{{#Wiki_filter:__         ._
{{#Wiki_filter:__
DPERATING DATA REPORT DDCKET NO         50-413 LATE July 14. 1995 DPEPATING STATUS                                                                       COMPLETED BY   _R.A. Willians TELEFHONE     704-382-5346
DPERATING DATA REPORT DDCKET NO 50-413 LATE July 14. 1995 DPEPATING STATUS COMPLETED BY
_R.A. Willians TELEFHONE 704-382-5346
: 1. Unit Nase: Catamba 1
: 1. Unit Nase: Catamba 1
: 2. Report:ng Feriod: June 1, 1995-June 30, 1995
: 2. Report:ng Feriod: June 1, 1995-June 30, 1995
: 3. Licensed Thersal Power (MWt):             3411
: 3. Licensed Thersal Power (MWt):
: 4. Nameplate Rating (Grsss MWel:               1305a                                   Notes
3411
: 4. Nameplate Rating (Grsss MWel:
1305a Notes
* Nameplate Rating
* Nameplate Rating
: 5. Design Electrical Rating (Net MWe):               !!45                               (Bross MWe) calculated as
: 5. Design Electrical Rating (Net MWe):
    ' 6. Maxieus Dependable Capacity (Gross MWe):         1192                               1450.000 MVA x .90 power
!!45 (Bross MWe) calculated as
: 7. Maxisus Dependable Capacity (Net MWe):           !!29                               factor per Page lii,
' 6. Maxieus Dependable Capacity (Gross MWe):
: 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last           NURE6-0020.
1192 1450.000 MVA x.90 power
: 7. Maxisus Dependable Capacity (Net MWe):
!!29 factor per Page lii,
: 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
Report. Give Reasons:
: 9. Fower level To Which Restricted, if Any (Net NWe):
: 9. Fower level To Which Restricted, if Any (Net NWe):
: 10. Reason for Restrictions, if any:
: 10. Reason for Restrictions, if any:
This Month     Yr.-to-Date       Casulative
This Month Yr.-to-Date Casulative
    !!. Hours In Reporting Period                                                       720.0           4343.0           87696.0
!!. Hours In Reporting Period 720.0 4343.0 87696.0
: 12. Number Of Hours Reactor Was Critica!                                             720.0           3391.3           67902.9
: 12. Number Of Hours Reactor Was Critica!
: 13. Reactor Reserve Shutdown Hours                                                 --0--           --0--             -     14. Hours 6enerator On-Line                                                         720.0           3296.2           66671.7
720.0 3391.3 67902.9
: 15. Unit Reserve Shutdown Hours                                                     --0--           --0--             --0--
: 13. Reactor Reserve Shutdown Hours
: 16. Bross Thereal Energy 6enerated (MWH)                                         2446541         10882358       217025789
--0--
: 17. Bross Electrical Energy Generated (MWH)                                       B60467         3878190       76561940
--0--
: 18. Net Electrical Energy Generated (MWH)                                           823235         3660325       719837B7
- 14. Hours 6enerator On-Line 720.0 3296.2 66671.7
: 19. linit Service Factor                                                             100.0           75.9               76.0
: 15. Unit Reserve Shutdown Hours
: 20. Un:t Availability fatter                                                         100.0             75.9               76.0
--0--
: 21. Unit Capacity Factor (Using MDC het)                                             101.3             74.7               72.5
--0--
: 22. thit Capacity Fatter (Using DER Net)                                             99.9             73.6               71.7
--0--
: 23. Unit forced Outage Rate                                                             0.0             1.3               B.7
: 16. Bross Thereal Energy 6enerated (MWH) 2446541 10882358 217025789
: 17. Bross Electrical Energy Generated (MWH)
B60467 3878190 76561940
: 18. Net Electrical Energy Generated (MWH) 823235 3660325 719837B7
: 19. linit Service Factor 100.0 75.9 76.0
: 20. Un:t Availability fatter 100.0 75.9 76.0
: 21. Unit Capacity Factor (Using MDC het) 101.3 74.7 72.5
: 22. thit Capacity Fatter (Using DER Net) 99.9 73.6 71.7
: 23. Unit forced Outage Rate 0.0 1.3 B.7
: 24. Shutd?mn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutd?mn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
None
: 25. If Shut Down At End Of Report Feriod. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Feriod. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Consercial Operation):                                           Forecast       Achieved INITIAL CRITICAllTY INITI AL ELECTRICITY COMMERCIAL DPERATION 9507200116 950630 PDR       ADDCK 05000413 R                           PDR
: 26. Units in Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICAllTY INITI AL ELECTRICITY COMMERCIAL DPERATION 9507200116 950630 PDR ADDCK 05000413 R
PDR


