ML20084U423: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:._ _ _ . _ . _           _  _ _ _ .        _ _ _ _ . _ . _ _ . . ..                              .
{{#Wiki_filter:._ _ _. _. _
            .s OPERATING DATA REPORT DOCKET NO.               _)0 336 DATE             04/04/91 COMPLETED BY                 C. Neron                               .
.s OPERATING DATA REPORT DOCKET NO.
TELEPHONE                   (203) 447 1791                       l EXT.             4417                                 l l
_)0 336 DATE 04/04/91 COMPLETED BY C.
l QPERATINO STATUS                                                                                                                                                               {
Neron TELEPHONE (203) 447 1791 EXT.
Notes: Items 21 and 22                                             1
4417 l
: 1.        Unit Name:                                         Milletone Unit 2                                     cumulative are weighted                                           l
QPERATINO STATUS
: 2.         Reporting Period:                                               March 1991                             averages. Unit operated                                           I
{
: 3.       Licensed Thermal Power (MWt):                                           2700                           at 2560 MWTH prior to its
Notes: Items 21 and 22 1.
: 4.         Nameplate Rating (Cross MWe):                                             909                           uprating to the current
Unit Name:
      -5.         Design Electrical Rating (Net MWe):                                       870                           2700 MWTH power level.
Milletone Unit 2 cumulative are weighted 2.
6.-       Maximum Dependable Capacity (Cross MWe):                                   893.88                                                                                 -
Reporting Period:
: 7.         Maximum Dependable Capacity (Net MWe):                                     862.88
March 1991 averages. Unit operated I
: 8.         If Changes Occur in Capacity Ratings (Items Number 3 Throur,h 7) Since Last Report, Give Reasons:
3.
Licensed Thermal Power (MWt):
2700 at 2560 MWTH prior to its 4.
Nameplate Rating (Cross MWe):
909 uprating to the current
-5.
Design Electrical Rating (Net MWe):
870 2700 MWTH power level.
6.-
Maximum Dependable Capacity (Cross MWe):
893.88 7.
Maximum Dependable Capacity (Net MWe):
862.88 8.
If Changes Occur in Capacity Ratings (Items Number 3 Throur,h 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Vhich Restricted, If any (Net MWe):
N/A
N/A
: 9.        Power Level To Vhich Restricted, If any (Net MWe):                                                  N/A
: 10. Reasons'For Restrictions, If Any:
: 10. Reasons'For Restrictions, If Any:                                             N/A                                           __
N/A This Month Yr. To Date Cumulative 1
This Month                 Yr. To Date                       Cumulative                   1
: 11. Hours In Reporting Period 744.0 2160.0 133800.0
: 11. Hours In Reporting Period                                                                     744.0                     2160.0                                 133800.0
: 12. Number Of Hours Reactor Was Critical 744.0 1953.8 98866.4
: 12. Number Of Hours Reactor Was Critical                                                         744.0                     1953.8                                   98866.4
: 13. Reactor Reserve Shutdown Hours 09 0.0 2205.1
: 13. Reactor Reserve Shutdown Hours                                                                   09                           0.0                               2205.1
: 14. Hours Generator on Line 744.0 1909 4 94244.2
: 14. Hours Generator on Line                                                                       744.0                     1909 4                                   94244.2
: 15. Unit Reserve Shutdown Hours 0.0 0.0 466.2
: 15. Unit Reserve Shutdown Hours                                                                       0.0                         0.0                                 466.2
: 16. Gross Thermal Energy Generated (MWH) 2008452.0
: 16. Gross Thermal Energy Generated (MWH)                                                 2008452.0                 _5019662.0                           260075726 4
_5019662.0 260075726 4
: 17. Gross Electrical Energy Generated (MWH) 669709.5               _j070026.5                               79109726.0             ,
: 17. Gross Electrical Energy Generated (MWH) 669709.5
: 18. Net Electrical Energ, Generated (MVH)                                                   646560.5                 1607255.5                               75938305.0
_j070026.5 79109726.0
      .19. Unit Service Factor                                                                           100.0                         88.0                                   70.4
: 18. Net Electrical Energ, Generated (MVH) 646560.5 1607255.5 75938305.0
: 20. Unit Availability Factor                                                                     100.0                         88.0                                   70.8
.19. Unit Service Factor 100.0 88.0 70.4
: 21. Unit Capacity Factor (Using MDC Net)                                                         100.7                         86.2                                   6 6_._6 22.-Unit Capacity Factor (Using DER Net)                                                           99.9                       85.5                                   65.4
: 20. Unit Availability Factor 100.0 88.0 70.8
: 23. Unit Forced Outage Rate                                                                           0.0                       12.0_                                   13.1
: 21. Unit Capacity Factor (Using MDC Net) 100.7 86.2 6 6_._6 22.-Unit Capacity Factor (Using DER Net) 99.9 85.5 65.4
: 23. Unit Forced Outage Rate 0.0 12.0_
13.1
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
N/A
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:                                                                     N/A 26.; Units In Test Status (Prior to Commercial Operation);                                                                                                                           '
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
Forecast                       Achieved INITIAL CRITICALITY                                                                       N/A     __.                    N/A INITIAL ELECTRICITY                                                                       N/A                             N/A
N/A 26.; Units In Test Status (Prior to Commercial Operation);
                                          . COMMERCIAL OPERATION                                                                       N/A                             N/A g 4170259 910409 re     ADOCK 050003 6 PD
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A
_. _              . _ . - _ _ . _ _                  . . _ - . _ _ - . _ - ~ . .                            , - . . _ . . . . , . .        . - . . .
. COMMERCIAL OPERATION N/A N/A g 4170259 910409 re ADOCK 050003 6 PD
- ~..


