ML20092H764: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I d | {{#Wiki_filter:I d | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
DATE | 50-387 gggy4 4 UNIT One 4 | ||
DATE 9/06/95 y | |||
COMPLETED BY R.S. Ball 3 | |||
3 TELEPHONE (717) S42-3453 e | |||
MONTII | i L | ||
DAY | -ita ; | ||
MONTII Aucust 1995 P | |||
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(MWe-Net) 1. | |||
1081 17, 1080 2. | |||
1079 18. | |||
1083 3. | |||
1075 19. | |||
1090 4. | |||
1078 20. | |||
1091 5. | |||
1083 21. | |||
1085 6. | |||
1985 22. | |||
1091 7. | |||
1091 23. | |||
1093 8. | |||
1095 24. | |||
1088 9. | |||
1096 25. | |||
1094 10. | |||
1088 26. | |||
1087 11, 1082 27. | |||
1085 12. | |||
1083 28. | |||
1091 13. | |||
1087 29. | |||
1089 14. | |||
1083 30. | |||
10 1 15. | |||
1076 31. | |||
1086 16. | |||
1076 INSTRUCTION: | |||
On this format, list the average daily unit power level in MWe-Net Ar each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power level in MWe-Net Ar each day in the reporting month. Compute to the nearest whole megawatt. | ||
Page1of1-9509210176 950915 PDR | Page1of1-9509210176 950915 PDR ADOCK 05000387 R. | ||
PDR | |||
j OPERATING DATA REPORT AN 4 @y@ | |||
DOCKET NO. | |||
50-387 UNIT One l:) | |||
7 DATE 9-06-95 E | |||
YRI | COMPLETED BY R.S. Ball W | ||
L J | |||
TELEPHONE (717) S42-3453 h+ | |||
PPat YRI 5 | |||
OPERATING STATUS NOTES: | |||
: 1. Unit Name: Susquehanna Steam Electric Station (Ul) | : 1. Unit Name: Susquehanna Steam Electric Station (Ul) | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
: 3. Licensed Thermal Power (MWt): | Aucust 1995 | ||
: 4. Nameplate Rating (Gross MWe): | : 3. Licensed Thermal Power (MWt): | ||
3441 | |||
: 4. Nameplate Rating (Gross MWe): | |||
1165 | |||
: 5. Design Electrical Rating (Net MWe): 1100 | : 5. Design Electrical Rating (Net MWe): 1100 | ||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
: 7. Maximum Dependabic Capacity (Net MWe): | 1128 | ||
: 7. Maximum Dependabic Capacity (Net MWe): | |||
1090 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Repon, Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Repon, Give Reasons: | ||
None | None | ||
: 9. Power Level To Which Restricted, If Any (Net MWe): | : 9. Power Level To Which Restricted, If Any (Net MWe): | ||
: 10. Reasons For Restrictions, if Any: | None | ||
: 11. Hours in Reporting Period | : 10. Reasons For Restrictions, if Any: | ||
: 12. Number of Hours Reactor Was Critical | N/A This Month Yr.-to-Date Cumulative | ||
: 13. Reactor Reserve Shutdown Hours | : 11. Hours in Reporting Period 744 5.831 107.232 | ||
: 14. Hours Generator On-Line | : 12. Number of Hours Reactor Was Critical 744 4.827.3 84.068.2 | ||
: 15. Unit Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours 0 | ||
: 16. Gross Thermal Energy Generated (MWH) | 0 1.032 | ||
: 18. Net Electrical Energy Generated (MWH) | : 14. Hours Generator On-Line 744 4.805.8 82.560.5 | ||
: 19. Unit Service Factor | : 15. Unit Reserve Shutdown Hours 0 | ||
: 20. Unit Availability Factor | 0 0 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 16. Gross Thermal Energy Generated (MWH) 2.437.773 15.301.864 260.459.734 17, Gross Electrical Energy Generated (MWH) 836.700 5.102.155 85.205.375 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 18. Net Electrical Energy Generated (MWH) 807.865 4.908.332 81.885.292 | ||
: 23. Unit Forced Outage Rate | : 19. Unit Service Factor 100.0 82.4 77.0 | ||
: 20. Unit Availability Factor 100.0 82.4 77.0 | |||
: 21. Unit Capacity Factor (Using MDC Net) 99.6 78 8 73.3 | |||
: 22. Unit Capacity Factor (Using DER Net) 98.7 78.1 72.6 | |||
: 23. Unit Forced Outage Rate 0 | |||
0 7.3 i | |||
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
None | None | ||
: 25. If Shut Down at End of Repon Period, Estimated Date of Startup: | : 25. If Shut Down at End of Repon Period, Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Page1ofI | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