DPERAT!NS DATA REFORT DOCKET ND       50-413-UNIT     Catamba 1 DATE July 14, 1995 COMPLETED Bf R.A. Williams TELEPHONE   704-382-5746 MONTH   June. 1995 pq       AVERAGE DAILY POWER LEVEL         pfq           AVERASE DAILY POWER LEVEL (MWe-Met)                                       (MWe-Met)
DPERAT!NS DATA REFORT DOCKET ND 50-413-UNIT Catamba 1 DATE July 14, 1995 COMPLETED Bf R.A. Williams TELEPHONE 704-382-5746 MONTH June. 1995 pq AVERAGE DAILY POWER LEVEL pfq AVERASE DAILY POWER LEVEL (MWe-Met)
I                 1145                     17                     !!48 2                 !!44                     IB                     !!47 3                 !!45                     19                     1149 4                 !!42                     20                     !!48 5                 1140                     21                     1143 6                 !!41                     22           _
(MWe-Met)
1143 7                 1140                     23                     !!43 0                 !!37                     24                     1142 9                 !!61                     25                     1142 10                 1144                     26                     !!40 11                 1140                     27                     1139 12                 1144                     2B                     !!41 13                 !!49                     29                     1142 14                 !!49                     30                     1142 15                 1146 16                 !!49
I 1145 17
!!48 2
!!44 IB
!!47 3
!!45 19 1149 4
!!42 20
!!48 5
1140 21 1143 6
!!41 22 1143 7
1140 23
!!43 0
!!37 24 1142 9
!!61 25 1142 10 1144 26
!!40 11 1140 27 1139 12 1144 2B
!!41 13
!!49 29 1142 14
!!49 30 1142 15 1146 16
!!49


UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO.                                                       50-413 UNIT WAME                                                       tarawtsa 1 DATE                                                     ui/13/yd                           .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
REPORT MONTH         June 1995             COMPLETED BY                                                       x. a. williams TELEPHONE                                                         (/ues-362-d346 (1)           (2) (3)           (4)       (5)
50-413 UNIT WAME tarawtsa 1 DATE ui/13/yd REPORT MONTH June 1995 COMPLETED BY x.
R   MET-E   HOD T           A   OF   LICENSE N               Y           S   SHUT EVENT   SYS-                   CAUSE AND CORRECTIVE O               P DURATION O   DOWN REPORT   TEM COMPONENT                   ACTION TO
a.
      . DATE       E   HOURS   N   R/X   NO. CODE   CODE             PREVENT RECURRENCE NO SHUTDOWNS   OR     REDUCTION S (1)           (2)                                           (3)                     (4)
williams TELEPHONE
F Forced     Reason-                                       Method:                 Exhibit G - Instructions S Scheduled   A-Equipment Failure (Explain)                 1-Manual                 for Preparation of Data B-Maintenance or test                         2-Manual Scram           Ent Event Report (LER w Sheets For Licensee C-Refueling                                   3-Automatic Scram D-Regulato n Restriction                     4-Other (Explain)       File ( M EG-0161))
(/ues-362-d346 (1)
E-Operator Training & License Examination F-Administrative                                                     (5)
(2)
G-Operator Error (Explain)                                             Exhibit I - Same Source H-Other (Explain) e w-           _-                                                                    -      .- -- . , _ _ _ . - - _ _ - - - _ _ - _ _ _ _ . - _ - _ _ - - - - . - - - _ _ _ _ _ _ _
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) e w-


                                                                                                                    =,
=,
I l
l f.) ~.
.. f.) ~.                                                                                                             ]
]
l 1
1 i
i DOCKET: 50-413       i UNIT: Catawba 1     ,
DOCKET: 50-413 i
Date: 07/14/95 l
UNIT: Catawba 1 Date: 07/14/95 l
                                                                                                                    'i NARRATIVE  
'i NARRATIVE  