s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _)0 336           .
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT:     Millstone Unit 2 !
_)0 336 UNIT:
DATE:     04/04/91         l COMPLETED BY     G. Neron TELEPl!ONE:     (203) 447 1791 EXT:   .4417 MONTil:       MARCIL1991 DAY     AVO. DAILY POWER LEVEL             DAY   AVO. DAILY POWER LEVEL (HVe-Net)                                 (MVe Net) 1                 871                       17             869 2                 871                       18             868 3                 871                       19             870 4                 870                       20             869 5                 071                       21             869.
Millstone Unit 2 DATE:
6                 870                       22             869         _
04/04/91 COMPLETED BY G. Neron TELEPl!ONE:
7                871                       23             867 8                 869                       24             867 9                 870                       25             866 10               870                       26             867 11               869                       27             866 12               870                       28             868 13               870                       29             869 14               870                       30             867 15               869                       31             867 16               869 INSTRUCTIONS i                        On this format, list the average daily unit power Icvel in MVe-Net for each day in the reporting month. Compute to the nearest whole megawatt, i
(203) 447 1791 EXT:
.4417 MONTil:
MARCIL1991 DAY AVO. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (HVe-Net)
(MVe Net) 1 871 17 869 2
871 18 868 3
871 19 870 4
870 20 869 5
071 21 869.
6 870 22 869 7
871 23 867 8
869 24 867 9
870 25 866 10 870 26 867 11 869 27 866 12 870 28 868 13 870 29 869 14 870 30 867 15 869 31 867 16 869 INSTRUCTIONS On this format, list the average daily unit power Icvel in MVe-Net for each i
day in the reporting month.
Compute to the nearest whole megawatt, i
l l
l l


I DOCKET NO.           50-336     .
I DOCKET NO.
UNIT SHLTTDOWNS /JD PFJG REDUCTIONS                                                     -UNIT NAME         Millstore 2             .
50-336 UNIT SHLTTDOWNS /JD PFJG REDUCTIONS
DATE       04/04/91 COMPLETED BY                 G. Neron TELEPHONE         (203) 447-1791 REPORT MONTH                 MARCH 1991                                               EIT.       4417 i       No. Date-           Type l            Duration.     Reason2'          Method of                   License                   Systgm             nent         Cause & Corrective (Hours)                         Shutting                     Event                     Code   Code                         Action to                   3 Down Reactor 3              Report #                                                   Prevent Recurrence e
-UNIT NAME Millstore 2 DATE 04/04/91 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 REPORT MONTH MARCH 1991 EIT.
    -W/A       N/A             N/A                   N/A         N/A                 N/A                       N/A                       N/A   N/A                           N/A t
4417 l
2' i
No.
Date-Type Duration.
Reason Method of License Systgm nent Cause & Corrective
[
(Hours)
Shutting Event Code Code Action to 3
3 Down Reactor Report #
Prevent Recurrence e
-W/A N/A N/A N/A N/A N/A N/A N/A N/A N/A t
i l
i l
i i      1:F Forced                 2 Reason:                                                                     3 Method
i 1: Forced Reason:
                                                                                                                                                          ' Exhibit G - Instructions l       S: Scheduled               A-Equipment Failure (Explain)                                                     1-Manual                               for Preparation of Data
Method
)                                 .B-Maintenance or Test                                                           2-Manual Scram                         Entry Sheets 'for License
' Exhibit G - Instructions 2
                                  .C-Refueling                                                                     3-Automatic Scram                       Event Report (LER) File D-Regulatory Restriction                                                       4-Continued from                       (NUREG-0161) j                                   E-Operator Training & License Examination                                                 Previous month
3 F
,                                  'F-Administrative                                                                 5-Power Reduction                       5 Exhibit 1 -Same Source G-Operational Error.(Explain)                                                               (Duration -0) i                                   H- 9ther (Explain)                                                               6-Other (Explain) 4
i l
                . . . _ _ _ __        . . . . . .  ._    ~.. -       . _ .              _ _ _ . . . .    ._. _ . . _ _ . _      -.          . - - -            . _ .                  ._        _
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data
)
.B-Maintenance or Test 2-Manual Scram Entry Sheets 'for License
.C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161) j E-Operator Training & License Examination Previous month
'F-Administrative 5-Power Reduction 5Exhibit 1 -Same Source G-Operational Error.(Explain)
(Duration -0) i H-9ther (Explain) 6-Other (Explain) 4
~.. -