50-337 | |||
+ | |||
UNIT One '- | |||
9 i | |||
l DATE 9-06-95 g | |||
Me* hod of | COMPLETED BY. | ||
i j 1. | R.S. Ball | ||
F. Forced | *IELEPHONE 0 17) 542-3453 REPORT MONTH August 1995 No. | ||
Date Type' Duration Reason Me* hod of Ixensee Component Cause & Corrective Action 2 | |||
Examination | (Ilours) | ||
Shutting Event System Code' to Present Recurrence 8 | |||
Down Reactor Report # | |||
Code' NO REPORT REQUIRED l | |||
i j | |||
1. | |||
2. | |||
3. | |||
4. | |||
F. Forced Reason: | |||
Method: | |||
Exhibit G -Instructions I | |||
S. Scheduled A - Equipment Failure (Explain) l-Manual for Preparation of Data l | |||
B - Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C - Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161) l D - Regulatory Restriction 4-Continuation from presious E - Operator Training & License month 5. | |||
Examination 5-Reduction Exhibit 1 - Same Source F-Administrative 9-Other C-Operational Error (Explain) | |||
H - Other (Explain) | H - Other (Explain) | ||
Page1ofI | Page1ofI | ||
. ~... | |||
SUSQUEHANNA STEAM ELECTRIC STATION i | SUSQUEHANNA STEAM ELECTRIC STATION i | ||
Docket Number: | Docket Number: | ||
None. | 50-388 Date: | ||
9/6/95 Completed by: | |||
R. S. Ball Telephone: | |||
(717) 542-3453 i | |||
Challenaes to Main Steam safety Relief Valves None. | |||
Chanaes to the Offsite Dose Calculation Manual | |||
) | ) | ||
Yes. See Attachment A for changes. | Yes. See Attachment A for changes. | ||
Maior chanaes to Radioactive Waste Treatment Systems None. | Maior chanaes to Radioactive Waste Treatment Systems None. | ||
i | i | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
50-388 UNIT Two ANN 4 DATE 9-06-95 fyp COMPLETED BY R.S. Ball | |||
'P TELEPHONE (7171 542 3453 3 | |||
m | E m | ||
rnvr | rnvr i | ||
p*''Rics8,$ | |||
MONTil | *c M | ||
MONTil Aucust 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | |||
(MWe-Net) 1. | |||
1059 17. | |||
1055 2. | |||
1054 18. | |||
1059 3. | |||
1050 19. | |||
1050 4. | |||
1052 20. | |||
1069 5. | |||
1056 21. | |||
1063 6. | |||
1061 22. | |||
1072 7. | |||
1073 23. | |||
1077 8. | |||
1076 24. | |||
1071 9. | |||
1072 25. | |||
1082 10. | |||
1064 26. | |||
1079 11. | |||
1058 27. | |||
1037 12. | |||
1058 28. | |||
1072 13. | |||
1061 29. | |||
1070 14. | |||
1053 30. | |||
1073 15. | |||
1045 31. | |||
1066 16. | |||
1049 INSTRUCTION: | |||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
Page1ofI l | Page1ofI l | ||
OPERATING DATA REPORT AN 4 | OPERATING DATA REPORT AN 4 DOCKET NO. | ||
50-388 | |||
<h UNIT Two O | |||
7 DATE 9-06-95 E | |||
COMPLETED BY R.S. Ball 9 | |||
YRI Notes: | i L | ||
TELEPliONE (717) 542-3453 0 | |||
+ | |||
c YRI SY Notes: | |||
OfERATING STATUS | OfERATING STATUS | ||
: 1. Unit Name: Susauchanna Steam Electric Station (U2) | : 1. Unit Name: Susauchanna Steam Electric Station (U2) | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
: 3. LicensedThermalPower(MWt): | August 1995 | ||
: 4. Nameplate Rating (Gross MWe): | : 3. LicensedThermalPower(MWt): | ||
3441 | |||
: 4. Nameplate Rating (Gross MWe): | |||
1168 | |||
: 5. Design Electrical Rating (Net MWe): 1100 | : 5. Design Electrical Rating (Net MWe): 1100 | ||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
: 7. Maximum Dependable Capacity (Net MWe): | 1132 | ||
: 7. Maximum Dependable Capacity (Net MWe): | |||
1094 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons: | ||
None | None | ||
: 9. Power Level To Which Restricted, If Any (Net MWe): | : 9. Power Level To Which Restricted, If Any (Net MWe): | ||
: 10. Reasons For Restrictions, if Any: | None | ||
: 11. Ilours in Reporting Period | : 10. Reasons For Restrictions, if Any: | ||
: 13. Number of11ours Reactor Was Critical | N/A This Month Yr.-to-Date Cumulative | ||
: 13. Reactor Reserve Shutdown llours | : 11. Ilours in Reporting Period 744 5.831 92.471 | ||
: 14. Ilours Generator On-Line | : 13. Number of11ours Reactor Was Critical 744 5.701.6 77.888.5 | ||