==SUMMARY==
==SUMMARY==
MONTH: June 1995 Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100%     j full power for the entire month.
MONTH: June 1995 Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100%
j full power for the entire month.
i F
i F
i i
i i
I I
I I
I I
I I
                                                                                                                      .i Prepared by: R. A. Williams                                                                               j Telephone: (704)- 382-5346                                                                                 }
Prepared by: R. A. Williams j
Telephone: (704)- 382-5346
}
I t
I t
t i
t i
l l
l
l l


e MONTHLY REFUELING INFORMATION REOUEST
e MONTHLY REFUELING INFORMATION REOUEST l.
: l.     Facility name:     Catawba. Unit 1
Facility name:
: 2.     Scheduled next refueling shutdown: May 1996                                                     !
Catawba. Unit 1 2.
: 3.     Scheduled restan following refueling: September 1996                                             !
Scheduled next refueling shutdown: May 1996 3.
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF                               ,
Scheduled restan following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CH ANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
ANY T.S. CH ANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
: 4.     Will refueling or resumption of operation thereafter require a technical specification change or !
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
other license amendment?
If yes, what will these be7 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If yes, what will these be7 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5.     Scheduled date(s) for submitting proposed licensing actioni and supporting information.
5.
: 6.     Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or nc-" noeratmg procedures).
Scheduled date(s) for submitting proposed licensing actioni and supporting information.
: 7.     Number of Fuel assembi,ies           (a)     in the core: 193 (b)     in the spent fuel pool: $M
6.
: 8. Present licensed fuel pool capacity: 1413 Size of requested or planned increase: .--
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or nc-" noeratmg procedures).
l
7.
: 9.     Projected date oflast refueling w hich can be accommodated by present license capacity:         i SrpicmLC 2002                                                                                   i l
Number of Fuel assembi,ies (a) in the core: 193 (b) in the spent fuel pool: $M 8.
1 DUKE POWER COMPANY                                   DATE: July 14.1995 Name of
Present licensed fuel pool capacity: 1413 Size of requested or planned increase:.--
l 9.
Projected date oflast refueling w hich can be accommodated by present license capacity:
i SrpicmLC 2002 i
1 DUKE POWER COMPANY DATE: July 14.1995 Name of


==Contact:==
==Contact:==
R. A. Williams           Phone: (704)- 382-5346 i
R. A. Williams Phone: (704)- 382-5346 i


