rom                             OPERATING DATA REPORT Ed                                                                     DOCKET NO. 50-266 m                                                                   DATE       october 5, 1983 I     83
=.
      % o COMPLETED BY           C. W. FAY TELEPHONE         414 277 2811
rom OPERATING DATA REPORT Ed DOCKET NO. 50-266 m
          ~
DATE october 5, 1983 I
oo      OPERATING STATUS Tuo                                                                 ........................
83 COMPLETED BY C. W. FAY o
i 37           1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
TELEPHONE 414 277 2811
~
OPERATING STATUS oo Tuo
; 37
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES i
: 2. REPORTIN6 PERIOD: SEPTEMBER 1983
: 2. REPORTIN6 PERIOD: SEPTEMBER 1983
                                                                        . NOTES
: 3. LICENSED THERMAL POWER (MUT): 1518.
: 3. LICENSED THERMAL POWER (MUT): 1518.                .                                                      .
: 4. NAMEPLATE RATIN6 (6ROSS MWE):
: 4. NAMEPLATE RATIN6 (6ROSS MWE):     523.8           .                                                      .
523.8
]               5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497.            .                                                      .
]
;              6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE): 519.      .                                                      .
: 5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497.
]               7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.        ........................
: 6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE): 519.
]
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
: 8. IF CHAN6ES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHAN6ES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
NOT APPLICABLE
;                9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):       390.0
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
;              10. REASONS FOR RESTRICTIONS, (IF ANY):     Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.
390.0
THIS MONTH               YR TO DATE       CUMULATIVE
: 10. REASONS FOR RESTRICTIONS, (IF ANY):
: 11. HOURS IN REPORTING PERIOD                                 720                   6,551           113,087
Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                       720.0                 6,502.6           94,074.9
THIS MONTH YR TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS                               0.0                     1.4             625.4 1               14. HOURS GENERATOR ON LINE                                   720.0                 6,495.9           91,604.2
: 11. HOURS IN REPORTING PERIOD 720 6,551 113,087
: 15. UNIT RESERVE SHUTDOWN HOURS                                   0.0                     0.0             793.5
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,502.6 94,074.9
: 16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH)                 842,740               7,584,827       123,533,816
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4 1
: 17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH)               278,960               2,519,690       41,395,480
: 14. HOURS GENERATOR ON LINE 720.0 6,495.9 91,604.2
: 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH)                 263,725               2,384,844       39,366,562
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
: 19. UNIT SERVICE FACTOR                                       100.0                   99.2               81.0
: 16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH) 842,740 7,584,827 123,533,816
: 20. UNIT AVAILABILITY FACTOR                                   100.0                     99.2             81.7
: 17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 278,960 2,519,690 41,395,480
: 21. UNIT CAPACITY FACTOR (USIN6 MDC NET)                       74.0                   73.5               71.2 i               22. UNIT CAPACITY FACTOR (USING BER NET)                       73.7                   73.2               70.0
: 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 263,725 2,384,844 39,366,562
: 23. UNIT FORCED OUTA6E RATE                                       0.0                     0.1               2.6
: 19. UNIT SERVICE FACTOR 100.0 99.2 81.0
: 20. UNIT AVAILABILITY FACTOR 100.0 99.2 81.7
: 21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 74.0 73.5 71.2 i
: 22. UNIT CAPACITY FACTOR (USING BER NET) 73.7 73.2 70.0
: 23. UNIT FORCED OUTA6E RATE 0.0 0.1 2.6
: 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
i                     Twenty-six week refueling and steam generator replacement outage scheduled to commence on October 1, 1983.
i Twenty-six week refueling and steam generator replacement outage scheduled to commence on October 1, 1983.
!              25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 i


DOCKET NO. 50-266 UNIT NAME      Point Beach Unit 1 DATE           October 5, 1983 COMPLETED BY C. W. Fay TELEPHONE     414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH     September, 1983 AVERAGE                   AVERAGE                           AVERAGE DAILY                     DAILY                             DAILY POWER LEVEL               POWER LEVEL                       POWER LEVEL DAY   MWe NET         DAY       MWe NET               DAY         MWe NET 1     359           11         309                 21           365 2     362           12         370                 22           367 3     363           13         371                 23           368
50-266 DOCKET NO.
]         4     371           14         369                 24           368 4
Point Beach Unit 1 UNIT NAME DATE October 5, 1983 COMPLETED BY C. W.
5      369           15         368                 25           371 6     371           16         369                 26           372 7     372           17         367                 27           372 8     371           18         366                 28           371 1
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
9     372           19         366                 29           372 10     367           20         367                 30           366 31 AD-28A
359 11 309 21 365 2
] (1-77)
362 12 370 22 367 3
363 13 371 23 368
]
4 371 14 369 24 368 5
369 15 368 25 371 4
6 371 16 369 26 372 7
372 17 367 27 372 8
371 18 366 28 371 1
9 372 19 366 29 372 10 367 20 367 30 366 31 AD-28A
]
(1-77)


