ML20084C218: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-s B ALTIMORE G AS AND ELECTRIC COMPANY P. O . B O X 1475 B A LTIM O R E. M A R YL AN D 21203 HUCLEAR POWER CEPARTMENT COLVERT CLIFFS NUCLEAR POWER PL ANT LUSOY. M ARYLAND 20657 April 24, 1984 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D.C.       20555 ATTENTION:     Mr. D. H. Jaffe, Project Manager Operating Reactors, Branch #3
{{#Wiki_filter:-s B ALTIMORE G AS AND ELECTRIC COMPANY P. O. B O X 1475 B A LTIM O R E. M A R YL AN D 21203 HUCLEAR POWER CEPARTMENT COLVERT CLIFFS NUCLEAR POWER PL ANT LUSOY. M ARYLAND 20657 April 24, 1984 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D.C.
20555 ATTENTION:
Mr. D. H. Jaffe, Project Manager Operating Reactors, Branch #3


==SUBJECT:==
==SUBJECT:==
Line 22: Line 24:


==REFERENCE:==
==REFERENCE:==
(a) Phone conversation dated 4/13/84 between D. H. Jaffe NRC, and L. E. Salyards, BC&E This letter forwards the status of NRC Generic Letter 83-37 Technical Specification Changes requested by reference (a). Enclosure (1) lists the Technical Specification Changes not yet requested, with a schedule
(a) Phone conversation dated 4/13/84 between D. H. Jaffe NRC, and L. E. Salyards, BC&E This letter forwards the status of NRC Generic Letter 83-37 Technical Specification Changes requested by reference (a).
            . of e fec ted submittal dates. Enclosure (2) forwards a list of those alread, submitted, but not yet issued by the NRC. The remaining items in Enclosure (1) of Generic Letter 83-37 are considered complete for Calvert Cliffs.
Enclosure (1) lists the Technical Specification Changes not yet requested, with a schedule
. of e fec ted submittal dates.
Enclosure (2) forwards a list of those alread, submitted, but not yet issued by the NRC.
The remaining items in Enclosure (1) of Generic Letter 83-37 are considered complete for Calvert Cliffs.
Should you have any questions regarding these matters,_please contact us.
Should you have any questions regarding these matters,_please contact us.
Very truly yours, sk.0. b Principal Engineer Operational Licensing & Safety
Very truly yours, sk.0. b Principal Engineer Operational Licensing & Safety
            .DJL/LES/sjb Enclosures 00 R$2**585R'o!$83!?7
.DJL/LES/sjb Enclosures 00 R$2**585R'o!$83!?7
  #gipf                   _    e.        -      .
#gipf e.
roa   . _m K
roa
_m K
m
m


DICUJSUPE (1)
DICUJSUPE (1)
Technical Specification Change Requests Not Yet Submitted Generic Letter 83-37                           Description                   Expected Enclosure (1) Item No.                               of Item             Submission Date (2)                       Post Accident Sampling Sys.           June 30, 1984 (5)                       Sanpling and Analysis of             June 30, 1984 Plant Effluents (4)                       Pain Steam Header Noble               ##
Technical Specification Change Requests Not Yet Submitted Generic Letter 83-37 Description Expected Enclosure (1) Item No.
Gas Monitor Instrunentation for Detection         #
of Item Submission Date (2)
(10) of Inadequate Core Cooling
Post Accident Sampling Sys.
            # Awaiting conpletion of modifications at Calvert Cliffs. . 'Ibese change requests will be submitted on a schedule.conmeneurate with conpletion of modifications, testing, and final OPERATIGIAL Status of the systems.
June 30, 1984 (5)
            ~ #An order modifying the' Operating Licenses for Units 1 and 2 dated March.2, 1984,Especified the operational due date-for the Main Steam Line Padiation-
Sanpling and Analysis of June 30, 1984 Plant Effluents (4)
            ' Monitors..
Pain Steam Header Noble Gas Monitor (10)
Instrunentation for Detection of Inadequate Core Cooling
# Awaiting conpletion of modifications at Calvert Cliffs.. 'Ibese change requests will be submitted on a schedule.conmeneurate with conpletion of modifications, testing, and final OPERATIGIAL Status of the systems.
~ #An order modifying the' Operating Licenses for Units 1 and 2 dated March.2, 1984,Especified the operational due date-for the Main Steam Line Padiation-
' Monitors..
n
n
                                              )         ,' ,
)
                                                                              ~
~
                                      " j. t         ,
" j. t
'        ~
~
R                                                                        '.+-
'.+-
:.1 .
R
m-
:.1.
m-O a
2