j OPERATINS DATA REPDRT DOCKET ND         50-414 DATE July 14. 1995 DPERAllNS STATUS                                                                       CDNPLETED BY       R.A. Willians TELEPHONE     704-302-5346
j OPERATINS DATA REPDRT DOCKET ND 50-414 DATE July 14. 1995 DPERAllNS STATUS CDNPLETED BY R.A. Willians TELEPHONE 704-302-5346
: 1. Unit Names Catawba 2
: 1. Unit Names Catawba 2
: 2. Reporting Period: June 1, 1995-June 30, 1995                                                                             ,
: 2. Reporting Period: June 1, 1995-June 30, 1995
: 3. Licensed Thersal Power (MWt):             3411
: 3. Licensed Thersal Power (MWt):
: 4. Naseplate Rating (Gross MWe):             1305*                                     N'otes
3411
* Nameplate Rating           ;
: 4. Naseplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):             !!45                                 (Bross NWel calculated as
1305*
: 6. f.anists Dependable Capacity (Gross MWe):       1192                                 1450.000 MVA x .90 power
N'otes
: 7. Maxisus Dependable Capacity (Net MWel:         !!29                                 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Since Last           NURE6-0020.
* Nameplate Rating
: 5. Design Electrical Rating (Net MWe):
!!45 (Bross NWel calculated as
: 6. f.anists Dependable Capacity (Gross MWe):
1192 1450.000 MVA x.90 power
: 7. Maxisus Dependable Capacity (Net MWel:
!!29 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Since Last NURE6-0020.
Report. Give Reasons:
Report. Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reason For Restrictions, If any:                                                                                         1 t
: 10. Reason For Restrictions, If any:
i This Month     Yr.-to-Date       Cumulative
1 t
    !!. Hours In Reporting Period                                                       720.0           4343.0         77712.0
i This Month Yr.-to-Date Cumulative
: 12. Number Of Hours Reactor Was Critical                                           720.0           4006.6         61015.9
!!. Hours In Reporting Period 720.0 4343.0 77712.0
: 13. Reactor Reserve Shutdewn Hours                                                 --0--             --0--           -     14. Hours Generator Gn-Line                                                         720.0           3965.4         60026.9
: 12. Number Of Hours Reactor Was Critical 720.0 4006.6 61015.9
: 15. Unit Reserve Shutdown Hours                                                   -             --0--           --0--
: 13. Reactor Reserve Shutdewn Hours
: 16. Gross Thersal Energy Generated (MWH)                                         2431938         13391101       193089904
--0--
: 17. Eross Electrical Energy Generated (MWH)                                       860828           4748891         68448271
--0--
: 18. Net Electrical Energy 6enerated (MWH)                                         817955         4494574         64460127
- 14. Hours Generator Gn-Line 720.0 3965.4 60026.9
: 19. Unit Service Factor                                                             100.0             91.3             77.2
: 15. Unit Reserve Shutdown Hours -
: 20. Unit Availability Factor                                                       100.0             91.3             77.2
--0--
: 21. Unit Capacity Factor (Using MDC Net)                                             100.6             91.7             73.3
--0--
: 22. Unit Capacity Facter (Using DER Net)                                             9?.2             90.4             72.4
: 16. Gross Thersal Energy Generated (MWH) 2431938 13391101 193089904
: 23. Unit Forced Dutage Pate                                                           0.0             E.7             8.8 ;
: 17. Eross Electrical Energy Generated (MWH) 860828 4748891 68448271
: 18. Net Electrical Energy 6enerated (MWH) 817955 4494574 64460127
: 19. Unit Service Factor 100.0 91.3 77.2
: 20. Unit Availability Factor 100.0 91.3 77.2
: 21. Unit Capacity Factor (Using MDC Net) 100.6 91.7 73.3
: 22. Unit Capacity Facter (Using DER Net) 9?.2 90.4 72.4
: 23. Unit Forced Dutage Pate 0.0 E.7 8.8
: 24. Shutdown Scheduled Over Next 6 Motths (Type, Date, and Duration of Each):
: 24. Shutdown Scheduled Over Next 6 Motths (Type, Date, and Duration of Each):
Refueling - October 06, 1995 - 39 days                                                                                 i i
Refueling - October 06, 1995 - 39 days i
i
: 25. If Shut Down At End Of Report Period. Estisated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estisated Date of Startup:
: 26. Un:ts in Test Status (Prior to Ccssercial Operat:en):                                           Ferecast       Achieved INITIAL CR!ilCALITY                                                                             !
: 26. Un:ts in Test Status (Prior to Ccssercial Operat:en):
INITIAL ELECTRIClif                                                                             ,
Ferecast Achieved INITIAL CR!ilCALITY INITIAL ELECTRIClif COMMERCIAL OFERATILd T
COMMERCIAL OFERATILd                                                                           ,
T


I
I OPERATING DATA REPDRT DOCKET ND 50-414 UNIT Catawba 2 BATE July 14. 1995 COMPLETED BY P.A. Willians 1
.                                                                                                                1 OPERATING DATA REPDRT DOCKET ND       50-414     ,
TELEPHONE 704-382-5346 CONTH June 1995 pal AVERAGE DAILY POWER LEVEL E!!Y, AVERAGE DAILY POWER LEVEL (MWe-Net)
UNIT     Catawba 2   :
(MWe-Net!
BATE July 14. 1995     ;
I 1139 17
COMPLETED BY   P.A. Willians 1 TELEPHONE   704-382-5346 CONTH   June 1995 pal       AVERAGE DAILY POWER LEVEL         E!!Y,         AVERAGE DAILY POWER LEVEL (MWe-Net)                                       (MWe-Net!
!!44 2
I                 1139                     17                     !!44 2                 !!36                     10                     !!43 3                 !!!3                     19                     1141 4                 !!36                     20                     1136 5                 !!37                     21                     1134 6                 1139                     22                     !!35 i
!!36 10
7                 !!36                     23                     1134 l
!!43 3
8                 1133                     24                     !!32 1
!!!3 19 1141 4
9                 1137                     25                     !!32 10                 !!38                     26                     !!31 11                 !!32                     27                     !!30 12                 !!35                     28                     !!32 13                 !!H                     29                     !!33 r
!!36 20 1136 5
14                 1147                     30                     1132 15                 !!44
!!37 21 1134 6
  .6                 !!44
1139 22
!!35 i
7
!!36 23 1134 l
8 1133 24
!!32 1
9 1137 25
!!32 10
!!38 26
!!31 11
!!32 27
!!30 12
!!35 28
!!32 13
!!H 29
!!33 r
14 1147 30 1132 15
!!44
.6
!!44


