NRC MONTHLY OPERATI!G REPORT DOCKET NO. 50-361 UNIT NAME SONGS - 2 DATE 12/15/83 CDifLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264           i OPERATING STATUS                                                                                   i l
NRC MONTHLY OPERATI!G REPORT DOCKET NO. 50-361 UNIT NAME SONGS - 2 DATE 12/15/83 CDifLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 i
: 1. Unit Name: San Onofre Nuclear Ganerating Station, Unit 2
OPERATING STATUS 1.
: 2. Reporting Period: 1 November 1983 through 30 November 1983                                         l
Unit Name: San Onofre Nuclear Ganerating Station, Unit 2 2.
: 3. Licensed Thermal Power (MWt):                   3,390                                             '
Reporting Period:
l
1 November 1983 through 30 November 1983 3.
: 4. Nameplate Rating (Gross We):                     1,127 5.'   Design Electrical Rating (Net IWe):             1,087
Licensed Thermal Power (MWt):
: 6. Maxhnum Dependable capacity (Gross MWe):       1,127
3,390 4.
: 7. Maximum Dependable Capacity (Net MWe):         1,087
Nameplate Rating (Gross We):
: 8. If Changes Occur In Capacity R4 tings (Items Number 3 2 trough 7)
1,127 5.'
Design Electrical Rating (Net IWe):
1,087 6.
Maxhnum Dependable capacity (Gross MWe):
1,127 7.
Maximum Dependable Capacity (Net MWe):
1,087 8.
If Changes Occur In Capacity R4 tings (Items Number 3 2 trough 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA
NA
: 9. Power Level To Which Restricted, If Any (Net MWe):            NA
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:                               NA This Month     Yr.~to-Date     Cumulative
NA This Month Yr.~to-Date Cumulative
: 11. Hours In Reporting Period                           720.0       8,016.0         10,476.2     -
: 11. Hours In Reporting Period 720.0 8,016.0 10,476.2
: 12. Number Of Hours Reactor Was Critical               331.03       4,567.78         6,329 9'I
: 12. Number Of Hours Reactor Was Critical 331.03 4,567.78 6,329 9'I
: 13. Reactor Reserve Shutdown Hours                       0               0               0
: 13. Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On-Line                             331.03       3,901.99         4,906.29
0 0
,            15. Unit Reserve Shutdown Hours                           0             ~ll               0
: 14. Hours Generator On-Line 331.03 3,901.99 4,906.29
: 16. Gross Thermal Energy Generated (MWH)         1,113,700     11,350,260     12,331,810
: 15. Unit Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (MWH)       377,014.5     3,743,343.0     3,929,343.0 l
~ll 0
: 18. Net Electrical Energy Generated (MWH)           355,434.5   ' T,476,163.0     3,601,163.0
: 16. Gross Thermal Energy Generated (MWH) 1,113,700 11,350,260 12,331,810
: 19. Unit Service Factor                               NA             NA               NA
: 17. Gross Electrical Energy Generated (MWH) 377,014.5 3,743,343.0 3,929,343.0
: 20. Unit Availability Factor                         NA             NA               IM
: 18. Net Electrical Energy Generated (MWH) 355,434.5
: 21. Unit Capacity Factor (Using MDC Net)                 0               0               0 l           22. Unit Capacity Factor (Using DER Net)                 0               0               0 l           23. Unit Forced Outage Rate                               0               0               0 l
' T,476,163.0 3,601,163.0 l
: 19. Unit Service Factor NA NA NA
: 20. Unit Availability Factor NA NA IM
: 21. Unit Capacity Factor (Using MDC Net) 0 0
0 l
: 22. Unit Capacity Factor (Using DER Net) 0 0
0 l
: 23. Unit Forced Outage Rate 0
0 0
l
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
None 25.
,            25. If Shutdown At End Of Report Period, Estimated Date of Startup: December 15, 1983
If Shutdown At End Of Report Period, Estimated Date of Startup: December 15, 1983
: 26. Units In Test Status (Prior To Cornercial Operation):           Forecast     Acnieved INITIAL CRITICALITY                           07/17/82     07/26/82 INITIAL ELECTRICITY                             9/82       09/20/82 03MMERCIAL OPERATION                     Under Review i
: 26. Units In Test Status (Prior To Cornercial Operation):
8401120263 831130 0565u           PDR ADOCK 05000361 R                 PM i
Forecast Acnieved INITIAL CRITICALITY 07/17/82 07/26/82 INITIAL ELECTRICITY 9/82 09/20/82 03MMERCIAL OPERATION Under Review i
L                                                                                           __          . _ _ _ _ _ _
8401120263 831130 0565u PDR ADOCK 05000361 R
PM i
L
: r. _ c
: r. _ c
  ~
~
P AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.           50-361 UNIT             SONGS - 2 DATE                 12/15/83 COMPLETED BY   C. A. Morris TELEPHONE   (714) 492-7700 Ext. 56264 MONTH:   November 1983 DAY   AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                 (MWe-Net) 1             -1096.71                     17               0 2               1103.48                   18               0 3               1100.35                   19               0 4             -1094.13                   20               0 5               1079.58                   21               0 6               1098.33                   22               0 7               1110.00                   23               0 8               995.00                   24               0 9               1072.92                   25               0 10               1095.83                   26               0 11               1105.48                   27               0 12               1096.00                   28               0 13               1100.67                   29               0 14               844.23                   30               0 15                 0                       31               NA 16                 0 0565u
P AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 MONTH:
November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-1096.71 17 0
2 1103.48 18 0
3 1100.35 19 0
4
-1094.13 20 0
5 1079.58 21 0
6 1098.33 22 0
7 1110.00 23 0
8 995.00 24 0
9 1072.92 25 0
10 1095.83 26 0
11 1105.48 27 0
12 1096.00 28 0
13 1100.67 29 0
14 844.23 30 0
15 0
31 NA 16 0
0565u


