D. C. 20555 T. G. Woods; Jr.
W. E. Ide
~
D. B. Fasnacht A.-C. Rogers
- B. - S. Ka plan J. Vorees
'J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G.-Bingham R. L. Patterson Ri W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self
. D. Canady Records Center
. Institute of' Nuclear Power Operations 1100 Circle 75 Parkway;-Suite-1500 Atlanta; GA 30339-b l-l-