UNIT SHUTDOWNS AND POWER REDUCTIONS           DOCKET BO. 50-414' UNIT NAME   uranua z         .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET BO.
DATE   u //1d/ n REPORT MOITTH         June 1995             COMPLETED BY   x. a. williams TELEPHONE   (/us)-auz-d346 (1)             (2) (3)           (4)       (5)
50-414' UNIT NAME uranua z DATE u //1d/ n REPORT MOITTH June 1995 COMPLETED BY x.
R   MET-E   HOD T               A   OF   LICENSE                                                   -
a.
N              Y               S   SHUT EVENT   SYS-                   CAUSE AND CORRECTIVE O               P   DURATION   O   DOWN REPORT   TEM COMPONENT               ACTION TO
williams TELEPHONE
    . DATE       E     HOURS     N   R/X   NO. CODE   CODE             PREVENT RECURRENCE NO   SHUTDO'4NS   OR     REDUCTION S (1)           (2)                                           (3)                   (4)
(/us)-auz-d346 (1)
F Forced     Reason-                                       Method:               Exhibit G - Instructions S Scheduled   A-Equipment Failure (Explain)                 1-Manual               for Preparation of Data B-Maintenance or test                         2-Manual Scram         Ent y Sneets For Licensee C-Refueling                                   3-Automatic Scram     Event Report (LER D-Regulatory Restriction                       4-Other (Explain)     File ( M EG-0161))
(2)
E-Operator Training & License Examination F-Administrative                                                   (5)
(3)
G-Operator Error                                                      Exhibit I - Same Source H-Other (Explain) (Explain)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDO'4NS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( M EG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
-o
-o


Line 159: Line 269:


==SUMMARY==
==SUMMARY==
MONTil: June 1995 Catawba Unit 2 beFan the month of June operating at 100% full power. The unit operated at or near 100%
MONTil: June 1995 Catawba Unit 2 beFan the month of June operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
full power for the entire month.
Line 166: Line 275:
I I
I I
MQNTIILY REFUELING INFORMATION REOUEST l
MQNTIILY REFUELING INFORMATION REOUEST l
: 1. Facility name:               Dtawba. Unit 2
1.
: 2.     Scheduled next refueling shutdown: October 1995
Facility name:
: 3.     Scheduled restart following refueling: November 1995 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.
Dtawba. Unit 2 2.
: 4.     Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Scheduled next refueling shutdown: October 1995 3.
Scheduled restart following refueling: November 1995 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5.     Scheduled date(s) for submitting proposed licensing action and supporting information.
5.
: 6.     Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Scheduled date(s) for submitting proposed licensing action and supporting information.
: 7.     Number of Fuel assemblies                   (a) in the core: 123 (b) in the spent fuel pool: 4_44
6.
: 8. Present licensed fuel pool capacity: 14j3 Site of requested or planned increase: - :.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 9.     Projected date of last refueling which can be accommodated by present license capacity:
7.
Srptember 2911 DUKE POWER COMPANY                                       DATE: July 14.1995 Name of
Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 4_44 8.
Present licensed fuel pool capacity: 14j3 Site of requested or planned increase: - :.
9.
Projected date of last refueling which can be accommodated by present license capacity:
Srptember 2911 DUKE POWER COMPANY DATE: July 14.1995 Name of


==Contact:==
==Contact:==
R. A. Williarns     Phone: (7(m - 382-5346 r
R. A. Williarns Phone: (7(m - 382-5346 r
_ _ _ _ _ - _ - _ _ . _}}
_ _ _ _ _ - _ - _ _. _}}

