{{#Wiki_filter:. .               . . . . . . --            .      _ - _ . . -  . . . - ~       ~       . ..    - - _.___        . _ .        .. -
{{#Wiki_filter:..
Peach Bottom Atomic Pow $r Statlin
... - ~
        . v PECO ENERGY                                                                       n ? l a ' * *""
~
Peach Bottom Atomic Pow $r Statlin v
PECO ENERGY n ? l a ' * *""
Delta. PA 17314.9739 717 456 7014 December 15,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Delta. PA 17314.9739 717 456 7014 December 15,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely,
Sincerely,
              . }/w',
. }/w',
Gerald R. Rainey Vice President, Peach Bo om Atomic Power Station l
Gerald R. Rainey Vice President, Peach Bo om Atomic Power Station P# 4J68 GRR/TNM/JGH:lph i
P# 4J68 GRR/TNM/JGH:lph i
enclosures cc:
enclosures cc:                 R.A. Burricelli, Public Service Electric & Gas                                                       l W.P. Dornsife, Commonwealth of Pennsylvania                                                           l R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center l
R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 230037 l
230037                                                                                I
I ccn 9514108 fI e
;              ccn 9514108 9512220031 951130 e
9512220031 951130 g
fI    g PDR       ADOCK 05000277 R..          ._                  .
PDR ADOCK 05000277 R..
PDR
PDR


  . . - . . _ .          . . ~ - _ - . -       . . -      _ - . - -                .      -      -- . - _ -    .      __ - -- .
.. ~ - _ -. -
                        .                              PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS  
PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS  


==SUMMARY==
==SUMMARY==
November 1995 UNIT 2 Unit 2 began the month of November at approximately 95% power. Operation remained at this level until an evaluation allowed power to be raised to 100% midday on November 7. On November 10, power was reduced 600MW for a rod pattem adjustment. On November 11, while increasing power from the rod pattern adjustment, power was held at approximately 750MW to troubleshoot vibration of the "A" reactor feed pump. Unit power returned to 100% and was subsequently reduced to 95%
November 1995 UNIT 2 Unit 2 began the month of November at approximately 95% power. Operation remained at this level until an evaluation allowed power to be raised to 100% midday on November 7. On November 10, power was reduced 600MW for a rod pattem adjustment. On November 11, while increasing power from the rod pattern adjustment, power was held at approximately 750MW to troubleshoot vibration of the "A" reactor feed pump. Unit power returned to 100% and was subsequently reduced to 95%
on November 20 to reduce vibration on the "A" reactor feed pump. Power remained at 95% for the rest of the month.
on November 20 to reduce vibration on the "A" reactor feed pump. Power remained at 95% for the rest of the month.
l l
UNIT @
UNIT @
Unit 3 began the month of November at 100% power. Unit 3 operated at that level until November 6 when a drop in power was experienced during 13 KV bus troubleshooting. Power was retumed                 l to 100% the same day and remained at that level for the rest of the month.
Unit 3 began the month of November at 100% power. Unit 3 operated at that level until November 6 when a drop in power was experienced during 13 KV bus troubleshooting. Power was retumed to 100% the same day and remained at that level for the rest of the month.
l l
l
l l
l l


_ . -    . . -      _.    .      - . _        ~ . , _ -  . .    - - _ - . - - - -          - -
~., _ -
j Attachmant to
j Attachmant to Monthly Operatir'1g Report for November 1995 UNIT 2 REFUELING INFORMATION 1.
* Monthly Operatir'1g     .
Name of facility:
Report for November 1995 I
l l
UNIT 2 REFUELING INFORMATION
: 1.       Name of facility:
Peach Bottom Unit 2 1
Peach Bottom Unit 2 1
: 2.       Scheduled date for next refueling shutdown:
2.
l Reload 11 scheduled for September 15,1996.
Scheduled date for next refueling shutdown:
                                                                                                                                )
Reload 11 scheduled for September 15,1996.
: 3.         Scheduled date for restart following refueling:
)
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for October 20,1996.
Restart following refueling forecast for October 20,1996.
: 4.       Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
N/A If answer is yes, what, in general, will these be?
: 5.       Scheduled date(s) for submitting proposed licensing action and supporting Information:
5.
N/A
Scheduled date(s) for submitting proposed licensing action and supporting Information:
!      6.       Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
N/A 6.
N/A
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
: 7.       The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Coro 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods
(a) Coro 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods


_. .. . _ . _ _ . .                    _ . _ _ _ _ _ _ .      _ ~ . _ _ . _ _ . _ _ _ _ _ _ . _ - _ _ . . _ . _ _          . _ . _ - . _ _ _ _ . _ _ . _ _ _ _ . . . _ _ _
_ ~. _ _. _ _. _ _ _ _ _ _. _ - _ _.. _. _ _
t Dockst No. 50 277
t Dockst No. 50 277 Attachment to Monthly Operating Report for November 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.
            '                                                                                                                                      Attachment to Monthly Operating Report for November 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued)
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
: 8.       The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
: 9.       The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2004 without full core offload capability.
September 2004 without full core offload capability.
September 1998 with full core offload capability.
September 1998 with full core offload capability.
l
l
      -y     . - ,                                          ,                                  ,,,                ,.g-. ,                          e   -
-y
,.g-.
e