                                                                                                                                      ,  ~
~
e UNIT SIRTrDOWNS AND POWER REDUCTIONS                     DOCKET NO, 50-361                     ,
e UNIT SIRTrDOWNS AND POWER REDUCTIONS DOCKET NO, 50-361 UNIT NAPE SONGS - 2 T
UNIT NAPE SONGS - 2               T REPORT MNTH NOVEMBER,1983                                 DATE 12/15/83 CDMPLETED BY C. A. Morris                   '
REPORT MNTH NOVEMBER,1983 DATE 12/15/83 CDMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 Method of Shutting Cause & Corrective l
TELEPHONE (714) 492-7700 Ext. 56264 Method of Shutting                                         Cause & Corrective Duration                Down      LER      Systeg   Conponent             Action to No.     Date Type l    (flours) Reason 2 Reactor 3     No.       Code      Codeb          Prevent Recurrence 25     831114   F       16         G         2       83-151       RB     VALVEX     Reactor manually tripped due to pressurizer pressure and level decreases, after an operator erroneously opened emergency boration valve 2HV-9247. 'Ihe operator was counseled.
Systeg Conponent Action to Duration Down LER Code Codeb Prevent Recurrence No.
* S       373         P         NA         NA         NA       NA       18-Month Surveillance Outag9 4
Date Type (flours)
1             2                                               3                     4 F-Forced     Reason:                                         Method:                 Exhibit F - Instructions S-Scheduled   A-D:Iuipment Failure (Explain)                   1-Manual               for Preparation of Data B-Maintenance or Test                           2-Manual Scram.         Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram.     Event Report (LER) File D-Regulatory Restriction                         4-Continuation from     (NUREG 0161)
Reason 2 Reactor 3 No.
E-Operator Training & License Examination         Previous Month F-Administrative                                 5-Reduction of 20%   5
25 831114 F
                    ';-Operational Error (Explain)                     or Greater in the     Exhibit H-Same Source H-Other (Explain)                                 Past 24 Hours 0565u                                                             6-Other (Explain) 1
16 G
2 83-151 RB VALVEX Reactor manually tripped due to pressurizer pressure and level decreases, after an operator erroneously opened emergency boration valve 2HV-9247. 'Ihe operator was counseled.
S 373 P
NA NA NA NA 18-Month Surveillance Outag9 4
1 2
3 4
F-Forced Reason:
Method:
Exhibit F - Instructions S-Scheduled A-D:Iuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)
E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%
5
';-Operational Error (Explain) or Greater in the Exhibit H-Same Source H-Other (Explain)
Past 24 Hours 0565u 6-Other (Explain) 1


cm     .
cm l
l     **
D L'.
D L' .


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.               50-361 UNIT                 SONGS - 2 DATE                     12/15/83 COMPLETED BY       C. A. Morris TELEPHONE       (714) 492-7700 Ext. 56264 November 1   0001       Unit is in Mode 1, at 100% reactor power. Turbine load is 1136 MWe gross.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
November 8   2035       Reduced reactor power to 65% to repair a leak on the south main feedwater pump miniflow line.
50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 November 1 0001 Unit is in Mode 1, at 100% reactor power.
November 9   0415       Increased reactor power to 100%
Turbine load is 1136 MWe gross.
November 8 2035 Reduced reactor power to 65% to repair a leak on the south main feedwater pump miniflow line.
November 9 0415 Increased reactor power to 100%
following repairs on the south main feedwater pump miniflow line and completion of the turbine stop and governor valve testing.
following repairs on the south main feedwater pump miniflow line and completion of the turbine stop and governor valve testing.
November 14   1902       Manually tripped reactor due to an inadvertent emergency boration.
November 14 1902 Manually tripped reactor due to an inadvertent emergency boration.
November 15   0530       Commenced 18-Month surveillance Outage.
November 15 0530 Commenced 18-Month surveillance Outage.
November 15   1240       Entered Mode 4.
November 15 1240 Entered Mode 4.
November 16   0140       Entered Mode 5.
November 16 0140 Entered Mode 5.
November 30   2359       Unit is in Mode 5 at 1000F. The surveillance outage is in progress.
November 30 2359 Unit is in Mode 5 at 1000F.
The surveillance outage is in progress.
0565u
0565u