Latest revision as of 01:56, 14 December 2024

Monthly Operating Rept for June 1995 for Catawba Nuclear Station
ML20086K369
Person / Time
Site: Catawba  
Issue date: 06/30/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20086K363 List:
References
NUDOCS 9507200116
Download: ML20086K369 (10)


Text

__

DPERATING DATA REPORT DDCKET NO 50-413 LATE July 14. 1995 DPEPATING STATUS COMPLETED BY

_R.A. Willians TELEFHONE 704-382-5346

1. Unit Nase: Catamba 1
2. Report:ng Feriod: June 1, 1995-June 30, 1995
3. Licensed Thersal Power (MWt):

3411

4. Nameplate Rating (Grsss MWel:

1305a Notes

  • Nameplate Rating
5. Design Electrical Rating (Net MWe):

!!45 (Bross MWe) calculated as

' 6. Maxieus Dependable Capacity (Gross MWe):

1192 1450.000 MVA x.90 power

7. Maxisus Dependable Capacity (Net MWe):

!!29 factor per Page lii,

8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Fower level To Which Restricted, if Any (Net NWe):
10. Reason for Restrictions, if any:

This Month Yr.-to-Date Casulative

!!. Hours In Reporting Period 720.0 4343.0 87696.0

12. Number Of Hours Reactor Was Critica!

720.0 3391.3 67902.9

13. Reactor Reserve Shutdown Hours

--0--

--0--

- 14. Hours 6enerator On-Line 720.0 3296.2 66671.7

15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Bross Thereal Energy 6enerated (MWH) 2446541 10882358 217025789
17. Bross Electrical Energy Generated (MWH)

B60467 3878190 76561940

18. Net Electrical Energy Generated (MWH) 823235 3660325 719837B7
19. linit Service Factor 100.0 75.9 76.0
20. Un:t Availability fatter 100.0 75.9 76.0
21. Unit Capacity Factor (Using MDC het) 101.3 74.7 72.5
22. thit Capacity Fatter (Using DER Net) 99.9 73.6 71.7
23. Unit forced Outage Rate 0.0 1.3 B.7
24. Shutd?mn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Feriod. Estimated Date of Startup:
26. Units in Test Status (Prior to Consercial Operation):

Forecast Achieved INITIAL CRITICAllTY INITI AL ELECTRICITY COMMERCIAL DPERATION 9507200116 950630 PDR ADDCK 05000413 R

PDR

DPERAT!NS DATA REFORT DOCKET ND 50-413-UNIT Catamba 1 DATE July 14, 1995 COMPLETED Bf R.A. Williams TELEPHONE 704-382-5746 MONTH June. 1995 pq AVERAGE DAILY POWER LEVEL pfq AVERASE DAILY POWER LEVEL (MWe-Met)

(MWe-Met)

I 1145 17

!!48 2

!!44 IB

!!47 3

!!45 19 1149 4

!!42 20

!!48 5

1140 21 1143 6

!!41 22 1143 7

1140 23

!!43 0

!!37 24 1142 9

!!61 25 1142 10 1144 26

!!40 11 1140 27 1139 12 1144 2B

!!41 13

!!49 29 1142 14

!!49 30 1142 15 1146 16

!!49

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT WAME tarawtsa 1 DATE ui/13/yd REPORT MONTH June 1995 COMPLETED BY x.

a.

williams TELEPHONE

(/ues-362-d346 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram

( M EG-0161))

D-Regulato n Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain) e w-

=,

l f.) ~.

]

1 i

DOCKET: 50-413 i

UNIT: Catawba 1 Date: 07/14/95 l

'i NARRATIVE

SUMMARY

MONTH: June 1995 Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100%

j full power for the entire month.

i F

i i

I I

I I

Prepared by: R. A. Williams j

Telephone: (704)- 382-5346

}

I t

t i

l

e MONTHLY REFUELING INFORMATION REOUEST l.

Facility name:

Catawba. Unit 1 2.

Scheduled next refueling shutdown: May 1996 3.

Scheduled restan following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CH ANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be7 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing actioni and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or nc-" noeratmg procedures).

7.

Number of Fuel assembi,ies (a) in the core: 193 (b) in the spent fuel pool: $M 8.

Present licensed fuel pool capacity: 1413 Size of requested or planned increase:.--

l 9.