l REFUELING INFORMATION REQUIIT
l REFUELING INFORMATION REQUIIT 1.
: 1. Name of facility:     Millstone 2
Name of facility:
: 3. Scheduled date for next refueling shutdown:           March. 1992
Millstone 2 3.
: 3. Scheduled dato for restart following refueling:                                         N/A
Scheduled date for next refueling shutdown:
: 4. Will refueling or resumption of operation thoroafter require a technical specification change or other license amendment?
March. 1992 3.
Epne at this time                                                                                 _
Scheduled dato for restart following refueling:
: 5. Scheduled date(s) for submitting licensing action and supporting information:
N/A 4.
ligne
Will refueling or resumption of operation thoroafter require a technical specification change or other license amendment?
: 6. Important licensing considerations associated with refueling, e.g.,
Epne at this time 5.
now or different fuel design or supplier, unroviewod design or performance analysis methods, significant changes in fuel design, new operating procedures Mil:. stone 2 will be replacing _ the Steam Generator sub-angemblies slgrnna the uncomina End of Cycle 11 ref&gling_pptaqq.                                     It is antacinated this will be accomolished under 10CPR 50.59.
Scheduled date(s) for submitting licensing action and supporting information:
: 7. The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool:
ligne 6.
In Core:   (a) 212       In Spent Fuel Pool:                                 (b)   112 HQTE: "hese numbers renresent the total fuel assemblies and consol-
Important licensing considerations associated with refueling, e.g.,
                  . dated fuel storage boxes in these two (2) Item Control Areas
now or different fuel design or supplier, unroviewod design or performance analysis methods, significant changes in fuel design, new operating procedures Mil:. stone 2 will be replacing _ the Steam Generator sub-angemblies slgrnna the uncomina End of Cycle 11 ref&gling_pptaqq.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has boon requested or is planned, in number of fuel assemblies:
It is antacinated this will be accomolished under 10CPR 50.59.
Currently 1277
7.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licenswi capacity:
The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool:
1994. Soont Fue: Pool Full, core off load caDacity is reachsd (with                 ~
In Core:
          -out consolidat:.on).
(a) 212 In Spent Fuel Pool:
1998. Core Full. Spent Fuel Pool Full 2009, Soent Fuel Pool Full. core off       'oad caDacity is reached-J gpntincent unon full scale storace of consolldated fuel in the Soent Fuel Pool.}}
(b) 112 HQTE: "hese numbers renresent the total fuel assemblies and consol-
. dated fuel storage boxes in these two (2) Item Control Areas 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has boon requested or is planned, in number of fuel assemblies:
Currently 1277 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licenswi capacity:
1994. Soont Fue:
Pool Full, core off load caDacity is reachsd (with
-out consolidat:.on).
~
1998. Core Full. Spent Fuel Pool Full
'oad caDacity is reached-2009, Soent Fuel Pool Full. core off J
gpntincent unon full scale storace of consolldated fuel in the Soent Fuel Pool.}}

Latest revision as of 03:57, 14 December 2024

Monthly Operating Rept for Mar 1991 for Millstone Unit 2
ML20084U423
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/31/1991
From: Neron G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20084U420 List:
References
NUDOCS 9104170259
Download: ML20084U423 (4)


Text

._ _ _. _. _

.s OPERATING DATA REPORT DOCKET NO.

_)0 336 DATE 04/04/91 COMPLETED BY C.

Neron TELEPHONE (203) 447 1791 EXT.

4417 l

QPERATINO STATUS

{

Notes: Items 21 and 22 1.

Unit Name:

Milletone Unit 2 cumulative are weighted 2.

Reporting Period:

March 1991 averages. Unit operated I

3.

Licensed Thermal Power (MWt):

2700 at 2560 MWTH prior to its 4.

Nameplate Rating (Cross MWe):

909 uprating to the current

-5.

Design Electrical Rating (Net MWe):

870 2700 MWTH power level.

6.-

Maximum Dependable Capacity (Cross MWe):

893.88 7.