1 .
1 n-REFUELING INFORMATION DOCKET NO.
n-REFUELING INFORMATION DOCKET NO.               50-361 UNIT                   SONGS - 2 DATE                     12/15/83 COMPLETED BY     C. A. Morris TELEPHONE       (714) 492-7700 Ext. 56264
50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 1.
: 1. Scheduled date for next refueling shutdown.
Scheduled date for next refueling shutdown.
Not yet determined.
Not yet determined.
: 2. Scheduled date for restart following refueling.
2.
Scheduled date for restart following refueling.
Not yet determined.
Not yet determined.
: 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined.
Not yet determined.
What will these be?
What will these be?
Not yet determined.
Not yet determined.
: 4. Scheduled date for submitting proposed licensing action and supporting information.
4.
Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
Not yet determined.
: 5. Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
5.
Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined.
Not yet determined.
: 6. The number of fuel assemblies.
6.
a) In the core. 217 b) In the spent fuel storage pool. 0
The number of fuel assemblies.
: 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. NA
a)
: 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
In the core.
217 b)
In the spent fuel storage pool.
0 7.
Licensed spent fuel storage capacity.
800 Intended change in spent fuel storage capacity.
NA 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
NA 0565u
NA 0565u


y     _
y i.
      . i.
NRC POGILY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE 12/15''3 CDMPLETED BY C a Morris TELEPHONE '(,
1 NRC POGILY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE 12/15''3 CDMPLETED BY C a Morris TELEPHONE '(, ) 492-7700 Ext. 56264 OPERATING STA'IUS
) 492-7700 Ext. 56264 OPERATING STA'IUS 1.
: 1. Unit Nane: San Onofre Nuclear Generating Station, Unit 3
Unit Nane: San Onofre Nuclear Generating Station, Unit 3 2.
: 2. Reporting Period: 1 November 1983 through 30 November 1983
Reporting Period: 1 November 1983 through 30 November 1983 3.
: 3. Licensed Thermal Power (MWt):                 3,390
Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):                 1,127
3,390 4.
: 5. Design Electrical Rating (Net MWe):           1,087
Nameplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):       1,127
1,127 5.
: 7. Maximum Dependable Capacity (New MWe):         1,087
Design Electrical Rating (Net MWe):
: 8. If Changes Occur In Capacity Ratings (Items Number 3 'Ihrough 7)
1,087 6.
Maximum Dependable Capacity (Gross MWe):
1,127 7.
Maximum Dependable Capacity (New MWe):
1,087 8.
If Changes Occur In Capacity Ratings (Items Number 3 'Ihrough 7)
Since Last Report, Give Reasons:
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA
NA
: 9. Power Level To Which Restricted, If Any (Net MWe):          NA
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:                             NA This Month   Yr .-to-Date   Cumulative
NA This Month Yr.-to-Date Cumulative
: 11. Hours In Reporting Period                         720.0         1590.0         1590.0
: 11. Hours In Reporting Period 720.0 1590.0 1590.0
: 12. Number Of Hours Reactor Was Critical               458.58         1060.48       1060.48
: 12. Number Of Hours Reactor Was Critical 458.58 1060.48 1060.48
: 13. Reactor Reserve Shutdown Hours                       0               0             0
: 13. Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On-Line                           404.73         1006.63       1006.63
0 0
: 15. Unit Reserve Shutdown Hours                         0               0             0
: 14. Hours Generator On-Line 404.73 1006.63 1006.63
: 16. Gross Thermal Energy Generated (MWH)       1,049,800     1,897,738       1,897,738
: 15. Unit Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (!Nd)       339,636.5       560,036.5       560,036.5
0 0
: 18. Net Electrical Energy Generated (MWH)         308,656.5       492,906.5       492,906.5
: 16. Gross Thermal Energy Generated (MWH) 1,049,800 1,897,738 1,897,738
: 19. Unit Service Factor                             NA             NA             NA
: 17. Gross Electrical Energy Generated (!Nd) 339,636.5 560,036.5 560,036.5
: 20. Unit Availability Factor                         NA             NA             NA
: 18. Net Electrical Energy Generated (MWH) 308,656.5 492,906.5 492,906.5
: 21. Unit Capacity Factor (Using MDC Net)                 0               0             0
: 19. Unit Service Factor NA NA NA
: 22. Unit Capacity Factor (Using DER Net)                 0               0             0
: 20. Unit Availability Factor NA NA NA
: 23. Unit Forced Outage Rate                             0               0             0
: 21. Unit Capacity Factor (Using MDC Net) 0 0
0
: 22. Unit Capacity Factor (Using DER Net) 0 0
0
: 23. Unit Forced Outage Rate 0
0 0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
18-Month Surveillance and Reactor Coolant Pump Seal Replacement Outage, January 6, 1984, 1-Month duration.
18-Month Surveillance and Reactor Coolant Pump Seal Replacement Outage, January 6, 1984, 1-Month duration.
: 25. If Shutdown At End Of Report Period, Estimated Date of Startup:             NA
: 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior To Comercial Operation):           Forecast   Achieved INITIAL CRITICALITY                         -
NA
08/29/83 INITIAL ELECTRICITY                         -
: 26. Units In Test Status (Prior To Comercial Operation):
09/25/83 COMMERCIAL OPERATION                   Under Review 0565u
Forecast Achieved INITIAL CRITICALITY 08/29/83 INITIAL ELECTRICITY 09/25/83 COMMERCIAL OPERATION Under Review 0565u


