ML20095L146: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ - _ - _ _ . __
{{#Wiki_filter:}}
I i                                ...                .
:              FLORIDA POWER CORPORATION I
CRYSTAL RIVER UNIT 3        .
i I
[g                  SEISMIC EVALUATION REPORT i                              FOR
!                  UNRESOLVED SAFETY ISL UE A-46 PDR Revision 0
 
CONTENTS f
-                                                                                                              Ease 1.-    In trod uction ' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1    Pu rpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2    Plant Description ................................... 1 1.3    Bac kg round . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.4    Report Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
: 2. Safe Shutdown Earthquake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1    Ground Response Spectra .............................. 5 2.2    In-Structure Response Spectrum ....... 1.................                                        6
                                                                                                                  .E Figure 2-1: Design Acceleration Spectra for CR3 . . . . . . . . . . . . . . . . . . . .                  8 Figure 2-2: Maximum Hypothetical Acceleration Spectra for CR3                      .........9 q          Figure 2-3: Response Spectrum for De 'gn for CR3 . . . . . . . . . . . . . . . . .                    10 L/          Figure 2-4: GIP Bounding and Reference Spectra versus CR3 Plant Spectra . .                            11
: 3. Project Team    .........................................12 3.1    Utility Representatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          12 3.2    Seismic Capability Engineers . . . . . . . . . . . . . . . . . . . . . . . . . . .            12 3.3    Third-Party Auditors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            13
: 4. Safe Shutdown Equipment List (SSEL) . . . . . . . . . . . . . . . . . . . . . . . . . .                14 4.1    Basic Criteria and Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . .            14 4.2    Methodology for Developing SSEL . . . . . . . . . . . . . . . . . . . . . . .                  17 4.3    Description of Safe Shutdown Path (s) . . . . . . . . . . . . . . . . . . . . . .              18 4.3.1 Reactor Reactivity Control . . . . . . . . . . . . . . . . . . . . . . . .              18 hm C
 
4.3.2 Reactor Coolant Pressure Control . . . . . . . . . . . . . . . . . . . .        19 4.3.3 Reactor Coolant Inventory Control . . . . . . . . . . . . . . . . . . .        20 4.3.4 Decay Heat Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . .      22 4.4    Electrical and Mechanical Support Systems for Hot Shutdown . . . . . . .              23 4.5    Description of Safe Shutdown Equipment Lists . . . . . . . . . . . . . . . .          27 4.6    Operations Review of SSEL . . . . . . . . . . . . . . . . . . . . . . . . . .      . 29 Figure 4-1:~ Safe Shutdown Alternatives for Reactor Reactivity Control .............................31 Figure 4-2:      Safe Shutdown Alternatives for Reactor Coolant Pressure Control . . . . . . . . . . . . . . . . . . . . . . . . . 32          i Figure 4-3:      Safe Shutdown Alternatives for Reactor Coolant Inventory Control ........................33
        - Figure 4-4:      Safe Shutdown Alternatives for Decay Heat Removal . . . . . . . .          34
: 5. Mechanical and Electrical Equipment Review . . . . . . . . . . . . . . . . . . . . . .      35 5.1    Summary of Review        .................................35                                      .
5.1.1 Seismic Capacity vs. Demand . . . . . . . . . . . . . . . . . . . . . .        35 5.1.2 Equipment Class Descriptions . . . . . . . . . . . . . . . . . . . . . .        36 i                5.1.3 Equipment Anchorages .........................'.                                36 5.1.4 Seismic Interaction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 1
5.2    Instances of Intent but Not Letter of Caveat Met    ...............36                              )
l          5.3    Summary of Outliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
!        Table 5-1      . Response Spectrum Exceedances for Building Elevations . . . . . .          38 Table 5-2        Effective Grade for Plant Structures ..................39 J
Table 5-3        Equipment Intent but Not Letter of PSP Caveat Summary . . . . .            40 l
O 4
Q                                                  i.i l
1
 
Table 5-4      Equipment Outlier Description and Resolution Summary . . . . . .            43 Cy V            Table 5-5      List of Inaccessible Items . . . . . . . . . . . . . . . . . . . . . . . . . 54 Table 5-6      Equipment Class Distribution -
Mechanical and Electrical Equipment .............                  57-
: 6.      Tanks and Heat Exchanger Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 6.1    Summary of Review      ................................58 6.2    Summary of outliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 Table 6-1      Tank and Heat Exchanger Outlier Description and Resolution Summary . . . . . . . . . . . . . . . . . . . . . 60
: 7.      Cable and Conduit Raceway Review . . . . . . . . . . . . . . . . . . . . . . . . . . .
62
: 8.      Plan for Addressing Unresolved Outliers  ........................63
: 9.      Significant or Programmatic Deviations from the PSP . . . . . . . . . . . . . . . .        64
: 10. Third Paity Audit Summary . .    .............................65
: 11. References .    .......      .................................66 Appendix A Resumes for Seismic Capability Engineers Appendix B Composite Safe Shutdown Equipment List (SSEL)
Appendix C Screening Verification Data Sheets (SVDS)
Appendix D Third Party Audit Reports t
I s                                                ill v
                                                                                                                    \
 
        .l.      Introduction 1.1    Purpose                                                                                  (
l The purpose of this report is to document the seismic evaluation performed to address Unresolved Safety Issue (USI) A-46 at Crystal River Unit 3. This evaluation was performed using Florida Power Corporation's Plant Specific Procedure (PSP - Reference 2) for resolving USI A-46. The Plant Specific Procedure used for seismic verification for Crystal River Unit 3 (PSP Revision 1) was formally submitted to the NRC on September 16,1994 (Reference 11).
]
1.2    Plant Description Crystal River Unit 3 is comprised of one nuclear power unit and uses a pressurized water reactor. Babcock and Wilcox designed and furnished the Nuclear Steam Supply System (NSSS) equipment and systems, including the fuel assemblies. Florida Power Corporation contracted with Gilbert / Commonwealth for engineering of the plant.                                            >
l 1.2.1 Site Characteristics                                                                            .
The 4,738 acre site is characterized by a 4,400 foot minimum exclusion radius centered on the Reactor Building; isolation from nearby population centers; sound foundation for structures; an abundant supply of cooling water; an ample supply of emergency power;          j i                and favorable conditions of hydrology, geology, seismology, and meteorology.
I Supply of emergency power at Crystal River Unit 3 include the following sources of electric power:
: a.      The generator has the capability to feed its own auxiliaries.        Upon a trip
:                        separating the substation from the transmission system, the turbine-generator is designed to stay in operation, supplying power to the unit auxiliary buses.
;                b.      Five 230 kv transmission lines - two being fed from Brooksville, two being
;                        supplied from Central Florida, and one from Fort White.
: c.      Either Unit 1,2,4, or 5 at Crystal River Complex.                                    l
: d.      Two' quick starting 3,000 kw diesel-generator units connected to the Engineered      i Safeguards (ES) buses.                                                                l 1.2.2 Power Level                                                                                    i l
,                The operating level of the reactor is 2544 MWt. An application with the NRC is
:                pending to upgrade the power level to 2568 MwT.
.                                                                                                              I O                                                      1
 
t i
i
 
===1.3  Background===
              . Because of the extent of the changes in the requirements for seismic qualification of equipment over the years, the U.S Nuclear Regulatory Commission (NRC) initiated i                Unresolved Safety Issue (USI) A-46, " Seismic Qualification of Equipment in Operating 4                Nuclear Plants," in December 1980. The purpose of USI A-46 is to verify the seismic adequacy of essential equipment in operating plants which had not been qualified in
:                accordance with more recent criteria.
In 1982, the Seismic Qualification Utility Group (SQUG) was formed to develop a
)                practical approach for seismic qualification of equipment in operating plants. The approach developed by SQUG was to use experience with the performance of power plant and industrial equipment in actual earthquakes as the primary basis for evaluating the seismic ruggedness and functionality of essential equipment in nuclear power plants.
In 1983, the NRC issued NUREG 1018 which includes a general endorsement of the use of experience data for verification of the seismic adequacy of equipment in nuclear plants.
In early 1987, the NRC issued Generic Letter (GL) 87-02 (Reference 1) to owners of i                operating nuclear plants which were licensed prior to the development of modern seismic qualification standards. The rxipients of GL 87-02 are referred to as A-46 plants and 4                include Crystal River Unit 3. Essentially, all owners of A-46 plants, including Florida
<                Power Corporation, are SQUG members. GL 87-02 requires plant owners to take action to verify the seismic adequacy of important equipment in their plants. The SQUG approach embodied in the Generic Implementation Plan (GIP)is explicitly recognized by 5
the NRC as the preferred method for accomplishing this objective.
l
: l.              On October 7,1988 Florida Power Corporation sent a letter to the NRC (Reference 9) stating that as a member of EPRI and SQUG, Florida Power Corporation has supported the many efforts on which the GIP is based. Florida Power Corporation further stated that Florida Power Corporation would review the final GIP after approval by the NRC t                and resolution of all outstanding issues. Based on this review, Florida Power j                Corporation stated that they would file a plant-specific response based on generic 4                resolution of USI A-46. In that plant-specific response, Florida Power Corporation said that they may elect not to perform certain aspects of the generic program and may 4                modify aspects based upon suitablejustification including the low seismic hazard existing at Crystal River Unit 3.
In 199.1, the NRC issued Supplement Number 1 to GL 87-02 (Reference 4) which transmitted Supplemental Safety Evaluation Report No. 2 on SQUG GIP, Revision 2, as correct:d on February 14,1992 (Reference 5).
J In mid 1994,- Florida Power Corporation contracted Dr. Paul Smith of the Readiness Operatton and Mr. Harry Johnson of Programmatic Solutions to prepare a document that
> O                                                      2 4
 
I i              provides justification for Florida Power Corporation to deviate from the " letter" of the GIP. This document is titled " Technical Basis for the Crystal River Unit 3 Plant Specific      l j                Procedure to Resolve NRC Generic Letter 87-02", Reference 6.                                    l
(                                                                                                                (
j                  From this report, Florida Power Corporation prepared a " Plant Specific Procedure (PSP)          I j                for Seismic Verification of Nuclear Plant Equipment," (Reference 2). This document has l                been forwarded to the NRC on August 27, 1994. The NRC subsequently issued a Request for Information, Reference 7. Florida Power Corporation provided a response to the Request for Information (Reference 10) and transmitted Revision 1 of the PSP
;                (Reference 11) which includes changes identified in Reference 10 to the Nuclear Regulatory Commission.
1.4 Report Organization s
The remaining sectior.; of thi treport are organized in accordance with Section 9.4 of the j                  PSP, Reference 2. These sectiens include the following:                                        ,
e  In Section 2, " Safe Shutdown Earthquake", the Crystal River Unit 3 Ground i
Response Spectra (GRS) and In-Structure Response Spectra (IRS) are described, i                            The bases for determining how seismic demand is determined for each equipment
[                            are provided in Section 5, and documented on the Screening Verification Data Sheets (SVDS) forms in Appendix C in this report.
e  In Section 3, " Project Team", the Crystal River Unit 3 project team is described.
l 7j                          Resumes for Seismic Capability Engineers (SCE) are included in Appendix A of
;.                          this report.
'r e  In Section 4, " Safe Shutdown Equipment List," there is information describing
!                            the safe shutdown path selection, plant operation procedures used, and Crystal
!                            River Unit 3 Operations Department review of the SSEL. The list of equipment on the SSEL is included in Appendix B.                                      ,
!
* In Section 5, " Mechanical and Electrical Equipment Review," screening l                            verification and walkdown results for mechanical and electrical equipment are
!                            discussed, in addition to the SVDS forms provided in Appendix C. Instances in which the use of a caveat is met without meeting the specific wording of the l                            caveat rule are identified. A summary of outliers and their resolution is provided.
;                          e In Section 6, " Tanks and Heat Exchanger Review," results of the tanks and heat l                            exchanger review are described, including instances in which the intent, of a i                            caveat is met. A summary of outliers and their resolution is provided, e In Section 7, " Cable and Conduit Raceway Review," a summary is provided of f
f the method used for the Crystal River Unit 3 PSP.
o                                                                    a e
i
 
I e- In Section 8, " Plan for Addressing Unresolved Outliers," the plan and schedule for addressing the remaining outliers is provided.
e  In Section 9, "Significant or Programmatic Deviations from the PSP," a statement is made that no significant or programmatic deviations from the Crystal River Unit 3 PSP are made, e  In Section 10, " Third-Party Audit Summary", the audit is summarized, including resolution of recommendations made by the auditor during the initial audit. The audit report is included in Appendix D.                                                      l 4
O O                                            4
 
f
!              2.      Safe Shutdown Earthquake O
lV 2.1  ' Ground Response Spectra 1                      This section gives information on the Crystal River Unit 3 Ground Response Spectra.
I                      The following information comes directly from the Crystal River Unit 3 Final Safety Analysis Report (FSAR - Reference 8).
'                      "The nearest faulting occurs at a distance of three miles to the east of the site.
7 Stratigraphic correlation and continuity of seismic refraction profiles negate the possible i                      existence of subsurface faults at the site."
j
                        ... The seismic study was performed by Weston Geophysical Research, Inc., who conducted a thorough literature search and examined available seismographs to determine
;                      the epicentral distribution of earthquakes in the southeastern United States, their focal depth, intensity and/or magnitude, and attenuation characteristics. Regional tectonics and
;                      fault patterns were investigated for possible association with known epicenters. This study indicated that the State of Florida is seismically inactive, and that the closest area to the site of significant seismic activity is Charleston, South Carolina. Attenuation data available for this area indicates that the site experienced an observed intensity no higher i                      than Intensity V (Modified Mercalli). The maximum ground motion at the site due to              <
this earthquake probably did not exceed 0.025g. For design purposes the maximum ground acceleration was assumed to be 0.05g. Response spectra were developed for the site normalized for a maximum ground motion of 0.05g and based upon a large                    j
  'O-                  earthquake in the Charleston, South Carolina region and moderate earthquakes in Florida."
1 "2.5.4 SEISMOLOGY" I                      "The seismicity analysis and response spectra were conducted by Weston Geophysical i-                    Research, Inc. Reverend Daniel Linehan, S.J., Director of Weston Observatory, acted
:                      as consultant on the seismicity analysis. The response spectra was completed by Dr.
:                      Allin Cornell, Department of Civil Engineering, Massachusetts Institute of Technology."
4 "2.5.4.1 Seismicity Analysis"
!'                      "The State of Florida is an area which is consistently seismically inactive. In a 300-year history, only eight earthquakes of Intensity IV (Modified mercalli) er greater have had
: j.                    their epicenters located within the State. No carthquake is known to have occurred within 50 miles of the plant site."
j                      "The two strongest earthquake to have affected the site area in north central Florida, 1                      were the North Florida Earthquake of January 12,1879, listed as Modified Mercalli VI; and the Charleston, South Carolina Earthquake of 1885 which had an epicentral intensity
;                                                                  5
 
4
:                      X, Modified Mercalli. There is no evidence that seismic activity in the southern n                  Appalachians or in the Greater Antilles Islands of the West Indies had any effect on the U                  Crystal River site."
                        "An attenuation curve or earthquake intensity with distance for the Atlantic and Gulf
                      ~ Coastal Plains indicates rather slow attenuation ofintensity with distance, due apparently to the deep Cretaceous sediment areas of the Coastal Plains regions. Based upon this
'                      attenuation data, the Florida earthquake of 1879 would have produced an intensity no higher than the Modified Mercalli IV at the site; and the Charleston earthquake of 1885 would have had an intensity no higher than V at the Crystal River site."                        l
  '                                                                                                                      l i
                        " Based upon the relationship between earthquake intensity and ground acceleration given        ;
I in Nuclear Reactors and Farthqukes TID-7024, United States Atomic Energy
;                      Commission, the Charleston, South Carolina earthquake would have resulted in a ground acceleration of approximately 0.025g at the site. A design value of 0.05g, or double the estimated acceleration from the history of the site, is considered conservative."
                        "2.5.4.2        Resoonse Spectra"                                                      ,
                        "The complete design response spectra was developed for the maximum ground acceleration of 0.05g, and considered earthquake magnitude and duration, epicentral i                      distance and focal depth, the intervening material through which the seismic waves          ~
propagate,and geologic conditions local to the site."
                        "The shapes of the spectra were estimated by two methods, one adjusting the average strong motion spectra for moderate distances computed by Housner, and another by 3
application of a method developed by Estere and Rosenbleuth. The resulting design response spectra represent the estimated spectra coinciding with established ground acceleration level of 0.05g, and are shown on Figures 2-35 and 2-36. Seismic design
;                        spectra for maximum hypothetical earthquake is shown in Figure 2-37."
2.2            In-Structure Response Spectrum The buildings containing SSEL equipment are the following:
: 1. Reactor Building: Post-tensioned concrete shell exterior with reinforced concrete and steel frame interior structures.
: 2.      Auxiliary Building:      Reinforced concrete building with steel roof support structure. Interior reinforced concrete and steel frame structures.
: 3.      Control Complex: Reinforced concrete building with interior reinforced concrete and steel frame structures.
: 4.      Emergency Diesel Generator Building: Reinforced concrete building with interior n          reinforced concrete and steel frame structures.
(_) 5.      Intermediate Building: Reinforced concrete building with interior reinforced                      ,
concrete and steel frame structures.
: 6.      Emergency Feedwater Tank
 
==Enclosure:==
Reinforced concrete building with interior reinforced concrete and steel frame structures.
: 7.      Turbine Building: Steel frame building with interior concrete and steel frame structures.
Prior to 1973, in accordance with industry practices, major components and equipment for Crystal River Unit 3 were qualified using a response spectrum equivalent to the Ground Response Spectrum (GRS) scaled by a structural response factor. In 1973, Floor Response Spectra (FRS) were developed for all plant buildings at major floor elevations.
They were developed using a response spectrum technique outlined by Biggs and Roesset in 1969 in a technical paper " Seismic Analysis of Equipment Mounted on Massive Structure."
The Crystal River Unit 3 in-structure spectra are less than the SQUG Reference Spectrum, except around about 11 Hz to 19 Hz at Auxiliary Building elevation 162 (67 feet above free field) and at the Reactor Building elevations above 160 feet (65' above r  free field), see Figure 2-4 and about 9Hz and higher of the interior concrete of the
(  Reactor Building for elevation 160 and higher. Only two SSEL items in the Reactor Building (RCV-10 and RCV-11) are above this elevation. Only four SSEL items in the Auxiliary Building (one solenoid valve (Class 8B), one flow transmitter (Class 18), and two air handler associated items (Class 10)) are located at elevations where the Crystal                  :
River Unit 3 in-structure spectra exceed the SQUG Reference Spectra. These six items                      !
. are considered as outliers to be treated later.
d O                                            '
I
 
i 4
4 m
                                                                                                                                \
i
:O i
a i
i-d l-C.3    -
t W
h                        ~
O.25  -                                                                                                      8 i
I                                                                                            values of Percent of                l i
t Critient Damping'
\
O*2 I'$
                        ~
N                                                          o%
j                        -
I w                -
0.5 %                      i O
0.15  -
l 1
I                        "
I%                        '
10      4 e                :                                                                          =*
i-h a.
0.1                            #
s f  C                            %                        v% s
_'                                % 10%                                            ;
;                  0.05
[        m                                          w 2o%
i l                                    ,        ,                .        .                        '
0                                                    0.8                      1.0 0          0.2      0.4              0.6 UNDAMPED PERIOD            (Se c.)
;      Figure 2-1: Design Acceleration Spectra for CR3
:O                                                          =
 
4 l%  O                                                                                                                                l 1
1 i
O. 6    -
!                        .                                                                                                          l i
i                        -
J
.                                                                                    YALUES OF PERCENT OF l                0. 5    -
CRITICAL DAMPlNG 4              -
1              M          -
2 a          .
!              E
: 0. 4    -
1 O          -                                                                                            05 i
U w  n,
                          .                                                                                            0.55 d
1 W
y wew      =
l l
!              *          -                                                                                            15 s                                                                                                                                    l i              a          -
              =          "
1 4
              =                                                                                                      25            1 C 0. 2 w          -
i i
4
              *          -                                                                                            55            1 l-75 l                              f                                                                                      105 i
0.1    -
                                        ~
N205                  -
1 i                                                                                                                                    !
0          '              '                                                                                  l l                        0      0. 2        0. 4                0. 6    0. 8                                    1. 0              ;
UNDAMPED PERIOD (SEC. )
1
:                                                                                                                                    1 1-
!                                                                                                                                    1 I                                                                                                                                    I
      . Figure 2-2: Maximum Hypothetical Acceleration Spectra for CR3                                                                j l                                                                                                                                    )
i.
!b l
s l
;                                                                                                                                    l V
 
    -                            - -        . .    -~ - .            -    - - - . .        --.        _ . - - .. . - . - - -                                ..
i
:O
                    '0                                                                                                                      yo %
                              \        \ \\        \ \\'              N      N //>L/              A      /\ A4 V V A                        E 8l C.5 %
i                  ', <N      \\          \ \\\\                      \ N/N                      A /f                                '
                                                                            ,X//y' / X 4 .,                                    d l /'// Mi s  y,
                            \
                      *                \ \ \\\N\                                                                                              Al i
s      N \ \ \ \\N5//NA/ M /A                                                                              .
Ap2 s s
N s
                                        \ x \ \\\Yk/Y      \ >wsax MAAb                                      <    [\ /d 2
e,                                      vs 9 p\ //
2                              .s N    N            \      \ NX A X 'sA /
~
                            \          \        x w/v?<ve(\ //\ A_s s.
i o v.
                    *          \ \ cPrM/XMMM                                                        MA/
l                        x<\            \ X/49VX XN5Ng s                                                                    //#/V-M2os MN MM*/A''WYG6(                                                                                        M W'T]
i
!        $              s \\dD(/f ( A C/                          '
( /\s              A N Df/ /WV\/                                        :
i C-            <\)9(M/ h/ Nh                            '
XX X N//[/ \/
        >              X/5d                      / V                s                hk WXW / V N I
        .a  -
                  ,. ,  W5 L/ X .              ;\
V 5/\
XNN
                                                              / J    \ /W
                                                                            / g g, Y      s            h/LN              MV    KNN V
y          #
eW #A Y\\W /
I^
'                  '" 'Y A                  VNNW              /        X/                                                                              ~
                        /X ,X
                        /A A        X N'VNNL /M                                            'I /\ X \ ')& M                                        l
!      M                                      Ad\M                                                D<A WoNh                                              j
                  #    //^            s X NNJJ                                                    39 \ X o' Ws'K e la                  /            JL      \ \ Afif                              A          &            o
                                                                                                                                  \#6NX          N
        %          *4
                          /            /    \      \ N))                              /    Y        No*SfN%
                                                                                                            /                          NA      N        I"
                      /        /
'                                                \ M/                                (\ / \ /\o K A                                          \'
                                                                                                                                                  '    N
                            /                    /X/d                              NXN As i^                                            N      N Den \
                        /                  ///                                      W&                                                        \
                'g
                                /// //                      / X \,
(\
                                                                                                                                  \      '
                                                                                                                                            \      '
)
                            /////                    / / \/'%                                    X\\\                                    \
l                    /////                      / / /Mo o i X\                                        \\'\\                            4    'N                  I
                .,///
                  .o2
(        .o3
                                            /      /
                                          .04 .os .os .o7.ooaJ
                                                              /                    9\\\\\\\                                              \
i
                                                                                        .a          3            4            .s .a  .7 a .s i.o I
l Figure 2-3: Response Spectrum for Design for CR3 O
10 i
 
n    !
I                    n h.
g                                      '
N.
                                                                          ?
                                                                          -        $                              ~ ,
0,                                        $*    k.          .      p                                "
E        a
                'J                                k      5
                                                                ~
* 0 2 i.
                                                              .B          a
                                                              $          k E    's
                                                                                                                  ~
8 n      m    <                \
o      8                      \
                                                                  \
g i!
b
                                  ~                                    '
4                          . e k            h
                                                  "                      \N                                        -
m lii g                              \
A.
h                                                            (                    ~
                                                                                                                    ~
u                                                                                    t 8
E                                                                                    &
e C                .
v                2
                                  >            b                                                                . -o 7    -4
                                  ~
8                                                    y
                                                                                                      =
k            5 s
j*                                              e 0
z            ep v              ae          e    -
a            2 5a                $
8 m                                                (
                                  $                                  x                                  f
                                                                                    \
                                                                                    ,                        f
.                                                                                                                ~0
                                                                                                          'f F                                                                  l 9    E 8    F=                                                                            >
W                                                                p n    8                                                                      ~
                                                      *          ~          -                  y    ,        O 3                        a    ;    0    o' 5    $
                                                                  ~
uopej p33y 8
Figure 2-4: GIP &unding and Reference SMctra versus CR3 Plant Spectra f -
v                                                11 r
 
1 i
: 3. Project Team
('~%
(    All Crystal River Unit 3 USI A-46 work was performed by Florida Power Corporation personnel, assisted by outside engineering consultants. The Project team was organized and managed as a combined effort of Florida Power Corporation Licensing Department (Mr. Al Friend) and Structural Engineering (Mr. Glenn Pugh).
Plant walkdowns were performed by Seismic Capability Engineers who meet the training, educational, and experience qualifications of Section 2 of the PSP). Plant walkdowns were performed in the following time frames:
: 1. From April 1994 to June 1994:        Selected equipment in the reactor building
: 2. March 1995: Most accessible non-intrusive walkdowns
: 3. September 1995: Most accessible intrusive walkdowns I
: 4.      March 1996 (planned): Outage walkdown of remaining items inaccessible during previous walkdowns.
Preparation of the Safe Shutdown Equipment List (SSEL) was performed by Florida Power Corporation personnel.
(3  3.1    Utility Representatives V
The overall coordination and responsibility for completion of the A-46 effort was performed by Mr. Al Friend of the CR3 Licensing Department.          Mr. Friend was instrumental in the development of the SSEL. Mr. Friend is the Florida Power Corporation SQUG Representative.
Engineering efforts were lead by Mr. C. Glenn Pugh of the CR3 Structural Engineering Department. Mr. Pugh had responsibility for the preparation of the PSP (Reference 2) and associated Technical Basis Document (Reference 6). Mr. Pugh led one walkdown team and had the responsibility for walkdown implementation and completion. Mr. Pugh is the Florida Power Corporation Alternate SQUG Representative.
Mr. Ken Vogel is the Supervisor of Operations Engineering and was responsible for the Operations review of the SSEL. The review was conducted by Mr. Leon Gagne, an Assistant Shift Supervisor and Licensed Senior Reactor Operator.
3.2    Seismic Capability Engineers The following Florida Power Corporation staff have received the SQUG certified training and meet the requirements for " Seismic Capability Engineer."
12
'v
                                                                                                    .n
 
l                                                                                                              l l                                                                                                              ,
Anthony Petrowsky, Supervisor Nuclear Engineering                                          i
  ~Q                Daniel L. Jopling, Senior Nuclear Structural Engineer Joe A. Iese, Senior Nuclear Structural Engineer i k/
,                  C. Glenn Pugh, Senior Nuclear Structural Engineer
;                  John O. Mascoll, Project Engineer B
Mr. Pugh led one walkdown team with Mr. Mascoll performing the duties of Seismic Capability Engineer for that tes.m.
The following consultants were contracted by Florida Power Corporation to assist in performing the seismic screening walkdown.
I                  Paul Smith, The Readiness Operation, Inc.
3                  Harry Johnson, Programmatic Solutions, Inc.
:                  Donald Rutherford, Programmatic Solutions, Inc.
l          ' Resumes for Seismic Capability Engineers are provided in Appendix A.
3.3    Third-Party Auditors The third-party audit of the Crystal River Unit 3 A-46 work was performed by Mr. Charbel Abou-Jaoude of VECTRA Technologies.
Mr. Abou-Jaoude's resume is provided in Appendix A and his report is in Appendix D.
I l
1 l
l i
1
 
    --  -    --.          _ . . -          -      - .=          --  -            --. ~~.              -
i
      - 4.      Safe Shutdown Equipment List (SSEL)
The SQUG Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment (Reference 5) provides guidance for identifying the various alternate methods,' or paths, to be used in accomplishing the following safe shutdown functions subsequent to a safe shutdown earthquake (SSE):
* Reactor Reactivity Control e      Reactor Coolant Pressure Control j~                e      Reactor Coolant Inventary Control e      Decay Heat Removal 2
The purpose of this section is to document those methods that were used to identify those safe shutdown paths and components that are needed _ to accomplish the four safe
:                shutdown functions at Crystal River Unit 3 (CR3). This section, along with FPC Plant
{                Specific Procedure (PSP) For Seismic Verification of Nuclear Plant Equipment satisfy the SQUG commitment to provid6 a Safe Shutdown Equipment List (SSEL) Report. This j                section includes the Composite SSEL, and Seismic Review Listing as well as the overall approach used to develop them.
i                The methodology used to identify the safe shutdown paths and components is in 4                accordance with the PSP except as noted herein. Using the guidelines provided in the l
PSP, and CR3 operating procedures and flow drawings, FPC has identified those systems and safe shutdown paths which can be used to accomplish the four safe shutdown j                functions. An overview of the basic approach taken to accomplish each of these shutdown functions is shown on Figures 4-1 through 4-4 In addition to the systems i                needed to directly perform the above functions, those support systems that will be needed to conduct a safe shutdown have also been identified herein.
In selecting the paths that could be used to conduct a safe shutdown, FPC reviewed the flow drawings for the systems associated with maintaining the four safe shutdown functions and the Normal and Emergency Operating Procedures for CR3. As a result, i-              the paths selected are similar to those used to shutdown the plant following other events and should result in little, or no, procedural changes for the plant. Operator actions
!                  which may need to be taken to compensate for equipment or system failure, and are considered out of the normal routine, are addressed in Section 4.3.
1 l        4.1      Basic Criteria and Assumptions The methodology used to select the safe shutdown path and equipment needed for a safe i                shutdown function utilizes certain criteria and makes certain assumptions. These criteria i                  and assumptions are identified in the following:
1 14 f
 
i i
;          4.1.1 Generic Criteria and Assumptions                                                                            J The generic criteria and assumptions used to select the safe shutdown paths and
;                  equipment are listed in PSP Sections 3.1.2 and 3.2. Some of the more significant criteria -
and assumptions used are-
: 1. The safe shutdown equipment should not rely upon offsite power. Offsite power may not be available for up to 72 hours following a design basis SSE. All identified equipment needing electrical power should be powered by the diesel generators or station batteries.
: 2. No other extraordinary events or accidents (e.g. LOCAs, HELBs, fires, floods, extreme winds, sabotage) are postulated to occur during the 72 hour period other
;                        than the earthquake itself and loss of offsite power.
t
;                  3. If achieving and maintaining safe shutdown is dependent on a single item of i                        equipment whose failure to perform its active function, either due to seismic loads i                        or random failure, would prevent accomplishment of any of the four essential j                        safe shutdown functions, an alternate path to safe shutdown by use of a different train or a different item of equipment in the same train will be identified for seismic evaluation.
[                  4. The safe shutdown systems chosen are of minimal complexity and effort to operate.
3
: 5. The safe shutdown systems chosen are consistent with the normt.1 and emergency operating procedures which are used to bring the plant to a safe shutdown
:                        condition following a loss of off-site power.
l                  6. Operator action is permitted, if necessary, to accomplish the safe shutdown function provided that sufficient manpower and time are available and proper
:                        procedures are in place.
p j                  7. Prior to the occurrence of an SSE, the unit was assumed to be at normal
;                        operating conditions. That is, the reactor coolant system was at or near normal operating pressure and temperature.
;                  8. If an item of equipment is taken out of service for maintenance, then that item of equipment was considered the single equipment failure.
: 9. The following equipment types are identified for seismic evaluation:
e          Active mechanical and electrical equipment which operates or changes
  ;                                    state to accomplish a safe shutdown function.
i O-o                                                            15 9
 
l e      - Active equipment in systems which support the operation of identified safe
'p                        shutdown equipment; e.g., power supplies, control systems, cooling L/                    systems, lubrication systems.
e        Instrumentation needed to confirm that the four safe shutdown functions have been achieved and are being maintained.
o        Instrumentation needed to operate the safe shutdown equipment.
e        Tanks and heat exchangers used by or in the identified safe shutdown
:                          path. Heat exchangers which are a part of the operating cooling system flow path but not required to function were also included in the evaluation. Additionally, the waste gas decay tanks were included in the j                          evaluation at NRC request to aid in resolution of USI A-40, Seismic Design Basis, for Crystal River 3.
          - 10. The following equipment types are D01 identified for seismic evaluation:
!                e        Equipment which could operate but does not need to operate and which,            r upon loss of power, will fail in the desired position or state without a                          relying on mechanical movement. This type of equipment is defined as passive for the purposes of this section.
!                e        Passive equipment such as piping, filters, and electrical penetration
;                          assemblies.
g                e        Self-actuated check valves and manual valves.
;                e        Major items of equipment in the Nuclear Steam Supply System (NSSS),
their supports, and components mounted on or within this equipment such t
as the reactor pressure vessel, reactor fuel assemblies, reactor intgrnals, j                          control rods and their drive mechanisms, reactor coolant pumps, steam            ,
4                          generators, pressurizer, and reactor coolant piping.
  !          11. Relief valves credited for providing over-pressure protection of a safe shutdown path are considered to be passive and are not included on the SSEL. Only those relief valves which may be challenged (i.e., become active) as a result of a
.                transient during the recovery from the seismic event are included on the SSEL.
  .              Relief valves not included in the above are considered either as an in-line component (such as a manual valve) or would be included with the parent
.                component by the " rule of the box".
: 12. Any equipment not included on the Safe Shutdown Equipment List (SSEL) should be assumed to be not available for plant shutdown.
16 l
1
 
    . .  --        .  -      -    .-        -                            ..    - - - =            .
: 13.      Components selected for use in performing a safe shutdown may include non-safety grade equipment.
4.1.2 Plant Specific Assumptions 1
i              1.      The unit will be brought' to and maintained in a hot standby condition for 72                      i hours following an SSE.          Hot standby is defined by plant Technical                        1 Specifications.
L
: 2.        Redundant components are specified where required to assure that any single failure of an SSEL component can be accommodated by.use of a redundant                            ,
i                          component or train. When applicable, components are specified that are required                    ,
to valve in a redundant train of a filter or heat exchanger assuming the primary train has to be taken out of service.
l                3.        An equipment failure is defined as the loss of the active functional capability of I                          the equipment, not its structural integrity. (e.g., it is not necessary to consider
;                          rupture or leakage of fluid from a valve as a credible failure mechanism).
4                4.        Certain types of equipment are inherently rugged and need not be evaluated for j                          seismic adequacy in the USI A-46 program. This applies to self-actuating check                    '
:                          valves without external actuators, manually operated valves, pressure and temperature gauges, flow elements and other items defined in the PSP.
: 5.        Tanks, heat exchanges, coolers, and other passive components which could fail and affect the safe shutdown function following a SSE are identified for seismic evaluation.
l                6.        Instrumentation, control, and relay cabinets which could fail and affect the safe shutdown function following a SSE are also identified for seismic evaluation.
[
3 Relays associated with safe shutdown equipment are contained in these cabinets i                          and are evaluated (but not specifically identified) as part of the cabinet evaluation.
i
;        4.2    Methodology for Developing SSEL The systems and equipment required for achieving and maintaining the safe shutdown as
!                identified by the PSP are those which provide the following primary functions:
I                                                                                                                            :
: a.        Reactor Reactivity Control
,                b.        Reactor Coolant Pressure Control
: c.        Reactor Coolant Inventory Control
: d.        Decay Heat Removal 2
'O                                                          17
:v                                                                                                                            !
f
 
1 The first step in the process was to identify the systems, both preferred and alternate that f'            would be relied upon to achieve each of these safe shutdown functions. This was accomplished by reviewing Normal and Emergency Operating Procedures, Safe Shutdown System Flow Drawings, Electrical Distribution System Drawings, System Descriptions, and Design Basis Documents. . The knowledge of experienced plant staff was heavily drawn upon for the selection. Once these systems were identified the next step was to identify the required supporting systems. This was performed by reviewing Electrical One-Line Diagrams, Wiring Diagrams, and Normal Operating Procedures.
Once all primary and supporting systems were identified, the next step was to identify the equipment and instrumentation in each system required to achieve the four shutdown                j functions. This was accomplished by reviewing the following documents.
I i                  a.      Electrical one line diagrams
: b.      Elementary wiring diagrams
: c.      Normal operating procedures
: d.      Emergency and abnormal transient procedures
: e.      System design descriptions
: f.      Flow drawings The system components and instrumentation resulting from this document review are identified in the composite SSEL (Appendix B).
4.3    Description of Safe Shutdown Path (s)
The following is a description of the systems and means by which each of the primary safe shutdown functions are accomplished at CR-3 for USI A-46 evaluation. Drawings which illustrate the safe shutdown paths are included in Figures 4-1 to 4-4.
4.3.1' Reactor Reactivity Control (Figure 4-1)
The reactor reactivity control function is necessary to ensure that the reactor core achieves and maintains a subcritical condition following a SSE. The primary method for reactivity control is by the insertion of the control rods into the core shortly after obtaining the signal to shutdown. A second method is the addition of liquid neutron poison (borated water) to the reactor coolant. This method takes a longer time than control rod insertion to make the core subcritical and is not capable of performing a rapid shutdown of the reactor. Therefore, the control rods and associated control rod insertion mechanism are considered the primary means to perform the initial reactivity control function.          .
The primary path for the reactivity control function is con rol rod insertion into the core upon receipt of either a manual or automatic trip sign:1 generated by the Reactor
.                  Protection System. Reactor trip is achieved by removing the power supply to the control
!'                  rods. Breakers to the control rods can be tripped from the control room or locally at the switchgear. No single failure will inhibit the protective action of the rod drive control system. The alternate path for control rod insertion can be achieved by using the trip 18
        ,                                                                                      __ __._ .__ _ _ ___._ _ d
 
t y
!'            push button. The control rod drive motors will lose power following a loss of offsite                  ,
power. This will result in the release and insertion of the control rods. Short-term reactivity control is, therefore, attained.
In addition to control rod insertion, long term reactivity control, if required, can be-
-              established by the addition of borated water from the borated water storage tank (DHT-1) to the Reactor Coolant System (RCS) through the makeup system. Long-term reactivity control is maintained by inventory addition from the DHT-1, which is sufficiently borated to maintain the required shutdown margin.
-              If there is no Reactor Coolant System (RCS) leakage or shrinkage while the plant is maintained in hot standby, long-term reactivity control is maintained by the use of
;.              letdown flow and the use of borated water from the boric acid storage tanks (CAT-5A and CAT-5B). If there is significant RCS leakage and shrinkage of the RCS volume, the make-up tank and DHT-1 will be the water source to achieve the long-term reactivity control. Since make-up pump MUP-1B is selected for the primary path for long-term reactivity control function. Make-up pumps MUP-1A and 1-C are the backup path.
Verification of reactor control rod insertion is accomplished by wide range neutron flux l              monitoring NI-1-A3, NI-2-B3, NI-3-C3, and NI-4-D3. An alternative to measuring 1              neutron flux directly is to measure other parameters which can be used to show that the i              core remains subcritical. Measurements could be made of the position of all the control i              rods, the temperature of the reactor coolant cold leg, and the boron concentration in the reactor coolant system, to assure the reactor remains subcrib.11, i
4.3.2 Reactor Coolant Pressure Control (Figure 4-2) i              The main method of reactor coolant (primary) pressure control is through control of a steam space in the pressurizer. Control of the steam bubble is achieved primarily through the use of pressurizer auxiliary spray and pressurizer heaters. The principal                  1 l              means of decreasing RCS pressure is through the use of pressurizer auxiliary spray valves (RCV-13). To increase pressure, the pressurizer heaters are used. The
:              pressurizer heaters can be powered from the emergency diesel generators in the event of 1              a loss of offsite power. There is sufficient redundancy in the pressurizer heaters and associated power sources such t!iat no single active failure can disable a sufficient number          ;
!              of pressurizer heaters to cause a loss of the pressure control function.
:                An alternate path for reducing the RCS pressure, is to open the PORV (RCV-10). In addition, Pressurizer Code Safety Valves will automatically open to limit RCS pressure below ASME Code allowable limits, however, overpressure protection is not expected                    ;
to be needed in this scenario. During Decay Heat Removal System operation at low pressure, the DHR safety valve provides overpressure protection RCS pressure is also affected by the control of injection of water into the RCS via the
.                MUPS, HPI, or LPI during low pressure operation and by the control of letdown and
                                                              ~
seal water return from the RCS. These operations are discussed in 4.3.3 " Reactor 19 r
 
i I
                                                                                      ..                        l
<                    Coolant Inventory Control". RCS pressure is also affected by the amount of decay heat removal from the RCS. This function is discussed in 4.3.4 " Decay Heat Removal".
cy                                                                                                              !
Process variables which can be measured for monitoring the reactor coolant . system pressure include reactor coolant pressure, reactor coolant temperature or subcooling
;                    margin, and pressurizer level if pressurizer heaters are used for pressure control.
.            4.3.3 Reactor Coolant Inventory Control (Figure 4-3)'
!                    The reactor coolant inventory control function is necessary to assure that the reactor core i                    remains covered so that decay heat can be removed, and to maintain a level in the
!                    pressurizer so that the pressurizer heaters can maintain RCS pressure control during and after the postulated earthquake. Reactor coolant inventory is controlled by isolating the
!                    boundary of the reactor coolant system and supplying water via the make-up system.
Inventory control has 2 elements which should be accomplished:                            i 5
: a.      . Loss of reactor coolant from the reactor coolant system should be minimized.
i
: b.      Sufficient make-up capacity.should be available to compensate for losses due to l
leakage from the reactor coolant system and for fluid shrinkage when the reactor coolant temperature is lowered.
The make-up and letdown functions of the make up and purification system are normally needed to control the reactor coolant inventory and maintain the pressurizer level within
!p V                its operating range. There are 3 make-up pumps and 5 injection paths for the make-up
: i.                    system. Since make-up pump MUP-1B is selected for normal plant operation, make-up
;                    pump MUP-1B and the associated flow path is selected as the primary path. The make-        ;
up tank (MUT-1) and the borated water storage tank (DHT-1) are used as the source of water supply for this system.
:            4.3.3.1          Make-up for Inventory Control (Figure 4-3)                                        ;
The make-up system provides increases in reactor coolant inventory to maintain pressurizer level using either the normal make-up flow path or any of the high pressure seal injection flow paths.
L j                    Make-up pumps MUP-1 A,1B and 1C are aligned for seal injection and normal make-up.
  ;                  At least one make-up pump is required to provide the flow.
MUP-1B is normally operating to provide make-up and seal injection. The make-up i                    pump (s) will initially take suction from the make-up tank MUT-1. Suction will be switched to the borated water storage tank for additional water inventory as the make-up j                    - tank inventory is depleted.-
In addition to providing inventory control, the make-up system supplies water for seal
:p
;v injection, the preferred method of protecting reactor coolant pump (RCP) seals. If seal injection is not available from the make-up system, another acceptable method of 20                                                l
 