Projected date oflast refueling w hich can be accommodated by present license capacity:

i SrpicmLC 2002 i

1 DUKE POWER COMPANY DATE: July 14.1995 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i

j OPERATINS DATA REPDRT DOCKET ND 50-414 DATE July 14. 1995 DPERAllNS STATUS CDNPLETED BY R.A. Willians TELEPHONE 704-302-5346

1. Unit Names Catawba 2
2. Reporting Period: June 1, 1995-June 30, 1995
3. Licensed Thersal Power (MWt):

3411

4. Naseplate Rating (Gross MWe):

1305*

N'otes

  • Nameplate Rating
5. Design Electrical Rating (Net MWe):

!!45 (Bross NWel calculated as

6. f.anists Dependable Capacity (Gross MWe):

1192 1450.000 MVA x.90 power

7. Maxisus Dependable Capacity (Net MWel:

!!29 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If any:

1 t

i This Month Yr.-to-Date Cumulative

!!. Hours In Reporting Period 720.0 4343.0 77712.0

12. Number Of Hours Reactor Was Critical 720.0 4006.6 61015.9
13. Reactor Reserve Shutdewn Hours

--0--

--0--

- 14. Hours Generator Gn-Line 720.0 3965.4 60026.9

15. Unit Reserve Shutdown Hours -

--0--

--0--

16. Gross Thersal Energy Generated (MWH) 2431938 13391101 193089904
17. Eross Electrical Energy Generated (MWH) 860828 4748891 68448271
18. Net Electrical Energy 6enerated (MWH) 817955 4494574 64460127
19. Unit Service Factor 100.0 91.3 77.2
20. Unit Availability Factor 100.0 91.3 77.2
21. Unit Capacity Factor (Using MDC Net) 100.6 91.7 73.3
22. Unit Capacity Facter (Using DER Net) 9?.2 90.4 72.4
23. Unit Forced Dutage Pate 0.0 E.7 8.8
24. Shutdown Scheduled Over Next 6 Motths (Type, Date, and Duration of Each):

Refueling - October 06, 1995 - 39 days i

i

25. If Shut Down At End Of Report Period. Estisated Date of Startup:
26. Un:ts in Test Status (Prior to Ccssercial Operat:en):

Ferecast Achieved INITIAL CR!ilCALITY INITIAL ELECTRIClif COMMERCIAL OFERATILd T

I OPERATING DATA REPDRT DOCKET ND 50-414 UNIT Catawba 2 BATE July 14. 1995 COMPLETED BY P.A. Willians 1

TELEPHONE 704-382-5346 CONTH June 1995 pal AVERAGE DAILY POWER LEVEL E!!Y, AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net!

I 1139 17

!!44 2

!!36 10

!!43 3

!!!3 19 1141 4

!!36 20 1136 5

!!37 21 1134 6

1139 22

!!35 i

7

!!36 23 1134 l

8 1133 24

!!32 1

9 1137 25

!!32 10

!!38 26

!!31 11

!!32 27

!!30 12

!!35 28

!!32 13

!!H 29

!!33 r

14 1147 30 1132 15

!!44

.6

!!44

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET BO.

50-414' UNIT NAME uranua z DATE u //1d/ n REPORT MOITTH June 1995 COMPLETED BY x.

a.

williams TELEPHONE

(/us)-auz-d346 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDO'4NS OR REDUCTION S

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER

( M EG-0161))

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)

G-Operator Error H-Other

-o

F DOCKET: 50-414 UNIT: Catawba 2 Date: 07/14/95 NARRATIVE

SUMMARY

MONTil: June 1995 Catawba Unit 2 beFan the month of June operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346

I I

MQNTIILY REFUELING INFORMATION REOUEST l

1.

Facility name:

Dtawba. Unit 2 2.

Scheduled next refueling shutdown: October 1995 3.

Scheduled restart following refueling: November 1995 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 4_44 8.

Present licensed fuel pool capacity: 14j3 Site of requested or planned increase: - :.

9.

Projected date of last refueling which can be accommodated by present license capacity:

Srptember 2911 DUKE POWER COMPANY DATE: July 14.1995 Name of

Contact:

R. A. Williarns Phone: (7(m - 382-5346 r