Maximum Dependable Capacity (Net MWe):

862.88 8.

If Changes Occur in Capacity Ratings (Items Number 3 Throur,h 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Vhich Restricted, If any (Net MWe):

N/A

10. Reasons'For Restrictions, If Any:

N/A This Month Yr. To Date Cumulative 1

11. Hours In Reporting Period 744.0 2160.0 133800.0
12. Number Of Hours Reactor Was Critical 744.0 1953.8 98866.4
13. Reactor Reserve Shutdown Hours 09 0.0 2205.1
14. Hours Generator on Line 744.0 1909 4 94244.2
15. Unit Reserve Shutdown Hours 0.0 0.0 466.2
16. Gross Thermal Energy Generated (MWH) 2008452.0

_5019662.0 260075726 4

17. Gross Electrical Energy Generated (MWH) 669709.5

_j070026.5 79109726.0

18. Net Electrical Energ, Generated (MVH) 646560.5 1607255.5 75938305.0

.19. Unit Service Factor 100.0 88.0 70.4

20. Unit Availability Factor 100.0 88.0 70.8
21. Unit Capacity Factor (Using MDC Net) 100.7 86.2 6 6_._6 22.-Unit Capacity Factor (Using DER Net) 99.9 85.5 65.4
23. Unit Forced Outage Rate 0.0 12.0_

13.1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

N/A 26.; Units In Test Status (Prior to Commercial Operation);

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A

. COMMERCIAL OPERATION N/A N/A g 4170259 910409 re ADOCK 050003 6 PD

- ~..

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

_)0 336 UNIT:

Millstone Unit 2 DATE:

04/04/91 COMPLETED BY G. Neron TELEPl!ONE:

(203) 447 1791 EXT:

.4417 MONTil:

MARCIL1991 DAY AVO. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (HVe-Net)

(MVe Net) 1 871 17 869 2

871 18 868 3

871 19 870 4

870 20 869 5

071 21 869.

6 870 22 869 7

871 23 867 8

869 24 867 9

870 25 866 10 870 26 867 11 869 27 866 12 870 28 868 13 870 29 869 14 870 30 867 15 869 31 867 16 869 INSTRUCTIONS On this format, list the average daily unit power Icvel in MVe-Net for each i

day in the reporting month.

Compute to the nearest whole megawatt, i

l l

I DOCKET NO.

50-336 UNIT SHLTTDOWNS /JD PFJG REDUCTIONS

-UNIT NAME Millstore 2 DATE 04/04/91 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 REPORT MONTH MARCH 1991 EIT.

4417 l

2' i

No.

Date-Type Duration.

Reason Method of License Systgm nent Cause & Corrective

[

(Hours)

Shutting Event Code Code Action to 3

3 Down Reactor Report #

Prevent Recurrence e

-W/A N/A N/A N/A N/A N/A N/A N/A N/A N/A t

i l

i 1: Forced Reason:

Method

' Exhibit G - Instructions 2

3 F

i l

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data

)

.B-Maintenance or Test 2-Manual Scram Entry Sheets 'for License

.C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161) j E-Operator Training & License Examination Previous month

'F-Administrative 5-Power Reduction 5Exhibit 1 -Same Source G-Operational Error.(Explain)

(Duration -0) i H-9ther (Explain) 6-Other (Explain) 4

~.. -

l REFUELING INFORMATION REQUIIT 1.

Name of facility:

Millstone 2 3.

Scheduled date for next refueling shutdown:

March. 1992 3.

Scheduled dato for restart following refueling:

N/A 4.

Will refueling or resumption of operation thoroafter require a technical specification change or other license amendment?

Epne at this time 5.

Scheduled date(s) for submitting licensing action and supporting information:

ligne 6.

Important licensing considerations associated with refueling, e.g.,

now or different fuel design or supplier, unroviewod design or performance analysis methods, significant changes in fuel design, new operating procedures Mil:. stone 2 will be replacing _ the Steam Generator sub-angemblies slgrnna the uncomina End of Cycle 11 ref&gling_pptaqq.

It is antacinated this will be accomolished under 10CPR 50.59.

7.

The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool:

In Core:

(a) 212 In Spent Fuel Pool:

(b) 112 HQTE: "hese numbers renresent the total fuel assemblies and consol-

. dated fuel storage boxes in these two (2) Item Control Areas 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has boon requested or is planned, in number of fuel assemblies:

Currently 1277 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licenswi capacity:

1994. Soont Fue:

Pool Full, core off load caDacity is reachsd (with

-out consolidat:.on).

~

1998. Core Full. Spent Fuel Pool Full

'oad caDacity is reached-2009, Soent Fuel Pool Full. core off J

gpntincent unon full scale storace of consolldated fuel in the Soent Fuel Pool.