1
                                                                                                                    \
maintaining seal integrity is by providing pump thermal barrier cooling from the Service      j Water system.
(q ,
    ./
4.3.3.2          Letdown for Inventory Control (Figure 4-3)
The letdown capability will greatly simplify reactor inventory control. Manual control        !
j'                    of components is required to achieve and control the letdown flow. Sufficient time is        I available to line up the necessary components. The letdovcn flow path requires the            j l                    letdown coolers, pressure reduction, and the make-up tank and/or borated water storage i                    tank.
l
!                    The Service Water system must be available for the letdown coolers MUHE-1 A, IB, or
!                      IC if letdown is used with reactor coolant temperature above 135'F. If cooling is not available, making letdown impossible, RCP seal injection flow w!!' gradually fill the
;                    reactor coolant system. The seal injection can be isolated by closing valve MUV-16 or by stopping all make-up pumps. MUV-16 will fail to its open position following the loss of instrument air.                                                                            l 1                                                                                                                  !
The supporting systems for the make-up and letdown functions are the decay heat closed        )
cycle cooling system, and the nuclear service closed cycle cooling system. The decay
:                    heat cic sed cooling system provides cooling for pump motor and bearing of the make-up pumps MUP-1 A and IC. If either train of the decay heat closed cycle cooling system is not available, the nuclear services closed cycle cooling water system can be aligned by manual valves to provide cooling for either make-up pump MUP-1A or IC. The
;(                    nuclear services closed cycle cooling system provides cooling for pump motor and bearing of the make-up pump MUP-1B. The cooling system is needed for heat removal from the letdown coolers, and to provide RCP thermal barrier cooling as a backup for reactor coolant pump seal injection.
The RCP seal return capability will minimize the amount of seal water discharging to the reactor building sump and the system will be used ifit is available. Isolation of the seal return and letdown flow will limit the RCS inventory loss. The seal return and letdown lines are isolated by the closing of MUV-018 and MUV-049 respectively. The closure of these valves could be achieved by operator actions from the control room or automatic actions. MUV-018 will fail to its closed position following the loss ofinstrument air and the depletion of its 10 minute backup air accumulator if the operator does not take manual action in this time period. MUV-049 will closs on high letdown cooler outlet temperature, or it will fail closed on loss of instrument air if the operator does not take manual action.
Process variables which can be measured for monitoring the inventory of the reactor i                      coolant system include water level in the pressurizer. If the water level drops below the  i lowest pressurizer level instrument reading (during a potential overcooling transient),    l then the subcooling margin would be monitored until the pressurizer level returned on scale.
:O 21 l
l
 
i l
l 4.3.4 Decay Heat Removal (Figure 4-4)
The decay heat removal function is accomplished by removing decay heat and stored heat from the reactor core and reactor coolant system at a rate such that overall reactor i
coolant system temperatures can be maintained at 532*F for hot standby condition. The
;                    isolation of the secondary side of the steam generators and the use of the sixteen main
                    ' steam safety valves will enable short term decay heat removal. While the reactor coolant l                    system is at high temperature, the steam generators can be used for removing decay heat        j
"                                                                                                                    l from the reactor.
!-                    To remove decay heat via the steam generators, it is necessary to establish natural 4
circulation of reactor coolant between the core and the steam generators. Since the i                    reactor coolant pumps are unavailable due to the loss of offsite power, natural circulation l
normally requires the reactor coolant to be subcooled to minimize void formation within        l the reactor vessel. After natural circulation is established, heat can be removed from          l l
;                    the reactor coolant system by boiling the feedwater on the secondary side of the steam          l l                    generators. The steem generated from this boiling can be discharged to the atmosphere j                    through the main steam atmospheric steam dump valv'es (MSV-025 and MSV-026) to
!                    establish the long-term decay heat removal function. The decay heat removal function is made up of prerequisite conditions that include primary system reactivity, inventory and pressure control to maintain the RCS in a subcooled liquid condition, and secondary
:                      side level and pressure control to provide for adequate heat transfer.
i
! A                  Two (2) atmospheric steam dump valves are available for decay heat removal. Both
!V                    valves are selected as the primary and backup trains for USI A-46. One steam generator t                      and one atmospheric steam dump valve are adequate for decay heat removal. Instrument j                      air is required for control of MSV-025 and MSV-026, and is supplied through the instrument air system. A backup supply of nitrogen is also available. The main steam L                      safety valves (MSSV) also can be used to discharge steam if the secondary side pressure L                      exceeds the MSSV set point. Make-up water can be fed into the secondary side of the            l
!                      steam generators through the Emergency Feedwater System.
.                      Either the turbine driven emergency feed water (EFW) pump EFP-2 along with steam
:                      inlet valves ASV-204 and ASV-005, and associated flow control valves EFV-55 or EFV-            1
!                      56 or the motor driven EFW pump EFP-1 along associated flow control valves EFV-57 or EFV-58 may be used as the path for providing EFW to the Steam Generator, i                      The Emergency Feedwater Tank inventory, the Condensate Storage Tank inventory, and            l the Condensate Hotwell inventory are u:;ed as the source of water for the EFW system j                      and are sufficient to maintain the plant at hot standby for 72 hours.
i                      Process variables which are used for monitoring the decay heat removal function include j                      reactor coolant temperature and pressure. Both the reactor coolant hot leg temperature and the cold leg temperature can be measured during natural circulation decay heat L                      removal conditions to verify that natural circulation is established between the reactor core and steam generators.
;                                                            22 s
 
L L        4.4    Electrical and Mechanical Support Systems for Hot standby 4.4.1 Emergency Diesel Generator Services 1
4              The emergency diesel generators are the alternative on-site power source. The auxiliary systems required to provide emergency services for the emergency diesel generators are the fuel oil, lube oil and jacket water cooling, starting air and room ventilation systems.
All mechanical components located near the diesel generators in the Diesel Generator Building are included as part of the diesel generators.
4.4.2 Electrical Power Distribution Since offsite power is assumed to be lost for 72 hours, the safe shutdown capability must utilize on-site diesel generator power for 72 hours. Hence, the electrical distribution system identified here to support safe shutdown components is essentially the engineered safeguard system. Review of plant procedures and evaluation of the electrical failure of an entire train are performed to determine capability to achieve the four safe shutdown functions.
The following electrical systems are required for achieving the safe shutdown functions:
A.        4160 Volt System G                    The 4160 volt system consists of five (5) switchgear buses. Only 4160 volt ES U                    Buses A and B are class 1E engineered safeguard switchgear and are required for shutdown.
B.      On-site Diesel Generators Two diesel generators are provided for shutdown and are connected to the 4160V ES Buses. Each generator is rated at 3000 KW and has sufficient capacity to supply power to required safe shutdown components. Emergency Diesel Generators are on standby and will start automatically upon loss of 4KV power.
C.      480 Volt System The 480 volt system receives power from the 4160 volt system. T! e 480 volt ES buses comprise 2 redundant class 1E electrical systems and are required for shutdown. The 480 volt plant auxiliary bus is a non-lE bus fed from one of the 4160 volt ES buses.
This bus is can be cross tied to any of the other non-lE 480 volt buses except the 480 volt reactor auxiliary bus 3A. The 480 volt reactor auxiliary bus 3A can be fed from 480 ES bus 3A. Several of the motor control centers fed from both the lE and non-lE buses are required for shutdown operation using normal operating procedures.
Other electrical systems required for safe shutdown functions include:
The 250/125 volt DC system including:
23
                                                                                  -                            8
 
i l                                Batteries - DPBA-1 A, DPBA-1B, and DPBA-1C, Chargers - DPBC-1 A through DPBC-11, and, 1
O                            Distribution panels - DPDP-1 A, -1B, -1C,
                                                      - DPDP-3A and DPDP-3B,
  ,                                                  - DPDP-4B,
"                                                    - DPDP-5A and DPDP-5B, j                                                    - DPDP-6A and DPDP-6B, and i                                                    - DPDP-8A through DPDP-8D; and j
The 120 volt vital power system including:
l                                Inverters - VBIT-1 A, -1B, -1C, -1D and IE, Distribution panels - VBDP-3 through VBDP-11, Regulating transformers - VBTR-2E, i                                                        - VBTR-3E, I                                                        - VBTR-4A through VBTR-4D, J                                Transfer switches - VBXS-1 A through -1E,
                                                    - VBXS-2A and VBXS-2B, and
                                                    - VBXS-3A through -3D; and l
!                          The 120 volt regulated power system including:
i                                Distribution panels - VBDP-1 and - 2, and i                                                    - VBDP-12 through -15, i                                Regulating transformers - VBTR-1 A and -1B, l
                                                          - VBTR-2E and VBTR-3A, and
;                                                        - VBTR-4A through -4D; and The 120/208 volt AC power system including distribution panels -51, -51 and -
68, and associated transfonners.
i
!          4.4.3 Nuclear Service Closed Cycle Cooling Water (NSCCW)
One NSCCW cooling pump (SWP-1A or IB) is required for all modes of operation              .
required for safe shutdown. One of the 4 NSCCW coolers (SWHE-1 A, IB,1C, or 1D) is required for normal NSCCW cooling system operation, but two are normally in service. NSCCW cooling pump SWP-1 A and coolers SWHE-1 A and IB are selected as the primary equipment for safe shutdown and pump SWP-1B and coolers SWHE-1C and ID are the backup equipment. The nuclear service sea water system, supplies cooling water to the NSCCW coolers.
For plant shutdown operations, this system provides cooling to:                            ,
!                  Letdown Coolers (MUHE-1 A, IB, & IC)
:                  Reactor Building Fan Coolers (AHHE-31 A, B, & C)
Reactor Building Fan Motor Coolers (AHHE-32A, B, & C)
Reactor Coolant Pump Seal Area Coolers
    /              Reactor Coolant Pump Motor Coolers (Upper Bearing Cooling, Lower Bearing Cooling, and Air Cooling - RCP-1A,1B,1C & ID) 24
 
Nuclear Service Closed Cycle Cooling Pump Motor Coolers (SWP-1A,1B, & IC)
Nuclear Service Sea Water Pump Motor Coolers (RWP-1, RWP-2A & 2B)                              l Reactor Coolant Pump Seal Return Coolers (MUHE-2A & 2B)
Makeup Pump 1B Motor Cooler (MUP-1B) -
Motor Driven Emergency Feedwater Pump Motor and Gear Oil Coolers (EFP-1)
Spent Fuel Coolers (SFHE-1 A & IB)
Spent Fuel Coolant Pumps Air Handling Units (AHHE-29A & 29B)                                  ;
Control Complex Chillers (CHHE-1 A & IB)                                                      I Instrument Air Compressors (IAP-1 A & IB) when the Secondary Service Closed                    l Cycle Cooling System is unavailable because offsite power has been lost.                      ;
The system is required to operate during hot standby whenever the equipment it is cooling is in operation.                                                                      1 4.4.4 Nuclear Service and Decay Heat Sea Water The Nuclear Service and Decay Heat Seawater Systems are hydraulically separate systems. The Nuclear Service Seawater System cools the Nuclear Service Closed Cycle            ;
Cooling Water System and runs all the time. The Decay Heat Seawater System Cools              !
the Decay Heat Closed Cycle Cooling Water Systems (2 separate trains) and runs only            l when one of those trains is running (mostly only when the Decay Heat Removal System            l is in operation).
4.4.5 Decay Heat Closed Cycle Cooling Water This system provides cooling water to make-up purification pumps MUP-1 A and IC.
Make-up and purification pump, MUP-1B is in operation under normal plant conditions and is provided cooling water by the nuclear services closed cycle cooling water system.
If make-up pump MUP-1B is not available, the use of make-up pump MUP-1A or IC will require that the decay heat closed cycle cooling water system associated with the operating pump be in operation or the nuclear services closed cycle cooling water system valves be manually aligned to provide cooling from that system. The nuclear services closed cycle cooling water system can be aligned by manual valves to provide cooling for either the make-up pump MUP-1A or IC, which is then the normally operating pump.                                                                                          I l
4.4.6 Control Complex Ventilation i
The Control Complex Ventilation Cooling Units (AHHE-05A and 05B) are required for safe shutdown in order to maintain acceptable temperatures within the control room, switchgear, relay rooms, battery charger and battery rooms. These units include fans (AHF-17A, B and 19A, B), chillers (CHHE-1 A and IB) chilled water pumps (CHP-1 A and IB) and associated dampers.
25 i
 
I l        4.4.7 Emergency Feedwater Instrument Cabinet Room Coolers AHHE-43 & 44 are the Emergency Feedwater Initiation and Control (EFIC) System cabinet room coolers. Their heat sink is the Chilled Water System. They are required
!                  to maintain the EFIC electronics operable.
i
!        '4.4.8 Diesel Generator Building Ventilation
;                  Heating and Cooling for the emergency diesel generator (EDG) rooms are separate.
l                  Cooling is provided by one of two fans for each EDG. AHF-22A & B for EGDG-1A i                  and AHF-22C & D for EGDG-1B. The fans auto start when the EDG starts and stay off
;                  otherwise.
1 The jacket coolant and lube oil for the EDG's are both heated so the EDG rooms never
:                  get cold.
;        4.4.9 Instrument Air
!                  The Instrument Air System is on the SSEL. Power for IAP-1 A & IB comes from the 480 volt Reactor Auxiliary Buses which are non-1E, but they can be cross-tied to the ES Buses. Cooling for the compressors can be provided by either the Secondary Services Closed Cycle Cooling Water System (non-safety) or the Nuclear Services Closed Cycle
;                  Cooling Water System. Procedures allow for operation of the instrument air compressors during a loss of off-site power.
.OD p                    In addition, the atmospheric dump valves (MSV-25 & 26) have nitrogen bottles which can be manually valved in to restore operation following a loss ofinstrument air. This could be used in the interim until the electrical and cooling water systems were realigned
;                    to support operation of the Instrument Air System.
4.4.10              Reactor Building Ventilation                                            .
The reactor building ventilation system consists of 3 fan assemblies; AHF-01 A/B/C and associated coolers AHHE-31 A/B/C which cool the containment air volume during normal operation as well as during emergency environmental conditions, should they occur.
Reactor building ventilation is required to maintain suitable and safe ambient conditions for operating equipment, and for instrumentation loops located inside the reactor building. The reactor building heat load is dissipated by the NSCCW System heat exchangers.
4.4.11              Lighting Requirements
: a.      Required Lighting There are no requirements for any permanent lighting. All required lighting supplement will be accomplished with flashlights and portable lights. Both battery powered and O              _ plug-in units connected to a diesel backed outlet will be utilized.
26 i
 
I
: b.      Lighting Verified O
V        The local battery powered light units were originally installed Seismic, anti falldown in l
Category 1 Structures. During the walkdowns these units were generically reviewed for      l interaction concerns by the walkdown teams. The results of this review confirmed that the units would not fall down during an earthquake. Since the unit remains in place it should function as required after the event, providing additional ambient lighting for operations personnel.
4.4.12        Spent Fuel Cooling This system circulates spent fuel pool water through spent fuel coolers (SFHE-1A and IB) to remove the heat generated from irradiated spent fuel stored in the pools. Without cooling for spent fuel pools for an extended period of time, radiological release to the  :
environment could occur. Although control of radiological release as a result of a loss of spent fuel pool cooling is not required by PSP, FPC included the spent fuel pool        j cooling system as a part of the seismic walkdown effort.                                  l a                                1 There are two main spent fuel coolant pumps (SFP-1A and IB) and two spent fuel coolers (SFHE-1 A and IB). Either of the spent fuel coolant pumps may combine with -
either of the spent fuel coolers to cool either spent fuel pool A or spent fuel pool B.
Both pumps and coolers will be used to remove decay heat from spent fuel stored in both pools, if required, and at the time of an entire core offload. During normal long term q        storage of spent fuel in the fuel pools, only one train of the system components will be used to maintain the pools below 135'F.                                                    I V
4.5    Description of Safe Shutdown Equipment List
!            The basic approach and format used for the Safe Shutdown Equipment List (SSEL) is similar to that described in the PSP. The following describes the information included I            in each field in the SSEL. The general SSEL notes and SSEL line items notes are            !
described and included in Appendix B.                                                      l
!                    Entry                          Descriotion of Contents                            !
.            1. SEQ No.                      This column contains a three-digit record number. This    ,
identifies the table sequence number. The sequence        I numbers are sequenced according to the time of entry into the table.
: 2. Train                        This column contains one of the following " train" numbers which serve to group components required to complete the path for the safe shutdown function.
I
: 1. Train 1: can be considered the primary train. Train
,p                                                  i equipment operates from Diesel Generator "A".    ;
V                                              Required by the PSP.
27
 
W Train 2; can be considered the secondary, or 2.
p                                  redundant train. Train 2 equipment operates from Diesel Generator "B". Required by the PSP.
i
: 3. Equipment Class      This column contains a number between 0 and 21. The number corresponds to major equipment class, assigned in the PSP, Table 3-1 which corresponds to the equipment categories included in the seismic experience              ,
data base.                                                          l 1
: 4. Equipment ID          This column contains CR3 equipment identification number.
: 5. Description of        This column contains a brief description of the Equipment            equipment.
: 6. Drawing No.          This column contains the piping or plant general arrangement drawing number (and sheet) which identifies the equipment location.                                  ..
: 7. Building              This column identifies the CR3 building where the equipment is located.
: 8. Floor Elevation      This column contains the elevation of the building floor from which the equipment can be seen.
: 9. Eval. Type            This field assists in manipulating the database. This field contains any one of the following 2 options. (N) - No seismic review needed. "S" - seismic review required to l
ensure seismic adequacy.
I
: 10. Notes                This column may contain a number which identifies a note (applicable to the SSEL) found in Appendix B.
: 11. Normal State        This entry identifies the normal state of the equipment during normal operation of the plant (e.g., open, closed, or o/c) for valves; run or off for pumps, etc.
: 12. Desired State        This entry identifies the desired state of the equipment required for the safe shutdown function.
: 13. Power Reg'd          The POWER RQD Field is used to document the need for electrical oower only and the supply source for that          ,
power        is  documented in the REQ'D                          l INTERCONNECTIONS & SUPPORTING COMPONENTS column along with any other supporting 28
[
 
E 1
i
  ;                                                              system such as Instrument Air (IA) or cooling water O                                                          (NSCCW, DHCCW, etc.).
  *V l                                                                The power required field has been coded "YES" if power is required to move the components to the desired
  ;                                                              position or maintain the component in the desired
  !                                                              position. "NO" has been assigned to those components
!                                                                which are in their desired position and failin that desired j                                                              position or those components which have no electrical 1                                                              mterface.
!                                14. Supporting System            This column contains the flow drawings or electrical
!-                                    Drawing No./ Revision      drawings which identify equipment or the operating and j                                                                control power sources.
: 15. Required Inter-              This column includes the supporting equipment (by -
!                                      connections and            tag) or systems needed by the equipment described j                                      Supporting Components      in this database record to perform its safe shutdowri    ,
:                                                                function. Each supporting or associated component has a separate database record.
l                                The Composite SSEL is included in Appendix B. This list includes all of the equipmen't
;                                identified as being needed for safe shutdown of the plant inchiding equipment which was
;                                reviewed for seismic adequacy.
J 4.6    Operations Department Review of SSEL In accordance with the PSP guidelines, the Safe Shutdown Equipment List (SSEL) t generated for resolution of USI A-46 was reviewed for compatibility with plant j                                procedures for shutdown of the plant. The plant's Operations Department verified the compatibility of the SSEL with the plant's normal and emergency operating procedures.
l                                The purpose of this review was to verify that the operators, following existing plant procedures, will eventually be directed to the use of equipment and instruments on the SSEL even though the operator may have first tried to shut down using equipment not included in the SSEL. Several methods are suggested in PSP Section 3.7 for performing this review. FPC selected a " desk top" review of the flow drawings and applicable procedures to ensure that the plant can be brought to a hot standby condition following an earthquake and maintained there for a minimum of 72 hours. Plant Operations i                                representatives have verified that all equipment required in the operating and emergency
.                                procedures for the selected safe shutdown path are included on the SSEL.
i In the event of an earthquake, plant seismic annunciator alarms will be initiated in the                l control room. Upon receiving a valid alarm, plant alarm and emergency procedures.
AR 303, " ESC Annunciator Response" and AP-961 " Earthquake" direct operators to
: l.  .
      \
manually trip the reactor if the conditions for a reactor trip are met per reactor trip procedure EOP-2, " Vital System Status Verification". If the conditions for a reactor trip 29                                                          !
1 1
i
 
are not met, the procedure directs the operators to verify all control rod and power            ;
  \          distribution parameters are within limits. The procedure also provides general guidance        l to determine overall impact of event on plant equipment. These procedures are adequate for plant response to the seismic event.
4.6.1 Conclusion of Operations Department Review I
FPC concludes that the equipment specified in the SSEL is sufficient to permit bringing the plant to a hot standby condition and maintaining it in that condition for 72 hours using the methodology and requirements contained in the PSP. While some operator actions are required, adequate staffing, direction and time are available to accomplish the required actions. FPC also concludes that the current operation and emergency procedures contain adequate guidance to ensure that safe shutdown can be achieved and maintained if only the equipment on the SSEL is available following a SSE.
O t
1 t
J
    \
Q 30 i                                                                                                        f
 
I t
1 4
O 1
:                                          REACTOR REACTIVlW i                                              CONTROL (PWR) a i
Initici ond Continued Control
!                                                      If CONTROL ROD 4
INSERBON i
;                                      Long-Terrn Control During Cooldown Of Reactor Coolont i
;-                                                      u
(
.                                U                                              u MU      INJECTION                                  HPI  INJECTION OF                                              OF
!                      BORATED WATER                                      BORATED WATER i
if                                              If d
4
' (~  .
Figure 4-1: Safe Shutdown Alternatives for Reactor Reactivity Control
  .                                                31 i
4
 
4 1-i
!O REACTOR COOLANT PRESSURE CC'NTROL (PWR) i                                                                                                                                      1
_ _ _ _ _ _ _ _ _ _ _ _                                              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _            i b                                                                                                                                    l 2
1 Decrease Pressure                                                        i i
;                                  Y                  .u                                                      u            y i
j'                                                                                                                                    ,
PRESSURIZER PRESSURIZER                                        PRESSURIZER      DHR SRV          l
,                        SRV O!SCHG.                                                                                DISCHARGE PORV                                              AUXIUARY
!                      (Al SRV Set Point          DISCHARGE                                                SPRAY (At SRV Set Point ressure Only)                                                                            Pressure Only)
]
;                                  o                  o                                                      u            y 1.
;                                                              Increase Pressure                                                      i i                                                                                          U i                                  If                if                                                    if          If MAKE-UP AND                  HPl                                            PRESSURIZER        LPl FEED PURIFICATION                FEED                                                HEATERS  (Low Press. Only)
SYSTEM i
e f                                                                      1f          N i
i'                                          .
4 i
Figure 4-2: Safe Shutdown Alternatives for Reactor Coolant Pressure Control 32 1                                              -
f
 
4 W
i.
I i
i i
{
REACTOR dOOLANT
_ INVENTORY CONTROL (PWR) l                                                  Feed into System                                                                                    *
}~
y f                                                                          l'                                    jr 1                                .MU                                HPl                                    LPl FEED j                                  FEED                            FEED                                    (L w Press.
q                                                                                                              Only)
}
F                                    U                                    p 4
V                              _          -
:                                                Items To Control To Minimize Discharge From System n
(                            F                                          o
!'                                                                                                                          o
).                  REACTOR COOLANT                    PRESSURIZER                                                    OTHER j
PUMP SEAL                                PORV i                                                                                                                VENTS AND LEAKOFF DISCHARGE                                                  DRAINS i
o n
1 j                                        NORMAL AND                                              PRESSURIZER EXCESS LETDOWN                                              SRV DISCHG.
PATHS                                          (At SRV Set Point
                                                      ,                                          Pressure Only) f 4
jr                    ,
Figure 4-3: Safe Shutdown Alternatives for Reactor Control Inventory Control l
33
/
r.
 
O DEC AY HEAT REMOVAL (PWR).
High Pressure Operation Steam Generator Cooling 9
k                            &
MAIN STEAM                  MAIN STEAW ATW. STEAM                SRV DISCHARGE DUMP valve                (" 5W stT Po#8T OtSCHARGE                  "" M t                              6 o
EMERGJEEDWATER FEED TO STEAu cEN.
Low Pressure Operation 4
6
!                                                                                        DECAY      HEAT j                                                                                      REMOVAL SYSTEM      .
4
                                                                                                                  .                  i DECAY HEAT CLOSED                                  l
;                                                                                  CYCLE COOLING WATER I
i 1r l
NUCLEAR SERVICES AND                                1 DECAY HEAT SEAWATER 1
;                                            it                                                  i t i
l i
Figure 4-4: Safe Shutdown Alternatives for Decay Heat Removal ls 34 i
t f
 
l l
: 5.      ' Mechanical and Electrical Equipment Review 5.1      Summary of Review The seismic screening and walkdown included verification of 727 equipment items in the 20 classes of equipment and the "other" equipment class.
i The review of the seismic adequacy of mechanical and electrical equipment on the i                  Crystal River Unit 3 Safe Shutdown Equipment List was performed in accordance with Section 4 of the PSP (Reference 2). SEWS forms in conformance with the PSP were used to record the screening and walkdown results. All data was recorded in a common database with the SSEL.                                                                  :
i i                  Thirty five (35) items, including 12 tanks, could not be walked down due to              )
inaccessibility. A listing of those items and their status is provided in Table 5-5.
The results of the screening and walkdown are presented in the Screening Verification 4
Data Sheet (SVDS) forms included in Appendix C.                                      1 5.1.1 Seismic Capacity vs. Demand                                                                l i
With the exception of six items of equipment, the Crystal River Unit 3 in-structure response spectrum for all SSEL items is enveloped by the SQUG Reference Spectrum:
The six items of equipment that have in-structure response spectra (calculated by Biggs method) that exceed the SQUG Reference Spectrum are the following:
i Item                    Class          Building              Elevation SF-9-FIT                18            Auxiliary                143' AH-967-SV              8B            Auxiliary                160' AH-196-POS              10            Auxiliary                160' AHD-01D                10            Auxiliary                160' RCV-10                  8B            Reactor                  168' RCV-11        .        8A            Reactor                168' With the exception of the six items identified above, all items of SSEL equipment for Crystal River Unit 3 meet the PSP (and SQUG GIP) capacity / demand requirements.
These six items are classified as Outliers.
i 35
 
d
.      5.1.2 Equipment Class Descriptions The distribution of the equipment items in each equipment class is shown in Table 5-6.
s 5.1.3 Equipment Anchorages The majority of floor mounted mechanical and electrical equipment is mounted on reinforced concrete pads. All reinforced concrete pads are integrally attached to the concrete floors by dowels. Some floor mounted equipment is bolted directly to structural
.              steel frames.
l              The floor mounted electrical enclosures typically have a base which is bolted or welded to the enclosure. For concrete floors the base is anchored either by expansion anchors or by welding to embeds in the concrete pad. For steel floors the base is welded or bolted.
2 The majority of wall and ceiling mounted mechanical and electrical equipment is mounted either by expansion anchors or by use of bolting to Unistrut embeds in the wall.
Where practical, anchor bolts were tightness tested by hand to assure that they did not freely spin in place. No such instance was found.
5.1.4 Seismic Interaction Crystal River Unit 3 exhibits good practice in housekeeping.              Maintenance and Operations equipment is generally either stored remote from safety related eaiiioment or is secured to preclude interaction. As a consequence, very few housekeeping          < action issues were identified in the walkdown.
l!
.              Due to the low seismic nature of the plant and the generally stiff supporting of
:              distribution systems, proximity interactions due to relative motions of supported items are rare.
A number of cabinets (containing relays) were found which were not bolted to adjacent cabinets.
In the turbine building, the major issue identified is potentially weak block walls in proximity to a number of (non-safety related) SSEL items.
i The conclusion of the SRTs is that CR3 design, maintenance, and operations practices
;              along with the low seismic nature of the site result in good design for seismic interaction.
5.2    Instances of Intent but Not Letter of PSP Caveat Met Other than the tanks and heat exchangers identified in Table 5-3, there were no instances of intent but not letter of PSP caveat met for electrical or mechanical equipment.
36 7
 
5.3  Summary of Outliers The following general types of outliers were found.
Capacity:
* In-structure demand exceeds screening capacity Caveats:
o    Potentially weak construction of battery racks e    Potential need to provide lateral support for transformers l
e    Vibration isolators without lateral support e    Maintenance issues - items not correctly reinstalled following maintenance (missing mounting bolts and control room ceiling hardware) e    Vertical pump shafts exceeding 20' e    Relays missing wire restraint clip e    Battery rack rails not snugly fit to batteries Anchorage:
e    Unanchored (or poorly anchored) cabinets (all unanchored cabinets are not safety-1 related items on the SSEL) p                e    Unanchored transformers (all unanchored transformers are not safety-related items
~!                        on the SSEL) e    Potential need for additional tubing supports (or repair) e    Anchorage design data (drawings and/or calculations) not yet located 7
:                Interaction 1
e    Potentially weak block walls in the turbine building                                l e    Cabinets with relays not bolted together e    Maintenance items left in close proximity to cabinets with relays (this was extremely rare - in general, all maintenance items were secured to preclude impact with other equipment) e    Potential proximity interaction with permanent maintenance and operations equipment
,                    e    Unrestrained breaker trolleys e    Missing door latch on relay panel e    Potential interactions of piping components with structural members A listing of outliers and resolutions is provided in Table 5-4.
No items were found to have Design Basis Deficiencies.
37
 
Table 5-1              Response Spectrum Exceedances for Building Elevations O                  Structure                              Elevation                    Frequency Range Where IRS Exceeds ABS Reactor Building                          160' and higher                                        9 Hz Auxiliary Building                        143' and higher                                      11 to 18 Hz Control Complex                                      Nonem                                          N/A Emergency Diesel                                    Nonem                                          N/A Generator Building Intermediate Building                                Nonem                                          N/A Emergency Feedwater Tank                            Nonem                                          N/A Enclosure Turbine Building                                    Nonem                                          N/A
* All SSEL items are located at elevations below 40' above grade.
O                                                                                                                                        I e
l t
2 O
38
  . .      .-.            .  .-- .              . - - - -            - - - - - - - . .=
 
  . - . . - . - _ -    .  . -          - . . - . - -    . -  . - . . . _ _ . . - . . . . . - . . . .      . . ~  - . . . . . . _
i                Table 5-2    Effective Grade for Plant Structures
'O l                                    Structure                            " Effective Grade" (Elev., Ft.)                                ,
Reactor Building                                                                      95'                            !
Auxiliary Building                                                                    95' Control Complex                                                                        95' Emergency Diesel Generator Building                                                    119' Intermediate Building                                                                  119' Emergency Feedwater Tank Enclosure                                                    118.5' Turbine Building                                                                      95' O
39 1
 
O                                                                                                                          %
TABLE 5-3: Equipsnent Intent But Not Letter of Caveat Summary 18-Dec-95                                                  -
SEQUENCE CLASS      ID NO          BUILDING        ELEV INTENT 134        21  CAT-5A        AUXILIARY        I19  (*) The longstudinal frequency for honzontal tanks per the GIP is haed on the =====phan that the saddle plate and its stiffeners bend with a fixed connection at the tank and a -
pinned connection at the base plate. Per this sneehad the
                          ~
calculated longitudinal L %af s 26      i Hz and the tank is considered "flexsble". Homer, this tank is well braced longitudinally with two cross members connecting the top and bottom extremes of each saddle (cross bracing exists on both sides of the tank) Therefore the bending stiffness of the                                                        i saddles is significantly greater than calculated and the resulting longitudinal L+ cy is underesta==ned The actual tank longitudmal frequency is greater than 33 Hz and the tank was therefore assunned " rigid" longitudinally.
144        21  CAT-5B          AUXILIARY        I19  (*) The longitudinal frequency for horizontal tanks per the GIP 4                                                                is based on the -_    ,c_+ that the saddle plate and its o
stiffeners bend with a fixed connection at the tank and a pinned connection at the base plate. Per this method the calculated longitudinal f.yaf s 26      i Hz and the tank is considered " flexible". However, this tank is well braced longitudinally with two cross members connecting the top and bottom extremes of each saddle (cross bracing exists on both sides of the tank). Therefore the bendicg stiffness of the saddles is significantly greater than calculated and the                                                        i l
l                                                                      resulting longitudinal frequency is underestimated. The l                                                                      actual tank longitudinal frequency is greater than 33 Hz and I                                                                      the tank was therefore assumed " rigid" longitudinally.
l j                                                                                                                  .
Table 5-3
: 1. .                                                  _
 
            .-. - ~~ - .              -  an. . . - .
7.. - -                          --
s O                                                                    O SEQUENCE CLASS      IDNO                BUILDING    ELEV INTENT AUXILIARY    095  Table 74 of Secison 7 of FPC's Plant Spec Ge Procedure for 45  21  DCHE-lA r-dimenam of the USI-AM issue speci6cs that the applicable range of sadde spacing for horizontal tanks and heat exchangers is 3* <
S < 27. This heat exchanger has 22* spacing. However, the heat a '- y is rigid longitudinally, the cairmt=amn resuks very only shghtly versus the same heat exchange with 20' saddle specsag, the capacity >> demand, and the heat M- ; r is located at the base elevanson in a low seismic area. It is concluded that the insent of the caveat is unet and the anchorage calculamon is appbcable.
AUXILIARY    095  Tabic 74 of Section 7 of FPC's Plant Spec Sc Procedust for 64  21  DCHE-1B resolutsam of the USI-AM issue specifies that the appiscable range of sadde spacing fer hori== sal ankst    and heat exchangers is 3* <
S < 20'. This heat exchanger has 22* spacing. However, the heat exchanger is rigid longitudinally, the calaal=eion resides vary only slightly versus the same heat exchange with 20* saddle spacing.
the riparney >> demand, and the heat exchanger is located at the 4^                                                                base elevation in a low seismic area. It is concluded that the intent of the caveat is met and the anchorage calculation is applicable.
AUXILIARY    095  Table 74 of Section 7 of FPC's Plant Specinc Premtisse for 108  2I    SWHE-lA resolution of the USI-AM issue specifies that the apphcable range of saddle spacing for hornental tanks and heat #- ,, -s is 3' <
S < 20'. This heat exchanger has 22' spacing. However, the heat exchanger is ngid longitudinally, the calculation results vary only slightly versus the same heat exchange with 20* saddle spacing, the capacity >> demand, and the heat exchanger is located at the base elevation in a low seismic area. It is concluded that the intent of the caveat is met and the anchorage calculation is applicable.
Table 5-3 m      -                  _
 
_ _ _ _ _            _ _ _.      __    . _ _ _ . _ _    _ _ _ . . . _ _ _ . . _                      _-.        .__.m__              . . .. . _ _ . _ _ . _    _ .
1
;                SEQUENCE CLASS    IDNO                  BUILDING                      ELEV INTENT 109        21  SWHE-1B              AUX 1LIARY                    095  Table 74 of hesia= 7 of FPC's Plant WAc Procedure for re= alma a= of the USI-AM issue speranee that the apphcable range of saddle spacing for horizontal tanks and heat +- ' 1 -. is 3' <
I S < 20'. His heat exchanger has 22' spacing However, the heat euch==ger is rigid !=g '' ",, the c= ands a= resuhs vary only slightly versus the same heat exchange with 20'sadde spacag, the capacity >> desmand, and the heat euchnager is located at the base elevanan in a low semanac area. It is concluded that the l                                  -
intent of the caveat is met and the anchorage c*=8=saam is                ;
110        21  SWHE-lC              AUXILIARY                    095  Table 74 of Section 7 of FPC's Plant Specific Proadure for resolution of the USI-AM issue specifies that the apphcable range          .
of saddle spacing for honzental tanks and heat exchangers is 3' <
S < 20'. This heat exchanger has 22' spacing. However, the heat            !
                                                                                              - ' ; r is rigid longitudinally, the calculauon resuks vary only          t slightly versus the same heat exchange with 20' saddle spacing.          [
the capacity >> demand, and the heat < schanger is lacased at the  ~
base elevanon in a low scismic area. It is concluded that the            i M                                                                                intent of the caveat is met and the ==charage calculanon is              +
appl e                                                                    l t
1II        21  SWHE-1D              AUXILIARY                      095  Table 74 of Secuon 7 of FPC's Plant Specific Procedure for resolution of the USI-AM issue specifies that the apphcable range of <=ddle spacing for hornaasal tanks and beat cych*aters is 3' <        t S < 20'. This heat evchanger has 22' spacing. However, the heat          l 1                                                                                              exchanger is rigid longitudinally, the calculataca re<=h< vasy only slightly versus the same heat exchange with 20' saddle spacing,          i the capacity >> demand, and the heat exchanger is located at the base elevation in a low seismic area. It is concluded that the            j intent of the caveat is met and the ancharage c*=Insaan is applicable.
Table 5-3 m                                                            __                  . _ _
 
7 l                                                                                                    0                                                                                                                                  Cp                                                                                U 1
l l                                                                                                      TABLE 5-4: Equipment Outlier Description and Resolution Summary 18-Dec-95 SEQ ID NUMBER    BUILDING    ELEV                                                  OUTLIER DESCRIPTION                              OUTLIER RESOLUTION 469 ACDP-68-T    CONTROL    124                                                Transformer coil not supported                      Modification: Prmide longitudinal support for j                                                                                                                                                                                        longitudinally.                                    the coils.
l f                                                                                                      720 AH-l%-POSI  COKIROL    160                                                  Capacity "N" The in-structure response            Review amplitudes ofin-structure response l
spectra for this elevation exceeds the SQUG        spectra and determine if there are available test
!                                                                                                                                                                                        Reference Spectrum.                                reports.
Bounding Spectrum #6: Tubing attached to Modification: Add supports for tubing.
positioner is not supported.
721 AH-l%POS2    CONIROL    108                                                  Bounding Spectrum #6: Tubing from the            Maintenance: Repair support.
positioner has a broken support (second support from positioner) which leaves the tubing unsupported over a long length.
g                                    722 AH-l%POS3    CONTROL    164                                                  Bounding Spectmm #6: Tubing from                  Maintenance: Secure tubing.
positioner is tie-wrapped to ist support. It is very loose and moves freely.
263 AH-%7-SV    AUXILIARY  160                                                    Capacity: The in-structure response spectra      Review applicability of GERS for solenoid for this elevation exceeds the SQUG              valves.
Reference Spectmm.
237 AHD-01D      AUXILIARY  160                                                    Capacity: The in-structure response spectra      Resiew amplitudes ofin-structure response for this elevation exceeds the SQUG              spectra and determine if there are available test Reference Spectrum.                              reports.
256 AHF-17A      CONTP.0L    164                                                    Anchorage 1: Fan has isolation type              (a) Perform calculation to determine anchorage supports that do not appear to be adequate      adequacy or (b) modify anchorage to include for lateral loads.                              lateral restraint (bumpers).
264 AHF-17B      CONTROL      164                                                    Anchorage 1: Fan has isolation type            (a) Perform calculation to determine anchorage supports that do not appear to be adequate      adequacy or (b) modify anchorage to include for lateralloads.                              lateral restraint (bumpers).
279 AHP-01 A    CONTROL      164                                                    Anchor Bolts and Embedment: Verify that        Perform search for applicable drawings.
pad is reinforced.
Table 5-4
 
                                                                                                                                                                          . _ ~ . _ . . _    ,          _ _ . . _ .    . . _      _m    .. ..
s
[~                                                                      v          ;
l l
SEQ ID NUMBER            BUILDING                                              ELEY                    OUTLIER DESCItFTION                            OUTUER RESOLUTION 280 AHP-OlB            CONIROL                                                  164                    Anchor Boks and Fmhedmarna Verify that        Perfona search for applicable drawings.
l:                                                                                                                                            pad is resaforced.
l l                                    281 AHP-01C '            CONIROL                                                  164                  A= char Boks and F=dwdanema Verify that        Perfona search for apphcable drawings.
pad is scanforced.
282 AHP-01D            CONHtOL                                                  164                  Anchor Bolts and Famhedament- Venfy that      Perfona scarch for apphcable drawnags.
                                                          '.                                                                                  Pad is reaaforced.
601 ATCP-1.              CONTROL                                                  124                  laseractaon #5: SOLA UPS (tag AN) os          hen se===ne- saamas ernad bok.                        ,
t second shelf front bottosa is secure with only I bolt.                                                                                            t l-                                    129 CAP-1B              AUXILIARY                                                I19                    Anchorage 1: One bolt missing from niotor    Performa cair= Ins == to detenname nacharage support to anosor base.                        adequacy i
l
              +                                                                                                                                                                                                                                  -
l              b.
I Table 5-4 m  - _ __- _ ___ ____ _ _ - _____                            _ _ _ _ - -                - _ - - _ _ _ _ _ _ _ _ - _ - _ _ _ _ - - ._                                                      -.      .            -      _      -. _.
 