i4        .
i 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.           50-362 UNIT             SONGS - 3 DATE               12/15/83 COMPLETED BY C. A. Morris TELEPHONE   (714) 492-7700 L
50-362 UNIT SONGS - 3 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 L
Ext. 56264 MONTH:   November 1983 i
MONTH:
DAY   AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVF.L (MWe-Net)                               (MWe-Net) 1                 0                       17           1047.40 2               394.15                   18           1047.92 i
November 1983 i
3               779.83                   19             83.63 4   __,
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVF.L (MWe-Net)
861.54                   20             0 5               456.29                   21             0 6                 0                       22             0 7                 0                       23             0 8                 25.63                   24             0
(MWe-Net) 1 0
;                    9                 0                       25             0
17 1047.40 2
,                  -10               427.65                     26             0 11               837.81                   27           194.77 12               848.42                     28           708.38 13               848.94                     29           1009.06
394.15 18 1047.92 i
                  -14               858.15                     30           991.73 15               932.17                     31             NA 16               992.44 0565u t
3 779.83 19 83.63 4
861.54 20 0
5 456.29 21 0
6 0
22 0
7 0
23 0
8 25.63 24 0
9 0
25 0
-10 427.65 26 0
11 837.81 27 194.77 12 848.42 28 708.38 13 848.94 29 1009.06
-14 858.15 30 991.73 15 932.17 31 NA 16 992.44 0565u t


UNIT SilUrDOWNS AND POWER REDUCTIONS                     DOCKET NO. 50-362                   J, UNIT NAE SONGS - 3                 -
UNIT SilUrDOWNS AND POWER REDUCTIONS DOCKET NO. 50-362 J,
REPORT MONTH NOVEMBER, 1983                                 DATE !2/15/83             -
UNIT NAE SONGS - 3 REPORT MONTH NOVEMBER, 1983 DATE !2/15/83 00NLE" RED BY C. A. Morris TELEPHONE (714) 492-//uo Ext. 56264 Method of Shutting Cause & Corrective Duration Down LER System Conponent Action to l
00NLE" RED BY C. A. Morris TELEPHONE (714) 492-//uo Ext. 56264 Method of Shutting                                             Cause & Corrective Duration                 Down       LER     System   Conponent               Action to No. Date Type l    (Hours)   Reason 2 Reactor 3    No.      Code 4    Codes            Prevent Recurrence 5     831031   F         29.3     A         4         NA       Of     PUMPXX     Reactor remains shutdown after manual trip on October 31, 1983.
2 3
6     831105   F         60.9     G         3         NA       HF     INSTRU     Turbine tripped on low vacuum.
Reactor No.
7     831108   S         47.67     B         2         NA       NA       NA       Manual trip for testing.
Code 4 Codes No.
8     831119   F       173.3       A         2         NA       IIC   IITEXCH     Manual trip due to condenser tube damage in the southwest quadrant.
Date Type (Hours)
1             2                                               3                       4 F-Forced     Reason:                                         Method:                 Exhibit F - Instructions S-Scheduled   A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram.         Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram.       Event Report (LER) File D-Regulatory Restriction                       4-Continuation from     (IUREG 0161)
Reason Prevent Recurrence 5
:                  E-Operator Training & License Examination         Previous Month F-Administrative                               5-Reduction of 20%   5 G-Operational Error (Explain)                     or Greater in the     Exhibit Il-Same Source l                 H-Other (Explain)                                 Past 24 Hours 0565u                                                           6-Other (Explain) l l
831031 F
29.3 A
4 NA Of PUMPXX Reactor remains shutdown after manual trip on October 31, 1983.
6 831105 F
60.9 G
3 NA HF INSTRU Turbine tripped on low vacuum.
7 831108 S
47.67 B
2 NA NA NA Manual trip for testing.
8 831119 F
173.3 A
2 NA IIC IITEXCH Manual trip due to condenser tube damage in the southwest quadrant.
1 2
3 4
F-Forced Reason:
Method:
Exhibit F - Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Continuation from (IUREG 0161)
E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%
5 G-Operational Error (Explain) or Greater in the Exhibit Il-Same Source l
H-Other (Explain)
Past 24 Hours 0565u 6-Other (Explain) l l