: 15. Unit Reserve Shutdown llours | : 13. Reactor Reserve Shutdown llours 0 | ||
: 16. Gross Thermal Energy Generated (MWil) | 0 717.9 | ||
: 17. Gross Electrical Energy Generated (MWil) | : 14. Ilours Generator On-Line 744 5.680.6 76.471.3 | ||
: 18. Net Electrical Energy Generated (MW11) | : 15. Unit Reserve Shutdown llours 0 | ||
: 19. Unit Service Factor | 0 0 | ||
: 20. Unit Availability Factor | : 16. Gross Thermal Energy Generated (MWil) 2.519.013 19.301.631 245.344.341 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 17. Gross Electrical Energy Generated (MWil) 819.048 6.300.736 80.475.520 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 18. Net Electrical Energy Generated (MW11) 790.491 6 085.416 77.486.312 | ||
: 19. Unit Service Factor 100.0 97.4 82.7 | |||
: 20. Unit Availability Factor 100.0 97.4 82.7 | |||
: 21. Unit Capacity Factor (Using MDC Net) 97.1 95 4 79.7 | |||
: 22. Unit Capacity Factor (Using DER Net) 96.6 94.9 79.3 23 Unit Forced Outage Rate 0 | |||
26 5.0 | |||
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
Refueline Outage to rJLmmence 9/16/95 with an estimated duration of 50 days. | Refueline Outage to rJLmmence 9/16/95 with an estimated duration of 50 days. | ||
25, if Shut Down at End of Report Period. Estimated Date of Startup: | 25, if Shut Down at End of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPERATION Page1of1 | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS | ||
_-[ | _-[ | ||
$(, | |||
No, | DOCKET NO. | ||
* Code' | 50-388 4 | ||
uNrr T | |||
DATE 9-06-95 COMPIEIED BY R.S. Ball TELEPHONE-(717) 542-3453 REPORT MONTH August 1995 Duration Reason' Method of Licensee System Component | |||
. Cause & Corrective Action - | |||
No, Date Tp (Hours) | |||
Shutting Event Code | |||
* Code' to Prevent Recurrence t | |||
5 Down Reactor Report # | |||
NO REPORT REQUIRED | NO REPORT REQUIRED | ||
.1. | |||
F. Forced | 2. | ||
D - Regulatory Restriction | 3. | ||
Examination | 4. | ||
F. Forced Reason: | |||
Method: | |||
Exhibit G -Instructions S. Scheduled A -_ Equipment Failure (Explain) 1-Manual for Preparation of Data B - Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C - Refueling 3-Automatic Scram Event Report (LER) File (NUREG4161) | |||
D - Regulatory Restriction 4-Continuation from previous E - Operator Tiaining & License month 5. | |||
Examination 5-Reduction Exhibit 1 - Same Source F-Administrative 9-Other G-Operat%'.r.' Error (Explain) | |||
H - Other (Eg ain) | H - Other (Eg ain) | ||
Page1ofI | Page1ofI f | ||
L. | |||
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: | SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: | ||
Chanaes to the Offsite Dose Calculation Manual | 50-387 Date: | ||
Yes. See Attachment A for changes. | 9/6/95 Completed by: | ||
R. S. Ball Telephone: | |||
(717) 542-3453 Challenoes to Main Steam safety Relief Valves None. | |||
Chanaes to the Offsite Dose Calculation Manual Yes. See Attachment A for changes. | |||
Maior chanaes to Radioactive Waste Treatment Systems None. | |||
.i i | .i i | ||
J 4 | J 4 | ||
'j l | |||
4 | |||
4 | |||
m | m 6 | ||
4-en 4 | |||
m,--gr A | |||
-e,a | |||
.n a n4 AeA a | |||
o | |||
.u sa r | |||
--a-. | |||
L k | |||
3 i | 3 i | ||
) | ) | ||
e d | |||
2 5 | 2 5 | ||
4 4 | 4 4 | ||
4 ATTACIIMENT A I | 4 ATTACIIMENT A I | ||
4 1 | 4 1 | ||
.1 M | |||
i n | i n | ||
e}} | e}} | ||
Latest revision as of 11:11, 13 December 2024
| ML20092H764 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/31/1995 |
| From: | Ball R PENNSYLVANIA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17158A899 | List: |
| References | |
| NUDOCS 9509210176 | |
| Download: ML20092H764 (9) | |
Text
I d
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-387 gggy4 4 UNIT One 4
DATE 9/06/95 y
COMPLETED BY R.S. Ball 3
3 TELEPHONE (717) S42-3453 e
i L
-ita ;
MONTII Aucust 1995 P
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
1081 17, 1080 2.