                                                                                                                                                                        /-
SEQ ID NUMBER                                  BUILDING                          ELEV                OUTLIER DESCRIPTION                                                                                        OUTLIER BESOLUTION 886 CEILING                                    COfflROL                          145                  Review of CR3 MCR Ce hag for A46 as                                                                    ' (a) Perforsa i==edsmana= desaga review to interactica source foren=srolRoomt                                                                            desenname if the i=sended >=samlina== methods C=hament on SSEL.                                                                                              would be ve===c=Hy adequate, and (b) =====ae===nr to insedi ceihag as intended if-
: 1. Lights. - Ataq==nely supponed where                                                                . this is desennised ac % se===cnily adequase or strap goes under support and provides                                                                          install namedic=*aan to assure sessmuc adagancy.
restraint However, strap goes front one light to the next one, so the strap is not effecove at the end o( or at a gap in, a run of lights. In addition, many m==artaa== cf light suppo ts to main imemahers are not correctly namedied (cads of synag leaded wire clips are not engaged in holes). Las for light is not posainely secured.
: 2. Main Strw Members. - Mais meinbers are spliced every 4 feet. .'Ihejoint is such that axial loads on the unemihers (axial loads 4                                                                                                                        do occur in carthquakes - especially for os ceilings not laterally braced like CR3) will likely break thejoint. This will not cause the main member to fall, but it could tih and cause ceiling pancis and lights to fall.
: 3. W y StrW members. -The, secondary strut members are gravity supported only - at the splice discussed above. Even if the splice does not break, the secondary members are likely to fall - which will hkely cause ceiling panels and lights to fall.
i 74 DCP-1B                                    AUXILIARY                          095                  Bounding Spectrust #7: A long run of                                                                              Review the piping cdcuantana piping eed to this pump has an axial support which uses a pipe clamp without any axial lugs that could be visually confinned.
Table 5-4 M._._.._____._.___m_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ _                          _ _ _ _ _      _        __
 
i l
l 0                                                                                                                                                    O f
SEQ ID NUMBER    BUILDING                            ELEV  OUTLIER DESCRIFTION                            OUTLIER RESOLUTION 198 DPBA-IA      CONTROL                            108    Bounding Spectrum #3: Confirmation that        Review original msmic calculauon for the the weight is less than 450 h is required.      racks to confirst weight < 450lb and to detennine if they would meet PSP requirements.
Bounding Spectrum #5: These a:e instraces where a 3/8" gap exists between the battenes Refit the rails to close gap as required.
and the rails at the front of the rack.
Bounding Spectrum #10: Rack construction appears to have weak connechon in virtually alljoints.
202 DPBA-1B      COfGROL                            108    Bounding Spectrum #3: Confirm. tion that        Review original seismic calculation for the the weight is less than 450 lb is required.      racks to confirm weight < 450lb and to deternune if they would meet PSP requiremenk Bounding Spectrum #5: There are instances where a 3/8" gap exists between the batteries Refit the rails to close gap as required.
and the rails at the front of the rack.
A CD                                                                Boundmg Spectrum #10: Rack construction appears to have weak connecuon in virtually alljoints.
434 DPBA-IC      TURBINE                            095    Interaction # 1: Block wall at one end of both Perform calculation of block wall adequacy.
racks & along one side of DPBA-1C.
435 DPBC-lG      URBINE                            095    Interaction #1: Block wall behind cabinet      Perform calculation of block w2tl adequacy.
(6" away) should be checked 436 DPBC-1H      TURBINE                            095    Interaction #1: Block wall behind cabinet      Perform calculauon of block wall adequacy.
(6" away) should be checked 437 DPBC-Il      TURBINE                            095    Interaction #I: Block wall behind cabinet        Perform calculation of block wall adequacy.
(6" away) should be checked.
493 DPDP-IC      TURBINE                              095    Interaction #4: Block wall room.                Perform calculation of block wall adequacy.
736 DPDS-IC      TURBINE                              095    Interaction #1: Block wall behind the          Perform calculation of block wall adeqt ex/.
cabinet.
737 DPXS-IC      TURBINE                              095    Boundmg Spectrum #5 & Anchorage #2:            Perform calculation of block w211 adequacy.
Mounted on block wall.
Table 5-4
 
      ..m._..          . . _ _ _ _ _      . _ . _ . ~.      . . . . -        . _    ._ . . . . _ . _ _ . _ . _ . _ . .              . _        ._.              _      _ . _ - - - - _
n BUILDING        ELEV          OUTLIER DESCRIPTION                                  OUTLIER RESOLU110N SEQ ID NUMBER l
CONTROL        124            Inscracten #5: CRD Semce Power Supply                ha===se===nr Mark storage area for CRD i            587 DRRD-2-1 on roller adpacent to DRRD-2-1.                      Semcc Power Supply away froma safety related i
l                                                                                                                          almpment.
l
;              559 EGCP-2A              DIFSFL          119            Inscraction #2: Hear-here calmnet can                Modification. (a) Move hear-here cdianes (b) i                                                                      isnpact wall of panel,                              add soR spacer between hear-here cabinet and panel, or (c) brace hear-here cabinet so that it
                                  .                                                                                        will not anove.
                                      ~
DIFSFI .        119            lateraction #2: Hear-here calmnet can                Modifie=sian (a) Move hear-here calmnet,(b) 562 EGCP-2B inapact wall of panel.                              add soR spacer between hear 4ere ed==re and panel, or (c) brace hear-here cabinet so that it will not nuove.
313 EGDG-1B              DIESEL          119            Inser=<1aan #2: Relay Cabinet has zero              Modification. Drill hole in bracket at larmanan clearance with bracket on EDG on right side. of relay cabinbet interference to een====ne potential inser=<1=ait.
  .p.          652 ERI                  CONIROL          I45            Bounding Spectnam #7/ Anchorage #1: ERI              (a) Perform calculation to determine 4                                                                    not anchored.                                        overturning / sliding potential and (b) for c= acid =ned overturning / sliding paae=ss=8 inseractions, == char the apphcable cabanes(s).
653 ER2                  CONTROL          145            Bounding Spectrum #7/ Anchorage #1: ER2              (a) Perform calculation to descraine not anchored.                                        overturning / sliding potential and (b) for calculased overturning / sliding paseass=8 interactions, anchor the apphcable cabinct(s).
654 ER3                  CONTROL          I45            Bounding Spectrum #7/ Anchorage #1: ER3            (a) Perform calculation to determine not anchored.                                      overturning / sliding potential and (b) for calculated overturning / sliding panensial inseractions, anchor the apphcable cabines(s).
655 ER4                  CONTROL          145            Bounding Spectrum #7/ Anchorage #1: ER4              (a) Perform calculation to descrinane not anchored.                                      overturning / sliding potential and (b) for calculated overturning / sliding panemaial interactions, anchor the applicable c=hanes(s).
Table 5-4
 
7 4
SEQ ID NUMBER        BUILDING ELEV            OUTLIER DESCRIFTION                          OUTLIER RESOLUTION 656 ERS              CONTROL  145            Ranarhng Spectnam #7/Aachorage #1: ERS      (a) Perform c=hiana= to desernisme not anchored.                                overturmang/rladiatr e 1
* and (b) for r=lculaaed ma            ';/shding pane s.
inscrar1aans anchor the appbcable cabesce(s).
657 ER6              CONULOL  145            Bounding Spectrum 67/Aachorage #1: ER6      (a) Perform c=hinanaa to desenaane                    '
not nachared-                                owr ";! ''''; posentaal and (b) for calculated overt - ;!_''';peacessal
                                  -                                                                        saferarenanc., anchor the applicable r=ha=ce(s).
658 ER7              CONIROL  145            Boundmg Spectrum #7/ Anchorage #1: ER7      (a) Perform calculation so desenmaac not anchared.                                overturning /shdaag pase=ani and (b) for cnicuissa,aa aun ';!shding;                4 -'
taaerartianc, anchar the apphcable cabeact(s).
659 ERS              CONIROL  145            Bounding Spectrum #7/ Anchorage #1: ERS      (a) Perform calculation so desennine not avhared.                                overturning /slidsag paseass=1 and (b) for c=icains,veovertunung/ sliding paae=*==
4                                                                                                  maecractanas anchor the appbcable enhanes(s).
Co
?
669 ESCP-4A          CONTROL  145            lateraction #2: Tool box, storage cabinet,    Madafirmanaa. Anchor pennanent cabiects.            i flammable liquid cabinet about 30" away.
670 ESCP-4B          COlGROL  145            Interaction #2: Tool box, storage cabinet,    Modific=saa= Aachar per==neas cabinets.              ;
ii====hae liquid cabinet shaus 30" away.
671 ESCP-4C          COKfROL  145            Interaction #2: Tool box, storage cabinet,    Modafacation Anchor per==nent cabinets.
II====hle liquid cabiact about 30" away.                                                          .
i 672 ESCP-4D          CONTROL  I45            Imeraction #2: Tool box, storage cabinet,    Modification Anchor per==near cabinets.
flammable liquid cabinet about 30" away.
673 ESCP-5A          CONIROL  I45            Interaction #2: Relay mounting panel          Mainten= ace: lastall missing lasch.
missing lower latch.
426 IAP-1 A          'IURBINE 095              Interaction #1: Fan belt guard not anchored  Maintenance: Reanchor the fan belt guard.
at motor end.
685 ICS-5            CONTROL  I45            Bounding Spectrum #3: Cabanets are not        Modification Attach cabinets ICS-5 and NNI-I connected.                                    at top.
Table 5-4
 
SEQ ID MUMDER                          BUILDING ELEV  OtfI' LIER DESCRIPTION                            OUTLIER RESOLUTION 354 MSV-411                          INTER      119    laserarsiam 1: Air line in casuar* with fire      Modificatson:(a) remove L-          ' ;in the proofing.                                        _ area of the air line, (b) support the air line so that it c===as anseract with the Lm _ '- ; or
:                                                                                                                          (c) rerouse the air line.
570 MIMC-09                          DftER      119    Anchorage #1: MCC on 4" high frame.                Madifirmanam Camacca MCC to frasac Frame bohed to floor. MCC mot anchoral to (sam ==e=d by weldsag) franne.
576 MIMC-12                          ~IURBINE  119    Banading Spectrum #7/Aachorage #1:                Modafu:atsomt !=<sali ch===el clamps rather Ch==nel base is poorly == chared.                  than washers.
513 MTSW-2C                        CONTROL    108    laseraction #2: ('a=duit has 0" clearance          Modefecataca Aranch enadma to cabsact or add with transformer enhn=ct                            soR spacer betwa:a conduet and cabanet.
516 MTSW-2F                          CONTROL  108    lateraction #2: Unastrut has 0* clearana on        Modific=4=a=: Cut 1/2" off of Unastrut.
top of cabanet.
A        495 MTSW-3A                        'IURBINE  095    Anchorage #1: The transformer hay for              Modification: (a) Attach transformer to frasne
* MTSW-3A was not opened, but it is acammed          (rema=ne=d bolting through slupping bolt that the samme outliers found in MTSW-3C          holes) and (b) attach frasac to floor would apply to MTSW-3A. The transfonner            (remaune=d weldsag the a=sade of the franse sits on a structural frame, however, (1) the      to e=hed).
transfonner is not anchored to the frame and (2) the frame is not markved directly to the floor.
896 MTSW-3C                          TURBINE  095      Aachar=y #1: The transformer sits K a            Modification: (a) Attach transfonner to frame structural frame, however,(1) the                (recoaurend bolting through shapping bolt transformer is not anchored to the fr _see and holes) and (b) attach fraane to floor (2) the frame is not anchored M.Jy to the        (recon ==e=d welding the a=sade of the frame floor.                                            to embed).
497 MTSW-3D                            IURBINE  095    Anchorage #1: The transformer hay for              Modification: (a) Attach transfonner to frame MTSW-3D was not opeacd, but it is =<aamed          (recomunced boknag through shipping bok that the same outliers found in MTSW-3C            holes) and (b) attach fraane to floor 8    would apply to MTSW-3D. The transformer            (reca==ead weldsag the an=<=le of the frame sits on a structural frame, however, (1) the      to embed).
transformer is not == chared to the frame and (2) the fran.e is not anchored directly to the floor.
Table 5-4
 
    . _ _        - __ _ _ . _                    . . . _ _ _ _ _ _ _ - . _ . _ . _ -_._ ._                                          -_.~_-.-.m_..                        _              ____m_._                    _. _ _ _ _ _          . .
m O
m t
U                                                                                                                    '
l i
SEQ ID MUMBER                        BUILDING                                  ELEV            OU11 nra DESCRAFTION                                OUTE1FR RESOLUTION l
l 602 MTSW-3F                          CONIROL                                    124              hi=dmar Spectrum #4: E:e trolley not                Madaricasian lastall clamps to secure treuey in                              i l                                                                                                                                                                  two du rena== (y,-                              '
                                                                                                                                                                                                                          '- to and parauct to restrained (on top ofc=hi=es).
the swischgear hacup).
i 603 MfSW-3F-T                        CONTROL                                    124              P-- =' ; Spectrum #4: No top bracing                Modifirmanan Prmide top bracing for the ede=siriad                                          transionner cons.
I 604 MfSW-3G -                        CONTROL                                    124              Bauading Spectrum #4: Troucy on top of              Modifiemiaa t===Is lamps                      c        so secure tsoucy in
                                                .                                                            SWGR free to unwe longitudi==lly along its          two darers- (m7-- ""-- to and pernas,ano                                      !
rails.                                              the swuchgear hacup).
605 MTSW-3G-T                        CONIROL                                    124              handing Spectrum #4: No top restranat                Modsficasian Preside top bracnag for the
<                                                                                                              idensirmed.                                          transionner coils.
498 MTSW-3J                        TURBINE                                    095              handing Spectnam #7 and Anchorage #1:                Resiew fa==d=saan pad scanferre== ear Need to verify base is anchored or pad is resaforced.
095              Aachge #1: The transformer sits on a                                                                                              !
ui      499 MTSW-3J-T                      TURBINE                                                                                                          Modafication: (a) Attach transioneer so framme O                                                                                                        structural frame, however,(1) the                    (reca=une=d boking through sluppsag bolt                                    .
transfonaer is not anchored to the frame and haics) and (b) =n=ch framac to Soor (2) the frame is not == chared directly to the      (maie=d weldian the aus<ide of the frame floor.                                              to embed).
7 MUP-1A                          AUXILIARY                                  095              laternesian 4: U-tmit aussang in pipe over            Madiricanan- lastall U-bolt.
motor                                            -
152 MUV-051                        AUXILIARY                                  I19              lateracason #1: Possibic interaction hermine          Resisit during outage to perfona tug test.
operator body 2" away from electncal box.
i 189 MUV-200                        AUXILIARY                                  124              lateractaca Effects #1: Zero clearance              Modafication: Cut steel plate to allow between sseet plane on operator and sacel            minimussa 1" clearance with angic.
angle on wall.
704 Ni&P-D2                          CONIROL                                    145              Interaction #2: Music Stand 24" from                Replace aussic cand with a stable stand (i.e., a cabinet.                                            stand with a low center of gravity) that can be used by operations without ca=cern for 8                                                        overturning.
709 NNI-5                          CORTROL                                    I45              Boundmg Spectrum #3: Cabinets not bolted            Modification: Attach cabinets ICS-5 and NNI-I together.                                          at top.
i Table S-4
 
D                                                                                                                    v' SEQ ID NUMBER    BUILDING  ELEV OUTLIER DESCRIPTION                          OUTLIER RESOLUTION 710 NNI-6        CONIROL  145  Bounding Spectrum #3: Not bolted to          Modification: Attach cabinets NN1-5 and NNI-cabinet NNI-5 (is boiled to cabinet NNI-7). 6 at top.
532 PORV/IEMP    CONTROL  138  Bounding Spectrum #4: Apple IC keyboard      Modancauon Secure keyboard.
not secured.
765 RCV-10      REACTOR  168  Capacity: The in-structure response spectra Review applicability of GERS for =lemand for this elevauon cur-k he t  SQUG          nives.
                      .                Reference Spectrum.
648 RCV-11      REACTOR  168  Capacity: The in-structure response spectra Review applicability of GERS for motor for this elevauon exceeds the SQUG          operased vahts.
Reference Spectrum.
714 RFL MPLXR    CONTROL  145  Bounding Spectrum #3: RFL MPLXR not          Modincation: (a) Bolt together or (b) add connected to adjacent GE rack.              spacer between RFL MPLXR and adjacent rack.
634 RR2B        CONIROL  124  lateraction #5: Door does not latch at the    Maintenance: Correct latch problem.
cn                                  top. Concern is potential banging effect on the relays.
535 RSA        CONTROL  108  Interaction #2: Zero clearance between        Modification: Add spacer cabinet and raceway fireproofing. Cabinet anchored with 6 3/4" diameter bolts.
536 RSA-1      CONIROL    108  Interaction #2: Zero clearance between      Modification: Add spacer cabinet and insulation on wall. I/4"      .
clearance between cabinet and bolt on w211.
98 RWP-1      AUXILIARY 095  Bounding Spectrum #2: Drawing FD-            Perform calculation to determine acceptability 290493X shows the casing /shaA to            of the casing / shaft cantilever about 28', which exceeds the 20' guideline.
90 RWP-2A      AUXILIARY 095  Boundmg Spectrum #2: Drawing FD-            Perform calculation to determine acceptability 290493X shows the casing / shaft to          of the casing / shaft.
cantilever about 28', which exceeds the 20' guideline.
Table 5-4 m                                                                                                        -    -.
 
N1/
SEQ ID NUMBER        BUILDING            ELEV    OUTLIER DESCRIPTION                            OUTLIER RESOLUTION 99 RWP-2B          AUXILIARY          095    Bounding Spectrum #1: Drawing FD-              Pt form calculation to detennene 9_-  , " * 'i 290493X shows the renme/shaR to                of the casing /shaR.
cantilever about 28*, which errwwk the 20' gudeline.
91 RWP-3A          AUXILIARY          095    Bounding Spectrum #2: Drawing FD-              Perform calculation to detenanne ---- , - ' "i 290493X shows the casing / shat to            of the casang/shaR.
cantilever about 28*, which eurwek the 20' gudeline.
100 RWP-3B          AUXILIARY          095    Bounding Spectrum #2: Drawing FD-              Perform calculation to determane 3rrvps=h=Iny 290493X shows the r.asing/shaR to              of the casang/shaR.
cantilever about 28*, which eurwek the 20' guedeline.
193 SF-9-FIT        AUXILIARY            143    Capacity: The in-structure response spectra    Resiew amplitudes ofin-structure response for this elevation exceeds the SQUG            spectra and determine if there are available test Reference Spectrum                              reports.
us
    "    97 SWP-1B          AUXILIARY          095      Interaction 1: Small glass oil reservoir does  Maintenance Replace protectiw wire cage.
not have protective wire cage. Fknarecerne light might fall and hit it.
84 SWV-354-SV1    AUXILIARY            095    Bounding Spectrum #3: Unistrut near SWV- Modafication: Positively attach Unistrut.
354-SVI and tubing not positively connected.
85 SWV-354-SV2    AUXILIARY            095    Bounding Spectrum #3: Unistrut near SWV- Modification: Positively attach Unistrut.
354-SV2 and tubing not positively connected.
607 TPC            CONTROL              124      Anchorage #1 (and Boundmg Spectrum #7):        Perform calculation to deternune adequacy of Missing anchor bolts.                          the existing anchorage 201 VBIT-1A          CONTROL              108    Interaction 2: Three bay cabinets not          Modification: connect cabinets at top.
connected at top.
524 VBXS-1B          CONTROL              108    Bounding Spectrum #6: Relay under RL-2        Maintenance: Replace wire clip.
does not have a wire restraint clip.
525 VBXS-IC          CONTROL              108    Boundmg_ Spectrum #6: lAwcr left relay          Maintenance: Replace wire clip.
lacks wire restraint clip.
Table 5-4
 
SEQ ID NUMBER      BUILDING          ELEY  OUTLIER DESCRIPTION                                  OUTLIER RESOLUTION 526 VBXS-ID        CONTROL            108    Bounding Spectrwn M: One small relay                M=im-n=ce: Repiam wire clip.
does not have wire restraant clip (RL2).
529 WXS-3B        CONIROL            108    Boundang Spectruan M: RL208 MOV208                  Maname==nce Replace wire clip.
relay does not have a wire restraant. Same i
for RL205 (MOV 205).
531 VBXS-3D        CONIROL            108    Boundang Spectnam M: RL208 & RL205 do Manaseanner Replacewireclip.
                        .                          not have wire restraint in pia .
un ca i
Table 5-4                                                                                                                                i
 
O                                                                                      O                                                                            O TABLE 5-5: List ofInaccessible items 18-Dec-95 BLDG                                                ELEV  REASON INACCESSIBLE                            RESOLUTION SEQ ID NO 19 CAHE-1          AUXILIARY                                            095  This item is ime for inspection.                It is adjacent to two idenocal umts that have been verifm1 and it is therefore concluded that CAHE-F is Wh as well.
489 CAV-126          REACTOR                                              095  This item is inaccessible for inspecuon        Inspecuon deferred to outage.
CONTROL                                              124  Interaction #5: Access of adjacent cabinets    Walkdown deferred to outage 588 DRRD-2-2 not permitted by operauons CONTROL                                              124  Interaction #5: Access of adjacent cabinets    Walkdown deferred to outage.
589 DRRD-2-3 not permitted by operauons INTER                                                136  Valve could not be seen.                        Walkdown deferred unut access can be 416 FWV-36 ci                                                                                                                                  obtained.
A CONIROL                                              108  Bounding Spectrum #3: Transformer                Walkdown deferred until out of operation.
513 MTSW-2C cabinet could not be opened to verify restraint.
CONfROL                                              108  Bounding Spectrum #3: Transformer              Walkdown deferred until out of operation.
514 MTSW-2D cabinet could not be opened to verify restraint.
CONIROL                                              108  Bounding Spectrum #3: Transformer                Walkdown deferred until out of operation.
515 MTSW-2E cabinet could not be opened to verify restraint.
CONTROL                                              108  Bounding Spectrum #3: Transformer              Walkdown deferred until out of operation.
l 516 MTSW-2F l                                                                                                                                                  cannot be aacssed until it is out of service
(                                                                                                                                                  for maintenance.
CONTROL                                              124  Bounding Spectrum #6: Access of rear of        Walkdown deferred until out of operation.
605 MTSW-3G-T                                                          #
cabinet not permitted by operations.
l i
CONTROL                                              124  Anchorage #1 arid Bounding Spectrum #7:        Tug test deferred to outage.
606 MTXS-1 Access of cabinet to perform tug test not pernutted due to nuuntenance.
Table 5-5                                                                                                                                                              .
 
(                                                                                        -
                                                                                                                                                                                      \
BLDG                                  ELEY  REASON INACCESSIBLE                              RESOLUTION SEQ ID NO AUXILIARY                              I19  Iparreccahle C--- , - - - in high-radassaan        Walked down froaa photo oussade the 153 MUDM-1A area that could not be enterect                    roomt.
154 MUDM-1B                        AUXILIARY                              119  Inaccessable Ca==paae='in high-radiataan            Walked down from photo amande the area that could not be essered.                    rooms.
490 MUHE-IA                        REACTOR                              -095  This ince is inamecahle for incpersian              incpereian deferred to outage.
491 MUHE-1B '  ,
REACTOR                                095  This item is inurecahac for increriaan.              lacpersian deferred to ousage.
492 M U H E-lC                    REACTOR                                095  This item is inwrecahle for incaareiaa.              Incperiaan deferred to outage.
125 MUr-1                          AUXILIARY                              I19  l- ;ha,- Tank iaude locked high                      narmaer of ALARA, tank evaluated front radiation area.                                      drawing a froni what could be seen 481 MUXS-1                          AUXILIARY                            095  Bounding Spectrum #3 & #7: Item could                Walkdown deferred to outage, not be opened to assess internal
                                                                                                  .,--__=
m    757 NI-1-A3                          REACTOR                              140 His item is innereaible for incaersiaa-              Inspection deferred to outage.
m 758 NI-2-B3                          REACTOR                              140 His item is in-ahle for inspection.                  la<per1 aa deferred to outage.
759 NI-3-C3                          REACTOR                              140 This item is inaccessable for inspection.            Inspectson deferred to outage.
760 NI-4-D3                          REACTOR                              140  This item is i-ch for inspection.                    lacpersion deferred to outage.
646 RC-002-TEI                        REACTOR                              139  This item is in-code for inspection.                Inspection deferred to outage.
647 RC-002-TE2                  ,
REACTOR                            139  This item is ia=reaihte for iariaa-                  Incperiaan deferred to outage.
533 RCPM-3A                            COMROL                              108  Bounding Spectrum #1: Access not                    Walkdown deferred to outage.
permitted by operations.
534 RCPM-3B                            CONTROL                            108  Bounding Spectrum #1: Arreu not                      Walkdown deferred to outage.
pernutted by operations.
716 RCV-13                              REACTOR                            145  This item is inacreuible for inspection.              Inspection deferred to outage.
124 SFDM-1                            AUXILIARY                          I19  Inaccessible: Tank in locked high radiation Tank was evaluated from photo aansade area.                                                restncied area due to ALARA Table 5-5
 
_. _.                .._ .  . _ . . . - - _ . ,  _- ._                      _ _ _ .  ..    . .- _ _ _ .                    . _~            . _.
          . SEQ ID NO        BLDG                  ELEY    REASON INACCESSIBLE .                            RESOLUTION
              -89 SWP-1A      AUXILIARY -            095    Anchorage 1: Motorversacalrestraamtcould Walkdown of this itema (revisit) to n: solve not be seca in the field.                        issue will be erheshdad 97 SWP-1B      AUX 1LIARY            095    Aarharage 1: Motor vertacal restraint could ' Walkdown of this itena (revisit) to resche not be seen in the fickL                          issue willbe N 104 SWP-IC      AUXILIARY              095    Anchorage 1: Motor vertical restraint could Walkdown of this iteam (revasit) to sesehe not be seen in the field.                        issue will be schenhalent
                          ~
883 WDT-1A      AUXILIARY              095    Inarre=& Tanks are tarked in high                  Walkdown deferred until acxass can be .
redinanan area.                                  abannervi
: 884 WDT-1B      AUXILIARY              095    Ir==ne=shae Tanks are locked in high              Walkdawn deferred until acce.s can be radiation area.                                    ahaminad 885 WDT-IC      AUXILIARY              095    la=me"shle. Tanks are locked in high              Walkdown deferred until access can be radiation area.                                    obtained.
783 WDT-5        REACTOR                095    His incan is innereah for inspection.              Inspersian. deferred to outage.
m o>
!                                                                                                                                                            i Table 5-5                                                                                                                                      ,
 
i 1
i l
Table 5-6    Equipment Class Distribution - Mechanical and Electrical Equipment Equipment Class      Number of Equipment                    Description of Class Items
.              0                        3              Other 1                      11              Motor Control Centers 2                        17            Low Voltage Switchgear 3                        5              Medium Voltage Switchgear 4                        14            Transformers 5                      40              Horizontal Pumps 6                        7              Vertical Pumps 7                      86              Fluid-Operated Valves 8A                      36              Motor-Operated Valves 8B                      91              Solenoid-Operated Valves 9                        11            Fans 10                      46              Air Handlers
  /~l          11                        2              Chillers V                                                      Air Compressors 12                        12                                                            j 13                        0              Motor Generators 14                      38              Distribution Panels 15                        3              Batteries on Racks 16                        14              Battery Chargers and Inverters 17                      2              Engine-Generators 18                      107              Instruments on Racks 19                      27              Temperature Sensors 20                      155              Instrumentation and Control panels and Cabinets TOTAL                      727 57
 
6.. Tanks and Heat Exchanger Review 6.1 Summary of Review The tanks and heat exchangers on the Crystal River Unit 3 SSEL were evaluated in accordance with Section 7 of the PSP (Reference 2). The PSP is the same as the GIP in this section.
The seismic screening and walkdown included verification of 91 items of equipment that are classified as tanks or heat exchangers. These tanks and heat exchangers can be grouped as follows:
Total Number                          Grouping 8                              Large flat bottom vertical tank 10                            Vertical tank with legs 7                              Vertical tank on steel base frame or skirt Horizontal tank on saddles                I 5
2                              Buried tanks O                      17                            Horizontal heat exchanger 2                            Vertical heat exchanger 2                              Coil type cooler (heat exchanger) 13                            Small in-line heat exchangers/ coolers 18                            Air Reservoirs 1
5                            Cooling Units                            i 1                            Gas bottles Twelve (12) bmks could not be walked down due to inaccessibility. A listing of those items and their status is provided in Table 5-5.
The results of the screening and walkdown are presented in the Screening Verification Data Sheet (SVDS) forms included in Appendix C.
O 58                                                j
{
 
              ' The only instances of intent but not letter of PSP caveat met were:
  !O                                                                                                        .
lV              e      Two horizontal tanks have cross bracing for the saddles. In these cases the                  !
                                                                                                                        )
longitudinal frequency was assumed to be rigid rather than flexible (as determined I
by the PSP calculational method which ignores cross bracing).
e      Six horizontal heat exchangers with saddle spacing greater than 20' (22' instead            ,
  ;                        of 20'). In these cases the heat exchangers are at grade, are rigid, and the                l
'                          capacity is much greater than the demand.
:              A listing of equipment that meets the intent but not the letter of a PSP caveat is provided            l in Table 5-3.
l 6.2    Summary of Outliers l              The following general types of outliers were found.                                                    ,
~
j              Caveats                                                                                    ,,
o      Vertical tank not meeting the PSP calculation criteria for sliding and overturning e      Poorly restrained gas bottles (on SSEL) j                  e      Potentially loose longitudinal restraint of horizontal tanks e      Anchorage design data (drawings and/or calculations) not yet located
[
N          Interaction j                  e      Potentially weak block walls in the turbine building                                        l A listing of outliers and resolutions is provided in Table 6-1.
[.
No items were found to have Design Basis Deficiencies.
i k
d J
59
 
(                                                  ,,                                                                        c.,
TABLE 6-1: Tsak and Heat Exchanger Outlier Description and Resolution Summary
:    18-Dec-95
!    SEQ ID NUMBER    BUILDING    ELEV  OUTLIER DESCRIPTION                            OUTLIER RESOLUTION 734 CDHE-4A    TURBINE    095    Anchor bolts: Requires an anchorage            Perform anchorage calculation.
evaluation.
735 CDHE-4B    TURBINE    095    Anchor bolts: Requires an anchorage            Perform anchorage calculation.
evaluation.
314 DFT-3A      DIESEL      119    Connection: Strap is not secured to tank.      Determine pretension on strap required to Tank might slide longitudinally.                preclude slipping. Assure anchor bolts apply at least this level of pretension Flexibility of attached piping: If tank slides, it mq,ht cause loss of pressure boundary in attached piping.
315 DFT-3B      DIESEL      119    Connection: Strap is not secured to tank.      Determine pretension on strap required to Tank might slide longitudinally.                preclude slipping. Assure anchor bolts apply at
  @                                    Flexibility of attached piping: If tank slides, it might cause loss of pressure boundary in attached piping.
423 DHT-1      SOUTH BERM  119    Connection between concrete shield wall and Need to review how concrete shielding is tank could not be determined in the field.      connected to tank (ifit is connected).
Anchorage type for the tank could not be      Determine anchorage type and perform confirmed.                                      calculation.
332 EFT-2      EFW TANK    119    Connections between anchor bolts and shell:    Review original seismic tank calculation to Calculations indicate sliding and              determine acceptability.
overturning capacity is less than guidelines require.
453 NGT-XX      TURBINE    095    Caveat for anchor bolts: Bottles                Bottles need 2nd restraint at 1/3rd height.
inadequately restrained.
18 WDT-3A      AUXILIARY  095    Bounding Spectrum #2: Calculation needed        Perform an anchorage calculation.
of anchorage adequacy.
Table 6-1
=
 
SEQ ID NUMBER    BUILDING  ELEV OUTLIER DESCRIPTION                        OUTLIER RESOLUTION 46 WDT-3B  AUXILIARY  095  Bounding Spectrum #2: Calculation needed  Perfonn an anchorage calculation.
of anchorage adequacy 59 WDT-3C    AUXILIARY 095  Bounding Spectrum #2: Calculation needed  Perform an anchorage ab i-*ina_
of anchorage adequacy l
l 3
f Table 6-1
 
i
: 7.      Cable and Conduit Raceway Review The Crystal River Unit 3 cable and conduit raceways were reviewed and evaluated in Appendix B of Reference 6. The conclusion of this review is as follows:
            " Based on the good performance in past earthquakes of raceways not designed for earthquakes and constructed to normal industrial practice, the fact that CR3 safety-related raceways were originally designed for and later re-evaluated for earthquakes, and the fact that Crystal River Unit 3 is a low seismic site, in our judgment the raceway systems at CR3 meet the intent of the GIP. Thus, a case by case review of the raceway systems at CR3, to the screening guidelines in the GIP or to any other guidelines in addition to the raceway seismic criteria used at CR3, is not needed to satisfy GL 87-02.
            "This judgment is supported by supplementary calculations interpreting the basis for the GIP vertical capacity guideline to infer a CR3-specific GIP-like guideline, and calculations interpreting the CR3 raceway design criteria in terms of GIP guidelines."      )
Additionally, it was noted in the Third Party Review that beam clamps are sometimes used with the clamp mounted on a vertical member (possibly subject to slipping). This configuration is        :
common in the Turbine Building and instances were also found in the other buildings. A              I walkdown was performed to review these clamps to determine whether or not these might              ,
adversely affect the seismic performance of the raceway. An extensive walkdown resulted in no identified problems. In general, the beam clamps are lightly loaded (typically, the support      j O. spacing throughout the plant is approximately half that allowed by the GIP). These clamps also were load tested during the walkdown (loads of several hundred pounds) with no indication of potential slipping. The conclusion, is that the beam clamps do not adversely affect the seismic performance of the raceways.                                                                        l l
:    There are no raceway outliers and raceways require no further action.
1 i
t l
4 e
J i
I 1
62 e
 
l I
l l
1
  .rms 8.      Plan for Addressing Unresolved Outliers                                                      !
U  Tables 5-4 and 6-1 summarize the resolution or status of each of the outliers. The outliers have l
been evaluated against the current licensing and design bases and no deviations were found. The outlier resolution presented in the tables is based upon the best information available at this time.
As more information becomes available, the resolution may change. Detailed schedules have not been formulated; however, the general plan will be as follows:
For outliers which can be resolved through routine maintenance, Work Requests will be generated and the problems will be corrected as part of the normal work control process. One exception to this is the Control Room ceiling. Additional work will be required to ascertain the      i
,      design configuration, evaluate its seismic adequacy, and devise a configuration control method to maintain the proper configuration. For outliers where the plant is in the design configuration, but still does not meet the PSP criteria, Project Authorizations will be prepared and scheduled in accordance with the Crystal River 3 Master Scheduling Program.
It is FPC's intent that all outliers be resolved by the end of Refuel 12, in the Spring of 2000.,
l V, 4
1 o
63 I
 
i i
f
:i 0                                              9.            Significant or Programmatic Deviations from the PSP 4
j                                              There are no significant or programmatic deviations from the Crystal River Unit 3 PSP l                                              (Reference 2).
(
1 i
i l
l 1                                                                                                                .
I
                                                                                                                                                                    .i i
a
?
k i
1' b
N i
i
}
4
}
1 h                                                                          .
4 i
i i
I s
A t
i 4
i                                                                                                64
: 10. Third Party Audit Summary l      A third-party audit was performed by Mr. Charbel Abou-Jaoude. He prepared his comments based on a review of the Technical Basis Report, the PSP, and a broad sampling of each of the 20 SQUG classes, tanks and heat exchangers, and electrical raceways. The audit resulted in four comments on the Technical Basis and four comments from the field reviews. These comments
)        have been addressed through further evaluation by the SRT. Mr. Abou-Jaoude's third party l      audit report is provided in Appendix D.
i Y
1
;l I
l
!O                                                                                                                      l i                                                                                                                      l 4
4 d
8
)
1 t
65 1
 
I
: 11. References
; (.p)                                                                                              1
: 1. Generic letter 87-02, " Verification of Seismic Adequacy of Mechanical and Electrical    )
Equipment in Operating reactors, Unresolved Safety Issue (USI) A-46," U.S. Nuclear
.          Regulatory Commission, Washington, D.C., February 19, 1987.
: 2.  " Florida Power Corporation Plant Specific Procedure (PSP) for Seismic Verification of Nuclear Plant Equipment", Revision 1, September 8,1994.
: 3. Florida Power Corporation letter to the Nuclear Regulatory Commission, dated August 27,1993.
: 4. USNRC, " Supplement No. I to Generic letter (GL) 87-02 that Transmits Supplementary Safety Evaluation Report No. 2 (SSER No. 2) on SQUG Generic Implementation Procedure," Revision 2, as corrected February 14, 1992.
: 5.  " Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," dated February 1992, copyright Seismic Qualification Utility Group (SQUG), Revision 2, corrected February 14, 1992.
: 6.  " Technical Basis for the Crystal River Unit 3 Plant Specific Procedure to Resolve NRC Generic Letter 87-02", Revision 0, June 1993.
: 7. Nuclear Regulatory Commission letter to Florida Power Corporation, dated April 12, 1994.                                                                                    .
1
: 8. Crystal River Unit 3, Final Safety Analysis Report.
: 9. Florida Power Corporation letter to the NRC, 3F1088-04, dated October 7,1988,
: 10. Florida Power Corporation letter to the Nuclear Regulatory Commission, dated August l
I 15, 1994.
: 11. Florida Power Corporation letter to the Nuclear Regulatory Commission, dated September 16, 1994.
l l
C)                                                                                                l 66 i
i
 
                      , - - - -    -----n- - - - - . .    . - - - - . . ~ - - - - - - - - - - . . - - - - - - - - - - - , - . - - -  . . - . - - -
4 i
O l
eee i
l                              FLORIDA POWER CORPORATION l
CRYSTAL RIVER UNIT 3 l
l k
l APPENDIX A
!                                              RESUMES FOR SEISMIC CAPABILITY ENGINEERS
                                              ~
i lO
 
i Appendix A Resumes for Seismic Capability Engineers
;                        Anthony Petrowsky, FPC Supervisor Nuclear Engineering Daniel L. Jopling, FPC Senior Nuclear Structural Engineer
<                      Joe A. Iese, FPC Senior Nuclear Structural Engineer C. Glenn Pugh, FPC Senior Nuclear Structural Engineer 4
John O. Mascoll, FPC Project Engineer Paul Smith, The Readiness Operation, Inc.
Harry Johnson, Programmatic Solutions, Inc.
Donald Rutherford, Programmatic Solutions, Inc.
'                        Charbel Abou-Jaoude, VECTRA Technologies, Inc.
i i
j i
i
!O i
J 4
e f
 
Anthony Petrowsky                                                      ,
1 PO Box 1014 j
Homosassa Springs, FL 34447                                                l (904) 382-3482
  ,p C
 