f)
f)
* A.
A.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.               50-362 UNIT                 SONGS - 3 DATE                   12/l5/83 COMPLETED BY     C. A. Morris TELEPHONE       (714) 492-7700 Ext. 56264 November 1     0001       Unit is in Mode 3, 545 0F.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-362 UNIT SONGS - 3 DATE 12/l5/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 0
November 1 0001 Unit is in Mode 3, 545 F.
Preparations for Mode 2 entry and return to power ascension testing are in progress.
Preparations for Mode 2 entry and return to power ascension testing are in progress.
November 1     1700       Entered Mode 2.
November 1 1700 Entered Mode 2.
November 1     1708       Reactor critical.
November 1 1708 Reactor critical.
November 2     0145       Entered Mode 1.
November 2 0145 Entered Mode 1.
November 2     0305       Synchronized generator and applied block load.
November 2 0305 Synchronized generator and applied block load.
November 3     0919       Reactor power at 80% and turbine load at 890 MWe gross.
November 3 0919 Reactor power at 80% and turbine load at 890 MWe gross.
November 5     1330       Reactor-tripped due to personnel error in connecting terminals when the vacuum trip was being returned to normal following heat treatment of the intake structure.
November 5 1330 Reactor-tripped due to personnel error in connecting terminals when the vacuum trip was being returned to normal following heat treatment of the intake structure.
November 6     0525       Entered Mode 2.
November 6 0525 Entered Mode 2.
November 6     1342       Reactor tripped on low DNBR.
November 6 1342 Reactor tripped on low DNBR.
November 7     1740       Entered Mode 2.
November 7 1740 Entered Mode 2.
November 7     1804       Reactor critical.
November 7 1804 Reactor critical.
November 7     2020       Entered Mode 1.
November 7 2020 Entered Mode 1.
November 8     0225       Synchronized generator and applied block load of 55 MWe gross.
November 8 0225 Synchronized generator and applied block load of 55 MWe gross.
November 8     1415       Tripped reactor with concurrent loss of offsite power in accordance with the power ascension program.
November 8 1415 Tripped reactor with concurrent loss of offsite power in accordance with the power ascension program.
November 9     2000       Entered Mode 2.
November 9 2000 Entered Mode 2.
November 9     2033       Reactor critical.
November 9 2033 Reactor critical.
November 9     2200       Entered Mode 1.
November 9 2200 Entered Mode 1.
November 10   0205       Synchronized generator and applied block load of 55 MWe gross.
November 10 0205 Synchronized generator and applied block load of 55 MWe gross.
November 10   0450       Reactor power at 50% and tutbine load at 485 MWe gross.
November 10 0450 Reactor power at 50% and tutbine load at 485 MWe gross.
November 18   0340       Reactor power 100% and turbine load at 1137 MWe gross.
November 18 0340 Reactor power 100% and turbine load at 1137 MWe gross.
0565u
0565u


p             .
p j
j o-   <3, a       ..
o-
<3, a
Page 2 of 2
Page 2 of 2


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH November 19   0213       Manually tripped reactor due to failure of the 3rd point heater high level dump baffle, which caused damage to the conder.ser tubes in the southwest quadrant.
OF OPERATING EXPERIENCE FOR THE MONTH November 19 0213 Manually tripped reactor due to failure of the 3rd point heater high level dump baffle, which caused damage to the conder.ser tubes in the southwest quadrant.
November 25   1915       Entered Mode 2 following completion of repairs.
November 25 1915 Entered Mode 2 following completion of repairs.
November 25   1938       Reactor critical.
November 25 1938 Reactor critical.
November 27   0443       Entered Mode 1.
November 27 0443 Entered Mode 1.
November 27   0728       Synchronized generator and applied block load.
November 27 0728 Synchronized generator and applied block load.
November 28   2120       Reactor power at 93.5% and turbine load at 1060 MWe gross.
November 28 2120 Reactor power at 93.5% and turbine load at 1060 MWe gross.
November 30   2359       Unit is in Mode 1 at 85% reactor power.
November 30 2359 Unit is in Mode 1 at 85% reactor power.
l
l l
                                                        ~
~
l l
l l
l l
l l
l l
l l
l 0565u I
0565u I
j
j