1079 18.
1083 3.
1075 19.
1090 4.
1078 20.
1091 5.
1083 21.
1085 6.
1985 22.
1091 7.
1091 23.
1093 8.
1095 24.
1088 9.
1096 25.
1094 10.
1088 26.
1087 11, 1082 27.
1085 12.
1083 28.
1091 13.
1087 29.
1089 14.
1083 30.
10 1 15.
1076 31.
1086 16.
1076 INSTRUCTION:
On this format, list the average daily unit power level in MWe-Net Ar each day in the reporting month. Compute to the nearest whole megawatt.
Page1of1-9509210176 950915 PDR ADOCK 05000387 R.
j OPERATING DATA REPORT AN 4 @y@
DOCKET NO.
50-387 UNIT One l:)
7 DATE 9-06-95 E
COMPLETED BY R.S. Ball W
L J
TELEPHONE (717) S42-3453 h+
PPat YRI 5
OPERATING STATUS NOTES:
- 1. Unit Name: Susquehanna Steam Electric Station (Ul)
- 2. Reporting Period:
Aucust 1995
- 3. Licensed Thermal Power (MWt):
3441
- 4. Nameplate Rating (Gross MWe):
1165
- 5. Design Electrical Rating (Net MWe): 1100
- 6. Maximum Dependable Capacity (Gross MWe):
1128
- 7. Maximum Dependabic Capacity (Net MWe):
1090
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Repon, Give Reasons:
None
- 9. Power Level To Which Restricted, If Any (Net MWe):
None
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 5.831 107.232
- 12. Number of Hours Reactor Was Critical 744 4.827.3 84.068.2
- 13. Reactor Reserve Shutdown Hours 0
0 1.032
- 14. Hours Generator On-Line 744 4.805.8 82.560.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.437.773 15.301.864 260.459.734 17, Gross Electrical Energy Generated (MWH) 836.700 5.102.155 85.205.375
- 18. Net Electrical Energy Generated (MWH) 807.865 4.908.332 81.885.292
- 19. Unit Service Factor 100.0 82.4 77.0
- 20. Unit Availability Factor 100.0 82.4 77.0
- 21. Unit Capacity Factor (Using MDC Net) 99.6 78 8 73.3
- 22. Unit Capacity Factor (Using DER Net) 98.7 78.1 72.6
- 23. Unit Forced Outage Rate 0
0 7.3 i
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down at End of Repon Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Page1ofI
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-337
+
UNIT One '-
9 i
l DATE 9-06-95 g
COMPLETED BY.
R.S. Ball
- IELEPHONE 0 17) 542-3453 REPORT MONTH August 1995 No.
Date Type' Duration Reason Me* hod of Ixensee Component Cause & Corrective Action 2
(Ilours)
Shutting Event System Code' to Present Recurrence 8
Down Reactor Report #
Code' NO REPORT REQUIRED l
i j
1.
2.
3.
4.
F. Forced Reason:
Method:
Exhibit G -Instructions I
S. Scheduled A - Equipment Failure (Explain) l-Manual for Preparation of Data l
B - Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C - Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161) l D - Regulatory Restriction 4-Continuation from presious E - Operator Training & License month 5.
Examination 5-Reduction Exhibit 1 - Same Source F-Administrative 9-Other C-Operational Error (Explain)
H - Other (Explain)
Page1ofI
. ~...
SUSQUEHANNA STEAM ELECTRIC STATION i
Docket Number:
50-388 Date:
9/6/95 Completed by:
R. S. Ball Telephone:
(717) 542-3453 i
Challenaes to Main Steam safety Relief Valves None.
Chanaes to the Offsite Dose Calculation Manual
)
Yes. See Attachment A for changes.