==SUMMARY==
:        oualified by 25 years of progressive engineering experience complemented by an excellent academic foundation including a Master of Science in Civil and Structural Engineering.
1 EXPERIENCE:
1/90 to Present    SUPERVISOR, NUCLEAR ENGINEERING DESIGN                        FloridaPowerCosporaten Supervise Structural Design Engineering Group within the Nudear Engineering Design Department. Responsible for the design and implementation of structural related backfit modifications for Crystal River Unit 3 Nuclear Power Station. Previous duties in this capacity included supervision of the Mechanical / Structural Design Group. Responsibility changed following the re-organintion of the Engineering Department when the corporate engineering staff was relocated to the plant site.
11/87 to 1/90      PRINCIPAL NUCLEAR STRUCTURAL ENGINEER                          Florida fowerCorporation Developed standardized design and acceptance criteria for structural related projects, implementation of vendor supplied computer software for nuclear safety related engineering anaiy;f Acting supervisor for structural and as-building functions within the
~
Nuclear Operations Engineering Department.
4/84 to 11/87      SENIOR NUCLEAR STRUCTURAL ENGINEER                            FloridaPowerCorporation
>V                      Responsible for the design of structural related backfit modifications for Crystal River i                        Unit 3 Nuclear Power Station.
2/82 to 4/84        LEAD SENIOR ENGINEER                                  Impell Corporation, Atlanta GA Functioned as a consultant to Florida Power Corporation on field assignment from 2/82 to 10/83. Upon return to corporate office, functioned as Assistant Project Engineer for Duke Power's Catawba Unit 2 Nuclear Power Station. Responsible for the final review and approval of design calculations and drawings associated with the Reactor Building nuclear piping systems. Responsible for the direct supervision of 20 design engineers assigned to the Duke Project.
1/81 to 2/82        DESIGN ENGINEER                              Ebasco Services Incorporated, Atlanta GA Perform analysis and design of major generating plant structures for a 2 Unit,600 MWe fossil plant located in Jacksonville FL.
9/78 to 1/81        PROJECT CIVIL ENGINEER                        Florida Powerd Light Company, Miami, FL        l Duties included directing and overseeing all civil engineering functions associated with    ;
I
.                        the design and construction of St. Lucie Unit 2 Nuclear Power Station.
1 4/70 to 9/78        PRINCEPAL ENGINEER                    Commonwealth Edison Company, Osicap IL                l
'f                      Progressive responsibility and promotions, beginning with design and construction of EHV Transmission Facilities. Subsequently transferred to Station Nuclear Engineering Department, responsible for technical evaluation of potential sites for both nuclear and fossil generating stations. Also initiated and directed engineering investigations and      ,
laboratory testing to obtain empirical structural design data for the purpose of reducing design conservatism and cost in the construction of Nuclear Power Stations.                  !
l
,                                                                                                                      1
 
i Anthony Petrowsky PO Box 1014 e                                          Homosassa Springs, FL 34447 (904) 382-3482 i
i 1
,        EDUCATION:      ILLINOIS INSTITUTE OF TECHNOLOGY - Chicago, Illinois Mauer of Science in Civil / Structural Engineering 1976 SOUTHERN ILLINOIS UNIVERSITY - Carbondale, Illinois Behelar of Science in Civil Engineering 1970
;        AWARDS:          Selected as 1975 participant in Commonwealth Edison " Advanced Technical Studies Program". This awards a one year paid sabbatical to pursue graduate studies in engineering.
PUBLICATIONS:    Presented paper to the American Society of Civil Engineers entitled " Underground Pumped Storage for Commonwealth Edison" 1976.                                      ,,
.                          Published paper entitled " Reducing Deflections in Steel Poles by Concrete Fdling" in Electric 1.icht and Power. November 1973.
CERTIFICATIONS: Registered Professional Engineer - Morida and Illinois PERSONAL:        Excellent Health.. Single f'
(
 
==REFERENCES:==
Excellent personal and professional references are available and will be furnished l                          upon request.
i i
/
1 O
 
0                                          0                                                    0 3        MM&&d&&sitiiggdigDKTy                                                                                ,
SQUG
    ~
(Certificate                      of Arlieuement        7 Elyis is to Gertify flirti E:ang petrotushg 17 as  Gompleted flye @(QMG lfl8alkbourn @rreening                                              ')
anb 9eismic ifualuation Graining Gourse                                                          .
TSleib 9eptember 14-18, 1992                                                    =
s N    P. S th Commonwealth Edison
                  ;                                                              i David A. Freed, MPR Associates              Robert P. Kassawara. EPRI SQUG Training Coordinator                  SQUG Program Manager I                                                                              ?
1 M  .
e
 
Daniel L Jopling, P. E.
q                                                                  RESUME EXPERIENCE SYNOPSIS A Professional Structural Engineer with a diverse engineering background in architectural structures as well as structures unique to the nuclear industry, Representing a progressively responsible involvement in structural engineering:
    -    Analysis and design involving; static and dyn&mic analysis of steel, concrete, masonry and timber structures applying numerous computer codes as well as hand analysis techniques. Analysis efforts addressed dead load, wind, seismic, and other static and dynamic loadings. Design efforts applied local and national building code requirements as well as ACl, ASME, AISC specifications.
    -    Project Manager; responsible for development of project scoping documents, schedules, technical instructions, cost control, interface with subcontractors as well as review and approval of results.
    -    Client relations activities; marketing, bid preparation, proposal preparation and in-house personnel tra;ning .
REPRESENTATIVE PROJECTS
    -    Lead Engineer; Boron Corrosion Inspection Crystal River 3, Florida Power Corp.
Development of inspection program for boric acid corrosion inside containment, direction of project team, assessment of results and final close out report.
    -    Project Manager for a facility addition; Federal Emergency Management Agency (FEMA), US Corps of Engineering Total scope, preparation of construction documents including arenitectyral subcontractor for a $3.5 million faci!ity expansion.
4    -    Project Engineer for Qualification of the Unit 2 Cable Spread Room Frame; Comanche Peak Steam Electric Statio'n, T U Electric Development a simplified approach for the dynamic (seismic) analysis and qualification of a complex frame structure.
    -    Project Engineer for the development of preliminary Rupture Restraint Design; Sizewell B Nuclear Station, CEGB United Kingdom Development of restrains criteria, training local design team and development of foot print loads.
i (D                                                        EMPLOYMENT HISTORY Florida Power Cooperation; Senior Nuclear Structural Engineer; responsible for structural design and analysis efforts, including seismic qualification for the Crystal River Unit 3 Nuclear Plant.
Crystal River, Florida (1991 to present)
ABB Impell; Section Manager; responsible for a consulting engineering business unit Ft. Worth, Texas; Manchester, United Kingdom; Knoxville Tennessee; Atlanta, Georgia; Charlotte, North Carolina (1981-1991, 1978-1979)
Piping Design Services (PDS); Senior Engineer; analysis and design activities for safety related structures Richland Washington (1979- 1981) i Mathews Corporation; Structural Designer Tampa, Florida (1972-1978)
U. S. Army; Drafter Republic of Vietnam; Fort Belvoir, Virginia (1970-1972)
EDUCATION and PROFESSIONAL QUALIFICATIONS Bachelor of Science in Engineering (Structures) University of South Florida Tampa, Florida Professional Engineer Florida (Structural) 31121      Georgia (Civil) 13623      Texas (Civil) 66911 Member American Society of Civil Engineers (O
w SQUG Walkdown Screening and Seismic Evaluation Training Course
 
        '                                  ,                    (        j
    ,              '      <      i                    4
                                                                                      =
i        t                                            n o
n                  g n
i d
E s
e                ie ns h
t l
a e
I R
P
                            ~e r                    w n          E re m                    c u r o o
m
                                                                    .g aa r n aa e                BG r                  C m
o            wM a
u                                        h t
i r
                                                      . a n
m s
s aa K r m
g ng                    mia i
e            g      un t i      3 S h P
l
                                                      .C G
P r t
bU r
                                                                    . o eG P
iU on9                                oQ n
eQ 7t                                      NS            RS                        _
i p  i      bia9 k r1 rt  i y
l p
l aG Aia~s  f l
G r
r 1
1 1
Gi3 n 7-o s
e.
r Ml e
f        o l t
                              ~u      a t
i a
c r o                -
ot        l      Qng u                                  ot sa i
s i
e    @iaA s
Ai n R r d
s    n              u                          P o Mo
                                                                      .C ei                  ef                                                        .
y a                                          d g                  -
l l yi b                                e ei n
t      G            I          i c e                        Fi r n a          B      h if c ms l                        AT dG
                                                                      . r a                -
i c                  t l
e s  i e                        '
i DS vU aQ p                                                      _
f i                      m 9                                          i y
n t                      oh r                  Gn                                                            -
a        ,
e                    s a
G                    I T
  , ,  '          '    >        '      ,                  I          k L
 
                                .        -          .-.          = - .
JOSEPH A. LESE Seruor Nuclear Stmetural Engsneer A
Twenty yars experience in structural design work in both ojJice andfield environments. Major emphasis given to on. site assignments at nuclear generatingfacilities performing design modification work and resolving corutmetion problems.
EXPERIENCE: Florida Power Corporation since 1989 1989 to        CrystalRiver Nuclear Power Station, Unit #3. Provide on site engineering supportfordesign modification present        packages, including the seismic design of electrical raceway supports. Also, responsible for structural engineering support in the areas of the tendon surveillanceprogram, Control Complex Habitability Envelope interfaces, and long term on site radwaste storage.
1986-89        GilbertlCommonwealth (GIC) since 1975 Crystal River Unit #3, Crystal River, FL. Provide contractor interfacefor the modification of electrical raceway hangers being upgraded for Appendit 'R' considerations.
1965            Tennessee Valley Authority, Knoxville, TN office. Performed structural design and review ofpipe support variances for Bellefonte Nuclear Power Station, Scottsboro, Alabama.
1984            Perry Nuclear Power Plant, Peny, Ohio. Site structural design team member responsiblefor administration offield change requests, nonconformances, field questions, and engineering change notices under contract to the Cleveland Electric illuminating Company.                                                    >
1963            GlC home office in Reading, PA assigned to design team for the analysis ofjet shields for Peny Nuclear Power Plant. Design incorporated shielding of critical components from postulated pipe breaks and resultant pressure loadings.
1982            R.E. Ginna Nuclear Power Station, Rochester, NY evaluated existing wallsfor resistance to waterpressure f                due to flood loads.
Q 1981            Washington Public Power Supply System, Hanford, WA. Design and review of Class Iand 11 pipe supports.
GlC home offi.e in Reading, PA. Design offoundations, manholes, and ductbanks for Peny Nuclear Power Plant.
1980            GlC home office in Reading, PA. Seismic design of raceway suppons for the VC Summer Nuclear Generating Station, Jenkinsville, SC Seismic design ofpipe supportsfor General Public Utilities' Three Afile Island Unit #1 per USNRC bulletins 79-02 and 7914.
1979            YC Summer Nuclear Station, Jenkinsville. SC On. site design of system supports and resolution of constntction problems associated with same.
1978            GlChome ofJice in Reading, PA. Seismic design ofduct, cable tray, and conduit supportsfor VC Summer and Peny Nuclear Power Plants.
1975 77        Engineering Technician at GlC oJJice. Assisted structural engineers in the desip ofsystem supports through calculations.and computer modeling.
1974            Pennsylvania Department of Transportation, Radnor, PA                                                      ,
Engineering Technician involved in environmental noise and air studies for Interstate 95 construction      l project in Philadelphia, PA.
EDUCATION: B.S. Civil Engineering, Drexel University,1978 A
REGISTRATION: Professional Engineer - Pennsylvania (1931) l
 
r-    '
                                                                                &                s-          -
                                                                                                                ~- _-
                                                                                                                  ^
  ,( E,(e                                                                                      -
3){        .
SQUG_
                                                                                                                            ~
i o      u L, (Certificate                                                          of          Arlyieuement                                                '
I t
                  ,                                            Glyis is to Gertify iljat                                                                  ,
t        .
        \
JJor A. iCese
{t 1
(                    ITas Gompleteb 117 e @(Q~dG Blalkbotun @rretning                                                                      ). .
anb @eismir IIvaluation Graining Gourse                                                                          i TS'ielb August 2-6, 1993                                                                  y j  1
                                                                                                                                                  )
l l
Neil P. Smith. Commonwealth Edison I                            '
* 5:                                                          SQUG Chairman i  l i                                                                                    ,
  )                                                David A. Fr '' kPR Associates                    Robert P. Kassawara EPRI                      {
SQUG T-    9 roordinator                        SQUG Program Manager 1 1  1
              ~
I                          ..
Vf,                                                  .
                                                                                                                              ...                  i l u
                *      *    *            *    *        *          *    *      *          *      *      *        *    *        *
* t
 
Resume C. Glenn Pugh, P.E.
O  EXPERIENCE SYNOPSIS:
A Professional Engineer with a diverse engineering background. This background includes the structural design and analysis cf commercial, industrial, and power generation (fossil, nuclear, and cogeneration) facility designs.
Analysis and design activit'es have involved the static and dynamic (seismic) analysis of steel, aluminum, wood, concrete, and masonry structures. Analytical efforts included numerous computer programs (both PC based and main-frames) also hand analysis techniques. Structural designs comply with local, and national building codes, including ASME, AISC, ACI, and other similar standards. Further experience includes extensive field inspection /walkdown of construction activities and operating plant equipment.
REPRESENTATIVE PROJECTS:
The following is a partial list of projects responsible for, or as having served as a team member:
    >    Project Engineer responsible for resolving the NRC's Unresolved Safety Issue (USI) A-46 at Crystal River Unit 3. Further, acted a lead engineer in the development of the site specific plan to address seismic safety issues for the plant.
* Responsible for a group of engineers and designers who participated in the design verification of conduit systems at a nuclear power plant. Participated in the development of a typical conduit span / support analysis document and computer software.
    >    Piping analysis and pipe support design for various auxiliary systems at a chemical recovery boiler project.
    >    Perform seismic and dynamic analysis on steel and aluminum water storage tanks.
    >    Perform rigorous piping analysis (deadweight, thermal, and seismic) and pipe support designs.
    >    The design and analysis of steel structures supporting equipment, platforms, and piping. This included
(]
V      detailed analysis of connections, base plates, member stresses, member selection, and deflections calculations.
    >    Construction support, including on-site coordinator between craft, vendors, client and office engineering staff. Also includes extensive field and piping walkdown experience.
EMPLOYMENT IIISTORY:
i i    Florida Power Corporation; Senior Structural Engineer; 11/91 to present.
ABA Impell Corporation; Lead Senior Engineer; Supervising Engineer; 3/90 to 11/91.
Rust International Corporation; Engineer II; Design Lead Engineer; 4/88 to 3/90.
Impell Corporation; Engineer 11; Principal Engineer; Senior Engineer; Lead Senior Engineer; 6/81 to 4/88.
;    Babcock and Wilcox Company; Associate Engineer; 3/80 to 6/81.                                                  i EDUCATION:
University of South Florida, Tampa, Florida, Bachelor of Science in Engineering, Civil / Structural emphasis.
SQUG Walkdown Screening and Seismic Evaluation training Course.
REGISTRATIONS:
Registered Professional Engineer:
Florida, 41451 Alabama,17403 Tennessee,19217 Wisconsin, E-27211 Michigan, 6201036425 p)
  \"
PROFESSIONAL AFFILIATIONS:
American Society of Civil Engineers
 
    '        ;      :    l;j:!                  ii '        !        ;l      ,
                    .                    '        4          i T4
.                                            )
l
-              l ia L)l h.
On
-                          t                                                    n o
n                        g i
d E
s                                _
e                        n i
ns e
h l
t a      I R
e
.                                                                                e      P                      -
w e r                          E re m                        e u n
o          .g e
u                      BG r o e
2 C
m m
o M_
f a
s aa r n aa wM s m aa
-      V                                                  n g9 h
t        K r
                                                                                            . g i
e        l i            un9 t i1 im S
P P
t r
eG ro P                      _
b U
_.          7  t        g            on                  l i
N e        oQ RS        '
-                          l          a                bi a
r    -
rl i y
y u.laG1    l t
r3        .-              ,g.
G U
At      f i
r e
j n
B f
n9 o
Og f
G n          6ir                              t s
e 2
52
                                                        ~4 L t    a e                      a g        Q S
ot i o
s l
G e          Qu
(
                                                        @la me b                    ic r A
R ot s
s r
in d
o a
                                                                                                          ~
g                                                        uu                    P o s                                                M o
                                                                                            .C
-                                el i y
l ef yi        o                  d g e n t        G          .      f c N                    Fi ei r n
_      g a        G                  i a
r
: g.                                              d                                AT e      mlbe                  dG c                                                      ivU
-                                                                s t                                aQ g
e                            DS i                            l p    iWe f
i                              m 9
t                              o. d r                      Gn g                                                        a                                                    -
e s                                ,                          -
a                                _              -
G 7                                                            -
1 y                                                                                                              -
  .6 r i:                                g                                      -
            ,ll i .
                                                                                                                      ~
 
l l
3
: (V                                                                                  Telephone
~
John O. Mascoll                                                  Home : (404) 446-9688 5007 Holbrook Circle, N.W.                                        Work : (817) 897-8913      l Duluth, Georgia 30136                                          Contact : (404) 329-6523    j l
1 l
CAREER OBJECTIVE I am interested in a Civil / Structural position where complete technical reliability and the ability to produce on the-spot research solutions are required.                          j i
.,                                                                                                        e
* Senior Engineer, ABB IMPELL CORPORATION, CENTRAL REGION, Fort Worth, Texas. (January 1991 to present).                                                            )
Currently assigned to Texas Utility's CPSES Unit 2, Scope "C" Project. I am involved i
In a four-man task team which is responsible for the design validation and approval
;O              of Unit 2 plant-wide emergency lighting system. Other responsibilities include the
,V            design validation and generation of footprint loads for electrical conduit and lighting fixture supports, utilizing Impell's "NEWCOND1" Computer Program and X/PD STRUDL Program.
Senior Structural Engineer, VIATECH SERVICES, INC., Birmingham, Alabama.
(October to December 1990).
Assigned to Southern Company's Vogtle Support Group, where I was involved in a snubber reduction program for Georgia Power Company's 'Alvin W. Vogtle Nuclear Plant.' My responsibilities included the interpretation of autopipe and ME101/M3 piping analysis, so as to justify the reduction of mechanical snubbers and the effect of this reduction on the remaining structural pipe supports. Re-evaluation and/or design changes of the affected piping supports was also required.
Advanced Structural Eneineer, SIMONS-EASTERN, INC., Atlanta, Georgia.
(September 1988.to October 1990).
f j
i Responsibilities included the analysis and design of partially open steel structures consisting of metal decking roof, purlins, rigid frame, fiberglass siding, pin column, pier and spread footing, monorail and two railroad tracks inside of building. Pile cap      1 foundations, pile supports, pipe bridge and towers, pile cap foundation and piers for      l q        towers and columns. All the above activities performed for Federal Paper Board Pulp Q        Mill, Augusta, Georgia, and Parsons & Whittemore's Alabama Pine Paper Mill Project.
1
 
i
  ;                                                                                                                  1 O                                                                                                    z 1
[          *    -
Advanced Stmetural Engineer. RUST INTERNATIONAL, Birmingham, Alabama.
Qune 1988 to September 1988).
]
;                  Responsible for analysis and design of steel framings to support roofing and decking; -
!                  steel columns; and girts to support metal sidings. Checked existing foundations and              :
;                    designed new foundations to support three-story buildings.                                      !
i i
j          ''      Structural Steel / Reinforced Concrete Design and Retrofit Services, IMPELL                    I
;                    CORPORATION SOUTHEASTERN /SOUTHCENTRAL REGION. Ganuary 1981 to
;                    June 1988).                                                                                    j i                    Started as an Engineer I. Developed a broad background in stmetural, dynamic, and seismic analysis of complex frames and equipment supports which encompassed a                    ,
,                    wide variety of technical tasks. Advanced to Senior Engineer. Responsible for organizing pertinent technical data and design specifications in order to develop      ,
analytical and field inspection procedures. These were then used in executing
;                    sophisticated analysis of non linear systems, and in analyzing structural and electrical
)                    components for vibrational / dynamic loading. The process involved the use of computerized programs such as MCAUI'O STRUDL and GTSTRUDL, Finite Element, i                    Base Plate II, and AUTO CAD. Also utilized a variety of structural codes and
;.                  references. During this time I completed employer sponsored in-house training course in Project Engineering Management, for which I was awarded a certificate.
i Accomplishments included assignments for the following:
l                    . Duke Power Company's McGuire Nuclear Power Plant. Designing and checking                    ,
piping supports to comply with NRC's Bulletin 79-14.
!                    . Duke Power Company's Catawba Nuclear Power Plant. Designing pipe supports L                        and rupture restraints for Unit I and II. Designed new safety-related supports to comply with ASME Section III, Subsection NF.
!                    . Southern Company Services, Plant E. I. Hatch. Cable Tray Re-qualification and l-                      Appendix "R" Project, and Vogtle Support Analysis Group.
                    . Tennessee Valley Authority, Watts Bar Nuclear Power Plant. Pipe support and
:                        rupture restraint project to comply with ASME Section III, Subsection NF.
                    . Tennessee Valley Authority, Browns Feny Nuclear Power Plant, Unit IL Designing and checking supports for the control rod drive system modification
:                        project.
,                    . TU Electric, Comanche Peak. Designing and checking Train "C" conduit support                )
:                        modifications for Unit I and II and rotating equipment qualificat'om O
U 1
i                                                                                                                    l l
l
 
3.
* Earlier Experience-BARBADOS WATER AUTHORITY, Barbados, West Indies). Gune 1972 to December 1975).
j                      Started as a Structural Draftsman. Responsibilities included the preparation of site development plans, and locating and designing storage areas for heavy duty construction equipment. Advanced to Engineer's Assistant. Performed calculations for the design of stmetural steel, reinforced concrete columns / column footings, widespan beams and reinforced concrete roofing. These tasks were required in the 3                      constmction of several underground reservoirs with a holding capacity of one to two million gallons of drinking water.
Education:
,                      (Six credit hours taken towards the Master's degree in Civil Engineering through
}                      University of South Carolina, Columbia).
B.E., Civil Engineering. Vanderbilt University, Nashville, Tennessee. Graduated December,1980.
;                      B.S., Physics. Fisk University, Nashville, Tennessee. Graduated December,1980.
Graduated from the Samuel Jackman Polytechnic, Barbados, West Indies. Awarded certificates in Technical Drafting, Economics, and English Language.
Erofessional Associations Associate Member, American Society of Civil Engineers.
Personal Data Born August 15,1951 in Barbados, West Indies...U.S. citizen since 1986... Married; two children... Height,6'-1"... Weight,195 lbs... Health, excellent.
1978 and 1979 ' Dual Degree Student of the Year, Fisk and Vanderbilt Universities.
1979 - NCAA All American in decathlon and long jump.
1979 - Pan American Games participant.
    ,{                - Interests include wood-working, weight-training, racquetball, and outdoor activities.
U                ,
e
 
1 3
1
                                                                                                                            ~
i 4
:                                                                                                                          4.
i b-1 1
i References 1
4 i                        These can be furnished upon request.
4 4
)
I 1
4 i
'.?
4 4
t f
4 i
i 4
A i
i i
I A
4 i
(
i 5
i e
I i
i I
F i
i I
 
1                                                                                                    President i  Paul Smith                                                            The Readiness Operation,Inc.
1s
~
Education University of Califomia - PhD in CiviVStructural Engiacering,1971 l
Lehigh University - Master of Science in Civil /Stmetural F ming,1964 University of Akron - Bachelor of Science in Civil Engineering,1962 l;
Licenssa and Registrations Civil Engineer - California C 24377                                                                    )
Professional History The Readiness Operation, Inc Oakland, Califomia - President,1989 to present l              EQE, San Francisco, California - Senior VP, Board of Directors, 1984 - 1989 4
Lawrence Livermore National Laboratory, Livermore, Califomia - Associate j
Program Leader for Seismic and Structural Safety,1976 - 1984 1974 - 1976 EDS Nuclear (Impell), San Francisco, Califomia - Supersising Engineer, i
Aubum University, Alabama - Assistant Professor of Civil Engineering. 1971 - 1974 l
J Marshall Spaceflight Center, Huntssille, Alabama - NASA-ASCE Fellow,1972 1 % 7 - 1971 University of Califomia, Berkeley - Teaching and Research Assistant, Bechtel, San Francisco, Califomia - CiviUStructural Engineer,1%7 l
US Army, Fort Belvoir, Virginia Engineering Officer,1%5 - 1%7 i                Shell Oil, New Orleans, Louisiana - Civil / Structural Engineer, 1964-1965 Bethlehem Steel, Bethlehem, Pennsylvania - Cisil/ Structural Engineer,1%3 Burger Iron, Akron, Ohio - Structural Steel Designer / Drafter,1952 - 1962 s                                                                                                                    l i
l l
Experience                                                                                                    l Dr Smith has over 30 years ofvaried experience in earthquake and stmetural en-i      gineering and in university teaching. He has managed large teams of research and desi engineers on projects ranging from nuclear power plants to industrial, commercial, and
'      public facilities. In recent years, he has developed a number of seismic training courses.
Dr Smith is currently performing Peer Revins for USI A46 and the IPEEE for l      Florida Power and Light, Philadelphia Electric, ani Wisconsin Public Service; participat-ing in the implementation of the Seismic IPEEE for ClevelandElectric //luminating;                            ,
leading the development of a plant specific A46 and Seismic IPEEE program for Florida l
'      Power Corp, and consulting on A46 and the Seismic IPEEE for Public Service Electric &
Gas ofNJ, Virginia Power, and Yankee Atomic Electric.
Dr Smith also organized a national workshop on the Seismic IPEEE, and has been
;        the primary advocate of simplifying and reducing the costs ofimplementation of both the A46 and the Seismic IPEEE.
In nuclear research, Dr Smith is best known as the developer and manager of NRC's Seismic SafetyMargins Research Program (SSMRP). The SSMRP completed the seismic probabilistic risk analysis (PRA) efYorts NRC began in the Reactor Safety Study, and developed Seismic PRA technology for the Seismic IPEEE. Dr Smith also in-itiated two well-known spin-off's from the SSMRP: (1) the Load Combination Program
'        (which led the NRC to revise piping criteria and adopt the leak before break philosophy),
and (2) the Seismic Hazard Characterization of the Eastern United States Program (to de-velop a more stable estimate of the earthquake hazard to benefit both NRC and the indu
-        try) which developed seismic hazard technology for Seismic PRAs for the Seismic IPEEE.
Tbe Readiness Operation
 
l 4
Dr Smith also initiated the Seismic Design Margin Program (which developed l                                                                                                            I i#      NRC's Seismic Marf'n approach for the Seismic IPEEE). Prior to the S j      of seismic design margins. He has been at the forefront of developing improved c                      .
for seismic destyi        for some time.' sed efforts on the seismic, tornado, and hurricane anai i
Dr Smit s also su the mooring system and eakwater for the Atlantic Generating Station (the floating nu-l    clear power plant).Dr Smith is one of the founders of using data from past earthqua j
NRC Unresolved Safety Issue A46: Seismic Qualification of Equipment in Oper.
j sfing Plants. His NUREG/CR-3017 was a key step in helping NRC issue its first w
* ten recognition of the feasibility of using these data for A46 and for the seismic verifi
  '      tion of equipment. In his five years at EQE, he was a consultant to the Seismic Qua                  i tion Utility Grou p on A46, and initiated many other applications of this new technology; for example, cabie tray, conduit and piping systems, tanks, anchorage, and cranes. H helped develop and present training programs on SQUG/ GIP technology. As EQE j        the conduit / cable tray approach that was ultimately license i
SQUG's conduit / cable tray methodology, and obtained SSRAP and NRC approv Dr Smith has attended the SQUG Seismic Capability Engineer traimng course.
!                  Dr Smith is one of the key developers of EPRI NP-6628: Procedurefor Selsm/c Evaluation and Design of Small Bore Piping (NCIG-14), which used earthquake experi-ence data to justify a " design by rule " approach for piping. N l        buildings, bridges, and offshore structures.Dr Smith has represented the US G l
changes on earthquake engineering, including NRC scientific exchanges with Japan 1979 and 1982, Korea in 1982, Europe in 1979 and 1983, and Taiwan in 1984.
l Selected Publicatians l                Publisher and 'iditor of the Earthquake Safety & Licensing Report **, A monthly 1.
newsletter on (nuclear) Industry earthquake safety, ISSN 104$.7895.
l                Seismic Qualfcation Using Earthquake Experience Data, Nuclear News, June 1989.
l          2.
: 3. Correlation ofSeismic Esperience Data in Non-Nuclear Facthries with Seismic Equipment l
Qualifcation in Nuclear Plants (A 46), prepared for the U.S. Nuclear Regulatory C l
sion by Lawrence Livermore National Laboratory, NUREG/CR-3017, Nov.1982.
: 4. SQUG Cable Tray and Conduit Evaluation Procedure, Second Symposium on Cur-l                rent issues Related to Nuclear Power Plant Structures, Equipment and Pip-j e
ing, Orlando, December 1989.
: 5. Procedurefor Seismic Emluation and Design ofSmall Bore Piping Developed by
!                EPRl/NC/G, Third Symposium on Current issues Related to Nuclear Power l
Plant Structures, Equipment and Piping, Orlando, December 1990.
l
: 6. Seismic Margins in Piping Systems, in Proceedings,1990 Pressure Vessel And l
Piping Conference, American Society of Mechanical Engineers, Nashville,1990.
: 7. Recommended Piping Seismic Adequacy Criteria Based on Performance During and Afte Ferthquakes, EPRI NP 5617 prepared for Electric Power Rosearch Institute,12/88.
j
: 8. Independent Seismic Walkdown Review Team (ISWRT) Critique ofSRSSQUG Type 1
Seismic Programfor Restart ofK-Reactor at the Savannah River Site, prepared by ISWRT for the US Department of Energy, February and April 1990.
l
: 9. Dr Smith is one of the significant contributors identified by SQUG for their Generic /mple-l mentation Procedure (GIP)for Seismic Verification ofNuclear Plant Equipment, Seismic Qualification Utility Group (SQUG), February 14,1992.
(        10. Towards Future Antiseismic Criteriafor Nuclear Plant Piping Systems, to be pub-lished in ASME Special Publication: Technology for fhe 90s.
: 11. Peer Reviewfor USl A46 and the Seismic IPE, to be published in ASME PVP 1993.
j Tbe Readiness Operation
 
Training Courses Developed and Presented "Owrview ofSeismic IPE and USI A-46. " Developed and presented with Programmatic Solutions. One day course presented in open enrollment sessions.
          "Trainingfor Engineers and Designers in SQUG Methods. " Developed and presented with Programmatic Solutions. Twc, day course presented on-site and in open enrollment.
          "Using SQUG MethodsforModifications andReplacements. " Developed and presented with Programmatic Solutions. Two day course presented on site and in open enrollment.
            "On-Site Overview of SQUG Methods and Their Usefor Modification and Replacements. " Developed and presented with Programmatic Solutions. Three hour overview course for management presented on-site.
            " Basic Seismic Engmeering. " Developed and presented with Programmatic Solutions.
l          Two day course presented on-site and in open enrollment.
            "SeismiclPE Workshop." Developed and presented with Programmatic Solutions. Two j          day workshop presented in open enrollment.
I i
l i
                                                                                                      )
i
!                                                                                                      l 1
4 I
;O The Readiness Operation 4
I                                                                                                      d
 
  , [dEdisliiiiiRfBIlliffEffiRIliidiHRilfiiBidignibSI
  ,q                                                                                                                sous                                          _
  'M (Certificate of Arlieuement                                                                                                                                    7                                                                  ;
,  ,4g 4                                                                                              Glyis is to Gertify ilynt i
                                                                                                        }3Etul @niiikr lyas Mompletch tlye B(Q~d6 ti!!alkbotun @rreening
["'                                                          anh Beismic ifualuation Graining Gourse g
    ,                                                                                if@elb                        August 10, 1992 6                                                        S000 g
{      l Neil P. Smith, Commonwealth 8dison
                                                              ' N. R                                                                                              SQUG Chairman
                                                                                ~
David A. Freed, MPR Asso[lates
                                                                                                                                ,                                    ff
                                                                                                                                                            %bert P. Kassawara EPRI                                                      (
I                                                                                                                                                              SQUG Program Manager SQUG Training Coordinator
    >~                                                                                                            ... _
_ ..                    _..... .------..,==,----._-----. _
_u.-                                                        _w._.___.-
      -                                                                . . . . _                              m..
                                          ===.
                                                                                                                =.
_ _.______.___.__ _ ___________ _ _ _________ _                                          _ . _ _ _ _ _            _    . _ _ . _      _ _ _ _ _ _ _ _ _            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  _____________._______m
 
4 PROGRAMMATif' SQL11TIONS l
I                Harry W. Johnson
                                                                                                                  \
                                                                                                                  \
Edacatloa Colunbia University - Meenanics Engineer,1968 l                          University of Miami - Master of Science in Civil Engineering,1%7 University of Miami - Bachelor of Science in Civil Engineering,1965 Bettis Atomic Power Laboratory - Reactor Engineering School,1972 j                            SQUG Walkdown Screening and Seismic Evaluation Training Course,1992 I                  Licenses and Registrations
<'                            California: Civil Engineer i
Professional History Programmatic Solutions,1992 Robert L. Cloud & Associates, Inc, Senior Associate, 1990-1992 l
2                            EQE Engineering, Senior Associate, 1986-1990 Impell Corporation, Section Manager, 1974-1986 l/                            Westinghouse Bettis Atomic Power Laboratory, Senior Engineer, 1969-1974 i                            Cornell Aeronautical Laboratory, Project Engineer, 1968-1969 4
Experience Mr. Johnson has over 20 years experience in engineering consulting in the l
power industry. In particular, Mr. Johnson has extensive experience in project l
management and design engineering.
L Mr. Johnson is currently performing Peer Reviews for USI A-46 and/or
* IPEEE for Peach Bottom 2 & 3 and Limerick I & 2, Salem Units 1 & 2, Arkansas Nuclear One Units 1 & 2, Grand Gulf, and Waterford. Mr. Johnson is also l
performing Peer Review of experience based piping re-evaluation for the Brookhaven National Laboratory HFTR, performing a QA Audit of Seismic Programs for Indian Point Unit 2, performing USI A-46 walkdown for Indian Point Unit 3, helping to develop a plant specific seismic program to address USI A-46 for Crystal River, participating in the implementation of the Seismic IPEEE for Perry, and providing l
EPRI/PSE sponsored training for Seismic Technical Evaluation of Replacement Items
!                      and for Use of SQUG Methods for New and Replacement Equipment.
s
 
PROGRAMMATir ROI11TIONR Mr. Johnson has performed SQUG type seismic verifications for Peach Bottom, Vermont Yankee, Pilgrim, Three Mile Island, Oyster Creek, Maine Yankee, O      Princeton Tokamak (TPTR), Savannah River Project, Cruas (France), Sequoyah, and Indian Point Unit 2.
For TVA Bellefonte, Mr. Johnson developed an implementation strategy for the overall IPEEE program (all external events).
Mr. Johnson has performed Independent Peer Reviews of comprehensive seismic interaction programs at Watts Bar and Comanche Peak and of the equipment seismic qualification program at Watts Bar.
Mr. Johnson has participated in the development of SQUG training programs, and developed the original draft of training for the SQUG seismic interaction modu Mr. Johnson (along with Paul Smith of TRO) developed a 2 day training course in SQUG walkdown methods which has been presented to GPU Nuclear, PSE&G of New Jersey, Rochester Gas & Electric, New York Power Authority, Carolina Power
            & Light, Martin Marietta, Stone & Webster, and Gilbert / Commonwealth.
Mr. Johnson is heavily involved in applying SQUG methods to nuclear procurement programs, and is active in industry initiatives in this area. To date Johnson has managed the development of these methods for seven plants. Mr.
Johnson is a contractor for EPRI/PSE in the development of Seismic Technical Evaluation of Replacement Items (STERI) and Generic STERI (GSTEIU).
At EQE Mr. Johnson started up and managed the Eastem Regional Office.
Project work included development of new methods for seismic evaluations of mechanical and electrical equipment using SQUG methods. For GPU Nuclear, Mr.
Johnson developed and managed all work associated with the seismic verification of TMI and OCNGS control room cabinets, including verification of many l            modifications.                                                              -
At Impell Mr. Johnson was Manager of Engineering Mechanics. This included design, project management and engineering evaluations.
j I
At Bettis Mr. Johnson haded a reactor engineering stress / test group for an advanced submarine project.
At Cornell Aeronautical Laboratory Mr. Johnson performed projects related to
'              automobile crash injury research.
t
'              Selected Publications
              " Guideline for the Seismic Technical Evaluation of Replacement Items for Nuclear 2
Power Plants (PSE-01)", EPRI NP-7484.
i l
T
 
PROGRAMMATIC Rn111TIONS "Use of Seismic Experience Data for Replacement and New Equipment", Nuclear Engineering and Design,1990.
      " Application of Industry Experience Data to Equipment Qualification", Third Symposium - Current Issues Related to Nuclear Power Plant Structures, Equipment and Piping, December 1990.
      " Impact of General Procurement and Commercial-Grade Item Initiatives", Third Symposium - Current Issues Related to Nuclear Power Plant Structures, Equipment and Piping, December 1990.
      " Integration of Seismic Technical Requirements for Replacement items into Nuclear Plant Design Basis", to be presented at ASME PVP Conference, June 1992.
      " Role of Seismic Engineers in CGI Technical Evaluations", Earthquake Safety &
Licensing Report, June 15, 1992.
        " Site Specific Procedures for Seismic Verification Walkdown for a Nuclear Plant".
Fourth Symposium - Current Issues Related to Nuclear Power Plant Structures, Equipment and Piping, December 1992.
        " Peer Review for USI A46 and Seismic IPE", presented at ASME PVP Conference, July 1993.
        " Integration of Seismic Qualification in the Engineering Change Process", presented        ,
at Fifth Symposium - Current Issues Related to Nuclear Power Plant Structures,
,                                                                                                  l
;      Equipment and Piping, December 1994.                                                        i i
5 4
l i
,                                                                                                  l 1
l l
4
 
n a-o                                  -
o _-                -  -      -
                                                                                                                              =-            -
o ,.
u g
_  .                                      I
    ,    'n  '
soua
        '[  o l
g (Certificate                                        of Arl7 ieuement Gijis is la Ecclify flyal                                                      u 4
l I[A&lr r y dl D kfH S D H
    ,        o                                                                                                                                          ,
lyas Montpleted flye 9(QQiG liialkbotun Bercening u
and &cisntic ifualuation Graining Gourse ilicib August 10-14, 1992                                                                  ,
                                                                                                                                                        ! 11 l
Neil P. Smith. Commonwealth Edison ,
                                                                                                            '"" g ; g g
v s      '<                  k,y David A. Freed. MPR Associates                Robert P. Kassawara. EPRI 4
      , j                                                      SQUG Training Coordinator                    SQUG Program Manager 4
m          -
u  l w.
 
l PROGRAMMATIC SOLUTIONS, INC. I DONALD H. RUTHERFORD Senior Associate l
Education Massachusetts Institute of Technology, MSCE (Structures).1969 Massachusetts institute of Technology, BSCE,1967 SQUG Walkdown Screening and Evaluation Training Course Summary of Experience Has over 22 years experience providing services to the nuclear power industry, primarily as a Project Manager or Project Engineer. Extensive experience in managing
            ' or participating in independent assessments, technical reviews or program audits for large management and engineering programs such as piping and pipe supports, cable trays, equipment seismic qualification, integrated interaction, etc., to assure compliance with specific regulatory and licensing commitments or standard engineering practice.
Extensive experience in piping stress analysis including the development and/or use of several piping analysis computer codes and in-depth familiarity with ASME Section lil, p        ANSI B31.1 and B31.7 code requirements. Developed and marketed two successful
(        general purpose piping analysis programs (PIPESD and SRPIPE). Experience with development and use of finite element analysis computer codes for general structural analysis (NASTRAN, STARDYNE, ANSYS, STRUDL, SAP, etc.) with special emphasis on dynamic loadings (seismic, aircraft impact, soil-structure interaction, explosion, etc.).
!          Exoerlence                                                                                            j i
May 1994 to Present: Programmatic Solutions,Inc., Smithtown, New York. Partner.
Seismic experience based operability evaluation of medium voltage switchgear for
;              Riverbend Station. Developed dynamic design guide for Limerick and Peach Bottom.
;              Seismic qualification of new instrument air station for Indian Point Unit 3. Organization l-            and data collection for USl A-46 walkdown for Crystal River Unit 3.
1.990 to 1994: Robert L. Cloud & Associates, Inc., Berkeley, California. Senior Associate and Nuclear Services Business Manager.                                                  ;
i Served as Project Manager and Lead Engineer for two separate programs at TVA's                    l Watts Bar and Sequoyah Nuclear Plants to establish and implement a design                        !
,              methodology and acceptance criteria for assuring stability of U Bolt supports. These              '
t        programs evaluated each individual U Bolt support used in conjunction with pinned behorterd . 7/94 l
 
IPROGRAMMATIC SOLUTIONS, INC. l D.H. RUTHERFORD Page 2 of 4 struts or snubbers in single or trapeze arrangements.
Served'as both Team Leader and participant in an integrated team approach (twelve reviewers from seven companies) that performed a detailed overview of the engineering plans and cost estimates for mechanical and civil / structural workscopes for completion of the Bellefonte Nuclear Plant Units 1 and 2.
Project Manager for the Engineering Overview Program which provided on-line review of activities at Watts Bar Unit 1 to assure proper implementation of improved methodologies for 18 elements of the Civil / Seismic Validation Program. Activities included establishing criteria and positions to resolve technical problems and licensing Issues. Project related tasks included participation in in-depth audits and technical reviews of engineering programs for piping and pipe supports, suspended systems (cable trays, conduit and HVAC), equipment seismic qualification, and integrated interaction. Also responsible for preparation /presentationof executive summary reports and interaction with client's upper level management.
Presenter / participant in Seismic Experience Methods Training Session for Seismic Verification of Equipment (SQUG methods) provided to engineers from Gilbert l    Commonwealth, General Public Utilities Nuclear, Rochester Gas & Electric and Public
. Service Electric & Gas.
I                                                                                                I
!    1982 to 1990: EDAC GmbH, Frankfurt, Germany. President, part owner and Manager of Engineering Services. Responsibilities included all marketing, business development, and financial operations for small engineering consulting company specializing in
;    structural mechanics and dynamics. Clients were European and primarily German l    speaking.
Project Manager responsible for the pre- and post test piping analyses and the
;    comparisons to test results for the client's (Siemens/KWU) representative support i    configuration for the SHAG (seismic loading simulated by building vibration) and SHAM l    (seismic loading simulated by direct actuation of the piping system) tests at a i    decommissioned German test reactor (HDR facility). These were full scale, in-situ tests jointly sponsored by industry (EPRI, Siemens/KWU and others) and nuclear regulatory agencies (U. S. NRC and German TUEV). The relative ability of six different support configurations using struts, snubbers, limit stops and two different energy absorber designs to protect piping under seismic or dynamic loading was investigated.
Developed and marketed SRPIPE, an IBM PC-based computer program for the static,
  ' dynamic, thermal and stress analysis of piping systems. SRPIPE became one of the primary piping analysis tools for several European chemical companies (BASF AG, Linde AG, Voest/ Alpine AG, NSQ-Hauk GMBH, TUEV/Essen, and others).
L
;        .m
 
IPROGRAhiAfATIC SOLUTIONS, INC. I i          D.H. RUTHERFORD Page 3 of 4 l                  Project Manager or Lead Engineer on several projects involving analyses of large and
,                  small bore piping systems (Main Steam, Feedwater, Auxiliary Cooling Water, etc.) for l                  Siemens/KWU nuclear plants (Biblis, Isar, Kruemmel, Philipsburg, etc.l. These analyses
!                  covered the gamut from standard static and dynamic (both response spectrum and time
!                  history analyses) load cases to special faulted conditions and nonlinear analyses such as pipe rupture, water / steam hammer, aircraft impact and explosion loadings.
j                  Performed independent confirmatory analyses of the reactor building of the Grafenrheinfeld Nuclear Plant under aircraft impact loading. Generated a composite l
model of the reinforced concrete outer shell, steel containment and reactor internals          !
i                  using axisymmetric solid and shell elements. Evaluated the effects of prescribed 0.07 sec. duration aircraft impact loading at 6 critical points of impact and compared final i                  results with results obtained using a separate computer code and procedure.
:                                                                                                                    1
: 1.                                                                                                                  I
~
1975 to 1981: Engineering Decision Analysis Company,Inc., Palo Alto, California and            j Frankfurt Germany. Senior Project Engineer and later Principal. Primary responsibilities
;                  included establishment and management of branch office in Germany.
Project Manager for a 5 man,18 month effort to perform seismic Soil Pile-Structure interaction analyses for the reactor building and other buildings for the pile foundation
:                  sites at Angra Units 2 and 3 in Brazil for Siemens/KWU AG. Evaluations included deteimination of plie to-pile interaction effects, distribution of forces along the piles, building r9sponse to seismic loading and generation of secondary floor response spectra for subsequent equipment and piping analyses.
On site Project Manager for the independent review of analyses of the civil struetures, equipment and components of the Bushehr Nuclear Plant Units 1 & 2 (Iran) for Siemens/KWU AG. Responsible for work (4 engineers) performed on-site at KWU offices in Offenbach and Erlangen Germany, for coordination of independent check analyses performed by EDAC engineers in Palo Alto, and for monthly progress reports to KWU management. The objective of EDAC's 8+ man-year review effort was to provide assurance that all analysis procedures, methodologies, acceptance criteria and practices used by the German A/E met or exceeded equivalent codes and standards applicable to U.S. plants (ASME Code, Standard Review Plan, NRC Regulations, ANSI Standards, PVRC Gijidelines, etc.).
1972 to 1975: URS/ John A. Blume & Associates, San Francisco, California. Senior Engineer.
Project Engineer responsible for development of the PIPESD computer program, a joint u                venture of JAB and Control Data Corporation (CDC) which provided static, thermal,
                          .a.
 
