ML20087L492: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:e ESAEGLAl]S                         U0lVK101 DUKE POWER            MlM9RGN.-
{{#Wiki_filter:e ESAEGLAl]S U0lVK101 MlM9RGN.-
e.o. nox saiso "can ta. Ga. It cruar.orre, x.o. e8242
DUKE POWER e.o. nox saiso "can ta. Ga. It cruar.orre, x.o. e8242
    - HAL B. TUCKER                                                                                   retzenoxz
- HAL B. TUCKER retzenoxz March 16, pg g p 3, 3 7 no4) amsas
_== - -
_== - -
            ==
 
March 16, pg g p 3 , 3 7 no4) amsas s
==
CLASS'FIED BY:
s CLASS'FIED BY:
Mr. -James P. O'Reilly, Regional Administrator NAME;"* um                                     e       p U. S. Nulcear Regulatory Commission                   TITL               dpg
Mr. -James P. O'Reilly, Regional Administrator NAME;"* um e
                                                                                                                    ~
p U. S. Nulcear Regulatory Commission TITL dpg
Region II P. O. Box 2203                                         ORG N!ZATION:A/ uA E            4 mx /g g --
~
Atlanta, Georgia 30301                                 DATE -.f// -sM P F
Region II
                                                                            /             -
/
A uA E mx /g g --
P. O. Box 2203 ORG N!ZATION:
4 Atlanta, Georgia 30301 DATE -.f// M P F
/
-s


==Subject:==
==Subject:==
McGuire Nuclear Station                         7p; Docket Nos. 50-369.-50-370                   AN                                   3 WMON McGuire Security Plan, Revision 19          M
McGuire Nuclear Station 7p; Docket Nos. 50-369.-50-370 AN 3 WMON
                                                                                      ^LL ' 3 L     PD D0 (Ca P BE G       0F A     m   h MAY BE Put;lSHED BY A FINE OR IMPRISORMENT OR BOTH UNDER THE PROVISIONS OF 10 CFR
^LL ' 3 L PD D0 (Ca P McGuire Security Plan, Revision 19 M
        ~  
BE G 0F A m
h MAY BE Put;lSHED BY A FINE OR IMPRISORMENT OR BOTH UNDER THE PROVISIONS OF 10 CFR
~  


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
Pursuant--to 10CFR 50.54(p), please find attached five (5) copies of Revision 19 to the McGuire Nuclear Station Security Plan. Revision 19 Eeflects changes.in vital area barriers and portals'2 the deletion of several interim chapter 10.0 statements concerning't'he interim barrier, deletion of interim drawing MSP 10-00, changes to several final drawings which reflect the Revision 19 text and changes to lock and key control commitments. Revision 19 does not decrease the effectiveness of the McGuire Nuclear Station Security Plan.
Pursuant--to 10CFR 50.54(p), please find attached five (5) copies of Revision 19 to the McGuire Nuclear Station Security Plan. Revision 19 Eeflects changes.in vital area barriers and portals'2 the deletion of several interim chapter 10.0 statements concerning't'he interim barrier, deletion of interim drawing MSP 10-00, changes to several final drawings which reflect the Revision 19 text and changes to lock and key control commitments. Revision 19 does not decrease the effectiveness of the McGuire Nuclear Station Security Plan.
This material is applicable to security provisions at McGuire Nuclear Station; therefore, Duke requests that this material be withheld from public disclosure pursuant to 10CFR 73.21.
This material is applicable to security provisions at McGuire Nuclear Station; therefore, Duke requests that this material be withheld from public disclosure pursuant to 10CFR 73.21.
Very truly yours,           -
Very truly yours,
                                                                          'WHEN SEPARATED FROM ENCLOSURES, HAi CLE THIS 000UMENT AS DECONTROLLE0 W               x               -
'WHEN SEPARATED FROM ENCLOSURES, HAi CLE THIS 000UMENT AS DECONTROLLE0 W
1 B. Tucker JWD:scs Attachments cc: w/one copy of at.tachment)                           (w/o attachment)
x 1 B. Tucker JWD:scs Attachments cc: w/one copy of at.tachment)
Mr. H. R. Denton, Director                         Mr. W. T. Orders Office of Nuclear Reactor Regulation               NRC Resident Inspector U. S. Nuclear Regulatory Commission               McGuire Nuclear Station Washington, D. C. 20555 Attention: Document Control-Desk M{        (E 8403270230 840316                                        $        del         [kt PDR ADOCK 05000369                                                   l A F                   PDR                                                 'l
(w/o attachment)
  $70)(
Mr. H. R. Denton, Director Mr. W. T. Orders Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Washington, D. C.
.                                                                                                                       i}}
20555 M{
(E Attention: Document Control-Desk del
[kt 8403270230 840316 PDR ADOCK 05000369 l
A F
PDR
'l
$70)(
i
.}}

Latest revision as of 14:05, 13 December 2024

Forwards Rev 19 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20087L492
Person / Time
Site: McGuire, Mcguire  
Issue date: 03/16/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8403270230
Download: ML20087L492 (1)


Text

e ESAEGLAl]S U0lVK101 MlM9RGN.-

DUKE POWER e.o. nox saiso "can ta. Ga. It cruar.orre, x.o. e8242

- HAL B. TUCKER retzenoxz March 16, pg g p 3, 3 7 no4) amsas

_== - -

==

s CLASS'FIED BY:

Mr. -James P. O'Reilly, Regional Administrator NAME;"* um e

p U. S. Nulcear Regulatory Commission TITL dpg

~

Region II

/

A uA E mx /g g --

P. O. Box 2203 ORG N!ZATION:

4 Atlanta, Georgia 30301 DATE -.f// M P F

/

-s

Subject:

McGuire Nuclear Station 7p; Docket Nos. 50-369.-50-370 AN 3 WMON

^LL ' 3 L PD D0 (Ca P McGuire Security Plan, Revision 19 M

BE G 0F A m

h MAY BE Put;lSHED BY A FINE OR IMPRISORMENT OR BOTH UNDER THE PROVISIONS OF 10 CFR

~

Dear Mr. O'Reilly:

Pursuant--to 10CFR 50.54(p), please find attached five (5) copies of Revision 19 to the McGuire Nuclear Station Security Plan. Revision 19 Eeflects changes.in vital area barriers and portals'2 the deletion of several interim chapter 10.0 statements concerning't'he interim barrier, deletion of interim drawing MSP 10-00, changes to several final drawings which reflect the Revision 19 text and changes to lock and key control commitments. Revision 19 does not decrease the effectiveness of the McGuire Nuclear Station Security Plan.

This material is applicable to security provisions at McGuire Nuclear Station; therefore, Duke requests that this material be withheld from public disclosure pursuant to 10CFR 73.21.

Very truly yours,

'WHEN SEPARATED FROM ENCLOSURES, HAi CLE THIS 000UMENT AS DECONTROLLE0 W

x 1 B. Tucker JWD:scs Attachments cc: w/one copy of at.tachment)

(w/o attachment)

Mr. H. R. Denton, Director Mr. W. T. Orders Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Washington, D. C.

20555 M{

(E Attention: Document Control-Desk del

[kt 8403270230 840316 PDR ADOCK 05000369 l

A F

PDR

'l

$70)(

i

.