p.3 REPUELING INFORMATION DOCKET NO.               50-362 UNIT                 SONGS - 3 DATE                   12/15/83 COMPLETED BY     C. A. Morris TELEPHONE       (714) 492-7700 Ext. 56246
p.3 REPUELING INFORMATION DOCKET NO.
: 1. . Scheduled date for next refueling shutdown.
50-362 UNIT SONGS - 3 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56246
: 1..
Scheduled date for next refueling shutdown.
Not yet determined.
Not yet determined.
: 2. Scheduled date for restart following refueling.
2.
Scheduled date for restart following refueling.
Not yet determined.
Not yet determined.
3.-   Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
3.-
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined.
Not yet determined.
What will these be?
What will these be?
Not'yet determined.
Not'yet determined.
: 4. Scheduled date for submitting proposed licensing action and supporting information.
4.
                  'Not yet determined.
Scheduled date for submitting proposed licensing action and supporting information.
: 5. Important Licensing considerations associated with refueling, e.g. new or-different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
'Not yet determined.
5.
Important Licensing considerations associated with refueling, e.g. new or-different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined.
Not yet determined.
: 6. The number of fuel assemblies.
6.
a) In the core. 217
The number of fuel assemblies.
                  ' b) . In the spent fuel storage pool. 0
a)
: 7.   . Licensed _ spent: fuel storage capacity. 800
In the core.
            -Intended change in spent fuel storage capacity.     NA
217
: 8. _ Projected date of last refueling that can be discharged to spent fuel storage. pool assuming present capacity.
' b). In the spent fuel storage pool.
0 7.
. Licensed _ spent: fuel storage capacity.
800
-Intended change in spent fuel storage capacity.
NA 8.
_ Projected date of last refueling that can be discharged to spent fuel storage. pool assuming present capacity.
NA 0565u
NA 0565u


Southern California Edison Company                   e ;CE S AN ONOFRE NUCLE A R GENE R A TING ST ATION P.O. B O X 128 S AN CLEMEN TE. C A LIFORNI A 92672 J. G. H A YN E S                                                                   retapsoNa ST ATaON M AN AGE R                                                                 1714)492-7700 December 15, 1983 Director Office of Management Information and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Southern California Edison Company e ;CE S AN ONOFRE NUCLE A R GENE R A TING ST ATION P.O. B O X 128 S AN CLEMEN TE. C A LIFORNI A 92672 J. G. H A YN E S retapsoNa ST ATaON M AN AGE R 1714)492-7700 December 15, 1983 Director Office of Management Information and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Sir:==
==Dear Sir:==
==Subject:==
==Subject:==
Docket Nos. 50-361/50-362 Monthly Operating Reports for November 1983 San Onofre Nuclear Generating Station, Units 2 and 3 Cnclosed are the Monthly Operating Reports as required by Section 5.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.
Docket Nos. 50-361/50-362 Monthly Operating Reports for November 1983 San Onofre Nuclear Generating Station, Units 2 and 3 Cnclosed are the Monthly Operating Reports as required by Section 5.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.
Please contact us if we can be of further assistance.
Please contact us if we can be of further assistance.
Sineerely, MAJ4---
Sineerely, MAJ4---
J.G. HAYNES STATION MANAGER Enclosures cc: J. B. Martin (Regional Administrator, USNRC Region V)
J.G. HAYNES STATION MANAGER Enclosures cc:
J. B. Martin (Regional Administrator, USNRC Region V)
A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)
A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) g s
J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) g s
                              . _  _ .}}
_.}}

Latest revision as of 02:10, 14 December 2024

Monthly Operating Repts for Nov 1983
ML20086G524
Person / Time
Site: San Onofre  
Issue date: 11/30/1983
From: Haynes J, Morris C
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8401120263
Download: ML20086G524 (12)


Text

r I

T<

NRC MONTHLY OPERATI!G REPORT DOCKET NO. 50-361 UNIT NAME SONGS - 2 DATE 12/15/83 CDifLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 i

OPERATING STATUS 1.

Unit Name: San Onofre Nuclear Ganerating Station, Unit 2 2.

Reporting Period:

1 November 1983 through 30 November 1983 3.

Licensed Thermal Power (MWt):

3,390 4.

Nameplate Rating (Gross We):

1,127 5.'

Design Electrical Rating (Net IWe):

1,087 6.

Maxhnum Dependable capacity (Gross MWe):

1,127 7.

Maximum Dependable Capacity (Net MWe):

1,087 8.

If Changes Occur In Capacity R4 tings (Items Number 3 2 trough 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA

10. Reasons For Restrictions, If Any:

NA This Month Yr.~to-Date Cumulative

11. Hours In Reporting Period 720.0 8,016.0 10,476.2
12. Number Of Hours Reactor Was Critical 331.03 4,567.78 6,329 9'I
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 331.03 3,901.99 4,906.29
15. Unit Reserve Shutdown Hours 0

~ll 0

16. Gross Thermal Energy Generated (MWH) 1,113,700 11,350,260 12,331,810
17. Gross Electrical Energy Generated (MWH) 377,014.5 3,743,343.0 3,929,343.0
18. Net Electrical Energy Generated (MWH) 355,434.5

' T,476,163.0 3,601,163.0 l

19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA IM
21. Unit Capacity Factor (Using MDC Net) 0 0

0 l

22. Unit Capacity Factor (Using DER Net) 0 0

0 l

23. Unit Forced Outage Rate 0

0 0

l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup: December 15, 1983

26. Units In Test Status (Prior To Cornercial Operation):

Forecast Acnieved INITIAL CRITICALITY 07/17/82 07/26/82 INITIAL ELECTRICITY 9/82 09/20/82 03MMERCIAL OPERATION Under Review i