5                            l PROGRAMMATIC SOLUTIONS, INC. l
  ,  D.H. RUTHERFORD l Page 4 of 4
(        dynamic and stress analysis capabilities for nuclear and process piping systems. Wrote and maintained software, provided user support, and conducted seminars and workshops on the application of the program. The program was available through CDC Service Centers in the U. S. and Europe and successfully captured a large share of the i
piping analysis market.
1969 to 1972: Itek Corporation, Lexington Massachusetts. Structural Engineer.
Performed structural evaluations of various optical components of orbital telescopes using data center based computer codes such as STARDYNE, NASTRAN, ANSYS and
  ;      STRUDL. Investigated alternative supporting structures for a large (1.5 meter diameter) optical mirror. Developed a finite element based comp, uter program for performing analyses of axisymmetric structures under non-ax', symmetric loadings.
i Bagent Publications i        Rutherford, D.H., and Bitner, J.L., " Stability of Pipe Supports Utilizing U-Bolts,"
i        presented at ASME Pressure Vessel and Piping Conference, Minneapolis, June 1994;
.i      published ASME PVP-Vol. 283.
2
}
)
i f
1 l
i O                                                                                            l m . ma i
 
o o                                                                                      o 7~~                                                                -
m =w w y m ,m.
t                                                                                                                                        ___                                                    r.
x                                                        .
                                                                                                                                                                ~.
                                                                                                                                                                      ._                              Q+ =,m-                                                      <
11
                                                                                                                                                                                                                                                                    }
1 (fCertificate of Arlyieuement                                                                                                                                                                                                              '
Glyis is to Erriify flyal l
l    r Bonalb                                                                                  ?!i.      Rutherfarb                              \.                                        .
                                                                                                                                                                                                                                                            , ,,(
I          l l
lyas Gompleteb ilye &(Q~uiG                                                                                                tilalkbourn Bereening                                                            i)!              ,
        '1 anh Beismic TEualuation @ raining Gourse                                                                                                                                                        [
        ,'                                                                                          ifielb 3 Rag 15- 19, 1995                                                                                                                    _
i, l                                                                                                                                                                                                                                                          I
                                                                                                                                                                                                                                                          !f I        ,
i                      TE 9JRLa!
Neil P. Smith. Common = mith Edison l l      /
i SQUG Chairman .
U          -    f2                                                      .              ML I                                                                                                                                                                                                                                                          j
                                                                                                                                                                                                                                            ~
David A. Freed MPR Associates                                                                                        Robert P. Kdssawara. EPRI SQUG Training Coordinator                                                                                            SQUG Program Manager I
ll
        )                                                                                                                                                                      .
(
1.dl 1 11
: i.                                                  1                                    3                                6                2 .        =  .    .:
                      .        .              - 22 E M.?OJ57N $3                                                                                                '
                                                                                                                                                                            $5sb $iI A22 2 % d i 3 . 'i W J =Er.; . :
i i
C-              _.      _ _ _ . _ _ _ _ _ . _    __      ._ _ . _ _ _ _ _ . _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _                    ___      _ _ _ . _ _ _ _ _ _ _ _ _ __ __                      __        _
i
 
                                                                              ~                            ~
3  07/06/98        14:[2 9404448589                    UCTRA-ATO'~~^ ~"                          ^~ @ 008' I
v l
V
;O                    '                                    '
i VECTRA                                                                                          ;
CHARBEL M. ABOU-JAOUDE
: i.                                                                                                            ,
          ' EXpMRTIRN Mr. Abou-Jaoude la a Technial Services Manager in VECTRA's Civil / Structural group, l          with a broad technical and managerial experience in the power industry. His areas of j          technical expertise are Structural Mechanics and Seismic Design; he has an in-depth '              i
!          knowledge of various industry c xies/ standards such as Sections ill & XI of the ASME              l Code, ANSI B31.1, IEEE-344 and 382, various USNRC Reg. Guides and - NUREG -                        ;
l i          Reports, ;WRC Bulletins, AISC, and ACI-34g. He is well versed in the' Generic                      i i
i          implemeritation Procedure developed by the Seismic Qualification Utility Group for the i          resolution of USI-A-46, and the methodologies developed by the industry for the response to Generic Letter 88 20 as outilned in NUREG-1407; he has completed the l-SQUG/EPRI sponsored A-46 and Seismic IPEEE training courses and has participated
;          in several A 48/IPEEE walkdowns as an SRT member. While at VECTRA, he has lead
:          the engineering efforts of various work scopes; his responsibilities have included:
j          Criteria development, training and personnel development, project execution, interface j          with regulators and outside organizations, and overall project management.
Currently; Mr. Abou-Jaoude is the Project Engineer for the NUSCo (Connecticut i          Yankee, Millstone Units 1&2), and PSE&G (Salem 1&2) A-46 projects. He is also the Project Engineer for the PECo (Peach Bottom 2&3) IPEEE/A-46 project and an SRT l
member of the Wolf Creek and Limerick 1&2 IPEEE efforts. At Connecticut Yankee,                    l Mr. Abou-Jaoude has been instrumentalin the successful completion of the project; he has provided cost effective resolutions to a number of outliers, and lead the j          development of implementation procedures for the procurement of new and                            l replacement equipment.                                                                            l Mr. Abou-Jaoude was the Assistant Project Manager for the Civil / Structural effort at TU
;          Electric CPSES Unit 2 Project. He had primary management responsibility for the work i          of 80 engineers in the Electrical Raceways, Seismic Equipment Qualification, and                  l I
l Seismic 11/1 disciplines. This effort involved the design validation of existing Raceway designs, issuance of new designs, establishing the qualification basis of all BOP Seismic _ Cat 1 and NSSS C1E equipment, procurement of new and replacement equipment, structural evaluation of non seismic commodities using an A-46 walkdown l          based approach, and field engineering to support the completion and start-up of Unit 2.          l l
l O                    :
1                        t                                                                                .
 
7_
F    Y            l i
      . VECTRA I
CHARBEL M. ABOU-JAOUDE                                                              Page Two
      ' pYDERTIRE (Cont'd)                                                                          _
F                                                                                                          :
Prior to his Unit 2 assignment at CPSES Mr. Abou-Jaoude was the Assistant Project-                -l i
Manager for the Secondary Water Chemistry improvement Project at Consumers                          !
}.
j"    Power (Palisades). This project involved modifications to the existing blowdown                      l system, the addition of various equipment items,: and the installation of. 2000.ft. of              (
;      piping., The design effort was completed in a period of six months with a peak staff of l      40. engineers; the design has been successfully implemented and its operation has
      .provided improvements beyond the plant's initial expectations. In addition to this
      . project he was involved in a number of projects for Consumers Power: He was the
[    - Project Engineer for consulting work related to the resolution of 79-14 piping and pipe l
support issues; he also was the Project Engineer for a modification to install a reactor
!      head shielding which involved generating the amplified response spectra and
!      performing the seismic analysis and qualification of the lifting ring / shielding structure.
Mr. Abou-Jaoude has also worked on a number of piping and equipment qualification
{
projects for Commonwealth Edison and Northern States Power. He was the Project Engineer for the development of criteria to evaluate integral welded attachments for Prairie Island; the completion of this effort provided successful closure of an NRC 7g-14 issus.
l-l Previously Mr. Abou-Jaoude lead a group of 18 engineers, working on the seismic qualification of BOP components, in support of a successful SQRT audit for TU Electric's Comanche Peak Station Unit 1. He was responsible for the technical j        adequacy, budget and schedule of the following scope:
I
* Preparation of summary packages and supporting calculations to demonstrate
!              th,e seismic qualification of storage tanks, heat exchangers, pumps, valves, the
!!              diesel generator set, piping, and other electrical components (motors, battery racks, control panels, and instrumentation devices).
l                                                                                                          I
* Evaluation of mechanical equipment rerating, under Section XI of the ASME s
,'              Code, for revised design conditions such as pressures, temperatures, nozzle                ,
loads, and or acceleration values (approx. 200. stress reports).
        ' Mr. Abou-Jaoude was also involved in the Comanche Peak cable tray hanger design validation effort. He was a group lead responsible for qualifying cable tray systems.
I                                                                                                          l i
T
__]
 
UN06/95    14:13      124044415159              ~ VECTRA-ATO ~                                gooy j' ,_                  _                      _
4 Y
* i0 l
7 VECTRA CHARBEL M. ABOU-JAOUDE                                                      Page Three s
[          EXPERTISE (Cont'd) 4 This required detailed dynamic analysis and evaluation of structural members and anchorages. He was involved in the development of criteria for modification reduction
.          techniques. He also worked on the dynamic testing of full scale cable tray systems and provided analytical results for correlation with measured test data.                                !
Prior to joining VECTRA, Mr. Abou-Jaoude has worked in the Middle-East on the construction of several commercial and industrial reinforced concrete buildings. He has also worked as a field engineer responsible for the Installation and maintenance of i          equipment at an automotive refurbishing plant in the United Arab Emirates.
EDUCATION  ,
O      M.S., Civil Engineering, December 1985 University;of Michigan Ann Arbor, Michigan B.E., Mechanical Engineering, July 1984 American University of Beirut. Box 110236, Beirut, Lebanon i
I PROFESSIONAL AFFILIATIONS American Society of Civil Engineers l
American Society of Mechanical Engineers
;            Tau Beta Pi Honor Society
;            Chi Epsilgn Honor Society
            . PUBLICATIONS Lee, B. J.~, Abou-Jaoude, C. M., and De Estrada, M., " Issues of Control Panel Rigidity in Selsmic Qualification," Proc. of 1991 Pressure Vessels and Piping (PVP) Conference, i            Vol. 220. -
l 0
L _ - _ _ __ _                                                                                                I
 
    ~~~ ' '                                                                  ~  ~      "  ~
07 /os/s3    14:15l  ~ 04oiin515s '        ~ VECTRA-ATO~^                              G OS)
T VECTRA CHARBEL M. ABOU JAOUDE                                                  Page Four a
PUBLICATIONS (Con't) i Lee, B. J., and Abou-Jaoude, C. M., "Effect of Base Uplift on Dynamic Response of Electrical and Mechanical Equipment," Proc. of 1992 Pressure Vessels and Piping
                  - (PVP) Conference, Vol. 237-2.
Roche, T.R., Abou-Jaoude, C.M., et al, " Comparison Between Analytical and Test Results for Transformer Base Details," Proc. of 1993 Pressure Vessels and Piping (PVP) Conference, Vol. 256-2.                        .
i 4
t d
i d
i e
i O
W
 
O-e e                                        e l                                                                                                                        ese i
i                                                                                                                              .
;                      FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3                                                                                      ~
l
'O l
l APPENDIX B COMPOSITE SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
O i
d
: c.                                                                      ,                                                            ,
                                                      %                                                                        /                                                            /
APPENDIX B: Composite Safe Shutdown Equipment List (Crystal River Unit 3) 15-Dec-95 SEQ      T  CL    ID NO        EQUIP DESCRIPTION              DRAWINC          KDC/  EVAL SSEL NOTE NOEL 4/ P%R - SUPORT DW ' INTERCONS R
N                                                                    EL                      DEstRED 14    ACDP45    DIESEL ROOM 480 VOLT            206 443-2      DIESEL    S            IN USE      Y            MTMC4 560 DISTRIBUTION PANEL 3A                          119                      IN USE 14 *ACDP46      DIESEL ROOM 480 VOLT            206-043-2      DIESEL    S            IN USE      Y            MTMC-5 561 DISTRIBUTION PANEL 3B                          I19                      IN USE ACDP-51    CONTROLCOMPLEX                  206443        CONTROL    5            ON          Y            MTMC-3 IBL 650    A  14 DISTRIBUnON PANEL A                            145                      ON ACDP-51-T  CONTROL COMPLEX                206 443        CON 110L  5            .ON          N            NOhT 598    A  4 DISTRIBUDON PANEL A                            124                      ON TRANSFOILAIER ACDP-52    CONTROLCOMPLEX                  206443        CONTROL    S              ON          Y            MTMC45AR 651    B  14 DISTRIBUTION PANEL B                          145                      ON ACDP-52-T  CONTROLCOMPLEX                  206 443      CONTROL    S            ON          N              NONE 599    B    4 DISTRIBUTION PANEL B                          124                      ON TRANSFORMER CONTROL                  ON        .Y              MntC-7 2AR 600    X  14    ACDP-68    ES DISTRIBUTION PANEL 3AB      206 4 43                  S 124                      ON ACDP48-T ES DISTRIBUTION PANEL 3AB          206443        CONTROL                  ON          N              NONE 469    X    4                                                                          S TRANSFORMER                                    124                      ON 8B    All433-ASV AllD l AllD-ID, AIID-2,& AHD-                  CONTROL    S                        N              CC AIR      i 248 3 CONTROL                                      164 8B    All433-Sv  Alto-l. AllD 1D, AHD-2,& AllD-  All-90        CONTROL    5                          Y            ACDP483 249 3 CONTROL                                      164
;                                                      Appendix B                                                                                                                              1 l
 
f                                                                            .
f'(%j ,)
' Q. '
SEQ  T  CL    ID NO          EQUlr DESCRIFTION          DitAWING              BLDGf    EVAL SSEL NOTE NORMt FWR styORT DW LNTERCONS g                                                                          n                        mm 270      8B    Mi-194-SV    AHD 13 & AHD-14 CONTROL    AH86                CONTROL      S                      Y              MTMC-4 2B 164 271      8B    AH-195-SV    AHD 15 & AHD 16 CONTROL    AHt7                CONTROL      S                      Y              N 164                                                  3EN 720        10  AH-l%        AHD-I CONTROL                                  CONTROL      S                                      CC AIR
                .POSI                                                          160 721        10  AH-l%        AHD-2 CONTROL                                  CONTROL      S-                                    CC AIR POS2                                                          gog 722        10  Mi-l%        AHD-3 CONTROL                                  CONTROL      s                                      CC AIR POS3                                                          164 723        10  AH-196-      AHD 1D CONTROL                                  AUXILIARY    s                                      CC AIR POS4                                                          160 245      8B    AH-l%5V      AHD 1, AHD-ID. AHD-2,& AHD. AH90              CONTROL      S                      Y-              ACDP483 3 CONTROL                                      164 246      BB    AH-199-SV    AHD 4 & AHD-5 CONTROL        AH80              CONTROL      s                      Y              MTMC-4 4B 164 272        8B  AH-200-SV    AHD4 & AHD-7 CONTROL        AH81              CONTROL      s                      Y              MTMC43D 164 247        8B  AH-246-SV    AHD-12 CONTROL              AH-89              CONTROL      s                      Y              ACDP483 164 135      8B  AH-250-SV    AHD-87 & AHD-22 POST-        Al!88              AUXIUARY    s                      Y                ACDP483 ACCIDENT CONTROL                                gg9 145      8B  AH-310-SV    AHD47 CONTROL                All26              AUXIUARY    S                      Y              MTMC-3 98 119 146      8B    All-3 t l-SV  AHD-88 CONTROL              All27              AUXILIARY  .s                      Y              MEMT-5 2B 119 Appendix B                                                                                                                                  2
 
                        .        _            . _ _        ..            .            ._-. ..~4 . _ _  . . . _ .    . , . _ . . _ _ -              _ _ . _. . . . _ . . . , _ . _ _                                                  _          .m  .. m ,
                                                                                                                        ~m                                                                                                                      (
                              ):                                                                                                                                                                                                                                .
seq      T'              CL ' ~ ID NO          EQUEF DESC8timON                    DRAWLNG              BLDC/  EVAL SSELNOTE NOSUW . FWR SUPO8tT WW ~ INTERCONS
                                    'R EL.                                            nyssmen g
306-                        88      AH-3554V - AHD43 CONTROL                        AH74            DEESEL          3.                                            Y                                          MTMCA 2C            !
                                                                                                                                  !19 307                        SB      AH-3564V AHD43 CONTROL                          AH75            DIESEL          s .-                                          Y-                                          MTMC42D 119                                                                                                                            i t
30g                      .8B        AH-3574V AHD41 CONTROL                          AH74            DIESEL          s                                              Y-                                          MTMC42C i19 3 04)                      SB      AH-3584V AHD42 CONTROL                          AH75            DtESEL          s                                              Y                                          MDO42D I19 302                        8B- AH-3654V AHD40 CON 11tOL                            AH77            DIESEL          s                                              Y                                          MIMC-22 119                                                                                                        2M
                          -303                        8B      AH 366 SV AHD40 CONTROL                          AH78            DIESEL          s                                              Y                                          MTMC 5 2D 119 304                        8B      AH-367-SV  AHD-58 CONTROL                        AH77            DIESEL          s                                              Y                                          MTMC-22 11,                                                                                                        2m 305                        8B      AH-3684V    AHD-59 CONTROL                        AH78            DIESEL          s                                              Y                                          MTMC-5 2D '
'                                                                                                                                  i19 250                        88      AH-381-ASV AHD-l. AHD-ID, AHD-2,& AHD-                          -CONTROL          s                                              N.                                        CC AIR 3 CONTROL                                              164
* AHD-1, AHD-ID, AHD-2,& AHD-                                                                                                                                                          '
251                          8B    AH-3814V                                          AH90            CONTROL          3                                              Y                                          ACDP483 3 CONTROL                                              164                                                                                                                          '
                                                                                                                                                                                                                                                                ?
763                          12    AH-506-PS    AHP-I A & AHP-1B CONTROL            AHI48            CONTROL          s                                              Y                                        MTMC-21 164                                                                                                      SCER 764                          12    AH-508-PS    AHP-IC & AHP-1D CONTROL              AH149            CONTROL          S                                              Y                                        k N IAL 164                                                                                                                          ,
266                          8B    AH-517-SV                                        AH150            CONTROL          3                                              Y                                      ' DPDP-5A21 164              -
Appendix B                                                                                                                                                                                                              3 L
k
 
T-
            %Y                                                                                                            N/                                                    %)
SEQ    T      CL              IDNO                                EQUlr DESCRIPTION          DRAMING.        BLDGI  EVAL SSEL NOTE NORM / P%R SUPORT DW INTERCONS R
EL                      DESIRED N
8B                AH-5184V                                                    AH150          CONTROL    S                    Y            SPSP-5B 21 267 164 252            8B                AH448-ASV AHD-1, MID-ID, AHD-2, & AHD-                                      CONTROL    S                    Y 3 CONTROL                                  164 253          8B                  AH4484V                        AHD-l. AHD-ID, AHD-2,& AfD M190            CONTROL    S                    Y              ACDP483 3 CONTROL                                  164 8B                  AH449-ASV AHD-l. AHD-lD AHD-2,& AHD-                                      CONTROL    S                    N            CC AIR 254 3 CONTROL                                  164 283          8B                  AH-9534V                        AHD-99 CONTROL              AH90          COVTROL    S                    Y              ACDP483 164 262          8B                  AH-9664V                        AHD l CONTROL              AH90          CONTROL    S                    Y              ACDP483 164 263          8B                  All-9674V                      MID-1 & AIID-1DCONTROL      AH90          AUXILIARY  S                    Y              ACDP483 160 l
273          8B                    AH-968-SV                    AllD-2 CONTROL              AH90          CONTROL    _S                    Y              ACDP483 164 255          8B                    AH-969-SV                    AHD-3 CONTROL                All-90        CONTROL      S                    Y              ACDP483 164 274          8B                    AH-970-SV                    AHD-99 CONTROL              AH90          CONDtOL      S                    Y            ACDP483 164 212          8B                    AH-971-SV                    AHD-12 CONTROL              AH89          CONTROL      S                    Y            ACDP483 108 718            20                    AliCP-4                      SCR CABINET FOR AlliiE-4A                  CONTROL    S            N/A      N AND AllHE-4B                              164                      N/A I
10                    AHD-01                        CONTROL COhlPLEX E!AKE-UP  302-753-1      CONTROL    S            OPEN                  CC AIR 278 AIR                                        164                      OPEN Appendix B                                                                                                                                                            4 m - __ ___    ._.        - _ _      . _ _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _
 
      . . .                        _    _ . _  _      . _ _ __ -          __-_._.._______.__.m O                                                              O                                                                  c san    T  CL      ID NO      EQUIP DESCRIFFION      DRAWING              BLDGf        EVAL SSEL NOTE NORM PHlR SUPORT DW INTERCONS R
3                                                                    EL                          naamrm 237        10      AHD41D    CONDOLCOMPLEX MAKF UP  302-753-1        AUXILLARY        s                                  CC AIR AIR                                      160 260      10      AHDO2      PNEUMATIC RF11FFTO      302-753-1        CONTROL          5                                  CC AIR ATMOSPHERE                                164 242        10    AHD43      CONTROLCOMPLEX FANS    302-751-1        CONTROL          s                                  CCAIR INTAKE                                    gg 261  A    10    AHD44      AHF-17A INTAKE          302-753-1        CONTROL          s            OPEN    Y.            MnC44E AH80              lH                            OPEN                  CC AIR i
277  A    10    AHDOS      AHF-17A DISCHARGE        AH30,302-        CONTROL          s            OPEN    Y            MDdC-4 4R i                                                              753-1            164                          OPEN                  CC AIR 275  B    10    AHD46      AHF-17B INTAKE          All81,302-      CONTROL          s            OPEN    Y            MNC4 3D, 753-1            IM                            OPEN                  CCAIR 288  B    10    AHD07      AHF-17B DISCHARGE        AH81,302-        CONTROL          s            OPEN    Y            MTMC4 3D, 753-1            3 r0                          OPEN                  CC AIR AHD-12                              AH89,302-        CONTROL          s          OPEN    Y            ACDP483, 211 X    10                SUPPLY TO CHEMLAB CC AIR 753-1            108                          OPEN 243 A    10    AHD-13      AHF-19A INTAKE          AH86,302          CONTROL          S          OPEN    Y              MDC42E 753-1            164                          OPEN                    CCAIR 258 A    10    AHD-14      AHF-19A DISCHARGE      AHf6,302-        CONTROL          S            OPEN    Y              MThC42E 753-1            IH                            OPEN                    CC AIR l
AHD-15      AHF-19B INTAKE          AH87. 302-        CONTROL          s            OPEN    Y              MTMC-22 244 B    10 753-1              IM                            OPEN                  3KN.CC AIR AllD-16    AHF-19B DISCHARGE        All87. 302-      CONTROL          s            OPEN    Y            MTMC-22 259 B      10 753-1            164                          OPEN                  3KN,CC AIR Appendix B                                                                                                                          5
 
        ~.
i.)                                                                U                                                                  d SEQ    T  CL        ID NO      EQL,tr DESCRIPHON            DRAWINC          BLDCI    EVAL SSEL NOTE NORM /      PWR SUPORT DW INTERCONS DESIRED
[                                                                    EL AHD-17    95* EXIVATION RETURN        AH88,302      CONTROL                      OPEN        Y              ACDP483..
196  X  10                                                                            S CC M 753-1        103                          OPEN SECONTARY PLANTIAB HOOD AHas,302-          CONTROL                      OPEN        Y              ACDP483 197  X  10        AHD-22                                                              S NM SUPPLY                      753-1        104                          OPEN AHF-22C DISCHARGE            AH77,301-    DIESEL          S          C WSED      Y              MTMC-22 325  B  10 *AHD-58                                      754-1        124                          OPEN                        2E EDO STARTAIR i
AHD-59    AHF-22D DISCHARGE            AH78,302-    DIESEL          S          C1DSED      Y              MTMC-5 2D, 320  B    10 754-1        120                          OPEN                        EDO START AIR AHD40    EGDG-1B INTER-ROOM          AH77. AH78 DIESEL              S          C WSED      Y              MTMC-22 324  B    10 302-754-1    124                          OPEN                        2W OR MIMC-5 2D, EDG START AIR              i AHD41    AHF-22A DISCHARGE            AH74,302    DIESEL                        C WSED      Y              MTMC-4 2C, 321  A    10                                                                            S 754-1        124                        OPEN                        EDO START        ,
AIR
                                                                                                                                                            ^
AHD42    AHF-22B DISCIIARGE            AH75,302-    DIE EL                      CWSED      Y              MTMC-4 2D.
322  A    10                                                                              S 754-1        124                          OPEN.                      EDO START AIR AHD43      EGDG IAINTER-ROOM            AH74, AH75 DIESEL                          C WSED      Y              MTMC-4 2C      f 323  A    10                                                                              S 302-754-1    124                          OPEN                        OR N            ;
2D, EDO STARTAIR 191 A    10        AHD-87    AHF-8A DISCHARGE            AH26,302-    AUX 113ARY      S          OPEN        Y              MTMC-3 9B.
751-1        128                          OPEN                        IAAIR 10      AHD-88    AliF-8B DISCIIARGE          All27,302-    AUX 111ARY      S          OPEN        Y              MTMC-5 2B, 187  B 75l-1          124 OPEN                        IA AIR          i l
Appendix B                                                                                                                                6
~.                                                                    -
 
seq                                  T  CL ~ ID No .        EQUIF DESCRIFTION                        DRAWING          BLDCI  EVAL SEEL NOTE NORMI PWR SUPORTIpW INTERCONS R
3-g                                                                                  EI,                      pm 276                            X    10    AHD 99      VENTIllATKW EQUIPMENT                    302-753-1      CONTROL      g            OPEN      Y'            CCAIR ROOM SUPPLY AIR                                          IM                        OPEN                                    ,.
268                            A    21    ANDR-IA      CommtOLCOMPLZX HVAC                      AHI48          CONTROL      g            ON        Y            m3137 COMPRESSED AIR DRYER A                                    iM                        ON                                >
AHI49                                    ON        Y~
269                            B    21. - AHDR-IB      CONTROLCOMPIIX HVAC WMPRESSED AIR DRYER B CONTROL      S                                    ACDP-5237 IM                        ON 642                            A-    9    AHF-OlA      REACTOR BUILDING AIR                      AH28,302-      REACTOR      3            FAST      Y              MTMC 4 IB HANDUNO FAN A                            751-1          1M                        FAST 500                              B    9    AHF4tB      REACTOR BUllDING Alst                    AH29,302-      REACTOR      g            FAST      Y              MTMC                                                                                                                                                            HANDID.O FAN B                            751-1          103                      FAST                    6AN 501                            AB    9    AHF-Olc      REACTOR BUIIDING AIR                      AH30,302-      REACTOR      S            FAST      Y              MTMC-71B HANDUNG FAN C                            751-7          103                      FAST 147                            A    10    AHF48A      SPENT WELNW PUMP A                        AH26,302-      AUXILLARY    S            ON        Y              MTMC-3 9B          i AIR HANDUNG                              751-1                                                                                '
119                      ON 148                          B    10    AHF-OSB      SPENT FUELCOOIANT PUMP B                  AH27,302      AUXIUARY    S            ON        Y              MTMC-5 2B AIR HANDUNG                              751-1          !!9                      ON 256                            A    9    AHF-17A      CONTROLCOMPLEX NORMAL                      AH30,302-      CONTROL      S            ON      Y              MTMC44B SUPPLY FAN A                              753-I          IH                      ON 9    AHF-17B      COVTROLCOMPLEX NORMAL                      AHSI,302-      CONTROL                    ON      Y              MTMC4 3D 264                            B                                                                                              S SUPPLY FAN B                              753-1          IH                      ON AHF-19A      CONTROLCOMPLIX RE1 URN                    AH86,302-      CONTROL                    ON      Y              MTMC42B 257                            A    9                                                                                        S FAN A                                      753-1          164                      ON l
9    AHF-898      CONTROLCOMPLEX RETURN                      AH87,302-      CONTROL      S            ON      Y              MTMC-22 265                            B FAN B                                      753-1          164          ,,          ON                      3U                !
                                                                                            - Appendix B                                                                                                                                                                      7 l
l
 
(-.                                                          .
d                                                                                                            (                                                      U SEQ                                    T  CL  ID NO        EQUlr DESCRIFTION                    DRAWING      BIEGf EVAL SSEL NOTE NORM / PWR SLTORT DW INTERCONS R-N                                                                        EL                    DESIRED 318                                  A  9    m-22A        DIESELGENERATOR ROOM A              AH74,302-  DIESEL    $            M          Y            MD4C-4 2C SUPPLY                              754-1      137                    ON 326                                  A  9    m-22B        DIESELGENERATOR ROOM A              AH75,302-  DIESEL    S            M          Y            KndC-4 2D SUPPLY                              754-1      131                    ON 329                                  B  9    AHF-22C      DIESELGENERATOR ROOM B              AH77,302-  DIESEL    S            OFF        Y            m SUPPLY                              754-1      137                    ON                      2G 327                                B  9    AHF-22D      DIESELOENERATOR ROOM B              AH78,302-  DIESEL    S            Of7        Y            MTWC-5 2D SUPPLY                              754-1      131                    ON AHF-54A      EFIC ROOMS COOLING A                AHit7. 302- CONTROL                ON        Y            MTMC-21 219                                A  10                                                                          S 765-1      124                    ON                      3E 220                                B  10  AHF-54B      EFIC ROOMS COOLING B                AHis6,302-  CONTROL  S            ON        Y            MTMC-22 765-1      124                    ON                      3U AHHE44A HENI1NG UNIT A FOR                                    CONTROL                ON        Y            MTSW-3J 287                                X  10                                                    AHII8,302-            S 2C, AHCP-4 CONTROLCOMPLEX                      753-1      170                    ON AHHE44B HEATING UNIT B FOR                        AH120,302- CONTROL                ON        Y            MTSW-3J 290                                X  10                                                                            S 3C,AHCP4 CONTROLCOMPLEX                      753-1        170                  ON AHHF-0$A COOllhG UNIT A FOR                        302-753-1  CONTROL                IN USE    N            CHP-lA 286                                A  10                                                                            S CONTROLCOMPLEX                        302-756-1  170                    IN USE AHHE-05B COOllNG UNIT B FOR                        302-753-1  CONTROL    S            IN USE    N            CHP-1B 289                                B  10 CONTROLCOMPLEX                        302-756-1  170                    IN LEE 21  AIIHE-13A COOLING COILS FOR REACTOR                302-756-1  INTER    s            ON        N N/A        NObT 333 BUILDING PENETRATIONS A                          095 AfillE-13B COOLING ColLS FOR REACTOR              302-756-1  INTER    S            ON        N N/A        NONE 334                                  21 BUIDLING PENETRATION B                            093      , , ,
Appendix B                                                                                  .                                                                    8
 
                                                                                                                ~
  ,m                                                                                                          m                                                      -,
Sze  T    CL                    ID No                          EQUlf DESCRIFFION                  DRAWING        BLDGf  EVAL SSEL NOTE NORW PWR SUPORT DW INTERCONS R
N                                                                                                            EL                      DESIRED 10                      AHHE-29A COOUNG UNIT FOR SFP-IA                              302-751-1  AUXILIARY    S            IN USE    N          SW 149 119                      IN USE 150      10                      AHHE-29B COOUNO UNIT FOR SFP-1B                              302 75I-1    AUXILLARY  S            IN USE    N          SW l19                      IN USE 76        21                        AHHE-30A COOUNG UNIT FOR DCP-1A                              302-751-1    AUXIUARY    S            IDII      N          N/A 095                      IN USE 77        21                        AHHE-30B COOUNG UNIT FOR DCP-1B                              302-751-1    AUXIUARY    S            IDLE      N          N/A 095                      IN USE 643  X    10                        AHHE-31A COOUNG UNIT A FOR                                  302-751-1    REACTOR    S            IN USE    N          AHF-IA SW NN                                              126                    IN USE                M CI AHHE-31B COOUNG UNIT B FOR                                                REACFOR                  IN USE    N          AHF-1B,5W 644  X    10                                                                                    302-751-1                S OR O REACTOR BUILDING                                126                      IN USE AHHL3tc COOUNG UNITC FOR                                      302-751-1    REACTOR                  IN USE    N        AHF-IC, SW 502 X    10                                                                                                              S OR Q REACTOR BUIU)ING                                103                      IN USE AHHE-32A h10TORCOOLER FOR AHF-IA                                          REACFOR                  IN USE    N        SW OR Q 645 X    10                                                                                      302-751-1              S 126                      IN USE AHHE-32B                hf0 TOR COOIIR FOR AHF-1B          302-751-1    REACFOR                  IN USE    N          SWOR Q 503 X    10                                                                                                              S 103                      IN USE AHHE-32C                hf0 TOR COOLER FOR AHF-IC          302-75l-1    REACTOR                  IN USE    N          SW OR O 504 X    10                                                                                                              S 103                      IN USE AHHE-43                COOllNG UNIT A FOR EFIC            302-765-1    CONTROL    5              IN USE  N          CHP-I A OR 217 A      10 CHP-1B ROOhlS                                          124                      IN USE AHHE4                  COOUNG UNIT B FOR EFIC              302-765-1    CONTROL    S              IN USE  .N          CHP-1 A OR -
218 B      10 ROOklS                          .
IN USE              CHP-1B 124 s
AIIP41A                CONTROL COkiPLEX ilVAC AIR AHl48                CONTROL    5              ON      Y          KgThtC-21 279 A      12 SCER COhiPRESSOR A                                    164        -
ON Appendix B                                                                                                                                                              9 h                _ _ . - _ - - - _ - - - _ _ _ _ _ _ _ _ _ . -                        . _ _ _ _ _
 
p                                                                      ,
s V                                                      Oe, seq                                      T                          CL                ID NO    EQUIP DESCRIFTM          DRAWING      BLDGf  EVAL . SSELNOTE NOR1W PWR SUPORT DW INTERCONS R
N                                                                                          EL                      DESIRED CONTROL COMPilX HVAC AIR AHI48      COtmtOL                  ON      Y            MTMC-21 280                                A                                12 - AHP-OlB                                                        S SCER COMPRESSOR B                        164                      ON 281                                  B                                12            AHP-01C CONTROLCOMPIIX HVAC AIR AH149      CONTROL    S            ON      Y            MTMC4IAL COMPRESSOR                          164                      ON CONTROLCOMPIIX HVAC AIR AH149      CONTROL                  ON      Y            MTMC4IAL 282                                  B                                12
* AHP41D          COMPRESSOR D S
164                      ON 719                                                                  20            hl      PANEL                              COfmtOL    S 164 e
8A              ARV-48  VACUUM BREAKER BFIIFF    302-131-1, TURBINE    g            C1DSED  Y            DPDP-3B 2,23
                #2 FOR CDHE-4A              AR-10      119                      OPEN 465                                                                8A              ARV-49  VACUUM BREAMR nriIFF    302-131-1, 1URBINE    S            CIDSED  Y            DPDP-3A FOR CDHE-4B              AR-li                                                      27,30 127                      OPEN 342                                  B                              8A            ASV-005 EFTB-1 STEAM ADMISSION  AS01,302-  INTER      S            CIDSED  Y            DPor.8B 5 &
051-1      095                      OPEN                  6 731                                  X                                  0          ASV-050 EFTB-1 TRIP & THROTTTE  302-051-1  INTER      S            OPEN    N            EFTB-l 095                      CONTROL                OOVE N            ,
875                            N/A                              N/A ASV-079              MSDT-20 ISOLATION        302 451-1 INTER      N            OPEN    N            N/A 119                    CLOSED                                    ,
881                            N/A                              N/A ASV os0              MSDT-191SOLAllON          302451-1  INTER      N            OPEN    N            N/A 124                    CLOSED 847                            N/A                                N/A ASVOs9              ASDT-121 SOLATION        3024511  INTER      N            OPEN    N            N/A 095                      CLDSED 848                            N/A                                N/A ASV-090              ASDT-13 tSOLATION        302-051-1 INTER      N              OPEN    N              N/A 095                      CIDSED 849                            N/A                              N/A ASV-091              ASDT-I4 ISOLATION        302-051-1  INTER    N              OPEN    N              N/A 095                      CLOSED Appendix B                                                                                                                                                                              10
 