ll         !      . !!  - : i: ; j   !,,            '.      i         'i
ll i: ;
(!;A 0D 1 -
j i
2                                                                    N 78 8B
'i
                                                                              .o
!;A
    )                                                                                                                _
D SF                                          a
::                                          t e                                    _
SF co hr ec                                                    -
de ud                                      ege<
l e                                                                                    _
d as evaoa mguna      t I
CFEDCBAR                                                          c                N I                                                                      ;ogoc r
  -    -    - - - - - - e a
OOAORRMEs tp dp e e a q o
                                                                    %eojo o%      r                            U h e m e g fiu n                                                                                      R        N e r ir u u n i:                                                          mrjoacC                    E        I Co5- yeovo4 D m ranaletp                                                                                            P        T titalem                                                                                      O
(      isotine                                                                                      R        S eotronan                                                                                            T        l i
xnr paaTy rgnt c
L                                U i                      M        T lltr                        eF                                                c                      O        D    -
a          iaR                  a                                        Re                        N        O iEvie                      oi                                            en                        T        W nrens                      rl                                            ps                        I I        N
)      r        it              u                                        oe                                  S o        nr          Tr                                            re r        gi          ee                                            t                          S        A c s                                                      E                        e      N
(        &t          t(                                            Nv                        p        D    .
e            i          e                                          oe                        t x        Lo              x                                          .n                        e        P p        in              p                                            t                      m        O l        c              l                                                                    b        W a        e              a                                                                    e        E i        n              i                                                                    ,r        R n        s              n                                                aeE
      )        e              )                                          myoe  r        v          1 R
E E                                                                                    9        D x                                                                                      8      U    _
a                                                                                    3        C m                                                                                              T I
0osycecu o    e n                        O 3                                                                    N S
432lM
                      - - -          e                                                                              _
t                                        C OAMMh                    .      -
a tuaao                                                  Tu htnnd eouu:                                                  os e
rmaa                                                  P all                .                              ra                      C
(
(
eiS t                                                 en                   TO vd                   EM             D p
0D 1 -
xcc                                                   e                   LP         UO r                                               nC                   EL         NC lSa                                                   to                   PE         IK acm ir r                 HT         TE Rr                   OE             T na                                                     ee                   NDDN
N 2
                  )
.o 78 8B
m                                                  cc                   E       AAN ut 5                                                           ri                     BTM.O YEE SE rv ox
)
(    Sate                                               ee                   4 COP         5 Nhtix                                                   n                   1 .      c o 0 uh           U e io h                                               cA                   4         t i -
D SF a
ri           Reoni                                                   ec                   / W o n 2 cb           Etnsb                                                     t                 2 .      b t 6 ei           Gs               i                                       i                 7         e   6     _
t e
t         -    oft                                               o                 7 F r B 0ffo                                                       n                 - a       e I       1o           rG                                                             2 y 5 a
SF co hr ec de ud ege<
            -      6rD               -                                                        8       ,
le d
c 1       API                                                                 1           h S      )    Ltrn                                                                   1       1 a           Eaes                                                                             9 U m           R     pt                                                                         8 n     Y e               Ear                                                                           3 i Fnru                                                                               t   '
as evaoa mguna t
it           c                                                                     1 lr          -
N CFEDCBAR I
c;ogoc I
r
- - - - - - e a
OOAORRMEs tp dp e e a q o h e m e g fiu n
%eojo o%
U r
R N
e r ir u u n i:
mrjoacC E
I ranaletp D m P
T titalem Co5-yeovo4 O
isotine R
S
(
eotronan T
l i
xnr rgnt L
U paaTy c
i M
T lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrens rl ps N
I I
r it u
oe S
)
o nr Tr re r
gi ee t
S A
c s
E e
N
(
&t t(
Nv p
D e
i e
oe t
x Lo x
.n e
P p
in p
t m
O l
c l
b W
a e
a e
E i
n i
,r R
myoe aeE n
s n
e
)
v R
)
r 1
E E
9 D
x 8
U a
3 C
m T
0osycecu I
n o
e O
3 N
S 432lM e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
t en TO
(
eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
HT TE ir Rr OE T
na ee NDDN m
cc E
AAN
)
BTM.O ut 5
ri YEE rv Sate ee 4 COP 5
SE
(
ox Nhtix n
1 c o 0 uh U e io h cA 4
t i
ri Reoni ec
/ W o n 2 cb Etnsb t
2 b t 6
ei Gs i
i 7
e 6
t oft o
7 F r B 0ffo n
- a e
I 1o rG 2 y 5 a 6rD 8
c 1
API 1
h Ltrn 1
1 S
)
a Eaes 9 U m
R pt 8 n Y
e Ear 3
i Fnru t
it c
lr 1
ey
ey