Maior chanaes to Radioactive Waste Treatment Systems None.
i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-388 UNIT Two ANN 4 DATE 9-06-95 fyp COMPLETED BY R.S. Ball
'P TELEPHONE (7171 542 3453 3
E m
rnvr i
p*Rics8,$
- c M
MONTil Aucust 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
1059 17.
1055 2.
1054 18.
1059 3.
1050 19.
1050 4.
1052 20.
1069 5.
1056 21.
1063 6.
1061 22.
1072 7.
1073 23.
1077 8.
1076 24.
1071 9.
1072 25.
1082 10.
1064 26.
1079 11.
1058 27.
1037 12.
1058 28.
1072 13.
1061 29.
1070 14.
1053 30.
1073 15.
1045 31.
1066 16.
1049 INSTRUCTION:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Page1ofI l
OPERATING DATA REPORT AN 4 DOCKET NO.
50-388
<h UNIT Two O
7 DATE 9-06-95 E
COMPLETED BY R.S. Ball 9
i L
TELEPliONE (717) 542-3453 0
+
c YRI SY Notes:
OfERATING STATUS
- 1. Unit Name: Susauchanna Steam Electric Station (U2)
- 2. Reporting Period:
August 1995
- 3. LicensedThermalPower(MWt):
3441
- 4. Nameplate Rating (Gross MWe):
1168
- 5. Design Electrical Rating (Net MWe): 1100
- 6. Maximum Dependable Capacity (Gross MWe):
1132
- 7. Maximum Dependable Capacity (Net MWe):
1094
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted, If Any (Net MWe):
None
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Ilours in Reporting Period 744 5.831 92.471
- 13. Number of11ours Reactor Was Critical 744 5.701.6 77.888.5
- 13. Reactor Reserve Shutdown llours 0
0 717.9
- 14. Ilours Generator On-Line 744 5.680.6 76.471.3
- 15. Unit Reserve Shutdown llours 0
0 0
- 16. Gross Thermal Energy Generated (MWil) 2.519.013 19.301.631 245.344.341
- 17. Gross Electrical Energy Generated (MWil) 819.048 6.300.736 80.475.520
- 18. Net Electrical Energy Generated (MW11) 790.491 6 085.416 77.486.312
- 19. Unit Service Factor 100.0 97.4 82.7
- 20. Unit Availability Factor 100.0 97.4 82.7
- 21. Unit Capacity Factor (Using MDC Net) 97.1 95 4 79.7
- 22. Unit Capacity Factor (Using DER Net) 96.6 94.9 79.3 23 Unit Forced Outage Rate 0
26 5.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueline Outage to rJLmmence 9/16/95 with an estimated duration of 50 days.
25, if Shut Down at End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITI AL ELECTRICITY COMMERCIAL OPERATION Page1of1
UNIT SHUTDOWNS AND POWER REDUCTIONS
_-[
$(,
DOCKET NO.
50-388 4
uNrr T
DATE 9-06-95 COMPIEIED BY R.S. Ball TELEPHONE-(717) 542-3453 REPORT MONTH August 1995 Duration Reason' Method of Licensee System Component
. Cause & Corrective Action -
No, Date Tp (Hours)
Shutting Event Code
- Code' to Prevent Recurrence t
5 Down Reactor Report #
NO REPORT REQUIRED
.1.
2.
3.
4.
F. Forced Reason:
Method:
Exhibit G -Instructions S. Scheduled A -_ Equipment Failure (Explain) 1-Manual for Preparation of Data B - Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C - Refueling 3-Automatic Scram Event Report (LER) File (NUREG4161)
D - Regulatory Restriction 4-Continuation from previous E - Operator Tiaining & License month 5.
Examination 5-Reduction Exhibit 1 - Same Source F-Administrative 9-Other G-Operat%'.r.' Error (Explain)
H - Other (Eg ain)
Page1ofI f
L.
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
9/6/95 Completed by:
R. S. Ball Telephone:
(717) 542-3453 Challenoes to Main Steam safety Relief Valves None.
Chanaes to the Offsite Dose Calculation Manual Yes. See Attachment A for changes.
Maior chanaes to Radioactive Waste Treatment Systems None.
.i i
J 4
'j l
4
m 6
4-en 4
m,--gr A
-e,a
.n a n4 AeA a
o
.u sa r
--a-.
L k
3 i
)
e d
2 5
4 4
4 ATTACIIMENT A I
4 1
.1 M
i n
e