N                                                                                                                      wY                                                        O SEQ          T  CL      IDNO                                                      EQUIP DESCRIPTION          DRAWING      BLDGf    EVAL SSEL NOTE NORMt Pwit SUPORT DW INTERCONS R
N.                                                                                                            EL                        DESIRED N/A ASV492                                                      ASDT-l5 ISOIADON              30245l-1  IN11R        N            OPEN      N            N/A 850        N/A 095                      CwSED ASDT-16 ISOLATION            302451-1  INTER        N            OPEN      N            N/A 844        N/A N/A - ASV-157 095                      CLOSED 8;5        N/A N/A ASV-160                                                      ASDT-lS ISOLATION            302451-1  IMER          N            OPEN      N            N/A 095                        CwSED N/A ASV-163                                                      ASDT-171SOIADON              302-051-1 INTER        N            OPEN      N            N/A 846        N/A 095                        CIDSED 869        N/A N/A ASV-169                                                      ASDT-13 ISOLATION            302-051-1  INTER        N            OPEN      N            N/A 100                      C wSED 341        A  8A      ASV-204                                                  EFTB-I STEAM ADMISSION      302451-1  INTER        S            CLOSED    Y            DPDP-SA 15 095                      OPEN                    A I7 20      ATCP-l                                                  ANTICIPATED TRANSIENT                  CO!GROL      S            N/A      N 601
                                                                                        %TT110UT SCRAM LOGIC                    124                      N/A CABINET BSP-IA                                                    REACTOR BUILDINO SPRAY      302431-1  AUXILLARY    S            OFT      N N/A        NONE 2              5 PUMP A                                075                      oft BSP-1B                                                    REACTOR BUILDING SPRAY    302431-2  AUXILIARY    S            OFT      N N/A        NONE 3              5 PUMPB                                075                      OFT 132            19    CA-10-TE                                                  BOTTOM BORIC ACID          302471-1  AUXILLARY    S            IN USE    Y            hWI-X OR STORAGE TANK CAT-5A                    i19                      IN USE                  NNI-Y 130        A    1g    CA-11-LT                                                  BORIC ACID STORAGE TANK A 302 4 71-1  AUXILIARY    S            IN USE    Y            VBDP-18 OR I19                      IN USE                  VBDP-3 25 CA-12-TE                                                    DOTTOM BORIC ACIT          302471-1  AUXILIARY    S            IN USE  Y            NN1-X OR 133            19 STORAGE TANK CAT-3B                  119                      IN USE                  NNI-Y I
l Appendix B                                                                                                                                                                        ll n--        - . -                  - - - _ - - - - _ - - - - - - - - - - - - - - - - - - - - - _ - - - _ _ _
 
r3                                                                            p                                                      f~~.
SEQ  T      CL                ID NO        EQUIP DESCRIPTION        DRA%1NG        BLDGI  EVAL SSEL NOTE NORM / PWR SUPORT DW INTERCONS R
N                                                                              EL                      DES 8 RED s
CA 13-LT  BORIC ACID STORAGE TANK B 302471-1    AUXIUARY    S            IN USE      Y        VHDP-18 OR 13i  B      18 VBDP-3 25 119                      IN USE 21                CAHE-1    PRESSURIZER SAMPi E COOER 302401-4    AUXILLARY  S            IDE          N        SW 19 'X 095                      IDE CAdE-2A    S1 TAM OENERAIDR ASAMPE 302401-4      AUXIUARY                  IDLE        N        SW 20  X      21                                                                              S
                                                                            .              COOER                                095                      IDLE 21                CAHE-2B    STEAM OENERATOR B SAMPE 302401 4      AUXIUARY    S            IDE        N        SW-21 COOER                                095                      IDE CAHE-5    PASS RC SAMPLE COOER      302-700-1  INTER      S            OFF        N N/A    NONE 351          21 095                      OFT CAHE4      PASS DECAY HEAT SAMPE    302-700-1  AUXIUARY    S            OFT        N N/A    NONE-112          21 COOER                                095                      OFT CAHE      PASS RC SAMPE PRE 400ER  302-700-1  INTER        S            OFT        N N/A    NONE 352          21 095                      OFF CAP-IA    BORIC ACID PUMP A          CA01,302  AUXIUARY                  OFF        Y          MTMC-310B 128  A        5                                                                              S 671-1      gg9                      og 129  B        5                CAP-1B    BORIC ACID PUMP B          CA01,302-  AUXIUARY    S            OFF        Y          MTMC-5 4B 671-1      119                      ON 134  A      21                CATSA      BORIC ACIDSTORAGE A        3024 71-1  AUXILLARY    S            IN USE    Y          MTMC-310D 119                      IN USE 144  B      21                CAT-5B    BOR]C ACID STORAGE TANK B  302471-1    AUXIUARY    S            IN USE    Y          MTMC4ID 119                      IN USE 8B                CAV-002    PZR AND LETDOWN OUTSIDE    3024 72-1,  INTER      S            CLOSED    Y          DPDP-5B 22 335 PENETRATION SAMPLE        CA-16      095                      OPEN ISOLABON Appendix B                                                                                                                              12
_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ __ --          -_ +    _ . _ _ _ _ _ -_  --
 
f~%                                                                f%                                                    rs N
l sEO  T    CL    ID NO        EQUIP DESCRIFTKW          DRAWI.%      BLDGf  EVAL- SSELNOTE NORW PWR SUPORT DW MTENCOME R
y                                                                EL                      Des.arn 7    CAV-057      BORIC ACID FUMPTD MAKE4JP CA22,302    AUXRIARY    S
                                                                                                  ""        Y          ACDP-514, 155  A~
                                ' TANK                        671-1      119'                    OPEN                  IA 158  A    '8B    CAV457-sV CAV-57 CONTROL              - CA22      AUXILIARY  S                      Y          ACDP-514 119 179  B      7    CAV460      BORIC ACID PUMP TO MAAFAJP CA22,302-  AUXIUARY    S            CIDSED    Y          ACDP-32 5
                    .              TANK                        671-1      121                      OPEN                IA 159  B    8B    CAV4605V CAV40 CONTROL                  CA22      AUXIUARY    S                    Y-        ACDP-52 5 119 489        8A    CAV-126      RC LETDOWN SAMPLE INSIDE    302-672-1  REACTOR      S          CLOSED    Y          MTMC-4 9A PENETRATIONISOLATION        CA-12, ES- 095                      OPEN VALVE                      AS4 649        20  CCBT        CENTRAL CONDtOL BOARD                  CONTROL      S          N/A      N TERMINATION CABINET                    I45                      N/A 461        18  CD467-LTI CONDENSATE STORAGETANK        302-011-2  TURBINE      $          IN USE    Y          VIRDP-l l OR LEVEL                                  339                      IN USE                VBDP-511 444        Ig  CD-10H.T    CONPENSER CDHE-4A          302-101-1  TURBINE      S          IN USE    Y          NNI Ho"AT.LL EVEL                          095                      IN USE 445        Ig  CD-101-LT . CONDENSERCDHE4B              302-101-1  TURBINE      S          IN USE  Y          NNI HOlvELLEVEL                            095                      IN USE 734        21  CDHE-4A      MAIN CONDENSER A            302-101-1  TURBINE      S          IN USE  N          N/A 095                      IN USE 735        21  CDHE4B      MAIN CONDENSER B            302-101 1 TURBINE      S          IN USE  N          N/A 095                      IN USE 439          6  CDP-IA      CONDENSATE PUMP A            302-101-2 TURBINE      S          ON-      N          N/A 095                      oft                                ,
Appendix B                                                                                                                B
 
7-s                                                                                      . %                                                      %
sEn      Y    CL    inNO                  EQUlF DESCRIFDON            pgAwmc          BIAGf  EVAL SSEL NOTE NORM PWR SUPORT DW INTERCONS R
N                                                                            EL                      wem 6    CDP-1B              CONDENSATE PUMP B          302-101-2    TURBINE    S            ON      N 447 095                      OIT 302411-2                g            N USE  N            N/A 466  X    21    CDT-1                CONDENSATE STORAOE TMK                  WEKF BER I19                      IN USE CONDENSATE STORAGE TANK 3024 11-2                                CIDSED  N            N/A 880  X    N/A CDV-103                                                          WEST BER    N TO EFW PUMPS ISOLATION                  121                      OPEN 886        0    CERJNO              CONTROL ROOM CEILING                    CONDtOL I45 804  X    8A    CFV-5                CORE FIDODTANK A            CF01,302-  REACTOR    S            OPEN  Y            MDec-76B DISCHAROE ISOIATKel          702-1        119                    CIDSED 805  X    8A CFV4                    CORE FIDOD TANK B            CF02,302-  REACTOR    S            OPEN  Y            MTMC-7 6C DISCHARGEISOLATION          702-1        119                    CIDSED CH-378-PT            CHV4s CONTROLOF CHHLIA      NONE        CONTROL    5            IN USE N            CC AIR 239  A      1g 164                      IN USE CH-379-PT            CIIV49 CONTROLOF CHHLIB      NONE        CONTROL                  IN USE N            CC AIR 241  B      18                                                                            S 164                      IN USE CHHLIA              CONTROLCOMPLEXCHILLER A CH01,302-        CONTROL                  ON    Y            DPDP-5A 9 238  A      11                                                                              S 756-1        164                    ON                  AND MTSW-3F3C CHHLIB              CONTROL COMPLEX CHIL11.R B CH02,302-      CONTROL    5            ON    Y            DPDP-5B 9 240  B      11 756-1        164                    ON                  AND MTSW-303C 284  A      5  CHP-IA              CillLLED WATER PUMP A        CH03,302-    CONTROL    S            ON    Y            MTMC-4 2A 756-1        164                      ON o
CIIP-1B              Cl!! LIED WATER PUMP B      C1104,302-  CONTROL                  ON    Y            MTMC-22 285  B      5                                                                              S 756-1        164                      ON                  4U Appendix B                                                                                                                          14
 
t O                                                                  O                                                      O l SEQ      T CL        ID NO        EQUIP DESCRIPTION        DRAWING      BLDGI EVAL $$EL NOTE NORM / P%R SCPORT DW LNTERCONS
:                                                                m                        D.....
IN USE    N            N/A 293    X    2i      CHT-1        CHTII FD WATER EXPANSION  302-756-1  CONTROL    s TM                                  181                      IN USE -
CHV468      SERVICE WATERTO CHHLIA    302-756-1  CONTROL    s            N USE    Y            CC AIR 291    A      7 CONTROLVALVE                        172                      IN USE                            ,
761            7    CHV468-      CHV48 COVTROL            (NONE)    CONTROL    s              IN USE  N            CC AIR
                      *POS                                              164                      IN USE 292-    B      7    CHV-069      SERVICE WATER TO CHHLIB  302-756-1  CONTROL    s              IN USE  Y            CC AIR CONTROL VALVE                        172                      IN USE 7    CHV469-      CHV-69 CONTROL            (NONE)    CONTROL    s              N USE    N            CC AIR 762 POS                                              164                      IN USE 8B    CHV490      NORMALCOOIJNG TO AHHL      CH07,302- CONTROL    S              OPEN    Y            VBDP-115 216    B 44 ISO!ATION VALVE        765-1      124                      OPEN 222    B    8B    CHV-097      APPX. R COOLING FROM AHHL CH07,302  CONTROL    s              CLOSED  Y            \DDP-11 $
44 ISOIATION VALVE        765-1      125                      CLOSED CllV-100                                CH07,302- CONTROL    s              IN USE  Y            CC AIR 22i    B      7                  AHHE-44 (EFIC ROOMS)
CONTROL VAL %E            765-1      125          .            IN USE CHV-100-    CHV-100 CONTROL          308494    CONTROL    s              IN USE              CC AIR 755              7 POS                                              124                      IN USE 8B    CIIV-100-SV CHV-LOO CONTROL            CH07      CONTROL    S                      Y            VBDP-11 $
213    B 124 CH07,302-                            OPEN    Y            VBDP-ll 5 l 214    B      8B'  CHV-101      NORMAL COOLING FROM                  CONTROL    s AnniL44 ISOLATION VALVE  765-I      124                      OPEN 8B    CHV-108      NORMAL COOUNG TO AHHL    CH08,302-  CONTROL    s              OPEN    Y            VBDP-314 224    A 43 ISOLATION VALVE        765-1      131                      OPEN
[
Appendix B                                                                                                                    15
 
  ,m                                                            (s                                                        em.
seq  T  CL  I)No        EQUIP DESCRIFLDN          DRAWING      BLDGI    EVAL SSEL NOTE NORhu PWR SUFORT DW. INTERCONS R
N                                                            EL                        DESIRED CHV-ll3                              CH08,302-  CONTROL                  IN USE    Y          \1tDP-314, 223  A    7              AllHEA3(EFIC ROOMS)                                S C AIR CONTROLVALVE              765-1      130                      IN USE 756        7  C H V-113- CHV-113 COVTROL            308-894    CONTROL      S            IN USE    N          CE AIR POS                                              124                      N USE Y            \1 BOP-314, 215  A    8B ' CHV-Il34V CHV-Il3 CONTROL            CHOS      W NTROL      S CC M 124 70  A    18  DC45-FT    DCP-I A DISCHARGE          302431-1  AUXILLARY    S            IN USE    Y          VBDP-21 OR 095                        IN USE                VBDP414 72  B    18  DC46-PT    DCP-IB DISCHARGE PRESSURE  302431-2  AUXHJARY    S            IN USE    Y            VilDP-11 OR 095                        IN USE                VBDP-5 Il 18  DC-50-LT  DC SURGETANK DCT-IAIIVEL 302431-1    AUXIIJARY    S              IN USE  Y            TPC 71 095                        IN USE DC-54-LT  DC SURGE TANK DCT-1B LEVEL 302431-2  AUXILLARY    S              IN USE  Y            TPC 75        18 095                        IN USE DCl!E I A  DECAY llEATCIDSED CYCLE    ?92431-1  AUXILLARY                  IDLE    N            DCP-IA 45  A    21                                                                S COOllNC A                            095                        IN USE DCifE-1B  DECAY llEAT CIDSED CYCLE  302431-2    AUXILLARY    S              IDLE    N            DCP-1B 64  B    21 COOLING B                            095                        IN USE DCP-IA    DECAY llEAT CIDSED CYCLE    DC01,302-  AUXILLARY                  OFF      Y            DPDP-5A 9 67  A      5                                                                S COOLING PUMP A              631-1      095                        ON                    AND WW-3F 74  B      5  DCP-IB    DECAY llEAT CIDSED CYCLE  DC02,302-  AUXILLARY    S              OFF      Y            DPDP-5B 9 COOLING PUMP B        ,
631-2      095                        ON                    AND MTSW-3G DCT-1A    DECAY IIEAT CCC SURGE      302431-1  AUXILIARY                    IN LSE  N            N'A 113 A    21                                                                S' TANK A                                095                        IN USE Appendix B                                                                                                                16 m                                                          ---                    _ _
 
                - - - = .          _ _ -    .  -    - -.                  . -      . = _ _    ~ . . . . . .        .    .    .  . _ .            - , - .              .
73                                                                      .
m F
  'see  T  CL          ID NO      EQUlf DESCRIFUON          DRAWING          BLDGI        EVAL SSEL MFFE NORW FH1R SUPORTWUr INTERCONS h                                                                      EL                                neuern DCT-1B  DECAY HEATCCC SURGE        302431-2    AUXILLARY          S              IN USE    N                  . N/A 114  B    21 TANK B                                    095                                IN USE                                                        ,
1 726        7          DCV-IO6  NITROGEN SUPPLY TO DCT-1A  302431-1    AID 03JARY N                      OPEN      N-                    WA                          !
095                                C1D8ED                                                        =
727        7          DCV-188  NITROGEN SUPPLY TO DCT-1B  302431-2    AUXILLARY N                        OPEN      N                    N/A 095                                C1D8ED 68  A    7          DCV-190  DCT-I A OVERPRESSURE      302431-1    AUXHlARY            $              IN USE    N                    N/A CONTROLVALVE                            095                                IN USE i
7          DCV-191  DCT-IB OVERFRESSURE        302 431-2    AUXILLARY                          IN USE    N                    N/A 69  B                                                                                      S CONTROLVAVLE ~                          095                                IN USE                                                      i DF-t-13  DIESELGENERATOR FUELOfL    DF01,302-    DIESEL                            IN USE    N                    N/A 743  A    18 DAY TANK AIIVELSETICH      281-1        gg,                                IN USE                                                      i DIESELGENERATOR FUELOIL    DF01,302-    DIESEL                              IN USE  N                    N/A 744  A    18          DF-2-13 DAY TANK ALEVEL5%TFCH      281-1        119                                IN USE 745  B    18          DF-3-LS  DIESEL GENERATOR FUELOIL    DF02,302-    DIESEL                              IN USE ~ N                    N/A DAY TANK B LIVELS%TICH      281-1        119                                IN USE 746  B    Ig          DF-4-LS    DIESEL GENERATOR FUELOIL  DF02,3C2-    DIESEL                              IN USE  N                    N/A DAY TANK B LEVEL SWITCH    281-1        119                                IN L4E 310  A      5          DFP-IA    AS hlOTOR DRIVFN FUEL OfL  DF01,302-    DIESEL              S              OFF      Y                    hfThtC-4 3B TRANSFER PUMP A            281-1        119                                ON                              AND DPDP-6A4                        i 311 B      5          DFP-1B    AC hlOTOR DRIVEN FUELOIL  DF02,302-    DIESEL              S                OFF      Y                    hfThlC-5 4A                r TRANSFER PUMP B        ,
281-1        119                                ON                              AND DPDP-6B4-                        3 5          DFP-IC    DC klOTOR DRIVEN FUELOIL  302-281-1    AUA111ARY          S                OFF      N N/A                NONE 175                                                                                        ' -
TRANSFER PUhtP C                        gg9                                OFF Appendix B                                                                                                                                          '17                  l
~-                                                                                                                          . - _  _      _ _          _____ _ __ _ _____
 
. fm b                                                          V                                                                                U SEQ  T    CL  IDNO        EQUIP DESCRIFHON          DRAWING      BLDGI    EVAL SSEL NOTE NORW      PWR SUPORT DW INTERCONS R
N                                                          EL                        DEstRED 5  DFP-ID    DC DRnTN fUELOIL          302-281-1  AUXILIARY    S            OFF        N N/A                        NONE 176 TRANSFER PUMP D                      gg,                      opy DFT-IA    DIESELGENERATORIVELOIL              SOUDt BER g              IN USE      N                            N/A 421  A    21                                      302-281-1 STORAGETANK A                        105                      IN USE DFT-1B    DIESEL GENERATOR FUELOIL  302-281-1  SOLTHIBER                IN USE      N                              N/A 422  B    21                                                              S STORAGETANK B                        105                      N USE A    21  DFT-3A    DIESELGENERATOR FUELOIL  302-281-1  DIESEL      S            IN USE    N                              DFP-IA 314 DAY TANK A                          i19                      IN USE 315 B    21  DFT-3B    DIESELGENERATOR FUELOIL  302-281-1  DIESEL        S            IN USE    N                              DFP-IB DAYTANK B                            119                      IN USE 195      18  Dil-07-LT  BORATED WATER STORAGE    302 441-1  BWST          S            IN USE    Y                              VBDP-8 3 TANK W TL                            i19                        IN USE 194      18  DH-07-LTI  BORATT.D WATER STORAGE    302441-1  BWST          S            IN USE    Y                              VBDP-9 3 TANK LEVEL                          119                        IN USE 420      1g  Dil-37-LT  BORATED WATER STORAGE      302 441-1 NAOH TAN      S            IN USE    Y                              VBDP-4 20 TANK LEVEL                            119                      IN USE 1        21  DilllE I A DECAY HEAT REMOVAL HEAT    302431-1  AUXILIARY    S            IDLE      N                              DC EXCHANGER A                          075                        IDLE 6        21  DlillE-1B  DECAY llEAT REhlOVAlliEAT  302431-2  AUXILIARY    S            IDLE      N                              DC                                  i EXCHANGER B                          075                        IDLE 4        5  DitP-IA    DECAY llEAT PUhtP A      302431-A  AUXILIARY    g            OFF      N N/A                          NOhT
                                                  -              075                        OFF 5  DIIP-1B    DECAY llEAT PUhiP B      302431-2  AUXIUARY    S              OFF      N N/A                          NONE 5
075                        OFF Appendix B                                                                                                                                              18
 
      .. .          .                                                                                                        .              .~      . . _ -  -.            . .      _            ._
O                                                                                                                            O                                                            O SEQ    T  CL    gDNO                                                                      EQUIP DESCRIPTION        DRA%TNC      BLDG /    EVAL SSEL NOTE NORM / PWR SUPORT DW INTERCONS R
N                                                                                                                          EL                            DE5tRED IN USE        N      N/A 423    X    21    DHT-1                                                                  BORATED WATER STORAGE      302441-1  SOUTH BER    S TM                                    119                          IN USE 874  WA  WA DHV-095                                                                      MALLUPTO PZR AUXIUARY      302 441-1  AUXILIARY N                  CID6ED        N      N/A SPRAY ISOtATION VALTT                I19                          OPEN WA          DHV-126                                                                MAKE-UPTO PZR AUXILIARY    302 441-1  AUXILIARY N                  CIDSED        N      N/A 873        WA
* SPRAY ISOLATION VAL \T                I19                          OPEN 298    A    21    DillLIA                                                                DIESELGENERATOR 111BE OIL  302-283-1  DIESEL        S                IDE          N      DISYSTEM CODI.IR I A                          119                          IN USE 299    B    21    DtitLIB                                                                DIESELGENERATOR LUBE OIL  302-283-1  DIESEL        S                IDLE        .N        DJ SYSTEM N IB                                  I19                          IN USE 300    A    21    DLHL2A                                                                  DIESELGENERATOR LUBE OIL  302-283-1  DIESEL        S                IDLE          N      DJ SYSTEM COOLER 2A                            I19                            IN USE 301    B    21    DillE-2B                                                                DIESEL GENERATOR LUBE OIL 302-283-1  DIESEL        S                IDLE          N      DJ SYSTEM M 2B                            119                          IN USE DPBA-IA                                                                  250/125V BATTERY A        206-0!!  CONTROL                        IN USE      Y 198    A    15                                                                                                                                S                                      DPBC-I A.
108                          IN USE                IC, A IE DPBA-IB                                                                  250/125V BA1TERY B        206 898  CONTROL                        IN USE      Y      DFBC-1B, 202  .B    15                                                                                                                                S 108                          IN USE                ID. A IF DPBA-IC                                                                  25a'125V BATTERY C        206 051-2 TURBINE                        IN USE      Y      DFBC-lO.
434    X    15                                                                                                                                S 095                            IN USE IH, A II 199    A    16    DPBC-IA                                                                  BATTERY CilARGER A        206-051-1 CONTROL      S                IN USE      Y      KIThlC-21
                                                                                                                        .              108                            IN USE              2BDR I
DPBC-lB                                                                  BATTERY CilARGER B        206-051-1  CONTROL      S                IN USE      Y      h!TMC4 3AL 204    B    16 tot                            IN USE Appendix B                                                                                                                                                                                      19
(
l
 
  .(%                                                        q                                                                    r s
SEQ    T CL    ID NO    EQUIF DESCRIFDON          DRAWING                    BLDGI EVAL SSEL NOTE NORM / PWR SUPORT DW INTERCONS R
N                                                                      EL                        DEstRED 200    A  16    DPBC lC  BATTERY CHARGER C        206 051-1                CONTROL    S            IN USE    Y          MIMC21 108                      IN USE                3BDR 205    B  16    DPBC-ID  BATTERY CHARGER D        206051-1                CONTROL    S            M USE      Y          MTMC43AR 108                      N USE 203    A  16    DFBC-lE  BATTERY CHARGER E        20H51-1                  CohTROL    S              STANMY    Y          MTMC-21 108                      STANDBY              4BDR 206  B  16    DPBC IF  BATTERY CHARGER F        206451-1                CONTROL    S            STANDBY  Y          MTMC43BL 108                      STANDBY 435    A*  16    DPBC lO  BATTERY CHARGER O        206051-2                TURBINE    S            IN USE    Y          MD4C-8 3A 095                      IN USE 436    B  16    DPBC-1:1 BATTERY CHARGER H        206451-2                TURBINE    S            N USE    Y          MTMC-9 3BL 095                      IN L4E 437  AB  16    DPBC-11  BATTERY CHARGER I        206051-2                TURBINE    S            STANDBY Y            DPXS-IC 095                      STANDBY 505    A  14    DPDP-IA  250/125V DC MAIN PANEL 3A 206451-1                CONTROL    S              IN USE  Y          EPBA-IA 108                      IN USE 506    B  14    DPDP-1B  250/125V MAIN FANEL3B    206451-1                CONTROL    S              N USE    Y          DFBA-IB 108                      N USE X  14    DPDP-IC  250/125V DC MAIN PANEL 3C  206051-1                TURBINE    S              IN USE  Y          DFBA-IC 493 095                        IN USE 494    X  14    DPDP-3A  250/I25V DC1URBINE        20645I-2                TURBINE    S              N USE    Y          DPDP-lC BUllDING PANEL A                                  095                        N USE I
DPDP-3B  250/125V DC TURBNIE        206 051-2              TURBINE                    IN USE  Y          DPDP-IC 575    X  14                                                                            S l                            BUIIDING PANEL B                                    I19                      IN USE i
t i    577    X  14    DPDP-4B  CONTROL COMPLEX DC PANEL 206 4 51-2                CONTROL    S              N USE    Y          DPDP-lC 18
!                            3B                                                  124                      IN USE l  Appendix B                                                                                                                        20 l
I m                                                                  - _ - - - _ _          _      _    _              _ _ ___        _ _ _ _ _ _ _ _ - .
 
              . -,                                                                                                                      g.        11 sEn    -T  CL  IDNO    EQUIP DESCRIPTION            DRAWING      BIAC/ . EVAL SSELNOTE NORM PHR SUPORT DW INTERCONS g                                                          EL                    nessern 206451-1  CONTROL                M USE    Y          DPDP-IA22 '
                      '578    A    14  DPDP-SA 250/125V DC ES PANEL A                            S 124                    M USE
                    -579      B    14  DPDP-5B 250/125V DC ES PANEL B      206-051-1  CONTROL  5            N USE    Y          DPDP-1B 8 124                    N USE 553    A    14  DPDP4A  2W125V DC ES DIESEL          206451-1  DIESEL    S          N L5E    Y          DPDP-5A 12 OENERATOR PANEL A                      I19                    IN USE B    14  DPDP4B  250/125V DC ES DIESEL        20645l-1  DIESEL    5          N USE    Y.          DPDP-5B 12 554 GENERA M PANElB                        119                    IN USE 507  .A    14  DPDP4A  250/125V DC ESSENTIAL        20645I-I  CONTROL    S            N USE    Y          DPDP-1 A 20 SERVICES PANEL A                        108                    IN USE 508    B    14  DPDP4B  250/125V DC ESSENTIAL        206451-1  CONTROL    S .-        N USE    Y          DPDP-1B 12 SERVICES PANEL B                        108                    IN USE DPDP-sc 250/125 VOLT DC EFIC PANEL D 206-051    CONTROL    S            N USE    Y-          DPDP-IA 580        14 124                    N USE 581        14  DPDP-8D 250/125 VOLT DC EHC PANEL D 206451      CONTROL    S          M USE    Y            DPDP-1B 124                    IN USE 14  DPDS-IA BATTERY 3A DISCONNECT        206 451-1 CONTROL    S          CIDSED  N          - N/A 739 SWITCH                                  108                    CLOSED DPDS-1B BATTERY 3B DISCONNEC[        2064 51-1 CONTROL    S          CIDSED  N            N/A 740      14 SHTTCH                                  108                    CIDSED DPDS-IC BATTERY 3C DISCONNECT        206451-2  1URBINE    S            CLOSED  N            N/A-736      14 SWITCH                                095                    CIDSED 582      20  DPTP-5A  ENGINEERED SAFEGUARDS DC                CONTROL    S TEST PANEL                              124 Appendix B                                                                                                          21
 
              %)                                                                                      GI                                                          w!
SEQ    T    CL    IDNO                              EQUIP DESCRIPTION        DRAWING          BLDGf  EVAL SSEL NOTE NOILW  PWR SUPORT DW INTERCONS R
N                                                                                        EL                    N 583          20    DFIT-5B                          ENGINEERED SAFEGUARDS DC                  CONTROL    S TEST PANEL                                124 555        20    DFTP4A                          ENGINEERED SAFEGUARDS                    DEESEL    S DIESELGENERATOR DCTEST                    gg9 PANEL 556        20
* DFI?4B                            ENGINEERED SAFEGUARDS                    DIESEL    S DIESEL GENERATOR DC TEST                  gg, PANEL 509        -20    DFTP-SA                          ENGINEERED SAFEGUARDS DC                  CONTROL    S TEST PANEL                                108 510        20    DFTP-8B                          ENGINEERED SAFEGUARDS DC                COhTROL    S 1EST PANTL                                gog 470          2    DNI                              MAN XFER S%1TCH FOR        208-041 hfU-  AUXIUARY  S            IN USE  Y              DPDP-5A 28 POWTR TO MUP-3B AND MUP-5B 31            095                    IN USE                  OR DPDP4B 2s DPXS-IC                                                      206-051-2    TURBINE                  IN USE  Y              MTMC4 3B 737  X      14                                    DPBC-1 INPUT PO%TR                                  S OR MTMC-9 TRANSFER S%TTCH                          095                    IN USE 3BR 586        20    DRRD42                            CRD DC BREAKER CABINTT                    CONTROL    S
                                                                                          -                  124 584        20    DRRD-10                          CRD AC BREAllR CABINET A-                CONTROL    S UNTI10                                    124 585        20    DRRD-1I                          CRD AC BREAKER CABINET B-                CONTROL    S UNTIIi                                  124 587        20  DRRD-2-1                          CRD DC BREAKER CABINET                  CONTROL    S UNTTI&2                                  124 Appendix B                                                                                                                                        22 m_---____-_______--___-_-_____      .- _ _ _ _ _ - _ _ _ __ _ - -____ ___ ____ -              -    _ . - -
 
ry                                                                                                                                                (x U                                                                                                                                                ' () -
SEQ    T    ct  3DNO      EQUIP DESCRIFTION      DRAMNG                              BLDGI EVAL SSELNOTE NORM /  PWR SL' PORT DW - INTERCONS R
N                                                                              EL                    pam 588        20  DN2-2    CRD DC BREAKER CABINET                                CONTROL      s L%TT 3 & 4                                              124 589        ~ 20  DRRD-2-3 CRD DC BREAKER CABINET                                CONTROL      s TRIP RESET                                              124 r
348  A      18  EF-23-FF EFP-1 TO OTSO-B FLOW    302 4 82-1                      NTER      S            IN USE  Y                          g3DP.s 095                    IN USE 338  B'    18  EF-24-FF EFP-2 TO 0T30 B FLOW    302-082-1                        INTER      S            IN USE  Y                          VBDP-10 095                    IN L5E 349  A      18  EF-25-FT EFP-1 TO OTSO A FLOW    302 4 82-1                      INTER      S            IN USE  Y                          VBDP-8                                            i 095                    N USE 1g  EF-26-FT EFP-2 TO OTSO A FLOW    302 482-1                        INTER                  IN USE  Y                          VBDP-10 339  B                                                                                      S 095                    IN USE EFW TANK  s            IN USE  Y                          VBDP-8 330  A      18  EF-98-LT EhtERGENCY FEEDWATER    302 4 82-2 TANK LEVEL                                                i19                    IN USE EF-99-LT EitERGENCY FEEDWATER    302 482-2                      EFWTANK                  IN USE  Y                          VBDP-10 33i  B      18                                                                              s TANK LEVEL                                                i19                    IN USE 590          20  EFIC-A  EhfERGENCY FEEDWATER                                      CONTROL  S            N/A    N INITIATION ANDCONTROL                                    124                    N/A CABINETA 591          20  EEB      EhfERGENCY FEEDWATER                                      CONTROL    S            N/A    N INITIATION AND CONUtOL                                    124                    N/A CABINET B 592          20  EFIC-C    EhtERGENCY FEEDWATER                                    CONTROL    S            N/A    N INITIATION ANDCONTROL                                    124                    N/A CABINET C Appendix B                                                                                                                                                23
 
hV                                                                w[
sEn  T  CL    ID NO                                                          EQUIP DESCRIFTION                                                            DRAWING        BLDG /  EVAL SSEL NOTE NORM /        PWR Sl? PORT DW INTERCONS R
N                                                                                                                                                                      EL                        ymm 593      20    EF1C-D                                                      EMERGENCY FEEDWATER                                                                          CONTROL    3            N/A            N DWT10N ANDCONTROL                                                                            124                      N/A CABINET D 594      20    EFIC-EC-A                                                  EMERGENCY FEEDWATER                                                                          CONTROL    S            N/A            N AUXILLARY EQUIPMENT                                                                          124                      N/A CABINET A 595      20    EFIC-EC-B                                                    EMERGENCY FEEDWATER                                                                        CONTROL    3            N/A            N AUX 113ARY EQUIPMENT                                                                        124                      N/A CABINET B 5%        20    EFIC-RC-IC EMERGENCY FEEDWATER                                                                                                                          CONTROL    s            N/A          N AUXILLARY REIAY CABENET IC                                                                  124                      N/A 597        20    EF1C-RC-ID EMERGENCY FEEDWATER                                                                                                                          CONTROL    5            N/A          N AUXILLARY RELAY CABINET ID                                                                  124                      N/A 350  A      5    EFP-1                                                        MOTOR DRIVEN EMERGENCY                                                        EF01,302-  INTER      S            IDLE          Y                DPDP.5A 10 FEEDWATER PUMP                                                                082-1      095                      IN USE                        AND WW-2C&2D 340  B      5    EFP-2                                                        TURBINE DRIVEN EMERGENCY 302482-1                                                          INTER        s            IDLE          N                EFIC,MS FEEDWATER PUMP                                                                            095                      IN USE EMERGENCY FEEDWATER                                                          302482-2    EFW TANK                  IN USE      N                N/A 332  X    21    EFT-2                                                                                                                                                                S TANK                                                                        .              I19                      IN USE 8A EFV41                                                            IlOTWELLISOIATION TO                                                          302482-1    INTER      s            CWSED        Y                DPDP4B1&
343 TURBINE DRIVEN EFP-2                                                          EF-06      095                      OPEN                          2 8A    EFV-02                                                          IlOTWELLISOIATION TO                                                        302-082-1,  INTER      S            C WSED        Y              DPDP-8A I A 344 MOTOR DRIVEN EFP-l                                                          EF47        095                      OPEN                          2 1
8A    EFV-03                                                        CDT-1 ANDElT-2ISOIATION                                                      302 4 82-I. INTER      S            CLOSED        N              NO POWER 345 TO EFP-1                                                                    EF-02        095                      OPEN                          AVA11ABLE Appendix B                                                                                                                                                                                                                                24
: 7.                                                                                                                                                                  7s
    \                                                                                          (                                                                              '
SPA)      T                CL  ID No              EQUIF DESCRIPTION        DRAWING        BLDG /    EVAL . SSELNOTE NORM /        FWR SUPORT DW INTERCONS
                  "                                                                                                              marssesn g                                                                                    EL CIDSED            N              ~NOPOWER 346                        8A EFV44                CDT-l ANDSfT-2 ISOLATION  302 4 82-1  INTER          S TO EFP-2                  EF03        095                          OPEN.                              AVAILABII i
868 N/A EFV-36              HOTWELLSHUTOFFTO EFP-1    302-082-1  TURBINE        N            CIASED          'N                N/A AND EFP-2                            096                          OPEN EE17,302- INTER                        OPEN            , Y .-            DPDP-58 29 337      B                  8B
* EFV-55            EFP-2 TO OTSO B CONTROL VALVE                      082-1 S
AND VBDP-095                          CONTR%
10 336      B                  8B  EFV-56            EFF-2 TO OTSO ACONTROL      EFIt,302-  INTER          S            OPEN              Y              . SPSP-5B 29 VALVE                      082-1      095                          CONULOL                            AND VBDP-10 EFV-57            EF7-1 TO OTSO B CONTROL    EF19,302-  INFER                        OPEN              Y                DPDP-SA 29 347      A                  8B                                                                            S VALVE                      082-1      095                          ACONTRO                            AND VBDP-8 L
EFV-58                                        EF20,302-  INTER                        OPEN              Y                DPDP-5A 29 353      A                  8B                      EFP-1 TO OTSO A CONTROL                                S VALVE                      082-1      119                        COfGROI.                            AND VBDP-8 20  EGCP-IA            EhiERGENCY DIESEL                    DIESEL          S            N/A              N 557 GENERATOR ACONTROL                      I19                        N/A PANEL 20  EGCP-1B            EMERGENCY DIESEL                      DIESEL        S            N/A              N 558 GENERATOR BCONTROL                    I19                          N/A PANEL                ,
20  EGCP-2A            EktERGENCY DIESELGEN A                DIESEL        S            N/A              N 559 ELENCAI.WMENT                          I19                        N/A CABINET 20  EGCP-2B            EktERGENCY DIESELGEN B                DIESEL          S            N/A              N 562 ELECTRICAL EQUIPh1ENT                  I19                        N/A CABINET Appendix B                                                                                                                                                        25
 
O                                                                                                                              O                                                                    O Sao                                                            T            CL    D NO    EQUIP DESCRIPTION          DRAWING                      BLDG / EVAL $$EL NOTE NORM / PWR SUPORTDW INTERCONS R
N                                                                                    EL                      DEstRED 563                                                                          20    EGCP-3A  DEESELGENERATOR A                                      DIESEL      S COMOL FOWER RELAY                                      g39 CABINET 564                                                                          20    EGCP-3B  DIESELGENERATOR B                                      DIESEL      S COWROL POWER REIAY                                    g39 CABINET 565                                                                        20    EGCP-4A DIEscLGENERATOR APO%IR                                DIESEL      S                                                e CIRCLTT BREAKER PANEL                                  g39 566                                                                        20    EGCP-4B DIESELGENERATOR B POWER                                DEESEL      S CIRCUIT BREAKER PANEL                                  gg9 EGDG-IA DIESELGENERATOR A            EG05 MTl3, DIESEL                                  STANDBY  Y            DPDP-5A, 312                                                            A            17                                                                                S DPDP4A, 302-282-1                  119                      IN USE EDG START AIR EGDG-1B DIESELGENERATOR B            EG06,lLITl4, DIESEL                    S            STANDBY Y            prDr.
313                                                            B            17 SB,DPDP4B, 302-282-1                  119                      IN USE EDG STARTING AIR EGT-lA  EDG A AIR RECEIVER I A      302-282-1                  DIESEL                    IN USE  N            N/A-317                                                            A          21                                                                                S 119                      IN USE EGT-lB  EDO A AIR RECEIVER IB      302-282-1                  DIESEL      S              .N USE N            N/A 318                                                          A          21 i19                      IN USE EGT-2A  EDO B AIR RECEIVER 2A      302-282-1                  DIESEL      S              IN USE N            N/A 319                                                            B          21 I19                      IN USE EGT-2B  EDG B AIR RECEIVER 2B        302-282-1                DIESEL      S              IN USE N            N/A 316                                                            B        21 i19                      IN USE 8B    EGV-36  EDO A AIR START SOLENOID    EGOS,302-                  DIESEL      S                    Y            DPDP4A 12 294                                                          A                                                                                          '-
VALVE                        282-I                      119 Appendix B                                                                                                                                                                                            26 m- _ - - - - - - - - - - - - -- - - - - - - - - . - . - - - - - - - _ - - - - - -                            - -------__ __.            _ _ _ _ . - - _
 
  ,r N                                                                                                                  f-~g
(
L)
          )                                                      /n ).
N/                                                    (J
                                                                                                                              )
SEQ      T CL  ID NO    EQUIP DESCRIFEION          DRAWING        BREG/ EVAL SSELNOTE NORM / FWR SUFORT DW INTERCONS EL                  DESIRED EGV-37  EDO A AIR STARTSOLEbotD                DIESEL    S                    Y              DPDr4A12 295    A  8B                                      EG0S. 302-VALVE                      252-1      g39 8B  EGV-40  EDO B AIR STARTSOLENOID    EG06,302-  DEESEL    S                    Y              DPDP4812 296    B VALVE                      282-1      g39 EDG B AIR STARTSOIINOID    EG06        DIESEL    S                    Y              DPDP4812 297    B  8B
* EG V-41  VALVE                                  gg9 EGV-52  EDO A AIR START 3-WAY      302-2s2-1  DEESEL                          N              EGV,36 747    A  7 VALVE                                  g39 EDG A AIR START 3-WAY      302-282-1  DIESEL                          N              EGV-37 748    A  7  EGV-53 VALVE                                  g39 749    B  7  EGV-54  EDG B AIR START 3-WAY      302-282-1  DIESEL                          N            EG V-40 VALVE                                  g39 750    B  7  EGV-55  EDG B AIR START 3-WAY      302-252-1  DIESEL                          N            EGV-41 VALVE                                  g39 751    A  8B  EGV-56  EDG A AIR START VALVE      302-282-1  DIESEL                          N            EGV-52 119 A  8B  EGV-57 . EDG A AIR START VALVE      302-282-1  DIESEL                          N            EGV-53 752 119 753    B  8B  EGV-58  EDG B AIR START VALVE      302-282-1  DIESEL                          N            EGV-54 119 754    B  8B  EGV-59  EDG B AIR START VALVE      302-282-1  DIESEL                          N            EGV-55 119 20  ERI      EVENTS RECORDER CABINET I              CONTROL    s          N/A      N 652 I45                    N/A 20  ER2      EVENTS RECORDER CABINET 2              CONTROL    S          N/A      N 653 145                  N/A Appendix B                                                                                                            27
~  _      __
 
gs
()
s j.3 kJ                                                                                                          O SEQ                        T .CL    ID NO                        EQUIFDESCRIFTION -                  DRAWING      BLDG / EVAL $5ELNOTE . NORM / FWIt SUyORT DW INTEDCONS
                                        "                                                                                                              .nsaamen EL ER3                        EVENTS RECORDER CABINET 3                    CDN11tOL    S              N/A      N 654                            20 145                        N/A ER4                        EVENTS RECORDER CABINET 4                    CONTROL    S              N/A      N 655                            20 145                        N/A ERS                        EVENTS RECORDER CABINET 5                    CONTROL    S              N/A      N 656                            20 145                        N/A ER6                        EVENTS RECORDER CABINET 6                    CONTROL    S              N/A      N 657                            20 145                        N/A ER7                        EVENTS RECORDER CABINET 7                    CONTROL    S              N/A      N-658                            20 145                        N/A EVENTS RECORDER CABINET S                    CONTROL    S              N/A      N 659                            20    ERS 145                        N/A ES SYSTEM CHANNELTEST                        CONTROL      S              N/A      N 660                            20    ESCC-1 NU I                                          145                      N/A ESCC-IA                    ES SYSTEM CHANNEL CABINET                  ' CONTROL      S              N/A      N 661                            20 IA                                            145                      N/A 662                            20    ESCC-1B                    ES SYSTEM CHANNELCABINET                      CONTROL    S IB                                            145 ESCC-2                                                                    CONTROL    S              N/A      N 663                            20                                ES SYSTEM CHANNELTEST CABINET 2                                    145                        N/A ESCC-2A                    ES SYSmlCHANNELCABINET                        CONTROL    S              N/A      N 664                            20
* 2A                                            145                        N/A 665                            20    ESCC-2B                    ES SYSTEM CHANNELCABINE1                      CONTROL-    S 2B                                            145 ESCC-3                      ES SYSTEM CllANNELTEST                        CONTROL      S              N/A      N 666                            20                                                                                        ' ~
CABINET 3                                      I45                      N/A Appendix B                                                                                                                                                                28
 