1 Docket No. 50-278
1 Docket No. 50-278 Attachmtnt to Monthly Operating Report for November 1995' UNIT 3 REFUELING INFORMATION
* Attachmtnt to         .
- 1.
Monthly Operating Report for November 1995' UNIT 3 REFUELING INFORMATION
Name of facility:
  - 1. Name of facility:
Peach Bottom Unit 3 2.
Peach Bottom Unit 3                                                                                                                                                   ,
Scheduled date for next refueling shutdown:
: 2. Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 15,1997 3.
Reload 11 scheduled for September 15,1997
Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997 4.
: 3. Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997
Will refueling or resumption of operation thereafter require a technical specification change or other -
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other -
license amendment?
license amendment?
N/A If answer is yes, what, in general, will these be?
N/A If answer is yes, what, in general, will these be?
: 5. Scheduled date(s) for submitting proposed licensing action and supporting infarmation:
5.
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Scheduled date(s) for submitting proposed licensing action and supporting infarmation:
N/A
6.
: 7. The number of fuel assemblies (a) In the core and (b) in the spent fuel storage pool:
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
;                (a) Core - 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods
N/A 7.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The number of fuel assemblies (a) In the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l l
                                                                                                                                                                                        \
\\


    ,                                                                                                                            i
i Docket No. 50-278 Attachm:nt to Monthly Operat!ng Report for November 'i995 Page 2 UNIT 3 REFUELING INFORMATION (Continued)
      *
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the 9.
* Docket No. 50-278 Attachm:nt to Monthly Operat!ng Report for November 'i995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.
present capacity:
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 2003 without full core offload capability.
September 1999 with full core offload capability.
September 1999 with full core offload capability.
b i           .
b i


y       .
l y
l 1
1 6VERAGE DGIC# UNI? POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH 80TTOM UNIT'2
6VERAGE DGIC# UNI? POWER LEVEL DOCKET NO. 50 - 277                                                 -                                                      .
't DATE DECEM8ER 15.1995
UNIT PEACH 80TTOM UNIT'2                                                                                                     .        't DATE DECEM8ER 15.1995                                                                                                 *
.p COMPANY PECO ENERGY COMPANY L.
                                                                                                                                                                                  .p COMPANY PECO ENERGY COMPANY                                                                                                                 !
P.
L.     P. HYDRICK                 ,
HYDRICK 8USINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION t
8USINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION                                                                                                 t TELEPHONE (717) 456-4383 5 MONTH NOVEM8ER 1995 DAY   AVERAGE DAILY POWER LEVEL             DAY         -AVERAGE DAILY PdWER LEVEL (MWE-NET)                                       (MWE_ NET) 1                   1039                   17                       1107                                                                                                     f.
TELEPHONE (717) 456-4383 5
2                  1041                     18                       1094 3                   1029                     19                       1107                                                                                                     i I
MONTH NOVEM8ER 1995 DAY AVERAGE DAILY POWER LEVEL DAY
4                    1046                     20                       1062                                                                                                     i l
-AVERAGE DAILY PdWER LEVEL (MWE-NET)
5                    1041                     21                       1042                                                                           -                          -
(MWE_ NET) f 1
t 6                   1037                   22                       1042 7                   1058                   23                       1050 8                   1094                   24                         1042                                                                                                     I 9                   1085                   25                         1042                                                                                                     '
1039 17 1107 2
10                   1065                   26                         1038                                                                                                     >
1041 18 1094 3
11                     789                 27                         1042                                                                                                     l i                                                                                                                                                                                   '
1029 19 1107 i
12                     985                   28                         1034
I 4
1046 20 1062 i
l 5
1041 21 1042 t
6 1037 22 1042 7
1058 23 1050 8
1094 24 1042 I
9 1085 25 1042 10 1065 26 1038 11 789 27 1042 l
i 12 985 28 1034
(
(
13                   1101                   29.                       1041 14                   1096 30                         1034 15                   1097                                                                                                                                                       .
13 1101 29.
1S                   1098 3                                                                                                                                                                                   ;
1041 14 1096 30 1034 15 1097 1S 1098 3
t
t
                                                                                                                                                                                  -h' i
-h i
i
i


              .                        .        - .                                          -                ~
~
l I
l I
i l
i l
AVEROGE DAILV UNIV-POCER LEVEL i
AVEROGE DAILV UNIV-POCER LEVEL i
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 j.
: j.                                                                             _________._                ______...__ . _
DATE DECEMBER 15.1995 COMPANY PECO ENERGY COMPANY L.
DATE DECEMBER 15.1995
P.
;.                                                                    COMPANY PECO ENERGY COMPANY L. P. HYDRICK
HYDRICK
(
(
BUSINESS SERVICES SITE SUPPORT DIVISION
BUSINESS SERVICES SITE SUPPORT DIVISION
]                                                                               PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i                             MONTH NOVEh2ER 1995 3
]
DAY   AVERAGE DAILY POWER LEV;L               DAY         AVERAGE DAILY POWER LEVEL (MwE-NET)                                           (MwE-NET) 1                     1117                     17                           1131 2                     1099                   18                             1114 3                     1113                   19                             1126 4                     1112                   20                             1110 5                     1125                   21                             1119
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i
MONTH NOVEh2ER 1995 3
DAY AVERAGE DAILY POWER LEV;L DAY AVERAGE DAILY POWER LEVEL (MwE-NET)
(MwE-NET) 1 1117 17 1131 2
1099 18 1114 3
1113 19 1126 4
1112 20 1110 5
1125 21 1119
)
)
6                       932                   22                             1118 l
6 932 22 1118 l
.                                7                     1084                   23                           1126 8                     1119                   24                           1122 9                     1115                   25                           1122 l_                             10                     1112                   26                           1118 11                     1125                   27                           1122 i                               12                     1109                   28                         '1114 13                     1120                   29                           1126 4
7 1084 23 1126 8
14                     1124                   30                           1118 15                     1120 16                     1121
1119 24 1122 9
* a O
1115 25 1122 l_
e 4
10 1112 26 1118 11 1125 27 1122 i
m                                                                                                                                                                      9 d
12 1109 28
4
'1114 13 1120 29 1126 4
_._._.____.____________m__                _ _ _          _
14 1124 30 1118 15 1120 16 1121 a
                                                                      -    -                              -m-       -                - + . - -me.- - - - s ~ ,
O 4
e m
9 d
4 m
-m-
- +. -
-me.-
s
~,