Line 102: Line 212:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.                                                                                                                                                                                       50-266 Unit Name                                                                                                                                                                                       Point Beach Unit 1 Date                                                                                                                                                                                             October 5, 1983 e                                                                                                      Completed By                                                                                                                                                                                     C. W. Fay Telephone                                                                                                                                                                                         414/277-2811
OF OPERATING EXPERIENCE Docket No.
.                                                                                                                                                                  Unit 1 operated at approximately 369 MWe net throughout the
50-266 Unit Name Point Beach Unit 1 Date October 5, 1983 Completed By C. W. Fay e
'                                                                                                      period. At 2200 hours on September 30, 1983, Unit 1 commenced load reduction for the steam generator replacement outage. The unit was taken off line at 0320 hours on October 1, 1983.
Telephone 414/277-2811 Unit 1 operated at approximately 369 MWe net throughout the period.
At 2200 hours on September 30, 1983, Unit 1 commenced load reduction for the steam generator replacement outage.
The unit was taken off line at 0320 hours on October 1, 1983.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
On September 26, 1983, a breach was found in a passive fire barrier in the west wall of the 4 KV vital switchgear room. The fire barrier was penetrated for the purpose of running cables in the cable tray which penetrates the wall by contractors in early spring this year. The problem was rectified the same day. A Significant Operating Event will be written on this incident.
On September 26, 1983, a breach was found in a passive fire barrier in the west wall of the 4 KV vital switchgear room.
The fire barrier was penetrated for the purpose of running cables in the cable tray which penetrates the wall by contractors in early spring this year.
The problem was rectified the same day.
A Significant Operating Event will be written on this incident.
On September 20, 1983, the annual NRC-required Emergency Plan drill was conducted and lasted approximately 10 hours.
On September 20, 1983, the annual NRC-required Emergency Plan drill was conducted and lasted approximately 10 hours.
On September 7, 1983, Unit 1 developed a control rod problem giving an urgent alarm. I&C was called in and after approximately 4 hours a faulty circuit board was replaced in the rod control system and the rod control system returned to normal.
On September 7, 1983, Unit 1 developed a control rod problem giving an urgent alarm.
On September 29, 1983, at 1430 hours, the smoke detection system for the cable spreading room and the 4160 V vital switchgear room was discovered out of service. Upon discovery, hourly inspections were commenced. The detection system was returned to service on September 30, 1983 at 1300 hours and a 30-day Licensee Event Report will be drafted for submittal to the NRC.
I&C was called in and after approximately 4 hours a faulty circuit board was replaced in the rod control system and the rod control system returned to normal.
On September 29, 1983, at 1430 hours, the smoke detection system for the cable spreading room and the 4160 V vital switchgear room was discovered out of service.
Upon discovery, hourly inspections were commenced.
The detection system was returned to service on September 30, 1983 at 1300 hours and a 30-day Licensee Event Report will be drafted for submittal to the NRC.
J d
J d