      ;/~\                                                                                                                    ,
U                                                                b                                                    (..)
SEQ  T      CL    ID NO        EQUIF DESCRIPTION          DRAwTNG    BLDG /      EVAL SSEL NOTE NORM / PHR SUPORT DW INTF N R
EL                        DESIRED N
ESCC-3A      ES SYSTEM CHANNELCABINET            CONTROL        S          'WA'      N 667          20 3A                                  145                        N/A                              t 677          20    N3B          ES SYSTEM CHANNELCABNET            CONTROL        S 38                                  g43 ESCP-1      MECHANICALINTERIDCK                CON 11tOL      S          N/A      .N 668          20
* CONTROL M                          145                        N/A ESCP-4A      ENGINEERED SAFEOUARDS              M OL            S          N/A      N 669          20 ACTUATION RELAY CABNET              145                        N/A 4A ESCP-48      ENGNEERED SAFEGUARDS                CONTROL        S          N/A      N 670          20
-                                        ACTUATION RELAY CABINET            145                        N/A 4B ESCP-4C      ENGNEERED SAFEGUARDS                CONTROL        S          N/A      N 671          20 ACTUATION RELAY CABINET              145                        N/A 4C ESCP-4D      ENGINEERED SAFEGUARDS              CONTROL        S          N/A      N 672          20 ACIVATION REIAY CABINET              145                        N/A 4D 20    ESCP-SA      ENGNEERED SAFEGUARDS                CONTROL        S            N/A      N 673 ACTUATION REIAY CABINET            145                        N/A SA 20  ESCP-3B      ENGINEERED SAFEGUARDS              CONTROL        S          N/A      N 674 ACTUATION REIAY CABINET            I45                        N/A SB ESCP-5C      ENGINEERED SAFEGUARDS              CONTROL        S          N/A      N 675          20 ACTUATION REIAY CABINET            145                        N/A SC Appendix B                                                                                                                  29
 
                ,n)                                                                              p                                                        rw-
_(                                                                                t  4 G                                                                                  s.s'                                                    (Ol-seq    T    CL  D NO                          EQUIP DESCRIPTION        DRAWIN;;      BLDGf  EVAL SSEL NOTE NORM / PWR SUPORT DW INTERCONS R
N                                                                                EL                      ymmm 676          20  ESCP-5D.                    ' ENGINEERED SAFEGUARDS                CONTROL      5            N/A      N ACTUATION REIAY CABWET              145                      N/A SD 483          20  ESP 8C-3Al ENGNEERED SAFEGUARDS                                    WIER        S            WA      N PRESSURE 5%TFCH CABINET              093                      N/A 3Al 484          20  ESP 9C-3A2 ENGINEERED SAFEGUARDS                                  INTER        S            N/A      N PRESSURE SWITCH CABINTT              095                      N/A 3A2 485          20  ES N 3A3 ENGNEERED SAFEGUARDS                                      MTER        S            N/A      N PRESSURE 5%1TCH CABINET              095                      N/A 3A3 471          20  ESN3A4 ENGWEERED SAFEGUARDS                                        AUXIIJARY    S            N/A      N PRESSURE SWITCH CABINET              095                      N/A 3A4 486          20  ESPSC-3B1                    ENGINEERED SAFEGUARDS                INTER        S            N/A      N PRESSURE SWITCH CABINET              095                      N/A 3BI 487          20  ES N 3B2 ENGINEERED SAFEGUARDS                                    INTER        S            N/A      N PRESSURE SWITCH CABINET              095                      N/A 3B2 488          20  ES N 3B3 ENGINEERED SAFEGUARDS                                      INTER      S            N/A      N PRESSURE SWITCH CABINET              095                      N/A 3B3 678          20  FSCP-1                        CONTROL PANEL WITH                    CONTROL    S            N/A -    N BATTERY RACK AND A10DUIIS            145                      N/A 20  FSCP-2                        LEASED LINE ANNUNCIATOR              AUXILIARY  S            N 'A    N 472 095                      N/A Appendix B                                                                                                                                  30
<a-.------_--------_-------___--__      - _ _ - - - - - - - . _ -                _____ _ _                                                      _        . _ __
 
p                                                              n (m                                                                                                                          )
                                                                .%/                                                    v SEQ  T    CL  gDNO      EQUIP DESCRIFFION            pgAw1Nc        BLDGi EVAL SSEL NOTE NOBLW P%R SUPORT DW INTERCONS R
N                                                              EL                    DESIRED 20    F3CP-3 LEASED IJE ANhMTOR                        CONTROL    s          N/A          N 679 145                    N/A 5    NP-7  AUXIIJARYIT.EDWATER PUMP 3024814          TUltBINE    s          OFF          N        N/A 446 7                                        093                    OFF 8A    FWV-14 FEEDWATER PUMP A SUCTION      FW22,302  1URBINE    s          OPEN          Y        MTMC-512A 463  B
                  .        ISOIATION VALVE              081-2      121                    CIDSED 464  A    8A    FWV-15 FEEDWA1TR PUMP B SUCTION      FW23,302-  TURBINE    s          OPEN          Y        MTMCJ 148 ISOLATION VALVE              081-2      121                    CWSED 460  B    8A    FWV-28 FEEDWATER PUMPS                FWl9,302-  TURBINE    S          CWSED        Y        MTMC-5 IIC DISCHARGE CROSSTIE            081-2      109                    CLDSED ISOIATION VALVE 419  B    8A    NV-29  OTSO B MAIN BWCK VALVE        FWI4. 302- INTER      S          OPEN          Y        MTMC-512C 081-1      142                    C WSED 417  A    8A    NV-30  OTSO A MAIN BWCK VALVE        FWI3,302  INTER      S            OPEN        Y        MWC-314C 081-1      IM                    C WSED 418  A    8A    FWV-31 OTSO AIDW IDAD BIDCK          FWil 302-  INTER      S            OPEN        Y        MTMC-3 I4A VALVE                          088-1      IM                    CIDSED 414  B    8A    NV-32  OTSO B IDW IDAD BIDCK          FW 12,302  INTER        s          OPEN        Y        M111C-512B VALVE                  -
081-1      IM                      CIDSED 415  B    8A N V-33    OTs0 B STARTUP BIDCK          FW31,302-  INTER      S          OPEN        Y        DPDP-8B 10 VALVE                        081-1      IM                      CIDSED 416  A    8A    FWV-36 OTSO A STAR 1UP BIDCK          FW30,302-  INTER      S          OPEN        Y        DPDP-8A 8 VALVE                        081-1      IM                      C WSED 448        5    GWP-IA  CONDENSATE INJECTION          302-142-1  1URBINE    s          ON            N      N/A PUMP 3A                                  095          '-        OFF Appendix B                                                                                                              31
 
(.
G                                                                                                                                '% )                                                        %)
SEQ                                                                T CL  ID No        EQUIP DESCRIFTION          DRAWING        BLDG /  EVAL : SSELNOTE NORM / -PWR SUPORT DW INTERCONS EL                      asurern h
l 5    GWP-IB      CONDENSATE INJECTION        302-142-I    1URBINE      S            ON        N            N/A 449 FUMP3B                                  095                        OFF 7    GWY1%      GWP-I A CONTROL VALVE      302-142-1'  TURBINE      S            CONTROL N              WA 450 095                        OFF 20    HTCP-2    N EMERGENCY LOAD                        ALDG11ARY    S      . N'A      N 473
                                                                                            .            SHEDDING-HEATTRACM                      095                        N/A 20    HTCP-3 ~  EDG-B EMERGENCY IDAD                    AUXILLARY    S            N/A      N 544 SHEDmNG HEATTRACM                        i19                        N/A HTCP4      EDG4 EMERGENCY LOAD                      AUXILIARY    S            N/A      N 474                                                              20 SHEDDING-HEATTRACLNG                    093                        N/A 20    HTCP-5    EDG A EMERGENCY LOAD                    AUXILLARY    S            N/A      N 545 SHEDDING-HEATTRACN                        I19                      N/A HVAC-16A IIVAC CONTROLCABINET 16A                  AUXILLARY    3            N/A      N 475                                                              20 093                        N/A 20    HVAC-16B HVAC CONTROLCABINET 16B                    AUXILLARY    S              N/A      N 476 095                        N/A 20    HVAC-17A HVAC CONTROL CABINET 17A                    AUXILLARY  S              N/A      N 546 119                      N/A 20    HVAC-17B HVAC CONTROLCABINET 17B                    AINIllARY    $            N/A      N 547 119                      N/A 20    HVAC-19    HVAC CONTROLCABINET 19                  DIESEL      S            N/A      N 567 119                      N/A 20    tiVAc-20    HVAC CONTROLCABINET20                    DIESEL      S            N/A      N 568 I19                      N/A 9
INSTRUMENT AIR IIEADER                  TURBINE                    IN USE    Y            TPC 428                                                            I8  1A M PT                                302 271-1 S
PRESSURE                                  095 IN USE Appendix B                                                                                                                                                                        32 1 - - - - - - . _ - - - - - - - - - - - - - - _ - - - - - _ - - - - - - _ - - - - -                              _ - _ -_ - _--_    ._.                                                      .            __
 
g-_                                                            -    .
  \                                                              b                                                            V-SEQ  T    CL    ID NO    EQUIP DESCRIFTION          DRAWING      BLDGf  EVAL SSEL NOTE  NOIL'4f PWIt SUPoitT DW INTERCXmS R                                                                                      DESIRED N
EL wl2-PS  mSTRUMENT AIR                WI. N2,_  M tBNE                  IMI        N                N/A 738  X    13                                                                S COMPRESSORIDAD'UNIDAD        302-271-1  095                    CONUtOI, PRESS SWITCH IADit-l INSTRUMEM AIR DRYER I        IA03,302-  TLTBINE                            Y                N12 429 A*    21                                                                S 3AE 271-1      095                    IN USE INSTRUMENT AIR AFTER-        302-271-1  TURBINE    S                      N                SC SYSTEM 430  A    21
* IAHE 1A COOLER A                                095                    IN USE IAHE-1B INSTRUMENT AIR AFTER-        302-271-1  TURBIhI    S                      N                SC SYSTEM 431  B    21 COOER B                                095                    IN USE
              ]2    IAP-IA  INSTRUMENT AIR              IA01,302-  TUltBINE                IDLE      Y                MTSW E 426  A                                                                      S 2C,DPDP-3A COMPRESSOR A                271-1      095                    IN USE i1. AND SC SYSTEM IAP-lB  INSTRUMENTAIR                1A02,302- TURBINE    S            IDE      Y                - MTSW-3D 427  B    12 2C, DPDP-3B COMPRESSOR B                  271-1    095                      IN USE
: 11. AND SC SYSTEM IAT-IA  INSTRUMENT AIR RECEIVER A    302-271-1  TURBLNT                IN USE    N                  N/A 432  A    21                                                                S                                                    ,
095          -        IN USE IAT-lB  INSTRUMENT AIR RECEIVER B    302-271-1  TURBINE    S            IN USE  N                  N/A 433  B    21 095                    IN USE AIR SUPPLY TIE IATO SA      302-271-2  TURBLNE    N            OPEN    N                  N/A 856      N/A 1AV-010 095                    CIDSED N/A IAV431      AIR SUPPLY BYPASS FOR IADR-  302-271-1  TURBINE    N            CIDSED    N                N/A        '
857 I                                      095                    OPEN 1ADT-2 ISOLATION            302-271-1  TURBINE    N            OPEN      N                  N/A 858 N/A  N/A IAV-036 095                      CIDSED Appendix B                                                                                                                    33
 
f'r                                                        r~-                                                        ,~
U                                                          (                                                          L)
  -SEQ    T  CL    ID NO    EQUIP DESCRIPTION        DRA%1NG.        BLDG / EVAL - SSELNOTE NORM / F%R SUPORT DW INTERCONS R
N                                                            EL                      DESIRED IAITT-1 ISOIADON          302-271-1  TLRBINE    N              OPEN    N            . N/A -
859  N/A N/A 1AV437 095                      C wSED N/A IAV-048    lADT-9 ISOLATION          302-271-1    RRBINE      N            OPEN    N              N/A 862  N/A 095                      CLOSED RRIENE                    OPEN    N              N/A .
863  N/A N/A IAV-06      IADT-10 ISOLATION        302-271-1                N 095                      C wSED 864  N/A N/A IAV450      IADT-3 ISOLATION          302-271-1    IURBINE    N            OPEN    N            .N/A 095                      CwsED 865  N/A  N/A IAv-051    lADT-71SOIATION          302-271-1    RRBibT      N            OPEN    N              N/A 095                      CLOSED IADT-3 ISOLATION          302-271-1  TURBINE    N            OPEN    N              N/A 866  N/A  N/A IAV48                                                                                                            i 095                      CLOSED OPEN    N-              N/A 867  N/A  N/A IAV49      IADT-7 ISOLATION          302-271-1  TURBWE      N 095                      CwSED IAV-188  IAP-I A WADER / UNLOADER  1A01,302    TURBINE    S-            OFF      Y              DPDP-3A II 424  A    8B VALVE                    271-1    , 095                      N USE 8B    IAV-189  IAP-IB wADEPAJNIDADER    IA02,302-    TURBINE    S            OFT      Y              DPDP-3B II -
425  B VALVE                    271-1        095                      IN USE N/A  N/A IAV-388      1ADT-8 ISOIADON          302-271-1    TURBINE    N              OPEN    N              N/A 860                                              '
095                      C wSED N/A 1AV-393      IADT-7 ISOLATION        302-271-1    TURBIhT    N            OPEN    N              N/A 861 N/A 095                      CwSED ICS      MAIN CONTROL BOARD                    CONTROL    S            N/A      N 680      20 145                      N/A 681      20    ICS-1    INTEGRATED CONTROL                  CONTROL    S SYSTEM CABINET I                      145 Appendix B                                                                                                              34
+                                          . _
 
l?
[
seq  T  CL    ID NO        EQUIP DESCRIPTION    DRAWING      BLDGf EVAL SSELNOTE NORMI FWR SUPORTDW INTEREONS
        =                                                                                  . . . . ,
EI.
l 682        20    BCS-2      INTEGRATED CONTROL                CONTROL    s i                              SYSTEM CABINET 2                  145 683        20    ICS 3      NTEGRATED CONTIOL                CONTROL    s SYS1TM CABNET3                    145 684                        INTEGRATED CONTROL                CONTROL    S 20
* BCs-4 SYSTEM CABINET 4                  145 685      20    BCS-S      NTEGRATED CONIROL                CONTROL    3 SYSTEM CABINET S                  145 MAIN STEAM UNE A-2                INTER                    IN USE      Y.      VBDP-s -
365  A    is    MS-106-PT                        302 4 11-1            S PRESSURETRANSMITTER              I19                  ' IN USE MS-107-PT  MAIN STEAM LINE A-1    302-011-1 NTER                    N USE      Y.      VBDP-10 378  B    13                                                            S PRESSURETRANSMITTER              I19                    IN USE 364  A    1g    MS-10s-PT  MAIN STEAM LINE A-2    302-011-1 INTER      S              IN USE    Y      \1BDP-9 PRESSURETRANSMITTER              I19                    IN USE 18    MS-109-FT  MAN STEAM UNE A-l      302-01I-1 INTER      S              IN USE    Y      VHDP-Il 379  B PRESSURE TRANSMITIT.R            I19                    IN USE 388  A    la    MS-l10-PT  MAIN STEAM LINE B-2    302-011-1  INTER      g            IN USE    Y      vigDP-s PRESSURE TRANSMITTER.            I19                    N USE la    MS-11I-rr  MAIN STEAM UNE B-1    302-011-1  INTER      S            IN USE    Y.      VBDP-10 394  B PRESSURETRANSMITTER                I19                    IN USE MS-Il2-PT  MAIN STEAM UNE B-2    302-011-1  INTER                    IN USE    Y        \1tDP-9 389  A    18                                                            S PRESSURE TRANSMITTER              I19                    IN USE 395 B    Ig    MS-n3-rr  MAIN STEAM ilNE B 1    302-011-1  INTER      S            IN USE    Y        VBDP-Il PRESSURE TRANSMITTER              I19      _              IN USE Appendix B                                                                                                        35 i                                                                    _                                                  .. _
 
fm-                                                            ry                                                                        [
0' SEQ. T    CL  ID NO    EQUIP DESCRIPTION          DRAWING                    SLDC/ EVAL SSEL NOTE NORW      PWIL St' PORT DW INTERCOM 5 R
N                                                                        EL                      DESIRED A    7  MsV-025 Anf0 SPHERIC DUMP VALVE A 3024111                  INTER      S          CIDSED      Y                VilDP-8,IA, 372                                                                                                                              EFIC t19                    CONTROL MSV426  ATMOSPHERIC DUMP VALVE B 302 4 11-1                INTER      3            CLOSED      Y                VHDP-10,IA, 3%  B    7 E
t19                    CONTROL MAIN STEAM UNE A-2 SAFETY  302-011-1              INTER      s            CIDSED      N                N/A 373  A    7
* MSV-033 VALVE                                              I19                    IN USE MSV434  MAIN STEAM UNE A-I SAFETY  302411-1              INTER                    CLOSED      N'                N/A 380  A    7                                                                          S VALVE                                              I19                    IN USE 7  MSV435  MAIN STEAM UNE B-1 SAFETY  302 011-1              INTER      S            CLOSED      N                N/A 384  B VALVE                                              I19                    IN USE 7  MSV-036 MAIN STEAM UNE B-2 SAFETY  302-011-1              INTER      S            CIDSED    N                N/A 397 B VALVE                                              I19                    IN USE MSV-037 MAIN STEAM LINE A-2 SAFE 1Y 302411-1                IN1ER                    CIDSED    N                N/A 374 A    7                                                                          S VALVE                                              I19                      IN USE MSV-03: hlAIN STEAM UNE A-1 SAFETY  302-011-1              INTER                    CLOSED    N                N/A 381 A    7                                                                          S VALVE                                                I19                    IN USE 7  MSV-039 MAIN STEAM UNE B-1 SAFETY    302-011-1              INTER                    CLOSED    N                N/A 385 B                                                                                S VALVE                  .
I19                    IN USE 382 A    7  MSV-040 MAIN STEAM UNE A-1 SAFETY    302411-1              LVFER      S            CIDSED    N                N/A VALVE                                                I19                    IN USE B    7  htSV441 MAIN STEAh! UNE B-2 SAFETY  302-01: i              INTER      S            CLOSED    N                N'A 398 VALVE                                                I19                      IN USE MSV442  MAIN STEAM UNE A-2 SAFETY    302411-1                INTER                    CIDSED    N                N/A 375 A    7                                                                          S YAI U                                                l19      ..              IN USE Appendix B                                                                                                                              36
 
              ,y.                                                          - ,                                                        ,
y SEQ    T  CL    ID NO    EQUIP DESCRIPTION '          DRAWING        BLDGf EVAL SSEL NOTE NORM / FWR ' SUPORT DW INTERCONS
                      'R N                                                            EL                    Dem
              .383    A    7    MSV443  MAIN STEAM 1JNE A-1 SAFETY  3024Il-1    INTER      S            CLOSED    N              N/A VALVE                                    I19                    IN USE B    7    MSV444  MAIN STEAM LINE B-I SAFETY  302 4 11-1  INTER      S            C1DSED    N              N/A 386 VALVE                                    I19                    IN USE 400    B    7    MSV443  MAIN STEAM LNE B-2 SAFETY 302 4 11-1    INTER      S            CIDSED    N              N/A VALVE                                    I19                    IN USE 376  A    7    MSV 046 MAIN STEAM UNE A-2 SAFETY 302 4 11-1    INTER'    S            CLOSED  N              N/A VALVE                                    I19                    IN USE 387  B    7    MSV447  MAIN STEAM IJNE B-1 SAFETY  3024Il-l    INTER    S            CLOSED  N              N/A VALVE                                    119                    IN USE 401  B    7    MSV-04: MAIN STEAM UNE B-2 SAFETY    3024H-1      INTER    S            CIDSED  N              N/A VALVE                                    I19                    IN USE 377  B  8A    MSV-055 OTSO ATO EFTB-1 STOP CHECK MSto,302-      INTER    S            OPEN    Y              DPDP-8B 14 011-1        119                    OPEN 402  B  8A    MSV-056 OTSO B TO EFTB-1 STOP CHECK MSO9,302-    INTER    S              OPEN    Y              DPDP-8B 16 011-1        119                    OPEN 876  N/A N/A MSV-297    MSDT-22 ISOLATION VALVE      302 4 11-1  INTER    N              OPEN    N              N/A
* 119                    C1DSED 877  N/A N/A MSV-299    MSDT-23 ISOIATION VALVE      3024Il-1    IN11R    N              OPEN    N              N/A 119                    CLOSED 878  N/A N/A MSV-301    MSDT-241SO1ATION VALVE        302-011-1    INTER    N              OPEN    N              N/A 119                    CIDSED 879  N/A N/A MSV-303                                  302411-1    INTER    N            OPEN    N              N/A MSDT-251SOLATI,0N VALVE 119                    CLOSED Appendix B                                                                                                                37 a_____-_____-__-________.                                      .    -                                          ..
 
s                                                              -g                                                      gs
  ' SEQ  T    CL  ID NO        EQUIP DESCRIPTION          DRAWING        BLDG / EVAL SSEL NOTE . NORM / FWIt SUPORTDW INTERCONS R
EL                      DESIRED N
MAIN STEAM LINE A 2        MS18,302    INTER                    OPEF4 -    Y            DPDP4A11 354  X      7  MSV-411 -                                                        S ISOLATION VALVE            011-1      119                      CLOSED MSV-4tl-    MSV-411 AIR RESERVOIR I    308-335    INTER                      N USE    N            N/A 366  X    21                                                                    S ARI                                                119                      M USE MSV-411 AIR RESERVOIR 2    308-335    INTER                      IN USE    N            N/A 367  X    21  MSV-411-                                                        S
* AR2                                                  119                      IN L5E MSV-4II-    MSV-4II AIR RESERW)lR3      305-335    INTER                      IN USE    N            N/A 368  X    21                                                                    S AE3                                                  119                      IN USE 356  X    8B  MSv-4 t i. MSV-411 CONTROL            MSl8,308-  INTER        S                      Y            DPDP4All SVI                                    335          339 MSV-4 H-                                MSIS 308    INTER                              Y            DPDP-8A 11 357  X    8B              MSV-411 CONTROL                                      S                                                t SV2                                    335          gg9 358  X    8B  MSV 411    MSV-4 tl CONTROL            MSIS 308-  INTER      S                      Y            DPDP4A 11 SV4                                    335          gg9                                                          j X    8B  MSV-        MSV-41I & MSV-412 CONTROL  MS18,308-  INTER      S                      Y            DPDP-8A 11 359 411/412-SV5                              335          g39 360  X    8B  MSV-        MSV-4tl & MSV-412 cOrrrROL  MS18. 308  INTER      S                      Y            DPDP4A H 411/412-SV6                          ,  335          gg9 355  X      7  MSV-412      MAIN STEAM LINE A-1        MS18,302    INTER      S              OPEN      Y            DPDP4AII ISOLATION VALVE            011-1        H9                        M ED INTER                    IN USE    N            N/A 369  X    21  MSV-412-    MSV-412 AIR RESERVOIR I    308-335                  S ARI                                                  119                      IN USE MSV-412-    MSV-412 AIR RESERVOIR 2    308-335      IN'IER                    IN USE  .N.            N/A 370  X    21                                                                    S AR2                                                    119                      IN USE Appendix B                                                                                                                  38 u
 
l' sEn  T    CL    ID NO        EQUIP DESCRIFTION        DRA%1NC                    BLDG / EVAL SSEL NOTE NORMt -PWR stTORT DW INTERCOl45 g                                                                            EL                    rwaara kSV-412    MSV 412 AIR RESERVOIR 3  308-335                INTER                    M USE  :N                  N/A 371 X    21                                                                              S AR3                                                          I19 -                  N USE -
361 X    8B    MSV-412    MSV 413 CONTROL          MSl8,305-              DTTER      S                    _Y-                DPDP4A 11.
SVI                                  335                    gg9 MSV-412 CONTROL          MSl8,308-              INTER                            Y                  DPDP4A 11 -
362 X    SB    MSV-412-                                                                  S
                  'SV2                                    335                    gg, 363 X    8B    MSV-412-    MSV-412 CONTROL          MS18,308-              DmER        S                    Y                  DPDP4A11 SV4                                  335                      g39 399 X      7-  MSV-413    MAIN STEAM IJNE B-1      MSl9,302-              INTER      S                    Y                  DPDP4A 11 ISOLA 110N VALVE          011-1                    gg9 MSV-413 AIR RESERVOIR I  308-335                INTER                    IN USE  Y                  MtA L 403 X    21    MSV-413-                                                                  S ARI                                                            119                    IN USE I
MSV-413-    MSV-413 AIR RESERVOIR 2  308-335                  INTER                  IN USE  N                ' N/A 404 X    21                                                                              S AR2                                                            119                    IN USE                                        ;
t MSV-413 AIR RESERVOIR 3  308-335                  INTER                  IN USE  N                  N/A 405 X    21    MSV-413-                                                                  S                                                          t AR3                                                            119                    IN USE I
406 X    8B    MSV-413    MSV-413 CONTROL            MS19. 308-              INTER      S                    Y                  DPDP-SA 11 '
SVI                                , 335                      g39                                                                  ,
407 X    8B    MSV-413-    MSV-413 CONTROL            MS19,308-              INTER      S                    Y                  DPDP-8A ll      !
SV2                                  335                      g39                                                                  !
408 X    8B    MSV-413    MSV-413 CONTROL            MS19,308-              INTER      S                    Y                  DPDP-SA 11
,                  SV4                                    335                      gg9 l
MSV-        MSV-413 & MSV-414 CONTROL                          INTER                            Y                  DPDP-SA ll 409 X    8B                                          MS19. 308-                        S 413/414-SV5                            335                      gg9 Appendix B                                                                                                                                39 i
D                                                                --- - -_--- -__-                              --              .n..s.              ., .
 
(G/  l                                                                                                                          4 SEQ  T  CL  ID NO          EQL1F DESCRIFTION        DRA%TNG      BLDGI  EVAL SSELNOTE NORM / F%R SLTORT DW INTERCONS
            .R-N                                                              EL                      DESIRED 410  X    8B  MSV-          MSV-413 & MSV-414 CONTROL MS19,308  INTER        S                    Y            DPDP4A Il 413/414 SV6                            335        g39 L
390  X    '7  MSV-414      MAIN STEAM UNE B-2        MS-19,302- INTER        g          OPEN      Y'            DPDP4AII ISOLATION VALVE          011-1      119                      CtOSED INTER                    IN USE    N            N/A 391- X    21  MSv-414      MSV-414 AIR RESERVOIR I  308-335                3
                      ~#                                                  119                      IN USE INTER                    IN USE    N            N/A 392  X    21  MSV-414-      MSV-414 AIR RESERVOIR 2  308-335                S E                                                  119                    IN USE 393  X    21  MSV414-      MSV-414 AIR RESERVOIR 3  308-335    INTER        S          IN USE    N            N/A AR3                                                119                    IN USE 411  X    8B  MSV-414-      MSV-414 CONTROL          MS19. 308- INTER        S                    Y            DPDP-SA ll SV1                                    335        gg9 412  X    8B  MSV-414-      MSV-4I4 CONTROL          MSl9,308-  INTER        S                    Y            DPDP-SA i1 SV2                                    335        g39 413  X    8B  MSV-414-      MSV-414 CONTROL          MSl9,308-  INTER        S                    Y            DPDP-5A II SV4                                    355        g39 511      20  MTCP-IA      UNDERVOLTAGE TEST                    CONTROL      S            N/A      N CABINET A              -            108                    N/A 512      20  MTCP-IB      UNDERVOLTAGE TEST                    CONTROL    S            N/A CABINET B                            108                      N/A 479  A      1  MTMC-03      480V ES MCC3Al            206417      AUXILIARY  S            IN L5E  Y            MTSW-3F 3D 095                      IN USE                AND DPDP-    ,
SA9 Appendix B                                                                                                                  40
 
y-(x b                                                      O SEQ  T  CL ID NO      EQUIP DESCRIPTION      DRAMING        BLDC/  EVAL SSEL NOTE NORM / PWR SUPORT DW INTERCOM 5 R                                                                                                                  L N                                                        EL                          N 549  A    I  nrruc44  4 0V ES MCC 3A2        206417      AUXILIARY    S              IN USE  Y            MT3W-3F 2B I19                        IN USE                AND N SA9 550  P    1  MTMC45    480V ES MCC 3BI        206417      AUXILLARY    S              IN USE  Y            MTSW-30 119                        N USE                28AND DPDP-SB 9 480  B    1  Mnaco6    4s0V ES MCC 3B2        206 4 17    AUXILIARY    S              IN USE  Y            MTSW-30 095                        IN USE                3D AND DPDP-3B 9 551  AB    1  wrMC47    4s0V ES MCC 3AB        206-017    AUXILIARY    S              IN USE  Y            MTXS-I 119                        IN USE 569  A    1  kmIC4:    480V PRESSURIZER HEATER 206416      INTER        S              IN USE  Y            MTSW-3C MCC3A                              319                        IN USE                IC AND DPDP-3A 11 570  B    1  MTMC49    4:0V PRESSURIZERIIEATER 206-016    INTER        S              IN USE  Y            MTSW-3D MCC3B                                I19                        IN USE              IC AND DPDP-3B il 576  A    1  MnIC 12  4:0V TURBINE MCC 3A    206-016    TURBINE      S              IN USE  Y            MTSW-3J 3C I19                        IN USE              AND DPDP-3A 13 477      1  MnIC-1    4s0V REACTOR MCC-3 A2    206-016    AUXILLARY    S                IN USE Y            MTSW-3C 095                          IN USE 548  A    I  MTMC-21  480V ES MCC 3A3          206-017    AUXILLARY    S                IN USE Y            MTSW-3F 2C I19                      ' IN USE                AND DPDP.
5A9 478  B    1  M u tC-22 480V ES MCC 3B3          206-017    AUXILIARY  S                IN USE Y            krI5W-30 095                          IN USE              2C AND DPDP-5B 9 Appendix B                                                                                                          41
 
n                                                            p                                                    - p Y                                                  '
SEQ  T    CL    IDNO        EQUIP DESCRIFTION      DRAHTNG    BLDG / EVAL SSEL NOTE NOftW FWR SUPORT DW INTERCONS R
N                                                          EL                      DESIRED 513  A    3    MTSW-2C    4160V ES 3A(NOltTH)    206411    CONTROL    $            N USE      Y          MTSW-2D 108                    IN USE 514  A    3    MTSW-2D    4160V ES 3A(SOLTTH)    206411    CONTROL    S            N USE      Y          EODG-IA 108                    EIUSE                  AND DPDP-SA10 515  B    3 . MTSW-2E      4160V ES 3B(NORTH)      20H11    CONTROL    S            IN USE ~  Y          MTSW-2F los                    IN USE 516  B    3    wrSW-2F    4164Tf ES 3B(SOUTH)      206411  CONTROL    S            N USE      Y-          EGDO1B los                    IN USE                AND DPDP-5B 10 495  A*    2    MTSW-3A    480VTURBME AUXIUARY BUS 206411    TURBINE    S            N USE    Y          M13W-3J IC A                                095                    IN USE                AND DPDP-3AI3 496  A    2    MTSW-3C    480V REACTOR AUXILIARY  206411 ' TURBINE    S            IN USE    Y          MTSW-3F 3A BUS A                            095                    IN USE                AND DPDP-3A ll 497  B    2    MTSW-3D    4s0V REACTOR AUXILIARY  206411  TURBINE    S            IN USE    Y          MTSW-3J IC BUS B                            095                      IN USE                AND DPDP-3B il 6()2 A    2    MTSW-3F    480V ES BUS 3A          20H17    CONTROL    S            IN USE    Y          MISW-2D 124                    IN USE                II. DPDP-5A
: 9. AND DPDP-5A 10 603  A    4    MTSW-3F-T 4160/480V ES BUS 3A      206 4 17 CONiltOL    S            IN USE  N          N/A TRANSFORMER                        124                    IN USE 604  B    2    krrSW-30    480V ES BUS 3B          206-017  CONTROL    S            IN USE  Y          MTSW-2F 4, 124                    IN USE                DPDP-5B ,
s AND DPDP-SB 10 Appendix B                                                                                                          42
 
f-s                                                                      g                                                                                                                                              m
                                                                                                            /
seq  T    CL    ID No        EQUIP DESCRIPTION          DRAWING              BIEGI            EVAL SSEL NOTE NORM /                                                                              PWR SUPORT DW INTEDCONS R
y                                                                        EL                                                                          DESIRED 4    MTSW-30-T 4:60/4:0V ES BUS 3B          206 417            CONTROL                                                                    IN USE                                          N        N/A 605  B                                                                                            S TRANSFORMER                                  124                                                                        N USE 498  B      2    MTSW-3J      4s0V PLANT AUXIUARY BUS    2064II            TURBINE              S                                                    N USE                                            Y        MTSW-2E 095                                                                        IN USE                                                    12.DPDP-3B 10 AND DPDP-3B 10 499  B      4    MTsW-3J-T 416w4 0VP1ANTAUXIUARY        206411            TURBINE              S                                                    N USE                                            N        N/A BUS MSN                                      095                                                                        N USE
^
606  X      2    MTXS-1      ES MCC 3ABINPUT POWER      206 017            CONTROL              S                                                      IN USE                                          Y        MTSW-3F TRANSFER 5%TTCH                              124                                                                        IN USE                                                    AND DPDP-5A.OR MTSW-30 AND DPDP-SB 41        1g    MU 002-FT PRESSURE TO RCP SEALS        302 4 61-3        AUXIMARY              S                                                      IN USE                                          Y        NNI-X OR 095                                                                        IN USE                                                    NY 742        7    MU403        MUV-5I CONrTROL            308-827            AUXIUARY              S                                                      IN USE                                            Y      IA POC                                                        I19                                                                        IN USE 8B    MU403-SV    MUV-51 AIR FAILIDCK        MU54,308-        AUXIUARY              S .                                                    STANDBY                                          Y      VBDP4 23 172 827                119                                                                        STANDBY 18    MU-0040PT LET-DOWNITDW                  302461-1          AUXIUARY              S                                                      IN USE                                          Y      VBDP-9 3 173 TRANSMITTER                                    119                                                                        IN USE 169      18    MU 004      LET-DOWN FIDW              302461-1          AUXIUARY~ S                                                                  IN USE                                          Y      VBDP-18 0R DFTl        TRANSMTFTER                                    I19                                                                        IN USE                                                    VBDP-5 25 171      19    MU405-TE LETDOWN LINE TEMPERATURE 302461-1                  AUXIUARY              S                                                      IN USE                                          Y      VBDP-5 25 I19                                                                          IN USE Appendix B                                                                                                                                                                                                              43
 
y-                                                                                                                                                                    p..
SEQ      T      CL . ID NO          EQUIP DESCR!rTION                                          DRAWING        BLIMP  EVAL ' SSELNOTE NORMt -PWR SUPORT DW INTERCol48 3                                                                                                      EL                        messern
                  -810                  18  MLW7        RCP3AI SEALINJECT10N                                        302 461-3  REACTOR      S            IN USE      Y          VBDP-I S OR DPTl        FLOW TRANSMITTER                                                        I19                        IN USE                . W-5 25 811                18  ML W 7-      REP 3A2 SEAL DUEC110N FLOW 302461-3                                    REACTOR      3              IN UEE      Y          VBDr.l g CR DFT2        TRANSMITTER                                                            119                        IN USE                  VBDP-5 25 18  MU407-      RCP3BI SEALINJEC110N                                        302461-3    REACTOR      S              M USE      Y          gDP-t s OR 812
* DFT3        FLOW TRANSMITTER                                                        119                        IN USE                  VBDP-3 25 18  MU4o7-      RcP 3B2 SEALINJECI1ON                                      302461-3    REACIOR      S              IN USE      Y-        VBDP-I S OR 813 DFT4        FIDW TRANSMIITER                                                        g39                        IN USE                  VBDP-325 162                0    W12-FT MAkE-UF FLOWTRANSMITTER 302461-2                                              AUXIUARY    $              IN USE      Y          ACDP-518 119                        IN USE 7    m 12        MUV-108 CONTROL                                            302461-2    AUXIUARY    S              IN USE      Y          IA 741 POC                                                                                  119                        IN USE 18  MU-014-LTI MAAE-UP TANK LEVEL                                            302 4 61-2  AUXIUARY    s              IN USE    Y          VBDP-8 3 121 TRANSMITTER                                                              119                        IN USE 122                18  MU414-LT2 MAKE-UP TANK LEVEL                                              302 4 61-2 AUXIUARY    S              IN USE    Y          VBDP-10 3 TRANSh M R                                                              I19                        IN USE 729                  7  MU415        MUV-16 cottrROL        -
302 461-1  AUXIUARY    S              IN USE    Y          gr POC                                                                                  095                        IN USE 34                8B  MU415-SV MUV-16 AIR FAIL LOCK                                            MU54,308-  AUX 1UARY  S              STANDBY    Y          VBDP4 23 830        095                        STANDBY
!                    123    X          18  MU-017-PT    M AhE-UP TANK PRESSURE                                      30246l-2    AUXIWARY    S              IN USE    Y          VBDP-I 8 OR TRANSMITTER                                                              119                        IN USE                VBDP-3 25 143                18  MU4I8-DPT LET-DOWN FILTER DELTA-P                                        302461-2    AUXIUARY    S              IN USE    Y          VBDP4 25 TRANSMflTER                                                              I19                        IN USE                OR VBDP-7
                                                                                                                                                -                                    18 l
l Appendix B                                                                                                                                                              44 l
l ___ _ ______ _ ___ __ _ __ _ __-_____-_ _ _-__ _ _ _ ____ _ _-_____            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                                  -    ,                  . _ _ _ _ _ _
 
p                                                                                                                                          .
J                                                              %Y seq    Y CL-    ID NO              EQUIP DESCRilmON            DRAWING      REDGf    EVAL SSEL NOTE NORMf PWR SUPORT DW INTES N MS                                  '
R N                                                                      EI.                        Am la  MU423-          - M PRESS DUECllON FIDW        302 4 14    AUXIUARY    S            M USE        Y              RCm 22                                                                                                                                  FOWER DFTl              IDOP B-1                                095                      IN USE MU423-            HI PRESS DUECTION FIDW      302 4 1-3  AUXIUARY    g            M USE        Y                RCITS-A 23          13 DFD              1DOP A-2                                095                      IN USE 13  MU423-            W PRESS DUECTION FIDW        30241-4    AUXIUARY    S            IN USE -    Y                RCIT3-B 24                                                                                                                                  POWER "DFD              IDOP B-2                                095                      W USE la  MU423-            M PRESS DUECTION FIDW        302461-3    AUXIUARY    S            IN USE      Y                RCETS-B 25                                                                                                                                  FOWER DFT4              IDOP A-1                                093                        IN USE la  MU423              M PRESS INJECTION FIDW      302 4 61-4  AUXIUARY    S            IN USE      Y                REMOTE                          !
26 DFT5              IDOP B                                  095                        IN USE                        N RELAY ACT                        -
CHANNELA                          I POWER                            r 1g  MU-023-            HI PRESS INJECTION FLDW      302461-3    AUX 1UARY  S              N USE      Y                  REMOTE 27 DPT6              LOOP A                                  095                        IN USE                          N RELAY ACT
* CHANNELA                        !
POWER 13  MU423-            M PRESS DUECTION FIDW        302 4 61-4  AUXIUARY    S              IN USE      Y                  REMOTE 23 DFT7              IDOP B                                  095                        IF USE -                      SHUTDOWN RELAY ACT CHANNEL B 1g  MU423-              HI PRESS INJECTION FLOW    302461-3    AUXIUARY    S              IN USE    Y                  REMOTE                          l 29 DPTS            . IDOPA                                    09$                        IN USE                        SHUTDOWN                        i RELAY ACT                      ;
CHANNEL B l
l MU-024-DFT . MAKE-UP FLOW TRANSMITTER 30246l-3              AUXIUARY    S              IN USE      Y                VBDP-9 3 .
i 42          18
!                                                                                          095                        IN USE l
i Appendix B                                                                                                                                  45 M __ _ _      ___    _        _    __._._u    +,        m-__-_ m._ _._          _r                    , _ ,              r-    - s. _.-- + _ ,
 