              #,          (                       =                                                                                                                                                                                             -                s--s                                                                           a.       s               .m.
(
                                                                                                                                                                                                                                                                                                                                                            .        J'-
=
OPERQTING DOTA REPORT DOCKET NO. 50 - 277                                                                                                                                                                                                                                           .
s--s a.
DATE DECEMBER 15.1995-                                                                                                                                                                                                                                   .
s
COMPLETED BY PECO                                                                                       COMPANY
.m.
                                                                                                                              ----__'NERGY_
J'-
                                                                                                                                                                                                                                                                                                                                                                              }
OPERQTING DOTA REPORT DOCKET NO. 50 - 277 DATE DECEMBER 15.1995-COMPLETED BY PECO COMPANY
L. P. HYDRICK                                                                                                                                                                                                                                   .
----__'NERGY_
BU5INESS SERVICES                                                                                                                                                                                                                               !
}
SITE SUPPORT DIVISION                                                                                                                                                                                                                           i PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
L.
        .-_ .__---..._..                                                                - . . . . - - . . _ - - _ - _ _ _ -- -_.-__.-                                                                                                                                                                                                                                        I 1 UNIT NAME: PEACH BOTTOM UNIT 2                                                         NOTES:                                                                                                                                                                                                                                                                         *
P.
                                      ~           ~~~~~~~~~~~~
HYDRICK BU5INESS SERVICES SITE SUPPORT DIVISION i
: 2. REPORTING PERI 66: AOVEMBER. i995 a                           _.---      _.------ _                        -__
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS I
: 3. LICENSED THERMAL POWER (MWT):                                 3458 4 NAMEPLATE RATING (GROSS MWE):                                     1221
1 UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
: 5. DESIGN ELECTRICAL RATING (NET MWE):                           1119
~
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWk):'.1159               ---                                                                                                                                                                                                                                                                                                  t
~~~~~~~~~~~~
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                         1093
: 2. REPORTING PERI 66: AOVEMBER. i995 a
                                                                                                                                                                                                                                                                                                                                                                            .i
3.
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
LICENSED THERMAL POWER (MWT):
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):                                                                                                                                                                                                                                                                                                                       ;
3458 4 NAMEPLATE RATING (GROSS MWE):
1 i                                                                                                                                                                                                                                                                                                                                                                             i 4
1221
: 10. REASONS FOR RESTRICTIONS. IF ANY:                                                                                                                                                                                                                                                                                                                                       j t
: 5. DESIGN ELECTRICAL RATING (NET MWE):
THIS MONTH                                   VR-TO-DATE                                                                                 CUMULATIVE                                                                                                                                       I i
1119 (GROSS MWk):'.1159 t
. 11. HOURS IN REPORTING PERIOD                                                                       720                                 8.016                                                                                   187.656
6.
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                     720.0                                   8.016.0                                                                               121.979.1
MAXIMUM DEPENDABLE CAPACITY
                                                                              --            _.....                          ---__......_                                                                                      ..=       .--
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
. 13. REACTOR RESERVE SHUTDOWN HOURS                                                                 0.0                                                   0.0                                                                         0.0 a
1093
. i 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
1 i
i
: 10. REASONS FOR RESTRICTIONS. IF ANY:
4 j
t THIS MONTH VR-TO-DATE CUMULATIVE I
i
: 11. HOURS IN REPORTING PERIOD 720 8.016 187.656
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 8.016.0 121.979.1
..=
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
[
[
'                                                                                                                                                                                                                                                                                                                                                                              t 14 HOURS GENERATOR ON-LINE                                                                   720.0                                   8.016.0                                                                               118.019.2                                                                                                                                       I j
a t
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                     0.0                                                   0.0                                                                           0.0
14 HOURS GENERATOR ON-LINE 720.0 8.016.0 118.019.2 I
_-_........_                                  ._____-- - -                                                                              _-- --__....                                                                                                                                            l
j
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                           2.382.922                                   27.329.402                                                                             355.650.285                                                                                                                                         i
