Text
__
DPERATING DATA REPORT DDCKET NO 50-413 LATE July 14. 1995 DPEPATING STATUS COMPLETED BY
_R.A. Willians TELEFHONE 704-382-5346
- 1. Unit Nase: Catamba 1
- 2. Report:ng Feriod: June 1, 1995-June 30, 1995
- 3. Licensed Thersal Power (MWt):
3411
- 4. Nameplate Rating (Grsss MWel:
1305a Notes
- Nameplate Rating
- 5. Design Electrical Rating (Net MWe):
!!45 (Bross MWe) calculated as
' 6. Maxieus Dependable Capacity (Gross MWe):
1192 1450.000 MVA x.90 power
- 7. Maxisus Dependable Capacity (Net MWe):
!!29 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Fower level To Which Restricted, if Any (Net NWe):
- 10. Reason for Restrictions, if any:
This Month Yr.-to-Date Casulative
!!. Hours In Reporting Period 720.0 4343.0 87696.0
- 12. Number Of Hours Reactor Was Critica!
720.0 3391.3 67902.9
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
- 14. Hours 6enerator On-Line 720.0 3296.2 66671.7
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Bross Thereal Energy 6enerated (MWH) 2446541 10882358 217025789
- 17. Bross Electrical Energy Generated (MWH)
B60467 3878190 76561940
- 18. Net Electrical Energy Generated (MWH) 823235 3660325 719837B7
- 19. linit Service Factor 100.0 75.9 76.0
- 20. Un:t Availability fatter 100.0 75.9 76.0
- 21. Unit Capacity Factor (Using MDC het) 101.3 74.7 72.5
- 22. thit Capacity Fatter (Using DER Net) 99.9 73.6 71.7
- 23. Unit forced Outage Rate 0.0 1.3 B.7
- 24. Shutd?mn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Feriod. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICAllTY INITI AL ELECTRICITY COMMERCIAL DPERATION 9507200116 950630 PDR ADDCK 05000413 R
DPERAT!NS DATA REFORT DOCKET ND 50-413-UNIT Catamba 1 DATE July 14, 1995 COMPLETED Bf R.A. Williams TELEPHONE 704-382-5746 MONTH June. 1995 pq AVERAGE DAILY POWER LEVEL pfq AVERASE DAILY POWER LEVEL (MWe-Met)
(MWe-Met)
I 1145 17
!!48 2
!!44 IB
!!47 3
!!45 19 1149 4
!!42 20
!!48 5
1140 21 1143 6
!!41 22 1143 7
1140 23
!!43 0
!!37 24 1142 9
!!61 25 1142 10 1144 26
!!40 11 1140 27 1139 12 1144 2B
!!41 13
!!49 29 1142 14
!!49 30 1142 15 1146 16
!!49
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT WAME tarawtsa 1 DATE ui/13/yd REPORT MONTH June 1995 COMPLETED BY x.
a.
williams TELEPHONE
(/ues-362-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) e w-
=,
l f.) ~.
]
1 i
DOCKET: 50-413 i
UNIT: Catawba 1 Date: 07/14/95 l
'i NARRATIVE
SUMMARY
MONTH: June 1995 Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100%
j full power for the entire month.
i F
i i
I I
I I
Prepared by: R. A. Williams j
Telephone: (704)- 382-5346
}
I t
t i
l
e MONTHLY REFUELING INFORMATION REOUEST l.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: May 1996 3.
Scheduled restan following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CH ANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be7 If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing actioni and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or nc-" noeratmg procedures).
7.
Number of Fuel assembi,ies (a) in the core: 193 (b) in the spent fuel pool: $M 8.
Present licensed fuel pool capacity: 1413 Size of requested or planned increase:.--
l 9.