e-MCLOSUFE (2)
e-MCLOSUFE (2)
Technical Specification Change Requests Already Submitted But Not Yet Approved by NRC Generic letter 83-37                               Description Enclosure (1) Item No.                                 of Item           Submittal Dated (1)                     Reactor Coolant System Vents         12/22/83 (3)                     Iong Tenn AW System Evalua-             4/09/84 tion-(4)                     Main Vent Noble Gas Effluent             4/09/84
Technical Specification Change Requests Already Submitted But Not Yet Approved by NRC Generic letter 83-37 Description Enclosure (1) Item No.
                                                          ,    Itnitor.
of Item Submittal Dated (1)
(6)                     Containment High Range:Radia-           4/09/84 tion Itnitor
Reactor Coolant System Vents 12/22/83 (3)
                                                                                  ~
Iong Tenn AW System Evalua-4/09/84 tion-(4)
(8)                     Cont'ainment Water Level Itnitor         2/24/83
Main Vent Noble Gas Effluent 4/09/84 Itnitor.
(6)
Containment High Range:Radia-4/09/84 tion Itnitor (8)
Cont'ainment Water Level Itnitor 2/24/83
~
(
(
                                                                                                                                      +
+
i
's i
                  's t
t k
k L
L
(
(
s       ^7--
s
j                                   1 Q                                                                                                         A I<                           1 -
^7--
j 1
Q A
I<
1 -
g
g
                                                                                                      ,w m
,w m
                                                        --                                                        M         Y-c,-
M Y-c,-
                ~                   ^                                                                       '        '
~
                              'A                                                       I                     4               - .
^
      .                                                    s g,                         -
'A s
(                                                   -}}
I 4
g,
(
-}}

Latest revision as of 04:54, 14 December 2024

Forwards Status of Generic Ltr 83-37 Tech Spec Changes Requested in 840413 Telcon,Including List of Changes Not Yet Requested,Schedule of Expected Submittal Dates & List of Changes Submitted,But Not Yet Issued by NRC
ML20084C218
Person / Time
Site: Calvert Cliffs  
Issue date: 04/24/1984
From: Latham D
BALTIMORE GAS & ELECTRIC CO.
To: Jaffe D
Office of Nuclear Reactor Regulation
References
GL-83-37, NUDOCS 8404270153
Download: ML20084C218 (3)


Text

-s B ALTIMORE G AS AND ELECTRIC COMPANY P. O. B O X 1475 B A LTIM O R E. M A R YL AN D 21203 HUCLEAR POWER CEPARTMENT COLVERT CLIFFS NUCLEAR POWER PL ANT LUSOY. M ARYLAND 20657 April 24, 1984 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D.C.

20555 ATTENTION:

Mr. D. H. Jaffe, Project Manager Operating Reactors, Branch #3

SUBJECT:

Schedule for submittal of Technical Specification Change Requests per NRC Ceneric Letter 83-37

REFERENCE:

(a) Phone conversation dated 4/13/84 between D. H. Jaffe NRC, and L. E. Salyards, BC&E This letter forwards the status of NRC Generic Letter 83-37 Technical Specification Changes requested by reference (a).

Enclosure (1) lists the Technical Specification Changes not yet requested, with a schedule

. of e fec ted submittal dates.

Enclosure (2) forwards a list of those alread, submitted, but not yet issued by the NRC.

The remaining items in Enclosure (1) of Generic Letter 83-37 are considered complete for Calvert Cliffs.

Should you have any questions regarding these matters,_please contact us.

Very truly yours, sk.0. b Principal Engineer Operational Licensing & Safety

.DJL/LES/sjb Enclosures 00 R$2**585R'o!$83!?7

  1. gipf e.

roa

_m K

m

DICUJSUPE (1)

Technical Specification Change Requests Not Yet Submitted Generic Letter 83-37 Description Expected Enclosure (1) Item No.

of Item Submission Date (2)

Post Accident Sampling Sys.

June 30, 1984 (5)

Sanpling and Analysis of June 30, 1984 Plant Effluents (4)

Pain Steam Header Noble Gas Monitor (10)

Instrunentation for Detection of Inadequate Core Cooling

  1. Awaiting conpletion of modifications at Calvert Cliffs.. 'Ibese change requests will be submitted on a schedule.conmeneurate with conpletion of modifications, testing, and final OPERATIGIAL Status of the systems.

~ #An order modifying the' Operating Licenses for Units 1 and 2 dated March.2, 1984,Especified the operational due date-for the Main Steam Line Padiation-

' Monitors..

n

)

~

" j. t

~

'.+-

R

.1.

m-O a

2

e-MCLOSUFE (2)

Technical Specification Change Requests Already Submitted But Not Yet Approved by NRC Generic letter 83-37 Description Enclosure (1) Item No.

of Item Submittal Dated (1)

Reactor Coolant System Vents 12/22/83 (3)

Iong Tenn AW System Evalua-4/09/84 tion-(4)

Main Vent Noble Gas Effluent 4/09/84 Itnitor.

(6)

Containment High Range:Radia-4/09/84 tion Itnitor (8)

Cont'ainment Water Level Itnitor 2/24/83

~

(

+

's i

t k

L

(

s

^7--

j 1

Q A

I<

1 -

g

,w m

M Y-c,-

~

^

'A s

I 4

g,

(

-