OPERATING LATA REPORT
OPERATING LATA REPORT DOCKET $0. 50-301 DATE october 5, 1983 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS
* DOCKET $0. 50-301 DATE     october 5, 1983 COMPLETED BY       C. W. FAY TELEPHONE     414 277 2811 OPERATIN6 STATUS
: 1. UNIT NAME: POINT BEACH NUCLEAR FLANT UNIT 2
: 1. UNIT NAME: POINT BEACH NUCLEAR FLANT UNIT 2       . NOTES                                                     .
. NOTES
: 2. REPORTING PERIOD: SEPTEMBER 1983                 .                                                          .
: 2. REPORTING PERIOD: SEPTEMBER 1983
.      3. LICENSED THERMAL POWER (NUT): 1518.               .                                                          >
: 3. LICENSED THERMAL POWER (NUT): 1518.
: 4. NAMEPLATE RATIN6 (8ROSS MWE):     523.8           .                                                          .
: 4. NAMEPLATE RATIN6 (8ROSS MWE):
: 5. DESI6N ELECTRICAL RATING (NET M4E): 497.          .                                                          .
523.8
: 6. MAXIMUM DEPENDADLE CAPACITY (6ROSS MUE): 519.    .                                                          .
: 5. DESI6N ELECTRICAL RATING (NET M4E): 497.
: 7. WAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.      ........................
: 6. MAXIMUM DEPENDADLE CAPACITY (6ROSS MUE): 519.
,      8. IF CHANGES 2; CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:
: 7. WAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.
: 8. IF CHANGES 2; CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:
NOT APPLICABLE
NOT APPLICABLE
: 9. PCUER LEVEL TO WHICH RESTRICTED, IF ANY (NET KWE): NOT APPLICABLE 4
: 9. PCUER LEVEL TO WHICH RESTRICTED, IF ANY (NET KWE): NOT APPLICABLE
: 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS HONTH           YR TO DATE               CUMULATIVE
: 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE 4
: 11. HOURS IN REPORTING PERIOD                                 720                 6,551                 97,872
THIS HONTH YR TO DATE CUMULATIVE
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                     720.0                 4,164.4             86,222.7
: 11. HOURS IN REPORTING PERIOD 720 6,551 97,872
: 13. REACTOR RESERVE SHUTDOWN HOURS                               0.0                       1.5               198.3 i   14. HOURS 6ENERATOR ON LINE                                   720.0               4,044.3             84,699.5
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,164.4 86,222.7
: 15. UNIT RESERVE SHUTDOWN HOURS                                 0.0                       1.5               182.7 l   16. 6ROSS THERMAL ENER6Y 6ENERATED (MWH)             1,087,367             6,054,148               117,569,742 J     17. GROSS ELECTRICAL ENER6Y SENERATED (MWH)             367,200           2,034,790               39,836,190
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3 i
!    18. NET ELECTRICAL ENER6Y GENERATED (MUN)               350,863           1,937,320               37,926,287 I     19. UNIT SERVICE FACTOR                                       100.0                     61.7               86.5
: 14. HOURS 6ENERATOR ON LINE 720.0 4,044.3 84,699.5
: 20. UNIT AVAILABILITY FACTOR                                   100.0                     61.8               06.7
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 182.7 l
: 21. UNIT CAPACITY FACTOR (USIN6 MDC NET)                       98.4                     59.7               78.8
: 16. 6ROSS THERMAL ENER6Y 6ENERATED (MWH) 1,087,367 6,054,148 117,569,742 J
: 22. UNIT CAPACITY FACTOR (USIN6 DER NET)                       98.1                     59.5               78.0
: 17. GROSS ELECTRICAL ENER6Y SENERATED (MWH) 367,200 2,034,790 39,836,190
: 23. UNIT FORCED OUTA6E RATE                                     0.0                     0.7                 1.5
: 18. NET ELECTRICAL ENER6Y GENERATED (MUN) 350,863 1,937,320 37,926,287 I
: 19. UNIT SERVICE FACTOR 100.0 61.7 86.5
: 20. UNIT AVAILABILITY FACTOR 100.0 61.8 06.7
: 21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 98.4 59.7 78.8
: 22. UNIT CAPACITY FACTOR (USIN6 DER NET) 98.1 59.5 78.0
: 23. UNIT FORCED OUTA6E RATE 0.0 0.7 1.5
: 24. SHUTDOWNS SCHEDULED DVER NEXT & MOMTHS (TYPE, BATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED DVER NEXT & MOMTHS (TYPE, BATE, AND DURATION OF EACH):
NONE
NONE
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SIARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS RE8UESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SIARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS RE8UESTED IN NRC LETTER DATED SEPTEMBER 22, 1977


DOCKET NOo     301 UNIT NAME       Point Beach Unit 2 DATE           October 5,   1983 COMPLETED BY C. W. Fay TELEPHONE       414/277-2811 AVERAGE DAILY UNIT POWER LEVEL a
DOCKET NOo 301 UNIT NAME Point Beach Unit 2 DATE October 5, 1983 COMPLETED BY C.
MONTH     September, 1983 l
W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL a
MONTH September, 1983 l
)
)
I                   AVERAGE AVERAGE                             AVERAGE DAILY                                 DAILY                               DAILY POWER LEVEL                           POWER LEVEL                         POWER LEVEL DAY   MWe NET                     DAY       MWe NET               DAY           MWe NET 1     430                       11           493                 21             485
I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
;              2      482                       12           490                 22             485 3     485                       13           491                 23             486 l             4     472                       14           489                 24             488 5     492                       15           489                 25             490
430 11 493 21 485 2
  ;            6      491                       16           490                 26             491 1
482 12 490 22 485 3
;            7     491                       17           488                 27             490 8     491                       18           481                 28             491
485 13 491 23 486 l
!;            9      492                       19           486                 29             491 l           10     492                       20           486                 30             472 l                                                                             31 AD-28A (1-77)
4 472 14 489 24 488 5
492 15 489 25 490 6
491 16 490 26 491 1
7 491 17 488 27 490 8
491 18 481 28 491 9
492 19 486 29 491 l
10 492 20 486 30 472 l
31 AD-28A (1-77)