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
: 17. c''OSS ELECTRICAL ENERGY GENERATED (MWH)                                           778.100 s
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.382.922 27.329.402 355.650.285 i
                                                                                                                                  '9.022.400                                                                             116.901.790                                                                                                                                         t
: 17. c''OSS ELECTRICAL ENERGY GENERATED (MWH) 778.100
; 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                             755.502                                   8.743.645                                                                             112.186.101 t                                                                           ..-_                -_..                    _...-_-_.---                                                                                --_ ...._...
'9.022.400 116.901.790 s
I PAGE 1 0F 2                                                                                                                                       !
t
                                                                                                                                                                                                                                                                                                                                                                            -k L
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 755.502 8.743.645 112.186.101 I
t PAGE 1 0F 2
- k L
I i
I i
__m  .                   _____._m_____.__              _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _                              _ _ _ . _ _ . _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ m __ _ . _ _ _ ._ _ _ _ _ _ _ _ _ _ __
m
. m m


OPERQTING DQTQ REPORT (CONVINUED)                                                                                                                                               DOCKET NO. 30                                                         ,277                                                                                     .;
.T OPERQTING DQTQ REPORT (CONVINUED)
f s
DOCKET NO. 30
DATE DECEMBER 15.1995                                                                                                                                                                                                         t THIS MONTH                           VR-TO-DATE                             CUMULATIVE
,277 f
: 19. UNIT SERVICE FACTOR                                                                                                                                                                                         100.0                                 100.0                                         62.9                                                                                                                                             ~!
s DATE DECEMBER 15.1995 t
: 20. UNIT AVAILABILITY FACTOR                                                                                                                                                                                   100.0                                 100.0                                         62.9                                                                                                                                               !
THIS MONTH VR-TO-DATE CUMULATIVE
                                                                                                                                                                                            -___.____-_.                            ____...-_---                          ._----..                                  =
)
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                                                                                                                         96.0                                   99.8                                       56.7
~!
: 22. UNIT CAPACITY' FACTOR (USING DER NET)                                                                                                                                                                       93.8                                   97.5                                       55.9
: 19. UNIT SERVICE FACTOR 100.0 100.0 62.9
: 23. UNIT FORCED GUTAGE RATE                                                                                                                                                                                         OO                                     OO                                           23                                                                                                                                             ,
: 20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.9
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
=
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP: N/A                                                                                                                                                                                                                                                                                                                                                                                 i
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.0 99.8 56.7
                                                                                                                                                                                                                                                                                                                                                                                                                                                      -fr
: 22. UNIT CAPACITY' FACTOR (USING DER NET) 93.8 97.5 55.9
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEAATION):                                                                                                                                                                   -FORECAST                         ACHIEVED INITIAL CRITICALITY                                                                                                                                                                           09/16/73                                                                                                                                                                                 .
: 23. UNIT FORCED GUTAGE RATE OO OO 23 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
INITIAL ELECTRICITY                                                                                                                                                                         -02/18/74 COMMERCIAL OPERATION                                                                                                                                                                       -07/05/74                                                                                                                                                                                   i i
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP: N/A i
                                                                                                                                                                                                                                                                                                                                                                                                                                                        ?
-f r
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEAATION):
-FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY
-02/18/74
(
i COMMERCIAL OPERATION
-07/05/74 i
?
I v
I v
r i
r i
i P
i P
PAGE 2 OF 2                                                                                                                                                             l t
PAGE 2 OF 2 l
e - i f
t e - i f
k
k I
                                                                                                                                                                                                                                                                                                                                                                                                                                        .      .. !    I


m _ _ _ - . _                               mm._-m._.._m..                                           m...m_-                           ._m . _ . _.__..m.__m- - _ . .._.. m..____..
m _ _ _ -. _
: m.
mm._-m._.._m..
* L t
m...m_-
OPERATING DATO REPOR7
._m
                                                                                                                                                                                                                                                                                                          =             f k'