8401120263 831130 0565u PDR ADOCK 05000361 R

PM i

L

r. _ c

~

P AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 MONTH:

November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-1096.71 17 0

2 1103.48 18 0

3 1100.35 19 0

4

-1094.13 20 0

5 1079.58 21 0

6 1098.33 22 0

7 1110.00 23 0

8 995.00 24 0

9 1072.92 25 0

10 1095.83 26 0

11 1105.48 27 0

12 1096.00 28 0

13 1100.67 29 0

14 844.23 30 0

15 0

31 NA 16 0

0565u

~

e UNIT SIRTrDOWNS AND POWER REDUCTIONS DOCKET NO, 50-361 UNIT NAPE SONGS - 2 T

REPORT MNTH NOVEMBER,1983 DATE 12/15/83 CDMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 Method of Shutting Cause & Corrective l

Systeg Conponent Action to Duration Down LER Code Codeb Prevent Recurrence No.

Date Type (flours)

Reason 2 Reactor 3 No.

25 831114 F

16 G

2 83-151 RB VALVEX Reactor manually tripped due to pressurizer pressure and level decreases, after an operator erroneously opened emergency boration valve 2HV-9247. 'Ihe operator was counseled.

S 373 P

NA NA NA NA 18-Month Surveillance Outag9 4

1 2

3 4

F-Forced Reason:

Method:

Exhibit F - Instructions S-Scheduled A-D:Iuipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

5

';-Operational Error (Explain) or Greater in the Exhibit H-Same Source H-Other (Explain)

Past 24 Hours 0565u 6-Other (Explain) 1

cm l

D L'.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 November 1 0001 Unit is in Mode 1, at 100% reactor power.

Turbine load is 1136 MWe gross.

November 8 2035 Reduced reactor power to 65% to repair a leak on the south main feedwater pump miniflow line.

November 9 0415 Increased reactor power to 100%

following repairs on the south main feedwater pump miniflow line and completion of the turbine stop and governor valve testing.

November 14 1902 Manually tripped reactor due to an inadvertent emergency boration.

November 15 0530 Commenced 18-Month surveillance Outage.

November 15 1240 Entered Mode 4.

November 16 0140 Entered Mode 5.

November 30 2359 Unit is in Mode 5 at 1000F.

The surveillance outage is in progress.

0565u

1 n-REFUELING INFORMATION DOCKET NO.

50-361 UNIT SONGS - 2 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 1.

Scheduled date for next refueling shutdown.

Not yet determined.

2.

Scheduled date for restart following refueling.

Not yet determined.

3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined.

What will these be?

Not yet determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined.

5.

Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined.

6.

The number of fuel assemblies.

a)

In the core.

217 b)

In the spent fuel storage pool.

0 7.

Licensed spent fuel storage capacity.

800 Intended change in spent fuel storage capacity.

NA 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

NA 0565u

y i.

NRC POGILY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE 12/153 CDMPLETED BY C a Morris TELEPHONE '(,

) 492-7700 Ext. 56264 OPERATING STA'IUS 1.

Unit Nane: San Onofre Nuclear Generating Station, Unit 3 2.

Reporting Period: 1 November 1983 through 30 November 1983 3.

Licensed Thermal Power (MWt):

3,390 4.

Nameplate Rating (Gross MWe):

1,127 5.

Design Electrical Rating (Net MWe):

1,087 6.

Maximum Dependable Capacity (Gross MWe):

1,127 7.

Maximum Dependable Capacity (New MWe):

1,087 8.

If Changes Occur In Capacity Ratings (Items Number 3 'Ihrough 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA

10. Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720.0 1590.0 1590.0
12. Number Of Hours Reactor Was Critical 458.58 1060.48 1060.48
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 404.73 1006.63 1006.63
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1,049,800 1,897,738 1,897,738
17. Gross Electrical Energy Generated (!Nd) 339,636.5 560,036.5 560,036.5
18. Net Electrical Energy Generated (MWH) 308,656.5 492,906.5 492,906.5
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA
21. Unit Capacity Factor (Using MDC Net) 0 0

0

22. Unit Capacity Factor (Using DER Net) 0 0

0

23. Unit Forced Outage Rate 0

0 0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

18-Month Surveillance and Reactor Coolant Pump Seal Replacement Outage, January 6, 1984, 1-Month duration.