oO HI                                                   Z I N                                                 O
oO HI Z
    -a co                                                 +
I N O
-a co
+
co to o
co to o
in N                     D
in N D
                                . . . .                  ct O
ct O
en N O:r O.
en N O O.
(D O 1
:r (D O 1
S'$.                 Type H
S'$.
Type H
(D C'
(D C'
Duration (Hours) w                     '
Duration (Hours) w
  = O N to o O to > %                             Reason I I I i 1 1 1 I O N
= O N to o O to > %
O O > O :o x 3 to en et t o.t (D (D m .n O biethod Of                   C D' (D 5 O C m P- C D                                                         Z (D M H M C C D H "
Reason I I I i 1 1 1 I O N
Shutting 3          b        H M m D m H (D et t                                                   m        8 ct P et W H (D 9                           DOwn Reactor           O
O O > O :o x 3 to en C
  - H (n O tt + 3 (D                                                   to       CD (D O rt M O D D D                                                   8       =
et t o.t (D (D m.n O biethod Of Z
XDM             M Q U ct                             td                     C tWD8M                   O                             H             3       8 H H tt M               (D N                           O             O       O P     P D 'c               W                     tc O             Z       O P tn < P O             O P-                       (D D             8       5 3 M G U (n             MH                         'O (n             Z       Z "M           P cr             C                     O (D                     tn O       3M         8M                         MO M       Q P-         0 (D                       ct               in     >
D' (D 5 O C m P-C D b
0      to                             tu           O       Z
Shutting 3 (D M H M C C D H "
    -        m rt       (t -                       Z<               t       O O             H-         O             .        O (D             ct X       t1 0           X
H m
* D             O       'O
8 M m D m H (D et t ct P et W H (D 9 DOwn Reactor O
    'O       P3             'O                         tt           B       O H       O               bd                                       tr     E 9       (D             >                                        0       CG P-       3               P-                                       M       lc D       m               D                     System           -
- H (n O tt + 3 (D to CD (D O rt M O D D D 8
    ~         *              ~
=
Code 4        s w
XDM M Q U ct td C
tn                                                              a X                                                       co     C P                                                       W       O 3
tWD8M O
COmpOngnt                   d y             Code                      @
H 3
8 H H tt M (D N O
O O
P P D 'c W
tc O Z
O P tn < P O O P-(D D 8
5 3 M G U (n MH
'O (n Z
Z "M
P cr C
O (D tn O
3M 8M MO M
Q P-0 (D ct in 0
to tu O
Z m rt (t -
Z<
t O
O H-O O (D ct X
t1 0 X
D O
'O
'O P3
'O tt B
O H
O bd tr E
9 (D
0 CG P-3 P-M lc D
m D
System Code 4
~
~
s tn w
a X
co C
P W
O 3
COmpOngnt d
Code y
en A W N Pd 3 1 1 1 I O tt O
en A W N Pd 3 1 1 1 I O tt O
O > 3 3 D*                             D ct C D W O                         8C 3" rt 3 3 0,                       O to (D 0 C C a                             O M9DW                               *d A P' P'                         Mm             O
O > 3 3 D*
                  - rt                               O3         8O O P en                             < Q,       tt 3         D XOO                                 O           M *0     CO
D ct C D W O 8C 3" rt 3 3 0, O to (D 0 C C a O
                  'O     M                           DO         tu t*     ZO P' en W                             rt O       'c td     HM DG3                                   M       =8       *3 tu PM                                 to M       O to         8 3D                                 0 (D       2OOZ
M9DW
                  *5                                 OO         tu     >>Z C rt           tD 8 3 O LD                         A             MH             *< tu tu
*d A P' P' Mm O
- rt O3 8O O P en
< Q, tt 3 D
XOO O
M *0 CO
'O M
DO tu t*
ZO P' en W rt O
'c td HM DG3 M
=8
*3 tu PM to M O to 8
3D 0 (D 2OOZ
*5 OO tu
>>Z C rt tD 8 3 O LD A
MH
*< tu tu
* M<
* M<
tn td       - (n m et tu                         (D O       A O O 'e   ui OX           Z D' rt P- X                       3           H . O O   o C D'         C O P O D'                         O>         A     rt P-   1 MH           Sc (D O D P-                       iD 0       N E   O D   w O CT         tu rt D (a tf                         rt       N
tn td
* CT rt o (D H         O (n             H                     H       -4     (D   Ha et         i     O m rt                         O       w *c   M to ommO                                   D         I D     C H         Pd O       MO                                 ,N'< 01 m i       mMU               i                           @      -  O H     W 'd H                                   H'       tY in       w tg et n 3                                     y     p N             in W (D (n
- (n m et tu (D O A O O 'e ui OX Z D' rt P-X 3
* w C 9             30     'O tt                                       Co D         .
H O
(D               td W M                                         W P-        -
O o C D' C O P O D' O>
                      'd D M C                                             rt     .
A rt P-1 MH Sc (D O D P-iD 0 N E O D w O CT tu rt D (a tf rt N
P tt iO P' M           i                                     w 0 '<
CT rt o (D H O (n H
H
-4 (D
Ha et i
O m rt O
w *c M to ommO D
I D
C H
Pd O MO
,N'<
01 m i
mMU i
O H
W 'd H H'
tY in w tg et n 3 y
p N
in W (D (n w C 9
30
'O tt Co D (D
td W M W P-
'd D M C rt P tt iO P' M i
w 0 '<


NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.     50-301 Unit Name       Point Beach Unit 2 Date           October 4, 1983 Completed By   C. W. Fay Telephone       414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the period with no significant load changes.
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date October 4, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the period with no significant load changes.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
On September 12, 1983, the Unit 2 containment hatch was-left unlocked. A Significant Operating Event was written on the incident.
On September 12, 1983, the Unit 2 containment hatch was-left unlocked.
A Significant Operating Event was written on the incident.
Safety-related maintenance included repairing a 2P2C charging pump leak and dismantling and inspection of the rotating element from 2P15A.
Safety-related maintenance included repairing a 2P2C charging pump leak and dismantling and inspection of the rotating element from 2P15A.
J
J
                                          , , _ . ,. __ .-__,.w... .m.,m..
.-__,.w...
.m.,m..


J' ntecomwn Bectrw miacounur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 10, 1983 Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:
J' ntecomwn Bectrw miacounur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 10, 1983 Director of Regulatory Operations U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1983.
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1983.
Very truly yours, N
Very truly yours, N
Vice Presi ent-Nuclear Power C. W. Fay Attachments Copics to J. G. Keppler - NRC Region III NRC Resident Inspector C. F. Riederer - PSCW 8
Vice Presi ent-Nuclear Power C. W. Fay Attachments Copics to J. G.
i}}
Keppler - NRC Region III NRC Resident Inspector C. F.
Riederer - PSCW 8 i}}

Latest revision as of 08:36, 14 December 2024

Monthly Operating Repts for Sept 1983
ML20080R851
Person / Time
Site: Point Beach  
Issue date: 10/05/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC
References
NUDOCS 8310180119
Download: ML20080R851 (9)


Text

.-

=.

rom OPERATING DATA REPORT Ed DOCKET NO. 50-266 m

DATE october 5, 1983 I

83 COMPLETED BY C. W. FAY o

TELEPHONE 414 277 2811

~

OPERATING STATUS oo Tuo

37
1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES i

2. REPORTIN6 PERIOD: SEPTEMBER 1983
3. LICENSED THERMAL POWER (MUT): 1518.
4. NAMEPLATE RATIN6 (6ROSS MWE):

523.8

]

5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE): 519.

]

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
8. IF CHAN6ES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

390.0

10. REASONS FOR RESTRICTIONS, (IF ANY):

Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.

THIS MONTH YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 6,551 113,087
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,502.6 94,074.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4 1
14. HOURS GENERATOR ON LINE 720.0 6,495.9 91,604.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH) 842,740 7,584,827 123,533,816
17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 278,960 2,519,690 41,395,480
18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 263,725 2,384,844 39,366,562
19. UNIT SERVICE FACTOR 100.0 99.2 81.0
20. UNIT AVAILABILITY FACTOR 100.0 99.2 81.7
21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 74.0 73.5 71.2 i
22. UNIT CAPACITY FACTOR (USING BER NET) 73.7 73.2 70.0
23. UNIT FORCED OUTA6E RATE 0.0 0.1 2.6
24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i Twenty-six week refueling and steam generator replacement outage scheduled to commence on October 1, 1983.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 i

50-266 DOCKET NO.

Point Beach Unit 1 UNIT NAME DATE October 5, 1983 COMPLETED BY C. W.

Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

359 11 309 21 365 2

362 12 370 22 367 3

363 13 371 23 368

]

4 371 14 369 24 368 5

369 15 368 25 371 4

6 371 16 369 26 372 7

372 17 367 27 372 8

371 18 366 28 371 1

9 372 19 366 29 372 10 367 20 367 30 366 31 AD-28A

]

(1-77)

ll i: ;

j i

'i

!;A

(

0D 1 -

N 2

.o 78 8B

)

D SF a

t e

SF co hr ec de ud ege<

le d

as evaoa mguna t

N CFEDCBAR I

c;ogoc I

r

- - - - - - e a

OOAORRMEs tp dp e e a q o h e m e g fiu n

%eojo o%

U r

R N

e r ir u u n i:

mrjoacC E

I ranaletp D m P

T titalem Co5-yeovo4 O

isotine R

S

(

eotronan T

l i

xnr rgnt L

U paaTy c

i M

T lltr eF c

O D

a iaR a

Re N

O iEvie oi en T

W nrens rl ps N

I I

r it u

oe S

)

o nr Tr re r

gi ee t

S A

c s

E e

N

(

&t t(

Nv p

D e

i e

oe t

x Lo x

.n e

P p

in p

t m

O l

c l

b W

a e

a e

E i

n i

,r R

myoe aeE n

s n

e

)

v R

)

r 1

E E

9 D

x 8

U a

3 C

m T

0osycecu I

n o

e O

3 N

S 432lM e

t C

OAMMh a

tuaao Tu htnnd os eouu:

e rmaa P

all ra C

t en TO

(

eiS vd EM D

xcc e

LP UO p

r nC EL NC lSa to PE IK acm r

HT TE ir Rr OE T

na ee NDDN m

cc E

AAN

)

BTM.O ut 5

ri YEE rv Sate ee 4 COP 5

SE

(

ox Nhtix n

1 c o 0 uh U e io h cA 4

t i

ri Reoni ec

/ W o n 2 cb Etnsb t

2 b t 6

ei Gs i

i 7

e 6

t oft o

7 F r B 0ffo n

- a e

I 1o rG 2 y 5 a 6rD 8

c 1

API 1

h Ltrn 1

1 S

)

a Eaes 9 U m

R pt 8 n Y

e Ear 3

i Fnru t

it c

lr 1

ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date October 5, 1983 Completed By C. W. Fay e

Telephone 414/277-2811 Unit 1 operated at approximately 369 MWe net throughout the period.

At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on September 30, 1983, Unit 1 commenced load reduction for the steam generator replacement outage.

The unit was taken off line at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on October 1, 1983.

The primary-to-secondary leakage remains stable at less than 10 gallons per day.

On September 26, 1983, a breach was found in a passive fire barrier in the west wall of the 4 KV vital switchgear room.

The fire barrier was penetrated for the purpose of running cables in the cable tray which penetrates the wall by contractors in early spring this year.

The problem was rectified the same day.

A Significant Operating Event will be written on this incident.

On September 20, 1983, the annual NRC-required Emergency Plan drill was conducted and lasted approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

On September 7, 1983, Unit 1 developed a control rod problem giving an urgent alarm.

I&C was called in and after approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> a faulty circuit board was replaced in the rod control system and the rod control system returned to normal.

On September 29, 1983, at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, the smoke detection system for the cable spreading room and the 4160 V vital switchgear room was discovered out of service.

Upon discovery, hourly inspections were commenced.

The detection system was returned to service on September 30, 1983 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and a 30-day Licensee Event Report will be drafted for submittal to the NRC.

J d

OPERATING LATA REPORT DOCKET $0. 50-301 DATE october 5, 1983 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS

1. UNIT NAME: POINT BEACH NUCLEAR FLANT UNIT 2

. NOTES

2. REPORTING PERIOD: SEPTEMBER 1983
3. LICENSED THERMAL POWER (NUT): 1518.
4. NAMEPLATE RATIN6 (8ROSS MWE):

523.8

5. DESI6N ELECTRICAL RATING (NET M4E): 497.
6. MAXIMUM DEPENDADLE CAPACITY (6ROSS MUE): 519.
7. WAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.
8. IF CHANGES 2; CUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 6IVE REASONS:

NOT APPLICABLE

9. PCUER LEVEL TO WHICH RESTRICTED, IF ANY (NET KWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE 4

THIS HONTH YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 6,551 97,872
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,164.4 86,222.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3 i
14. HOURS 6ENERATOR ON LINE 720.0 4,044.3 84,699.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 182.7 l
16. 6ROSS THERMAL ENER6Y 6ENERATED (MWH) 1,087,367 6,054,148 117,569,742 J
17. GROSS ELECTRICAL ENER6Y SENERATED (MWH) 367,200 2,034,790 39,836,190
18. NET ELECTRICAL ENER6Y GENERATED (MUN) 350,863 1,937,320 37,926,287 I
19. UNIT SERVICE FACTOR 100.0 61.7 86.5
20. UNIT AVAILABILITY FACTOR 100.0 61.8 06.7
21. UNIT CAPACITY FACTOR (USIN6 MDC NET) 98.4 59.7 78.8
22. UNIT CAPACITY FACTOR (USIN6 DER NET) 98.1 59.5 78.0
23. UNIT FORCED OUTA6E RATE 0.0 0.7 1.5
24. SHUTDOWNS SCHEDULED DVER NEXT & MOMTHS (TYPE, BATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF SIARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS RE8UESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NOo 301 UNIT NAME Point Beach Unit 2 DATE October 5, 1983 COMPLETED BY C.

W.

Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL a

MONTH September, 1983 l

)

I AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

430 11 493 21 485 2

482 12 490 22 485 3

485 13 491 23 486 l

4 472 14 489 24 488 5

492 15 489 25 490 6

491 16 490 26 491 1

7 491 17 488 27 490 8

491 18 481 28 491 9

492 19 486 29 491 l

10 492 20 486 30 472 l

31 AD-28A (1-77)

oO HI Z

I N O

-a co

+

co to o

in N D

ct O

en N O O.

r (D O 1

S'$.

Type H

(D C'

Duration (Hours) w

= O N to o O to > %

Reason I I I i 1 1 1 I O N

O O > O :o x 3 to en C

et t o.t (D (D m.n O biethod Of Z

D' (D 5 O C m P-C D b

Shutting 3 (D M H M C C D H "

H m

8 M m D m H (D et t ct P et W H (D 9 DOwn Reactor O

- H (n O tt + 3 (D to CD (D O rt M O D D D 8

=

XDM M Q U ct td C

tWD8M O

H 3

8 H H tt M (D N O

O O

P P D 'c W

tc O Z

O P tn < P O O P-(D D 8

5 3 M G U (n MH

'O (n Z

Z "M

P cr C

O (D tn O

3M 8M MO M

Q P-0 (D ct in 0

to tu O

Z m rt (t -

Z<

t O

O H-O O (D ct X

t1 0 X

D O

'O

'O P3

'O tt B

O H

O bd tr E

9 (D

0 CG P-3 P-M lc D

m D

System Code 4

~

~

s tn w

a X

co C

P W

O 3

COmpOngnt d

Code y

en A W N Pd 3 1 1 1 I O tt O

O > 3 3 D*

D ct C D W O 8C 3" rt 3 3 0, O to (D 0 C C a O

M9DW

  • d A P' P' Mm O

- rt O3 8O O P en

< Q, tt 3 D

XOO O

M *0 CO

'O M

DO tu t*

ZO P' en W rt O

'c td HM DG3 M

=8

  • 3 tu PM to M O to 8

3D 0 (D 2OOZ

  • 5 OO tu

>>Z C rt tD 8 3 O LD A

MH

  • < tu tu
  • M<

tn td

- (n m et tu (D O A O O 'e ui OX Z D' rt P-X 3

H O

O o C D' C O P O D' O>

A rt P-1 MH Sc (D O D P-iD 0 N E O D w O CT tu rt D (a tf rt N

CT rt o (D H O (n H

H

-4 (D

Ha et i

O m rt O

w *c M to ommO D

I D

C H

Pd O MO

,N'<

01 m i

mMU i

O H

W 'd H H'

tY in w tg et n 3 y

p N

in W (D (n w C 9

30

'O tt Co D (D

td W M W P-

'd D M C rt P tt iO P' M i

w 0 '<

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date October 4, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the period with no significant load changes.

The primary-to-secondary leakage remains stable at less than 10 gallons per day.

On September 12, 1983, the Unit 2 containment hatch was-left unlocked.

A Significant Operating Event was written on the incident.

Safety-related maintenance included repairing a 2P2C charging pump leak and dismantling and inspection of the rotating element from 2P15A.

J

.-__,.w...

.m.,m..

J' ntecomwn Bectrw miacounur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 10, 1983 Director of Regulatory Operations U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1983.

Very truly yours, N

Vice Presi ent-Nuclear Power C. W. Fay Attachments Copics to J. G.

Keppler - NRC Region III NRC Resident Inspector C. F.

Riederer - PSCW 8 i