_.__..m.__m-m..____..
OOCKET NO 40 - 27S
m.
__.. _=_                     __
L t
                                                                                                                                                                                                                                                                                                          ..        g DATE DECEM8ER 15.1995
OPERATING DATO REPOR7 f
* t i
=
COMPLETED BY PECO ENERGY COMPANY                                                                                                                     ,
k OOCKET NO 40 - 27S g
l L. P. HYDRICM                                                                                                       _}
__.. _=_
BUSINESS SERVICES                                                                                                             I SITE. SUPPORT DIVISION                                                                                                     j PEACH BOTTOM ATOMIC POWER STATION
DATE DECEM8ER 15.1995 i
                                                                                                                                                                ' TELEPHONE                (717)                                                                                                                    -[
t COMPLETED BY PECO ENERGY COMPANY l
3
L.
                                                                                                                                                                                          ...___456-4383_. _ ......__....___.__
P.
I OPERATING STATUS                                                                                                                                                                                                                                                                                                 ;
HYDRICM
: 1. UNIT NAME: PEACH BOTTOM UNIT 3                                                                                                                               NOTES:
_}
                                          ._-_-__._____......._-_...-___.....                                                                                                                                                                                                                                            ?
BUSINESS SERVICES I
: 2. REPORTING PERIOD:                                     NOVEMBER, 1995 t
SITE. SUPPORT DIVISION j
: 3. LICENSED THERMAL POWER (MWT):                                                                                                     3458 p
PEACH BOTTOM ATOMIC POWER STATION
: 4. NAMEPLATE RATING (GROSS MWE):                                                                                                           1221
...___456-4383_. _......__....___.__
_- _- _---.....                                                                                                                                                                                                  t t
-[
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                                                                                 1119
' TELEPHONE (717) 3 I
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159                                                                                                                                                                                                                                                                         ,
OPERATING STATUS 1.
UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
?
: 2. REPORTING PERIOD:
NOVEMBER, 1995 t
3.
LICENSED THERMAL POWER (MWT):
3458 p
4.
NAMEPLATE RATING (GROSS MWE):
1221 t
: 5. DESIGN ELECTRICAL RATING (NET MWE):
1119 t
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159 i
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093 l
i 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE I
: 11. HOURS IN REPORTING PERIOD 720 8.016 183.552 l
i
i
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                                                                                              1093                l                                                                                                                                                        i
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.298.5 120.557.9 6
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
p
: 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 7.284.0 117.163.2 a..
: 10. REASONS FOR RESTRICTIONS. IF ANY:                                                                                                                                                                                                                                                                                    ;
'5.
THIS MONTH                            YR-TO-DATE                          CUMULATIVE                                                                          I
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 11. HOURS IN REPORTING PERIOD                                                                                                                                                720                              8.016                          183.552                                                                    l i
 
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                                                                             720.0                             7.298.5                         120.557.9                                                                       6
==
                                                                                                                                                                                                                            .... __ .....                                                                                p
I
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                                                                                                           0.0                               0.0                                   0.0                                                               '
: 16. GROSS THERMAL ENERGY GENERATCD (MWH) 2.471.160 20.968.885' 347.542.828 I
14 HOURS GENERATOR ON-LINE                                                                                                                                           720.0                             7.284.0                         117.163.2
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.900 6.759.500 113.905.532
_.._....__..                            _. -___.___                        a..         ..._---.                                                                    *
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 800.042 6.478.200 109.319.559 h
'5. UNIT RESERVE SHUTDOWN HOURS                                                                                                                                           0.0                               0.0                                   0.0
PAGE 1 OF 2 i
                                                                                                                                                  ==                     ____            ..._--...___                        _........._.                                                                              I
s
: 16. GROSS THERMAL ENERGY GENERATCD (MWH)                                                                                                                 2.471.160                             20.968.885'                         347.542.828
..m.
______                  ____.....-_.                        __.          _ .....                                                                    I
..1 mm-
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                                                                                                   821.900                           6.759.500                       113.905.532
.e
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                                                                                     800.042                           6.478.200                       109.319.559 PAGE 1 OF 2                                                                         i s
      .    ._.m.       ____.__..___._.1                   _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . .                              _ _ _ _ _ _              _ - _            -      _                  mm-         - . -                    __                                          .e       _          _ _


t OPERQTING DQTA CEPORT (CONTINUED)-                                                           DOCCIET NO. 50 - 278               ,[
t OPERQTING DQTA CEPORT (CONTINUED)-
ls r
DOCCIET NO. 50 - 278
DATE DECEMBER 15.1995                                                                   I
,[
__..__________.______________                                                  .i THIS MONTH                 VR-TO-DATE                       CUMULATIVE                               I t
l s
