ML20086H190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.                                                          .
{{#Wiki_filter:.
    ' VERhiONT YANKEE NUCLEAR POWER CORPORATION SCVcNTY OCVcH OMOVE OTitCCT Rurt. Ann. VtmMONT 05701 sitPLY tos P. O. DOX 187 VYve2356 VERNON. VERMONT 05354
' VERhiONT YANKEE NUCLEAR POWER CORPORATION SCVcNTY OCVcH OMOVE OTitCCT Rurt. Ann. VtmMONT 05701 sitPLY tos P. O. DOX 187 VYve2356 VERNON. VERMONT 05354 Deccaber 4, 1972
                                        " ..                              Deccaber 4, 1972
+-
                                              +-
United States Atomic EnerEy Comission Directorate of Regulatory Operations, Region I 970 Broad Street Newark, New Jersey 07102 l
United States Atomic EnerEy Comission Directorate of Regulatory Operations, Region I 970 Broad Street         ..
Newark, New Jersey       07102 l      


==REFERENCE:==
==REFERENCE:==
Operating License DPR-28 i
Operating License DPR-28 i
Docket No. 50-271 Abnormal Occurrence No. A0-72-14 Gentlenent l               An defined by Technical Spectfications for the Vermont Yankee
Docket No. 50-271 Abnormal Occurrence No. A0-72-14 Gentlenent l
)       Nuelcar Power Station, Section 6.7.A.c, we are reporting the following Abnormal Occurrence as A0-72-14 and conffreing our telephone converaction with your office.
An defined by Technical Spectfications for the Vermont Yankee
)
Nuelcar Power Station, Section 6.7.A.c, we are reporting the following Abnormal Occurrence as A0-72-14 and conffreing our telephone converaction with your office.
At approximately 1015 on the corning of Deccaber 4 while perforning routino surveillance on the Core Spray System, the Reactor Pressure Switch (RilR/ Core Spray Pernisoive) designated pS 2-3-523 actuated at a pressure
At approximately 1015 on the corning of Deccaber 4 while perforning routino surveillance on the Core Spray System, the Reactor Pressure Switch (RilR/ Core Spray Pernisoive) designated pS 2-3-523 actuated at a pressure
        <335 pufn, This constitutco a violation of Technical Specifications, Tablo 3.2.1, which specifles a value of 350 -l- 15 poig, and requires two operable inntrunent channela per trip system. The nyate:n vould have operated, if required, due to the one out of two logic employed. The reactor who operating at a power level of approximately 65% at the time of this occurrence.                                                                         "
<335 pufn, This constitutco a violation of Technical Specifications, Tablo 3.2.1, which specifles a value of 350 -l-15 poig, and requires two operable inntrunent channela per trip system. The nyate:n vould have operated, if required, due to the one out of two logic employed. The reactor who operating at a power level of approximately 65% at the time of this occurrence.
The switch van irnediately recet, functionally tested, and verified to be operable within the tolerance npecified. This renedial action van completed in a tino span which precluded the neceouity of further action.
The switch van irnediately recet, functionally tested, and verified to be operable within the tolerance npecified.
Very truly youro, VERP .'T Y N 'E PUCLEAR POWER CORPORATION hl       hl O         1 Robert F. nes                 '_#
This renedial action van completed in a tino span which precluded the neceouity of further action.
Plant Superintendent                 ),       7[.
Very truly youro, VERP.'T Y N
HFL/rph                                                                                 t- m <'
'E PUCLEAR POWER CORPORATION hl hl O
I       >
1 Robert F.
(}}
nes Plant Superintendent
),
7[
HFL/rph t-m <'
I
(
-}}

Latest revision as of 02:06, 14 December 2024

AO 50-271/72-14:on 821204,during Core Spray Sys Surveillance,Reactor Pressure Switch Ps 2-3-52B Actuated at Less than 335 Psig.Switch Immediately Reset & Verified
ML20086H190
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/04/1972
From: Rosalyn Jones
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-50-271-72-14, VYV-2356, NUDOCS 8401160051
Download: ML20086H190 (1)


Text

.

' VERhiONT YANKEE NUCLEAR POWER CORPORATION SCVcNTY OCVcH OMOVE OTitCCT Rurt. Ann. VtmMONT 05701 sitPLY tos P. O. DOX 187 VYve2356 VERNON. VERMONT 05354 Deccaber 4, 1972

+-

United States Atomic EnerEy Comission Directorate of Regulatory Operations, Region I 970 Broad Street Newark, New Jersey 07102 l

REFERENCE:

Operating License DPR-28 i

Docket No. 50-271 Abnormal Occurrence No. A0-72-14 Gentlenent l

An defined by Technical Spectfications for the Vermont Yankee

)

Nuelcar Power Station, Section 6.7.A.c, we are reporting the following Abnormal Occurrence as A0-72-14 and conffreing our telephone converaction with your office.

At approximately 1015 on the corning of Deccaber 4 while perforning routino surveillance on the Core Spray System, the Reactor Pressure Switch (RilR/ Core Spray Pernisoive) designated pS 2-3-523 actuated at a pressure

<335 pufn, This constitutco a violation of Technical Specifications, Tablo 3.2.1, which specifles a value of 350 -l-15 poig, and requires two operable inntrunent channela per trip system. The nyate:n vould have operated, if required, due to the one out of two logic employed. The reactor who operating at a power level of approximately 65% at the time of this occurrence.

The switch van irnediately recet, functionally tested, and verified to be operable within the tolerance npecified.

This renedial action van completed in a tino span which precluded the neceouity of further action.

Very truly youro, VERP.'T Y N

'E PUCLEAR POWER CORPORATION hl hl O

1 Robert F.

nes Plant Superintendent

),

7[

HFL/rph t-m <'

I

(

-