ML20087P594: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:U- 0703 0982-L LO8 (IEB83-08)-84(03-22 )-L | {{#Wiki_filter:U- 0703 0982-L LO8 (IEB83-08)-84(03-22 )-L | ||
.lLLINDIS POWER COMPANY | |||
JP | ' JP CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect: Clinton Power Station Unit 1 IE Bulletin No. 83-08 o | ||
IE Bulletin No. 83-08 o | |||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
This'is in response to the subject IE Bulletin No. 83-08 on the matter of reactor trip breaker failures. Westinghouse DB, Westinghouse DS, General Electric AK-2 or similar breakers with undervoltage trip attachments (UVTA) are not used in safety related applications at the Clinton Power Station. | This'is in response to the subject IE Bulletin No. 83-08 on the matter of reactor trip breaker failures. Westinghouse DB, Westinghouse DS, General Electric AK-2 or similar breakers with undervoltage trip attachments (UVTA) are not used in safety related applications at the Clinton Power Station. | ||
I hereby affirm that the information in this letter is correct to the best of my knowledge. | I hereby affirm that the information in this letter is correct to the best of my knowledge. | ||
Sincerely yours, | Sincerely yours, | ||
. Hall Vice President GEW: lam cc: | |||
G. A. Harrison, NEC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety Director - Office of I&E USNRC, Washington, DC 20555 8404090199 840322 PDR ADOCK 05000461 G | |||
PDR MAR 2 81984 Jeg 1h6 | |||
..}} | |||
Latest revision as of 13:50, 13 December 2024
| ML20087P594 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/22/1984 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 0982-L, 982-L, IEB-83-08, IEB-83-8, U-0703, U-703, NUDOCS 8404090199 | |
| Download: ML20087P594 (1) | |
Text
U- 0703 0982-L LO8 (IEB83-08)-84(03-22 )-L
.lLLINDIS POWER COMPANY
' JP CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect: Clinton Power Station Unit 1 IE Bulletin No. 83-08 o
Dear Mr. Keppler:
This'is in response to the subject IE Bulletin No. 83-08 on the matter of reactor trip breaker failures. Westinghouse DB, Westinghouse DS, General Electric AK-2 or similar breakers with undervoltage trip attachments (UVTA) are not used in safety related applications at the Clinton Power Station.
I hereby affirm that the information in this letter is correct to the best of my knowledge.
Sincerely yours,
. Hall Vice President GEW: lam cc:
G. A. Harrison, NEC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety Director - Office of I&E USNRC, Washington, DC 20555 8404090199 840322 PDR ADOCK 05000461 G
..