: 19. UNIT SERVICE FACTOR                                           100.0                             90.9                               63.8
r DATE DECEMBER 15.1995 I
) 20. UNIT AVAILABILITY FACTOR                                     100.0                             90.9                               63.8                       ;
.i THIS MONTH VR-TO-DATE CUMULATIVE I
21 UNIT CAPACITY FACTOR (USING MDC NET)                           101.7                             77.4                               57.5                       t
t
_..__          ____          ____________                                    ...___                          t l 22. UNIT CAPACITY FACTOR (USING DER NET)                           99.3                             75.3                               55.9                       +
: 19. UNIT SERVICE FACTOR 100.0 90.9 63.8
l 23. UNIT FORCED OUTAGE RATE                                           O.0                             2.0                             11.0                       -
)
l                                                     _.__..______                  ____________.                    _        . _ - _ . - - - _ _
: 20. UNIT AVAILABILITY FACTOR 100.0 90.9 63.8 21 UNIT CAPACITY FACTOR (USING MDC NET) 101.7 77.4 57.5 t
24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
t l
: 22. UNIT CAPACITY FACTOR (USING DER NET) 99.3 75.3 55.9
+
l
: 23. UNIT FORCED OUTAGE RATE O.0 2.0 11.0 l
g 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
{
4
4
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP                           N/A
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP N/A h
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):~                 FORECAST                     ACHIEVED                                                 I INITIAL CRITICALITY                                                               08/07/74 INITIAL ELECTRICITY                                                               09/01/74
(
* COMMERCIAL OPERATION                                                             12/23/74 i
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):~
FORECAST ACHIEVED I
INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 i
P h
t i
t i
I t
Y I
PAGE 2 OF 2 e     3
t PAGE 2 OF 2 i
* T b
e 3
T b
.)
.)
4 1
4 1
4 as       .
4 t
A
?
as A


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                         DOCKET NO. 50 - 2T7 UNIT NAME PEACH BOTTOM UNIT 2
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 2T7 UNIT NAME PEACH BOTTOM UNIT 2
                                                                                                                                                                                                                                                                = _ - _ - - - - - - - _ _ _ - - - - - - . . . . . . - - - - .
= _ - _ - - - - - - - _ _ _ - - - - - -...... - - - -.
DATE DECEMBER 15.1995 REPORT MONTH NOVEMBER. 1995                                                                                                                                                           COMPLETED BY PECO. ENERGY COMPANY L. P. HYDRICK' BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
DATE DECEMBER 15.1995 REPORT MONTH NOVEMBER. 1995 COMPLETED BY PECO. ENERGY COMPANY L.
  -----....---.. ----------------------------                                                    ---------------~~--------------- ------........---- ..--... - -___.                                                                                                                                                                                                                                                .
P.
METHOD OF                   LICENSEE                                             SYSTEM COMPONENT ~ CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN                           EVENT                                                     CODE                                                                             CODE         ACTION TO NO.         DATE             (1)) (HOURS)         (2)   REACTOR (3) l               REPORT *                                                                 (4)                                                                       (5)   PREVENT RECURRENCE 13         951111               F         11.0     H           4                                                                                           CM                                                   PUMPEX                       REACTOR FEED PUMP VIBRATION REACTOR NOT SHUT DOWN 11.0 4
HYDRICK' BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
(1)                                   (2)                                                                                                                                                                                       (3)                             (4)
---------------~~--------------- ------........----..--... - -___.
F - FORCED                         REASON                                                                                                                   METHOD                                                                                           EXHIBIT G - INSTRUCTIONS S - SCHEDULED                       A - F.OUIPMENT FAILURE (EXPLAIN)                                                                                           1 - MANUAL-                                                                                   FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                                                                                                 2 - MANUAL SCRAM.                                                                           ' ENTRY SHEETS FOR LICENSEE C - REFUELING                                                                                                           3 - AUTOMATIC SCRAM.                                                                           EVENT REPORT (LER)
METHOD OF LICENSEE SYSTEM COMPONENT ~ CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
D - REGULATORY RESTRICTION                                                                                     .4 - OTHER'(EXPLAIN)                                                                                       FILE (NUREG-0161)
DATE (1))
J                                     E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE                                                                                                                                                                                                                     (5)
(HOURS)
(2)
REACTOR (3) l REPORT *
(4)
(5)
PREVENT RECURRENCE 13 951111 F
11.0 H
4 CM PUMPEX REACTOR FEED PUMP VIBRATION REACTOR NOT SHUT DOWN 11.0 4
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - F.OUIPMENT FAILURE (EXPLAIN) 1 - MANUAL-FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
' ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION
.4 - OTHER'(EXPLAIN)
FILE (NUREG-0161)
J E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
G - OPERATIONAL ERROR (EXPLAIN)
H- OTHER(EXPLAIN)                                                                                                                                                                                                       EXHIBIT I - SAME SOURCE 9
H-OTHER(EXPLAIN)
_ _ _ _ _ . . _ . . _ . . _ - - . _ . _ - _ - - - - . _ _ _ _ _ - _ _ - _ _ - - _ - - - . - _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ - _ _ _ _ _ _                                                  _ _ - _ . _ _ _ _ _ , _ _ . _ _ _ . _ _ - . . - _ - _ _ _ . _ _ _ _ . _ _ _ _ . _ . _ - - _ _ . _ . _ _ . _
EXHIBIT I - SAME SOURCE 9
~


_ . .  -m . m   _ ..    ._m I
-m
. m
._m I
b 4
b 4
I
I f
!                                                      UNIT SHUTDOWNS AND POWER. REDUCTIONS                                                           DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3                                                                                       ,
UNIT SHUTDOWNS AND POWER. REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 l
l                                                                                                                                                                      DA?2 DECEMBER 15.1995 REPORT MONTH NOVEMBER, 1995                                                           COMPLETED BY PECO ENERGY COMPANY                                                                                         '
DA?2 DECEMBER 15.1995 REPORT MONTH NOVEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L.
L.     P. HYDRICK BUSINESS SERVICES                                                                               f SITE SUPPORT DIVISION                                                                           {
P.
HYDRICK BUSINESS SERVICES f
SITE SUPPORT DIVISION
{
PEACH EOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
PEACH EOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
____.._____________.._..___________-                                  -      _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . -                                        =____..__..._._.-______                                         y i
=____..__..._._.-______
          )                     i
y i