Projected date oflast refueling w hich can be accommodated by present license capacity:
i SrpicmLC 2002 i
1 DUKE POWER COMPANY DATE: July 14.1995 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
j OPERATINS DATA REPDRT DOCKET ND 50-414 DATE July 14. 1995 DPERAllNS STATUS CDNPLETED BY R.A. Willians TELEPHONE 704-302-5346
- 1. Unit Names Catawba 2
- 2. Reporting Period: June 1, 1995-June 30, 1995
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
1305*
N'otes
- Nameplate Rating
- 5. Design Electrical Rating (Net MWe):
!!45 (Bross NWel calculated as
- 6. f.anists Dependable Capacity (Gross MWe):
1192 1450.000 MVA x.90 power
- 7. Maxisus Dependable Capacity (Net MWel:
!!29 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itess Number 3 Through 71 Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
1 t
i This Month Yr.-to-Date Cumulative
!!. Hours In Reporting Period 720.0 4343.0 77712.0
- 12. Number Of Hours Reactor Was Critical 720.0 4006.6 61015.9
- 13. Reactor Reserve Shutdewn Hours
--0--
--0--
- 14. Hours Generator Gn-Line 720.0 3965.4 60026.9
- 15. Unit Reserve Shutdown Hours -
--0--
--0--
- 16. Gross Thersal Energy Generated (MWH) 2431938 13391101 193089904
- 17. Eross Electrical Energy Generated (MWH) 860828 4748891 68448271
- 18. Net Electrical Energy 6enerated (MWH) 817955 4494574 64460127
- 19. Unit Service Factor 100.0 91.3 77.2
- 20. Unit Availability Factor 100.0 91.3 77.2
- 21. Unit Capacity Factor (Using MDC Net) 100.6 91.7 73.3
- 22. Unit Capacity Facter (Using DER Net) 9?.2 90.4 72.4
- 23. Unit Forced Dutage Pate 0.0 E.7 8.8
- 24. Shutdown Scheduled Over Next 6 Motths (Type, Date, and Duration of Each):
Refueling - October 06, 1995 - 39 days i
i
- 25. If Shut Down At End Of Report Period. Estisated Date of Startup:
- 26. Un:ts in Test Status (Prior to Ccssercial Operat:en):
Ferecast Achieved INITIAL CR!ilCALITY INITIAL ELECTRIClif COMMERCIAL OFERATILd T
I OPERATING DATA REPDRT DOCKET ND 50-414 UNIT Catawba 2 BATE July 14. 1995 COMPLETED BY P.A. Willians 1
TELEPHONE 704-382-5346 CONTH June 1995 pal AVERAGE DAILY POWER LEVEL E!!Y, AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net!
I 1139 17
!!44 2
!!36 10
!!43 3
!!!3 19 1141 4
!!36 20 1136 5
!!37 21 1134 6
1139 22
!!35 i
7
!!36 23 1134 l
8 1133 24
!!32 1
9 1137 25
!!32 10
!!38 26
!!31 11
!!32 27
!!30 12
!!35 28
!!32 13
!!H 29
!!33 r
14 1147 30 1132 15
!!44
.6
!!44
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET BO.
50-414' UNIT NAME uranua z DATE u //1d/ n REPORT MOITTH June 1995 COMPLETED BY x.
a.
williams TELEPHONE
(/us)-auz-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDO'4NS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( M EG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
-o
F DOCKET: 50-414 UNIT: Catawba 2 Date: 07/14/95 NARRATIVE
SUMMARY
MONTil: June 1995 Catawba Unit 2 beFan the month of June operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346
I I
MQNTIILY REFUELING INFORMATION REOUEST l
1.
Facility name:
Dtawba. Unit 2 2.
Scheduled next refueling shutdown: October 1995 3.
Scheduled restart following refueling: November 1995 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 4_44 8.
Present licensed fuel pool capacity: 14j3 Site of requested or planned increase: - :.
9.
Projected date of last refueling which can be accommodated by present license capacity:
Srptember 2911 DUKE POWER COMPANY DATE: July 14.1995 Name of
Contact:
R. A. Williarns Phone: (7(m - 382-5346 r
_ _ _ _ _ - _ - _ _. _