25. If Shutdown At End Of Report Period, Estimated Date of Startup:

NA

26. Units In Test Status (Prior To Comercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/29/83 INITIAL ELECTRICITY 09/25/83 COMMERCIAL OPERATION Under Review 0565u

i 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-362 UNIT SONGS - 3 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 L

MONTH:

November 1983 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVF.L (MWe-Net)

(MWe-Net) 1 0

17 1047.40 2

394.15 18 1047.92 i

3 779.83 19 83.63 4

861.54 20 0

5 456.29 21 0

6 0

22 0

7 0

23 0

8 25.63 24 0

9 0

25 0

-10 427.65 26 0

11 837.81 27 194.77 12 848.42 28 708.38 13 848.94 29 1009.06

-14 858.15 30 991.73 15 932.17 31 NA 16 992.44 0565u t

UNIT SilUrDOWNS AND POWER REDUCTIONS DOCKET NO. 50-362 J,

UNIT NAE SONGS - 3 REPORT MONTH NOVEMBER, 1983 DATE !2/15/83 00NLE" RED BY C. A. Morris TELEPHONE (714) 492-//uo Ext. 56264 Method of Shutting Cause & Corrective Duration Down LER System Conponent Action to l

2 3

Reactor No.

Code 4 Codes No.

Date Type (Hours)

Reason Prevent Recurrence 5

831031 F

29.3 A

4 NA Of PUMPXX Reactor remains shutdown after manual trip on October 31, 1983.

6 831105 F

60.9 G

3 NA HF INSTRU Turbine tripped on low vacuum.

7 831108 S

47.67 B

2 NA NA NA Manual trip for testing.

8 831119 F

173.3 A

2 NA IIC IITEXCH Manual trip due to condenser tube damage in the southwest quadrant.

1 2

3 4

F-Forced Reason:

Method:

Exhibit F - Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continuation from (IUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

5 G-Operational Error (Explain) or Greater in the Exhibit Il-Same Source l

H-Other (Explain)

Past 24 Hours 0565u 6-Other (Explain) l l

f)

A.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-362 UNIT SONGS - 3 DATE 12/l5/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 0

November 1 0001 Unit is in Mode 3, 545 F.

Preparations for Mode 2 entry and return to power ascension testing are in progress.

November 1 1700 Entered Mode 2.

November 1 1708 Reactor critical.

November 2 0145 Entered Mode 1.

November 2 0305 Synchronized generator and applied block load.

November 3 0919 Reactor power at 80% and turbine load at 890 MWe gross.

November 5 1330 Reactor-tripped due to personnel error in connecting terminals when the vacuum trip was being returned to normal following heat treatment of the intake structure.

November 6 0525 Entered Mode 2.

November 6 1342 Reactor tripped on low DNBR.

November 7 1740 Entered Mode 2.

November 7 1804 Reactor critical.

November 7 2020 Entered Mode 1.

November 8 0225 Synchronized generator and applied block load of 55 MWe gross.

November 8 1415 Tripped reactor with concurrent loss of offsite power in accordance with the power ascension program.

November 9 2000 Entered Mode 2.

November 9 2033 Reactor critical.

November 9 2200 Entered Mode 1.

November 10 0205 Synchronized generator and applied block load of 55 MWe gross.

November 10 0450 Reactor power at 50% and tutbine load at 485 MWe gross.

November 18 0340 Reactor power 100% and turbine load at 1137 MWe gross.

0565u

p j

o-

<3, a

Page 2 of 2

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH November 19 0213 Manually tripped reactor due to failure of the 3rd point heater high level dump baffle, which caused damage to the conder.ser tubes in the southwest quadrant.

November 25 1915 Entered Mode 2 following completion of repairs.

November 25 1938 Reactor critical.

November 27 0443 Entered Mode 1.

November 27 0728 Synchronized generator and applied block load.

November 28 2120 Reactor power at 93.5% and turbine load at 1060 MWe gross.

November 30 2359 Unit is in Mode 1 at 85% reactor power.

l l

~

l l

l l

l l

0565u I

j

p.3 REPUELING INFORMATION DOCKET NO.

50-362 UNIT SONGS - 3 DATE 12/15/83 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56246

1..

Scheduled date for next refueling shutdown.

Not yet determined.

2.

Scheduled date for restart following refueling.

Not yet determined.

3.-

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined.

What will these be?

Not'yet determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

'Not yet determined.

5.

Important Licensing considerations associated with refueling, e.g. new or-different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined.

6.

The number of fuel assemblies.

a)

In the core.

217

' b). In the spent fuel storage pool.

0 7.

. Licensed _ spent: fuel storage capacity.

800

-Intended change in spent fuel storage capacity.

NA 8.

_ Projected date of last refueling that can be discharged to spent fuel storage. pool assuming present capacity.

NA 0565u

Southern California Edison Company e ;CE S AN ONOFRE NUCLE A R GENE R A TING ST ATION P.O. B O X 128 S AN CLEMEN TE. C A LIFORNI A 92672 J. G. H A YN E S retapsoNa ST ATaON M AN AGE R 1714)492-7700 December 15, 1983 Director Office of Management Information and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

Docket Nos. 50-361/50-362 Monthly Operating Reports for November 1983 San Onofre Nuclear Generating Station, Units 2 and 3 Cnclosed are the Monthly Operating Reports as required by Section 5.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.

Please contact us if we can be of further assistance.

Sineerely, MAJ4---

J.G. HAYNES STATION MANAGER Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)

J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) g s

_.