                                                            , METHOD OF         -LICENSEE                   SYSTEM COMPONENT                           CAUSE AND CORRECTIVE l                       TYPE DURATION REASON SHUTTING DOWN                 EVENT                     CODE                   CODE                     ACTION TO                                                                                                   I
)
NO.1         DATE               (1)     (HOURS)   (2)   REACTOR (3)         REPORT a                       (4) l                 (5)             PREVENT RECURRENCE.                                                                                                 '
i
;  ________________________________.                                  =                         --
, METHOD OF
                                                                                                                            .______________                                      .__________-                      ______ .____..____.                                      t
-LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l
14         951106                 F         9.0     H           4                                           EB             INSTRU                 13 KV BUS TROUBLESHOOTING.
TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I
NO.1 DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT a (4) l (5)
PREVENT RECURRENCE.
=
t 14 951106 F
9.0 H
4 EB INSTRU 13 KV BUS TROUBLESHOOTING.
}
REACTOR NOT SHUT DOWN I
REACTOR NOT SHUT DOWN I
4 l
4 l
I l                                     9.0 l
I l
(1)                                   (2)                                                                                 (3)                                               (4)
9.0 l
F - FORCED                           REASON                                                                   METHOD                                                   EXHIBIT G - INSTRUCTIONS S - SCHEDULED                         A - EQUIPMENT FAILURE (EXPLAIN)                                           1 - MANUAL                                               FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                                                 ~ 2 - MANUAL SCRAM.                                        ENTRY SHEETS FOR LICENSEE l                                       C - REFUELING                                                           3 - AUTOMATIC SCRAM.                                     EVENT REPORT (LER)
(1)
I                                       D - REGULATORY RESTRICTION                                               4 - OTHER (EXPLAIN)                                         FILE (NOREG-0161)                                                                             '
(2)
l                                       E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE                                                                                                                                 (5)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)
~ 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST l
C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
I D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NOREG-0161) l E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EAPLAIN)
G - OPERATIONAL ERROR (EAPLAIN)
H- OTHER(EXPLAIN)                                                                                                                   EXHIBIT I - SAME SOURCE                                                                           ,
H-OTHER(EXPLAIN)
i e
EXHIBIT I - SAME SOURCE i
5 4
e 4
                                                                                                                                                                                                                                                                  &e.         I 4                   I i
5
                                                                                                                                                                                                                                                                  .          t l
&e.
I I
4 l
i t
r t
r t
i                                                                                                                                                                                                                                                               .        . ,
i I
I
- ~
                                                                . . .                                                                          - ~                       -                                                              _      __.}}
.}}

Latest revision as of 08:27, 13 December 2024

Monthly Operating Repts for Nov 1995 for PBAPS Units 2 & 3
ML20095G938
Person / Time
Site: Peach Bottom  
Issue date: 11/30/1995
From: Hydrick L, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9512220031
Download: ML20095G938 (14)


Text

..

... - ~

~

Peach Bottom Atomic Pow $r Statlin v

PECO ENERGY n ? l a ' * *""

Delta. PA 17314.9739 717 456 7014 December 15,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely,

. }/w',

Gerald R. Rainey Vice President, Peach Bo om Atomic Power Station P# 4J68 GRR/TNM/JGH:lph i

enclosures cc:

R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 230037 l

I ccn 9514108 fI e

9512220031 951130 g

PDR ADOCK 05000277 R..

PDR

.. ~ - _ -. -

PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

November 1995 UNIT 2 Unit 2 began the month of November at approximately 95% power. Operation remained at this level until an evaluation allowed power to be raised to 100% midday on November 7. On November 10, power was reduced 600MW for a rod pattem adjustment. On November 11, while increasing power from the rod pattern adjustment, power was held at approximately 750MW to troubleshoot vibration of the "A" reactor feed pump. Unit power returned to 100% and was subsequently reduced to 95%

on November 20 to reduce vibration on the "A" reactor feed pump. Power remained at 95% for the rest of the month.

UNIT @

Unit 3 began the month of November at 100% power. Unit 3 operated at that level until November 6 when a drop in power was experienced during 13 KV bus troubleshooting. Power was retumed to 100% the same day and remained at that level for the rest of the month.

l

~., _ -

j Attachmant to Monthly Operatir'1g Report for November 1995 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 1

2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1996.

)

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 20,1996.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting Information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Coro 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods

_ ~. _ _. _ _. _ _ _ _ _ _. _ - _ _.. _. _ _

t Dockst No. 50 277 Attachment to Monthly Operating Report for November 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l

-y

,.g-.

e

1 Docket No. 50-278 Attachmtnt to Monthly Operating Report for November 1995' UNIT 3 REFUELING INFORMATION

- 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997 4.

Will refueling or resumption of operation thereafter require a technical specification change or other -

license amendment?

N/A If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting infarmation:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) In the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

\\

i Docket No. 50-278 Attachm:nt to Monthly Operat!ng Report for November 'i995 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the 9.

present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

b i

l y

1 6VERAGE DGIC# UNI? POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH 80TTOM UNIT'2

't DATE DECEM8ER 15.1995

.p COMPANY PECO ENERGY COMPANY L.

P.

HYDRICK 8USINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION t

TELEPHONE (717) 456-4383 5

MONTH NOVEM8ER 1995 DAY AVERAGE DAILY POWER LEVEL DAY

-AVERAGE DAILY PdWER LEVEL (MWE-NET)

(MWE_ NET) f 1

1039 17 1107 2

1041 18 1094 3

1029 19 1107 i

I 4

1046 20 1062 i

l 5

1041 21 1042 t

6 1037 22 1042 7

1058 23 1050 8

1094 24 1042 I

9 1085 25 1042 10 1065 26 1038 11 789 27 1042 l

i 12 985 28 1034

(

13 1101 29.

1041 14 1096 30 1034 15 1097 1S 1098 3

t

-h i

i

~

l I

i l

AVEROGE DAILV UNIV-POCER LEVEL i

DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 j.

DATE DECEMBER 15.1995 COMPANY PECO ENERGY COMPANY L.

P.

HYDRICK

(

BUSINESS SERVICES SITE SUPPORT DIVISION

]

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i

MONTH NOVEh2ER 1995 3

DAY AVERAGE DAILY POWER LEV;L DAY AVERAGE DAILY POWER LEVEL (MwE-NET)

(MwE-NET) 1 1117 17 1131 2

1099 18 1114 3

1113 19 1126 4

1112 20 1110 5

1125 21 1119

)

6 932 22 1118 l

7 1084 23 1126 8

1119 24 1122 9

1115 25 1122 l_

10 1112 26 1118 11 1125 27 1122 i

12 1109 28

'1114 13 1120 29 1126 4

14 1124 30 1118 15 1120 16 1121 a

O 4

e m

9 d

4 m

-m-

- +. -

-me.-

s

~,

(

=

s--s a.

s

.m.

J'-

OPERQTING DOTA REPORT DOCKET NO. 50 - 277 DATE DECEMBER 15.1995-COMPLETED BY PECO COMPANY


__'NERGY_

}

L.

P.

HYDRICK BU5INESS SERVICES SITE SUPPORT DIVISION i

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS I

1 UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:

~

~~~~~~~~~~~~

2. REPORTING PERI 66: AOVEMBER. i995 a

3.

LICENSED THERMAL POWER (MWT):

3458 4 NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119 (GROSS MWk):'.1159 t

6.

MAXIMUM DEPENDABLE CAPACITY

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093

. i 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

1 i

i

10. REASONS FOR RESTRICTIONS. IF ANY:

4 j

t THIS MONTH VR-TO-DATE CUMULATIVE I

i

11. HOURS IN REPORTING PERIOD 720 8.016 187.656
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 8.016.0 121.979.1

..=

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

[

a t

14 HOURS GENERATOR ON-LINE 720.0 8.016.0 118.019.2 I

j

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.382.922 27.329.402 355.650.285 i
17. cOSS ELECTRICAL ENERGY GENERATED (MWH) 778.100

'9.022.400 116.901.790 s

t

18. NET ELECTRICAL ENERGY GENERATED (MWH) 755.502 8.743.645 112.186.101 I

t PAGE 1 0F 2

- k L

I i

m

. m m

.T OPERQTING DQTQ REPORT (CONVINUED)

DOCKET NO. 30

,277 f

s DATE DECEMBER 15.1995 t

THIS MONTH VR-TO-DATE CUMULATIVE

)

~!

19. UNIT SERVICE FACTOR 100.0 100.0 62.9
20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.9

=

21. UNIT CAPACITY FACTOR (USING MDC NET) 96.0 99.8 56.7
22. UNIT CAPACITY' FACTOR (USING DER NET) 93.8 97.5 55.9
23. UNIT FORCED GUTAGE RATE OO OO 23 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP: N/A i

-f r

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEAATION):

-FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY

-02/18/74

(

i COMMERCIAL OPERATION

-07/05/74 i

?

I v

r i

i P

PAGE 2 OF 2 l

t e - i f

k I

m _ _ _ -. _

mm._-m._.._m..

m...m_-

._m

_.__..m.__m-m..____..

m.

L t

OPERATING DATO REPOR7 f

=

k OOCKET NO 40 - 27S g

__.. _=_

DATE DECEM8ER 15.1995 i

t COMPLETED BY PECO ENERGY COMPANY l

L.

P.

HYDRICM

_}

BUSINESS SERVICES I

SITE. SUPPORT DIVISION j

PEACH BOTTOM ATOMIC POWER STATION

...___456-4383_. _......__....___.__

-[

' TELEPHONE (717) 3 I

OPERATING STATUS 1.

UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:

?

2. REPORTING PERIOD:

NOVEMBER, 1995 t

3.

LICENSED THERMAL POWER (MWT):

3458 p

4.

NAMEPLATE RATING (GROSS MWE):

1221 t

5. DESIGN ELECTRICAL RATING (NET MWE):

1119 t

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159 i
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 l

i 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE I

11. HOURS IN REPORTING PERIOD 720 8.016 183.552 l

i

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.298.5 120.557.9 6

p

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 7.284.0 117.163.2 a..

'5.

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

==

I

16. GROSS THERMAL ENERGY GENERATCD (MWH) 2.471.160 20.968.885' 347.542.828 I
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.900 6.759.500 113.905.532
18. NET ELECTRICAL ENERGY GENERATED (MWH) 800.042 6.478.200 109.319.559 h

PAGE 1 OF 2 i

s

..m.

..1 mm-

.e

t OPERQTING DQTA CEPORT (CONTINUED)-

DOCCIET NO. 50 - 278

,[

l s

r DATE DECEMBER 15.1995 I

.i THIS MONTH VR-TO-DATE CUMULATIVE I

t

19. UNIT SERVICE FACTOR 100.0 90.9 63.8

)

20. UNIT AVAILABILITY FACTOR 100.0 90.9 63.8 21 UNIT CAPACITY FACTOR (USING MDC NET) 101.7 77.4 57.5 t

t l

22. UNIT CAPACITY FACTOR (USING DER NET) 99.3 75.3 55.9

+

l

23. UNIT FORCED OUTAGE RATE O.0 2.0 11.0 l

g 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

{

4

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP N/A h

(

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):~

FORECAST ACHIEVED I

INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 i

P h

t i

Y I

t PAGE 2 OF 2 i

e 3

T b

.)

4 1

4 t

?

as A

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 2T7 UNIT NAME PEACH BOTTOM UNIT 2

= _ - _ - - - - - - - _ _ _ - - - - - -...... - - - -.

DATE DECEMBER 15.1995 REPORT MONTH NOVEMBER. 1995 COMPLETED BY PECO. ENERGY COMPANY L.

P.

HYDRICK' BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383


~~--------------- ------........----..--... - -___.

METHOD OF LICENSEE SYSTEM COMPONENT ~ CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1))

(HOURS)

(2)

REACTOR (3) l REPORT *

(4)

(5)

PREVENT RECURRENCE 13 951111 F

11.0 H

4 CM PUMPEX REACTOR FEED PUMP VIBRATION REACTOR NOT SHUT DOWN 11.0 4

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - F.OUIPMENT FAILURE (EXPLAIN) 1 - MANUAL-FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

' ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION

.4 - OTHER'(EXPLAIN)

FILE (NUREG-0161)

J E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H-OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE 9

~

-m

. m

._m I

b 4

I f

UNIT SHUTDOWNS AND POWER. REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 l

DA?2 DECEMBER 15.1995 REPORT MONTH NOVEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY L.

P.

HYDRICK BUSINESS SERVICES f

SITE SUPPORT DIVISION

{

PEACH EOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383

=____..__..._._.-______

y i

)

i

, METHOD OF

-LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l

TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I

NO.1 DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT a (4) l (5)

PREVENT RECURRENCE.

=

t 14 951106 F

9.0 H

4 EB INSTRU 13 KV BUS TROUBLESHOOTING.

}

REACTOR NOT SHUT DOWN I

4 l

I l

9.0 l

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)

~ 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST l

C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

I D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NOREG-0161) l E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EAPLAIN)

H-OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE i

e 4

5

&e.

I I

4 l

i t

r t

i I

- ~

.