                                    . _ . m . _
m
                                                                                                                    ~
                                                /                                                                                                                                          d seq      T  CL-      to NO        EQUIP DESCRWTION          DRAWING .      BEEGI    EVAL SSELNOTE ' NORW .FWR SUPORT WW INTEREONS R-y                                                                  EL                          namern i
43        'la      MU424-      MAKE UP FIDWTRANSMITTER 302 4 61-3    AUXILIARY    S          . IN USE        Y                      VBDP4 25 i
DPT2                                                095                        IN USE                                OR VBDP-7 la.
730          7      MU425        MUV-31 CONTROL            306430      AUXILLARY    g          - IN USE        Y                      IA N
095 '                      IN USE ~
35        88
* MU4254V MUV-31 AIRFAILIDCK                MU54. 308-  AUXILLARY    g          ' STANDBY- Y                            VBDP4 23 8#          095                        STANDBY 30        13        MU427-DPT RCPTOTALSEALINECTION        302461-3    AUXILLARY      S            IN USE        Y                      VBDP-18 OR -
FIDW TRANSMf!TER                      095                        IN USE                                VIM)P-5 25 806'        18        MU431-FTI RCP3AI SEAL RETURN FLOW    302461-2    REACTOR        S            IN USE -      Y                      VBDP-I ll                    ,
TRANSMITTER                            119                        IN USE                                OR VBDP-5 7 807        18        MU431-FT2 RCP 2A2 SEAL RETURN FIDW    30246l-2    REACTOR        S            IN USE        Y Y                    VBDP-1 1I                    ,
TRANSMITTER                            I19                        IN USE                                OR VBDP-S 7 808        18        MU-031-FT3 RCP 3BI SEAL RETURN FIDW    302461-2    REACTOR      S            N USE      .Y                    . VBDP-111                  .r TRANSMITTER                            119                        IN USE .                              OR VBDP-S 7                  '
=
809        18      MU431-FT4 RCP3B2 SEAL RETURN FIDW      302 4 61-2  REACTOR      S            IN USE      Y                        VBDP-l 11 TRANSMITTER                            119                        IN USE                                OR %E*-5 7
* 170        13      MU4sI-DPT LET-DOWN PRE-FILTER DELTA- 302461-1      AUXILLARY    S            IN USE      Y                        VBDP-1 1 OR PTRANSM N                              119                        IN USE                                VBDP-S 11 728        1g        MU-102-DPI RCP SEALINECTION FILTER    30246I-3    AUXILLARY N                IN USE      N                        N/A DELTA-PINDICATOR                        095                        IN USE 21        MUDM-IA    MAEUP AND PURIFICATION    302461-1    AUX 111ARY    S              IN USE      N 153                                                                                                                                      N/A.
DEMINERAI17FR IA                        339                        IN USE I
21        MUDM-IB    MAKE-UP AND PURIFICATION  302 461-1    AUXILLARY    $              IN USE      N                      N/A 154                                                                                  '~
DEMINERAllZER IB                        yg9                        IN USE Appendix B                                                                                                                                        46                    t
 
r s-                                                                                                                                          p                                                                        s, b                                                                                                                                            U                                                                d SEQ          T    CL    ID NO                                                                          EQUIP DESCRIPTION          DRAWING      BLDG /    EVAL SSEL NOTE NORMI P%1L SUPORT DW INTERCONS R
g                                                                                                                                  EL                          nessern ET-DOWN COOER 3A            3024 61-1  REACIOR                    N USE        N              SW '
490        A      21. MUHE-IA                                                                                                                              S 095                        IN L5E 491        X      21    MUHE-1B                                                                    LET-DOWN COOLER 3B          302 461-1  REACTOR      S            IN USE      N              SW 095                        IN USE MUHFIC                                                                      ET-DOWN COOER 3C                        REACTOR                    N USE        N              SW 492        A      21                                                                                                              302 461-1                S 095                        IN USE 21    MUHE 2A                                                                    RCP SEAL RETURN COOER 3A    30246l-2  AUXILLARY    S            IN USE      N              SW 126 119                        IN USE 127                21    MUHE-2B                                                                      RCP SEAL RETURN COOER 3B    30246l-2  AUX 1UARY    S            N USE      N              SW 119                        IN USE 7          A      5    MLT-IA                                                                      klAKE-UP AND FURIFICATION  MU-1,302  AUXIUARY      S            OFF        Y              DPDP-4A 10 PUMP 3A                    661-4 302- 095                        ON                          AND MTSW.
631-1                                                              2D 8        AB      5    MUP-1B                                                                      MAk.E-UP AND PURIFICATION  MUO2,      AUXILLARY    $            IN USE      Y              MUXS-1 PUMP 3B                    MUO3. 302- 095                        IN USE                      AND DPM-661-4                                                              SA 10 OR DPDP-5B 10 5    MUP-IC                                                                      MAKE-UP AND PURIFICATION    MUO4,302- AUX 111ARY    $            OFF        Y              DPDP-5B 10 11          B PUMP 3C                    661-4 302- 095                        ON                          AND MTSW.
631-2                                                              2F 9          A      5    MUP-2A                                                                        MUP-I A MAIN OIL PUMP      MUO5      AUXILLARY    S            OFF        Y              MTMC-4 SA 095                        ON 12        AB      5    MUP-2B                                                                        MUP-1B MAIN OIL PUMP      MUO6      AUXILLARY    S              N USE      Y              MTMC-7 2B 095                        IN USE 13          B      5    MUP-2C                                                                        MUP-1C MAIN OIL PUMP      MUO7      AUX 111ARY  S              NT        Y              hfIllC-5 4C 095                        ON MUP-4A                                                                        MUP-1 A GEAR 011' PUMP    MU0S      AUXILIARY                  OFF        Y 10          A      5                                                                                                                                        S                                        MT11C-4 3C 095                        ON Appendix B                                                                                                                                                                                                      47
 
i g ~g                                                          g j
                                                                  's SEQ    T CL    IDNO      EQUIP DESCRIFTION      DRA%1NG        BLDGI    EVAL SSEL NOTE NORW    PWR SUPORT DW INTERCONS R
y                                                          EL                        Drman l
14  AB  5    MUP-4B    MUP-1B GEAR OIL PUMP    MUO9          AUXIUARY    S            IN USE    Y                  MTMC-7 2C .
095                      IN USE 15  -B  5    MUP-4C    MUP-IC GEAR OIL PUMP    MU10          AUXIMARY    S            OFF      Y                  MTMC-5 3D 095                      ON 125    X  21    MUT-1    MAKENPTANK              302 4 1-2    AUXIUARY    S            N USE    N                  N/A 119                      IN USE 839      N/A MUV-014      MAKEUPPUMPS ISOLATION  302461-3      AUXIUARY N                OPEN      N VALVETO RCP SEALS                    095                      OPEN 840      N/A ilUV415      MAKEUP PUMPS ISOLATION  3024 61-3    AUXILIARY N              OPEN      N                  N/A VALVETO RCP SEALS                    095                      OPEN 31        7    MUV-016  RCP SEALINJECTION FLOW  MU54,302-    AUXILIARY    S            IN USE    Y                  VBDP-6 23, CONTROL VALVE            661-3        095                      IN USE                        IA 841      N/A MUV-017      MUV-16 BYPASS VALVE      302 461-3    AUXILIARY  N            CLOSED    N                  N/A 095                      OPEN 163      8A    MUV-Ols  RCPSEALISOIATION VALVE  302 4 61-3,  AUXIUARY    S            OPEN      Y                MTMC-7 2D W 23          119                      OPEN 36      8A    MUV-023  IIPINJ CONTROL VALVE TO  30246I-3      AUXILIARY    S .          CLOSED    Y                MTMC-3 RCS INLET UNES LOOP A ,  ES-A27. MU-  095                      OPEN                        6BLIOR 23                                                                  MTMC-22 IBDR 37      8A    MUV-024  HPINJ CONTROL VALVE TO  302461-3      AUXIUARY    S            C1DSED    Y                MTMC-3 RCXINLET LINES LDOP A                  095                      OPEN                        6MI OR MTMC-5 SCRI 38      8A MUV425      IIPINJ CONTROL VALVE TO  302461-4,    AUXILIARY    S            CLOSED      Y                MTMC-22 RCS INLET UNES LOOP B    ES-B27. MU-  095                        OPEN -                      2BDR OR 21                                                                    MTMC-3 6BL2 Appendix B                                                                                                                    48 e .                            .                                              .                            _ - _ - _ _ _ _ _              - _ _ - _ _ _ _
 
l                                                SEQ  T  CL    D NO                              EQUlf DESCRIPTION                pstA%1NG              BLDGf  EVAL SSEL NOTE NORM / FHM SUPORT UW INTERCONS i                                                      .R g                                                                                                    EL                              DESIRED l
44      8A MUV426                                HPINJ CONTROL VALVETO            302461-4          AUXIUARY    S                    CIDSED  Y        MD4C 5 RCS DHT UNESIDOP B              ES-B27 MU-        095                                OPEN              SCR2 OR 22                                                                      MDec-3 6BR2          ,
l 39      8A    MUV-027                            HPICONTROLVALVE TO RCS          302 4 61-3        AUX 1UARY    S                    OPEN    Y        MTMC-73C 1 DOPA                            ES-abo t*        095                                CIDSED MU-16 7    MUV-031                            MAKE-UP FIDW CONTROL              MU54,302-        AUXIUARY    S                    IN USE  Y        VBDP4 23 32                                                                                                                                                                          i VALVE                            66l-3            095                                IN USE            3A 829      N/A MUV434                                BYPASS ISOLATION VALVETO          30246l-3          AUXIUARY N                        CLOSED  N.        N/A RCP SEALS                                          095                                OPEN 830      N/A MUV-035                              BYPASS ISOLATION VALVETO          302461-3          AUXILIARY    N                    CIDSED  N        N/A RCP SEAIS                                          095                                OPEN 33        7    MUV449                            LET-DOWN FIDW ISOLATION          hRD3,302          AUX 1UARY    S                    OPEN    Y        prpP-SB 20 VALVE                            661-1            095                                OPEN              IA 40      8B    MUV449-                            MUV-49 CONTROL                    MU33              AUXIUARY    S                              Y        DPDP-88 20 SV                                                                                    095 151        7    MUV-050                          LET-DOWN BIDCK OROFICE            MU33,302-          ALDGUARY    S                      OPEN    Y        ACDP-Si t j                                                                                                    ISOLATION VALVE                  661-1              !!9                              OPEN              ANDIA          l 120      8B    MUVan                            MUV-50 COrGROL                    MU33              AUXIUARY    S                              Y        ACDP-SI I SV                                                                                    3ng 152        7    MUV45i                            LET-DOWN FLOW CONTROL            MU54,302-          ALOGUARY    S                    CONTROL Y          VBDP-6 23 VALVE                            66l-1              119                                CONTROL            ANDIA 62      8A MUV45                                HI PRESS INJECTION SUCTION        302461-4          AUXILIARY    S                    CIDSED  Y          MTMC-22 9B FROM BWST                        ES-B27. MU-        095                                OPEN 17 Appendix B                                                                                                                                                            49
 
                                                                                                                                                                      'T
                                        's s                                                                                                                    w                                                                v SEQ              T                    CL  ID NO                      EQUlF DESCRIFTION          pgAwgNG                          BLDCI  EVAL _ SSELNOTE NORM /  FWR SUPORT DW INTEREDNS y                                                                                                                  EL                      Drstaan
                                            -%                                    8A MUV473                    BWSTTO MUP-I A & MUP-IB        MUlt 302-                    AUXILLARY    s            CIDSED    Y              MTMC-21 ISO 1ATION VALVE                661-4                        095                        OPEN                    10F        ,
13g                                    7  MUV490                  LETDOWN FIL1ER MUFIrlBTO 302461-2                            AUXILLARY    s            OPEN      Y              ACDP-52 5, nRTF-1 ISO 1ATION VALVE        MU 42                        119                        OPEN                    IA IITDOWN FILTED MLEIATO 302461-2                                                        OPEN      Y              ACDP-517, 139                                    7
* MUV491                  MUT-1 ISOIATION VALVE          MU 42 AUXIUARY 119 s
OPEN                    IA 140                                    7  MUV-096                  IITDOWN FILTER MLEIA          302-661-2                    AUXILLARY    s            OPEN      Y              ACIh .517 INLETISOLA' DON VALVE          MU-41                      I19                        OPEN                    IA 141                                    -7  MUV497                  IITDOWN FILTER MUFLIB          302461-2                    AUXILLARY    s            OPEN      Y.            ACDP-52 5 INLETISOIATION VALVE            MU-41                      119                        OPEN                    IA 8A  MUV-100                  MUFIrl A/MLTIrlB BYTA$s        302461-2,                  AUX 1113Y ' s              CIDSED    Y              MTMC-4 98 142 VALVE                          MU42                        119                        CLOSED 7  MUV-103                  BORIC ACID PUMPTO MAkF UP 302461-2                        AUXILLARY    s            CLOSED    N              IA 1%
TANK ISOLA 110N VALVE                                        I19                      OPEN 160                                  8B  MUV-103-                  MUV-103 CONTROL                MU36                      ALMY        s                      Y              ACDP-51 I sV                                                                                    gg, 7  MUV-108                    BORIC ACID PUMPTO MITT-1      302-661-2                  AUXILIARY    s            CLOSED    N              IA 157                                                                                                                                                                                            t FLOW CONTROLVALVE                                          I19                      CONTROL                            ,
8A  MUV-112                    LETDOWN TO MUT-1 OR WD        MUIS,302-                  AUXILLARY    s            TO MUT-1  Y              MTMC-3 98 161 DIVERTER                      661-1                      119                      TO MUT-1 182                                    7  MUV-116                    DEMINERAllZER MUDM-IA          302-661-1                  AUXILLARY  s              OPEN    Y              ACDP-517 ISOLATION VALVE TO            MU-39                      122                      OPEN                      IA LETD0%W FILTER L
Appendix B                                                                                                                                                                                  50 m_- _ - _ . - - _ - - - - - - - - _ --              - _ - - - - - - - _ _ _ _ _                  _ _ _ _ _ _ _ _ _ _ _                        - - _ _ _ - - _ - _                                                      . - -
 
                                                                ,,                                                                                              .\
b                                                            b                                                                                                \I SEQ  T    CL    IDNO        EQL1F DESCRIPTION        DRAWING        BLDG /  EVAL SSEL NOTE              .N    PWR SUFORT IpW INTERCONS R
N                                                              EL .                                Wam 183        7    MUV-117  DEMINARAI 17FR MUDM-1B    302461-3    AUXILLARY  g                        OPEN          Y                                  Acor.52 5, ISOLATION VALVE TO        MU-40        122                                  OPEN                                              IA IITDOWN FILTER 188        7    M UV-124  IsOuTION VALVETO          30241-1      AUXIUARY    S                        OPEN -        Y                                  ACDP-517 FLitlFICATION              MU-38        124                                  OPEN                                              IA DEMINERAI17FR MLDM-I A 190        7    MUV-133  ISOIATION VALVE TO        302461-1    AUXIUARY    S                        OPEN          Y                                  ACDP-52 5 DEMINERAI17FR MUDM-1B      MU-39        124                                  OPEN                                              IA 184      8A    MUV-194  MUFL-2A%4UFL 2B BYPASS    302461-1    AUXIUARY    S                        CIDSED        Y                                  MTMC-410D VALVE                      MU43        123                                  C1DSED 189        7    MUV-200  LETDOWN !SOIATION VALVE    302461-1    AUXILLARY  S                        OPEN          Y                                  ACDP-52 5 TO DEMINERAI17Fe MUDM-1A  M            124                                  OPEN                                              M 192        7    MUV-20I    LETDOWN ISOLATION VALVE  302461 1    AUXIUARY    S                        OPEN            Y                                  ACDP-517 TO DEMINERAI 17FR MUDM-1B              128                                  OPEN                                              IA 185        7    MUV-242    PREFILTER MUIL2AINLET    302 461-1    AUXIUARY    g                        OPEN            Y                                  ACDP-517, ISOLATION VALVE          MU-34        123                                  OPEN                                              IA 180        7    MUV-243    PREFILTER MUF1,2A    -
302461-1    AUXIUARY    g                        OPEN            Y                                ACDP-517 DISCHARGE ISOIATION VALVE              121                                  OPEN                                              IA 181        7    MUV-244    PPEFILTER MUFle2B          302 461-1  AUXIUARY    S                        OPEN            Y                                ACDP-52 5 DISCHARGEISOLATION VALVE MU-35        121                                  OPEN                                              IA 136        7    MUV-245    PREFILTFR MUFI,2B INLET
                                      -                  302 4 61-1  AUXIUARY    $                        OPEN              Y                                ACDP-52 5
                            ' ISOIATION VALVE            MU-34        123                                OPEN                                                IA 166        7    MUV-253    REACTOR COOLANT PUMP      302461-2    AUXILIARY  S                        OPEN            Y                                DPDP-5B 22 SEAL BLEEDOFFISOLATION    ES-B54, MU-                                                                                          IA 119                                CIDSED VALVE                      44 Appendix B                                                                                                                                                      51
 
Ip\
                  -]                                                            %
(
(-)
NJ SEQ      T    CL      ID No    EQUIF DESCRIFTION      DRA%1NG        BLDC/    EVAL $5EL NOTE NORM / PHR sUPORT DW INTERCONS R
N                                                              EL                        DESIRED MU SYSTEM TO PZR AUX    302461-3      AUXILLARY N              "m        N          N/A 882          N/A MUV-273 SPRAY ISOLATION VAL \T                130                      OPEN N/A MUV 453      SEALINJECT10N MLE3A    302461-3      AUXILIARY N              C1DSED    N            N/A 831 INIITISOLATION VAL \T                095                      OPEN N/A MUv-454      SEALINJECTION MUL3A    302 4 61-3    AUXILLARY N              C1DSED    N            N/A 832                -
INLETISOIATION VALVE                  095                      OPEN SEALINJECTION MUL3A    30246l-3      AUXILLARY                """                    N/A 833          N/A MUV-455                                                        N                      .N OUTIITISOLATION VALVE                095                      OPEN 834          N/A MUV-456      SEALINJECTION MUL3A      302461-3    AUXILIARY N              CIDSED    N            N'A OUTIITISOLATION VALVE                095                      OPEN 835          N/A MUV-457      SEAL INJECTION MUFL-3B  30246l-3    AUXILIARY    N            C1DSED    N            N/A INLETISOIATION VAL %I                095                      OPEN N/A MUV-458      SEALINJECTION MUFI,3B    302461-3    AUXILIARY N              C1DSED    N            N/A 836 IN1ETISOLATION VAL \T                095                      OPEN N/A MUV-459      SEALINJECTION MUFIA3B    302 461-3    AUXILLARY N                CLOSED    N            N/A' 837 OUTLETISOLATION VAL %                095                      OPEN N/A MUV 460      SEALINJECTION MUF13B    302461-3      AUX 111ARY N              C1DSED    N            N/A 838 OUTLETISOLAllON VALVE                095                      OPEN 481    X      3    MUXS-l    4160VISOLATION S%TTCH  206411        AUXILIARY  s            EITHER    N            N/A 095                      EITHER 21    NGT-XX    ADV BACKUP NITROGEN    302 4 73-2    TURBINE    S            STANDBY  N-          N/A 453 SUPPLY TANKS (10)                    095                      IN USE 18    NGV-299  ADV BACKUP NIdOGEN      302473-2      TURBINE    N            CLOSED    N          N/A 732
* SUPPLY VALVE                          095                      NED Appendix B                                                                                                                    52 n---------------------_-_----------------------_---__-_-----------------                                                                          - .
 
                            .. --                                                                                                                          m U_                                                                                                                            O                                                    U(%
SEQ                              T CL'                ID NO    ~ EQUIP DESCRIPTION -                          DaA%1NG      BLDGt EVAL. SSELNOTE NORM / PWR SUPORTIrW INTERCONS
                                                                    "                                                                                                                  namnrn 3                                                                                            Et 733                                  13                  NOV-308  ADV BACKUPNITROGEN                            3024 73-2  TLitBENT  N-            Cs mn    N            N/A SUPPLY VADT                                              095                    OPEN                        -
853                                N/A NOV-312                    ADV NTTROGEN BACKUP                          302 4 73-2 TURBINE  N            C1) DEED  N            N/A ISOLA 110N VALVE                                        095                    OPEN 354                                N/A NOV-324                    NITROGEN HEADER VENT                          302472-2  TURBINE    N            OPEN      N VALVE                                                    095                    N 697                                  20                  NBAP-Al. NIAPSYSTEMSUBASSEMBLY A                                  CONTROL    S            N/A      N CABMET I                                                I45                    WA 698                                  20                  NIAP-A2  NIAP SYSTEM SUBASSEMBLY A                                CONTROL  .S            N/A -    N CABMET2                                                  145                    N/A 699                                  20                  Ni&P-B1  NIAP SYSTEM SUBASSEMBLY B                                CONTROL    5            MA        N CABEET I                                                I45                    N/A 700                                20                  NIAP-B2  NIAP SYSTEM SUBASSDIBLY B                                CONTROL    S            N/A      N CABEET 2                                                145                    N/A 701                                '20                  Ni&P41    NIAP SYSTDISUBASSEMBLY C                                CONTROL    5            NA        N CABWET I                                                  145                    N/A 702                                20                  NIAP42    NIAP SYSTEM SUBASSDiBLY C                                CONTROL    S            N/A.      N CABWET 2                                                  145                    WA 703                                20                  NIAP-DI  NIAP SYSTEM SUBASSEMBLY D                                CONTROL    S            N/A      N CABW Ul                                                  145                    N/A 704                                20                  NIAP-D2  NIAP SYSTEM SUBASSEMBLY D                                CONTROL    S            N/A      N          .
CABMET 2                                                  145                    N/A l ..                                757                                20                  NI-t-A3  PROPORTIONALCOUNTER                            E-2176    REACTOR  S            IN USE . Y            VBDP-317 ASSEMBLY                                                  I40                    IN USE l
,                                  Appendix B                                                                                                                                                                        53 l
 
                                                                                                                  ,~s                                                                                                pm (m.
                >J
                                  )
                                                                                                                                                                                                                .Nd
(                    ).
SEQ                T                            CL      IDNO    EQUlr DESCRIPTION        DgAw1NG      BLDGl    EVAL ; SSELNOTE NOEUW FWR SLTORTDW INTERCOM 5
                                    ."                                                                                    EL                        DESERED                                                                                          _t NI-2 m  PROPORTMAL COUNTER      E-2176      REACTOlt                    M USE          ~Y                                        VBDP417 758                                              20                                                            S ASSEMBLY                            140                        N USE 759                                              20  EM      COMPENSATEDION          E-2177      REACTOlt . S              M USE          Y                                        VBDP-517 CHAMBER / ASSEMBLY                  H0                          M USE COMPENSATEDION                      REACTOR                    IN USE          Y                                        VBDP417 760                                              20
* NI4  M CHAMBER / ASSEMBLY E-2177                  S I40                      ' IN USE 705                                              20  NNI-1  AUWARY COMOL SYSTEM                  W NTROL      S CABENET 1                            343 706                                              20  NNI-2  AUXILIARY CONTROLSYSTEM              CONTROL      S CABNET 2                            343 707                                              20  NNI-3  AWilARY CONTROLSYSTEM                CONTROL      S CABMET 3                            g43 708                                            20  hW      AUXILJARY CONTROLSYSTEM              CONTROL      S CABMET 4                              343 709                                            20  NNI-5  AUX 112ARY CONTROLSYSTEM            CONTROL      $
CABINET 5                            g43 710                                            20  NN14    AUXILLARY CONTROLSYSTEM              CONTROL      S CABINET 6                            g43 711                                            20  NNI-7  AUXILIARY CONTROL SYSTEM            CONTROL      S CABINET 7                            343 712                                            20  NES    AUXILIARY CONTROL SYSTEM            CONTROL      S CABINET 8                            145 482                                            20  NSP    NUCLEAR SAMPLE PANEL                  AUXILLARY    S              N/A            N 093        ._              N/A Appendix B                                                                                                                                                                                                        54 F . _ _ _ _ _ _  _ . _ _ _ _ _ _      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                            __    __          __                .-                  ___ --    ___ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ . . _ _ . . . _ _ . _ _ _
 
n      T
            - .-              w --T1.                  B_l-          .-      - --  --        T- .--
N                                                            EL            Bemm 532      20    FOItV/ TEMP FORV& TEMPERA 1URE                  CONTROL    S  N/A      N SATURATION CABENET                  105 '          N/A -
  .734        13 . RCeol-LTI PRESSURIZER MVEL            302 4 51-1  REACTOR    S  IN USE  'Y.      VBDP43 1RANSWTTER                          095            IN USE IN USE  Y
  -735 '      13 - RC4ol-LT2 PRESSUltIZER TRANSMITTER LEVEL        302 4 51-1  REACTOIt    S                  VBDP-18 OR N525 095            IN USE 786        13    RC401-LT3 FItESSURf7FR E VEL        302451-1    REACTOR    S  IN USE  Y      \h10 3 N                                    095            IN USE 646        19    RC402-TEI FRESSURIZERTEMPERATURE    30245I-1    REACTOIt    S IN USE  N 139            IN USE 647        19    RC-002-TE2 PRESSURIZERTEMPERATURE    302451-1    REACTOR      S  IN USE  N 139            IN USE 1
797        13    RC403A- ' REACTOR COOLWTSYSTEM      302 4 51-1  REACTOR      S  N USE  Y      VBDP-317 -
PTl          PRESSURE TRANSMTTER                095            IN USE 793'      13    RC-003A-    REACTOR COOLANTSYSTEM  302451-1    REACT 91t    S  IN USE  Y    ' VBDP-517 PT2          PRESSURETRANSMITTER                095            IN USE 799      13    RC403A-      REACTOR COOLANT SYSTEM  302451-1  REACTOR      S  N USE  Y      \1BDP-3 21 FT3          PRESSURE TRANSMITTER                095            IN USE 800      13    RC-003A-    REACTOR COOLANTSYSTEM    302 4 51-1  REACTOR    S  IN USE 'Y      \11DP-521 FT4          PRESSURE TRANSMITTER                095            IN USE 801      18    RC403B-      REACTOR COOLANT SYSTEM  302 451-1  REACTOR    S  N USE  Y      g1 gor.417 FIl          PRESSURE 11tANSMITTER              095            N USE 802      18    RC403B-      REACTORCOOL,WTSYSTEM '  302451-1    REACTOR    S  N USE  Y        51BDP417 FT2          PRESSURE TRANSMITTER                095            IN USE e
Appendix B                                                                                              55
 
                                                          -                                    - . _      _        _      .        _m  ._          .      _    _ . . _ .          . _    m _        ..
                                                                  ~
p                                                                        ],
i                                                                                                                                        Y'                                                              J l --    sEn        T    CL                                            In NO                        EQUIF DESCRIFTION        DRAWING          BLDCf  EVAL S$ELNOTE NORlw            FWR sUFORTWur INTEREDNE R-3                                                                                                                          RL-                            nresern
        ~803                      13                                      RC403B-                  REACTOR COOLANT SYSTEM  302451-1      REACTOR    S                  M USE .      Y            VBDP4 21 PT3                      PRESSURETRANSMITTER                    995                            IN USE 314                    19                                      RC404A-                  REACTOR COOLANT SYSTEM  302451-1      REACTOR    S                  IN USE -    N 1TI                      HOTMG ATEMPERAlVRE                      I19                            IN USE                            ,
815                    19                                      RC404A-                  REACTOR COOLANTSYSTEM    302451-1      REACTOR      S                  N USE        N
* TE2                              HOTLEO ATEMPERATURE                    I19                            IN L5E 816                    19.                                      RC404A-                REACTOR COOLANTSYSTEM    302451-1      REACTOR      S                  IN USE      N TE3                      HOTMO ATEMPERATURE                      I19                            IN USE 817                      19                                      RC404A.                REACTOR COOLANT SYSTEM  301451-1      REACTOR      S                  IN USE      N                        .
TE4                      HOT LEO A17MPERAltitE                  I19                            IN USE 713                      19                                      RC 004B.                REACTOR COOLANT SYSTEM  302451-1      REACTOR      S                  IN USE      N TEI                      HOT LEG BTEMPERATURE                    I19                            IN USE 818                    19                                      RC-0048-                REACTORCOOIAlff SYSTEM  302451-1      REACTOR      S                  IN USE      N TE2                    HOT EO B TEMPERATURE                    119                            IN USE 819                      19                                      RC404B-                REACTOR COOLANTSYSTEM    302451-1      REACTOR      g                  IN USE    .N TE3                    HOT LEG B TEMPERATURE                    yg9                            IN UEE 820                      19                                      RC-004B.              REACTOR COOLANT SYSTEM    302 451-1    REACTOR      S                    IN USE    N TE4                    HOT EG BTEMPERATUltE                    119                            IN USE 821                    19                                      RC-00$A-              REACTOR COOtANT SYSTEM    302451-1      REACTOR    S                    IN USE    N TER                    COLD MG ATEMPERATURE                    I19                            IN USE 822                    19                                        RC405A-              REACTOR COOIANT SYSTEM    302 4 51-1    REACTOR    S                    IN USE    N TE2                    COLD LEG B TEMPERATURE                  g39                            IN L5E i
823                      19                                      RC-005A-              REACTOR COOIANT SYSTEM    30245l-1      REACTOR    S                    IN USE    N TE3                    COLD LEO BTEMPERATL1tE                  119                              IN L5E i
Appendix B                                                                                                                                                                                            56
 
m O                                                                                                                                                                                          .
                                                                                                                                                                                                                                  %J
                                            -SEQ              T    CL        ID No                EQUIP DESCRIFDON                                    DRAWING      BLDG / EVAL SSEL NOTE . NORMI        P%?- SUPORT BW INTERCOME R
y                                                                                                      EL                        Demmen 824          19        RC405A-            REACTOR COOLANT SYSTEM                                3024 51-1  REACTOR  .S            IN USE        N TE4              COID EO ATEMPERATURE                                              I19                      IN USE                                                  i 825          19- RC405B.                  REACTOR COOLANT SYSTEM                                302 451-1  REACTOR    S-            IN USE        N TER              CXMD LEO BTEMPERATURE                                            I19                    : E USE 826          19        RC405B.            REACTOR COOLANTSYSTEM                                302 451-1  REACTOR    S            M USE        N
* TE2                CXMD LEO B TEMPERATURE                                          I19                      IN USE 827          19        RC405B-            REACTOR COOLANT SYSTEM                                302451-1  REACTOR    S            IN USE        N TE3                CULD LEO BTEMPERATURE                                            I19                      M USE 828          19        RC405B-            REACTOR COOlANTCOID EG 302451-1                                  REACTOR    S            IN USE        N TE4                B N TURE                                                        I19                      IN USE 789          18        RC-014A-          REACIORCOOLANT SYSTEM                                3024 51-1  REACTOR    S            M USE        Y                  VBDP-317 DFTI              HOTEO AFLOW                                                      095                      IN USE 790          18        RC414A-            REACTOR COOIANTSYSTEM                                302 4 51-1 REACTOR    S            IN USE -      Y                  VBDP-417 DPT2              HOT EO A FLOW                                                    095                      M USE 791          13        RC414A-            REACTOR COOLANT SYSTEM                                302 4 51-1 REACTOR    S              IN USE      Y                  VBDP-517 DPT3              HOT LEO A FIDW                                                  095                      IN USE 792          13        RC414A-            REACTOR COOIANT SYSTEM                                302451-1  REACTOR    S              IN L5E      Y                  VBDP417 DPT4              HOT EO A FIDW                                                    095                      IN L5E 793          18        RC-014B-            REACTOR COORANT SYSTEM                                302 451-1  REACTOR    S              IN USE      Y                  \13DP-317 DFTI                HOT EO B FLOW                                                  095                      IN USE 794          18        RC 014B-            REACTORCOOLANT SYSTEM                                302451-1  REACTOR  .S              IN USE -    Y                  VBDP-417 DPT2                HOT LEO B FLOW                                                  095                        IN USE i
795          18          RC414B-            REACTOR COOLANT SYSTEM                                3024 51-1  REACTOR    S              IN USE      Y                  \130r-517 DPT3              HOT LEO B FLOW                                          -
095                      IN USE Appendix B                                                                                                                                                                  57 n--_------ - - _ - - - . - - _ _ _ - - - - - _ _ - - _ _                _ - -          _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _. . . . _ . _                                        . _ _ _    _.    - _ . _ _          _ _ _ _ _ _
 
                                                                                    -~                                                          -
        'V
                                                                                                                                                \    /.
Ssq      T CL      ID NO      EQUIP DESCRIPTION          DRAWING          BLDGf  EVAL : SSELNOTE NORAS/ PWR StJPostT DW INTERCOfES R
EL                          Nn N
                        ~
796        18    RC4148-  REACIOR COOLANT SYSTEM      3024 51-1      REACTUst      s              M USE    Y            VgDP4tT
                                . DFT4      HOTLEO B FLOW                              095                      -- IN USE -
j l.
I 787        18    RC-131-FT  REACIDR COOtANT SYSTEM      302 451-1      REACTOR    '
S              M UBE    Y            VBDP410 j                                            PRESSURE                                  095                          IN USE                OR VEP-7
: l.                                                                                                                                          17
            .788          18
* RC-131-FTl REACIDR COOIANT SYSTEM        302451-1      REACIDIt      S              M USE    Y              VBDP-3 s OR -
PsESSURE                                  095                          IN USE                  VBDP-3 25
            -571          20 ' RCCP-I      PRESSURIZER HEATER SCR                    INTER          S          . N/A      N CONTREPANEL                                I19                        N/A 622        20    RCITS-A    REACTOR COOIJLNT                          CONTROL      -S              N/A    N MNY N                                      124                        N/A SYSTEM CABINET A 623        20    RCITS-B    REACTOR COOIANT                            CONTROL.        S            N/A    N MNY N                                      824                          N/A SYSTEM CABINET B 624        20    RCITSC    REACTOR COOLANT                            CONTROL        S            N/A    N MTNTORY TRACM                              124                          N/A .
SYSTEM CABINETC 533        20    RCPM-3A    REACTOR COOLANT PUMP                        CONTROL        S            N/A    N POWER NORNG CABMET                          108                      'N/A A
534        20    RCPM-3B    REACTOR COOLANT PUMP                      CON 11tOL      S            N/A    N POWER MONITORING CABIhTT                    108                        N/A B
572        20      RCTR-!    RCP-IC TRANSFORMER                          INTER        S              N/A    N CABINET                                    g39                      . gjg Appendix B                                                                                                                          58 n                                      -        . - _        -    -
 
n                                                                            ~
n'                                                    p seq              T    CL    13 NO          EQUlF DESCRIFTION        DRAWINc        BLDGI  EVAL SSELMOTE NORM / P%R SUFORT DW INTERO3NS R
N                                                                  EL                    DESIRED 20    RCTR-2      RCF-IDTRANSFORMER                      lhTER      S            N/A      N 573 CABINET                                119                      N/A-552                    20    RCTR-3      RCP-IATRANSFORMER                      AUXILIARY  S.        . N/A -    N N ET                                  119                      N/A' i
20    RCTR 4      RCP-1B TRANSFORMER                    INTER      S            N/A      N 574                      '
N                                      119                    N/A                              ,
8B    RCV-10      PRESSURIZER FOWER        RC13,25.27  REALTOR    S            C1DSED  Y            DPDP-48 I 765 OPERATED RFIIFF VALVE    302 451-1    gg                      g 648                    BA    RCV-Il      PRESSURIZER BIDCK VALVE  RCl3. 302-  REACTOR    S            OPEN    Y            MTMC73A 651-1        168                    OPEN 716                  8A    RCV-13      PRESSURIZERINLET          302 4 51-1,  REACTOR    S            CLOSED. Y            MTMC-7 '
AUX 111ARY SPRAYISOLATION  RC14        145                    OPEN VALVE 717                  8A    RCV-53      DH TO PRESSURIZER          RC16,302-  REACTOR'  s            CIDSED  Y            MTMC-7 5B AUXILIARY SPRAY ISOIATION  65l-1      145                    OPEN VALVE 714                  20      RFL MPLXR RFL MULTIPLEXER FOR 500 KV              CONTROL    S            N/A      N SWITCllYARD                            145                    N/A 715                  20      RNR        RECORDER NEST RACK                    CONTROL    S            N/A      N 145                    N/A 625                  20      RR-HV      AUXILIARY RELAY RACK                  CONTROL    S            N/A      N HEATINO AND VENTIIATION                124                    N/A 62-                  20      RR-PSA      AUXIUARY RELAY RACK                    CONTROL    S            N/A    N 124                    N/A 627                  20      RRI        AUXILIARY RELAY RACK                  CONTROL    S            N/A      N
                                                                                                                          ~
I24                    N/A Appendix B                                                                                                                            59 R ___ _ _ _ _ _ _ _ _ _ _ _ _ _ . . - _ _ _ _  ___      _ _ .__                  _ _    _                                                .
 
N                                                                  kJ                                                                            .,
                    -SEQ      Y CL    ID NO    EQUIF DESCRIPTION                  DRA%1NG    BLDG /      EVAL SSELNOTE NORM / F%R SUFORT DW INTERCONS R
g                                                                EL                          sarssman 628        20    RRIA-    ENGINEERED SAFEGUARD                        CONTROL          s          N/A          N AUXIUARY REIAY RACK RRIA                    124                          N/A 629        20    RRIAB    ENGINEERED SAFEGUARD                        CONTROL          s          N/A          N AUXIUARY REIAY RACK                          124                          N/A RRlAB 630        20
* RRIB      ENGINEERED SAFEGUARD                        CONTROL          s          N/A-          N AUXIUARY REIAY RACK RRIB                    124                          N/A 631        20    RR2      AUXIUARY REIAY RACK                          CONTROL          s.          N/A          N 124                          N/A 632      20    RR2A    ENGINEERED SAFEGUARD                        CONTROL          3          N/A -        N AUXIUARY REIAY RACK RR2A                    124                          N/A 633      20    RR2AB    ENGINEERED SAFEGUARD                        CONTROL          S          N/A          N AUXIUARY REIAY RACK                          124                          N/A RR2AB 634      20    RR2B    ENGINEERED SAFEGUARD                        CONTROL          s            N/A          N AUXIUARY REIAY RACK RR2B                    124                          N/A 635      20    RR3      AUXIUARY RELAY RACK                          CONTROL          S            N/A          N 124                          N/A 636      20    RR3A    ENGINEERED SAFEGUARD                        CONTROL          S            N/A          N AUXIUARY REIAY RACK RR3A '                    124                          N/A 637      20    RR3B    ENGINEERED SAFEGUARD                        CONTROL          s            N/A          N AUXIUARY RELAY RACK RR3B                      124                          N/A 638      20    RR4A    POST-ACCIDENT hlONITORING                    CONTROL          S          N/A          N PANEL 4A                                      124                          N/A 639      20    RR4B      POST-ACCIDENT hlONITORING                    CONTROL          S          N/A          N PANEL 4B                                    124                          N/A Appendix B                                                                                                                                            60 w A ___  _ - + _ -  . _ - _ - _ - _ -      _ . _ _ . _ - - . - _ - _ - . _ . - -
 
T.
7- -                                                                                          (~s hwI '                                                                                                                                                .
SEQ          T . CL - ID NO    EQUlf DESCRIPTION                            DRA%1NG    BLDC/ EVAlo SSEL NOTE    .N  FWR SUFORT DW INTERCONS R
N                                                                        EL                      pum 640          20      RR5BI ENGINEERED SAFEOUARD                                  CONTROL  5              N/A  N AUXIIJARY RELAY RACK                                  124                      N/A RR$BI 641          20      RR$B2 ENGINEERED SAFEGUARD                                  CONTROL  3              N/A  N AUXILLARY RELAY RACK                                  124                      N/A RR$B2 535          20      RSA  REMOTE SHUTDOWN RELAY                                CONTROL    5              N/A  N CABINET A                                            108                      N/A 536        20      RSki  REM 01E SHUIDOHW REIAY                                CONTROL    5              N/A  N N U A-l                                              108                      N/A 537        20      RSACA REMOTE SHUTDO%H                                      CONTROL    5              N/A  N AUXIIJARY CABINET A                                  108                      N/A 538        20      RSACB REMOTESHUTD0%W                                        CONTROL    S              N/A  N AUXILLARY CABINET B                                  108                      N/A 539        20      RSB  REMOTE SIRTfDO%W RELAY                                CONTROL    S              N/A  N CABINET B                                            108                      N/A 540        20      RSB-1 REMOTE SHUTDO%W REIAY                                CONTROL    S              N/A  N NET &l                                                108                      N/A 541        20    RSPA  REMOTE SHUTDO%N PANEL-                                CONTROL    s              N/A  N SECTION A                                            108                      N/A 542        20    RSPAB REMOTE SHUID0%H PANEL-                                CONTROL    S              N/A  N SECTION AB                                            108                      N/A
:543                20    RSPB  REMOTE SliUTDOWN PANEL-                              CONTROL    S              N/A  N SECTION B                                              108                      N/A Appendix B                                                                                                                          '61
 
                                                                                      -  . -      ,< ._            . _ . . . -      m.              .__          _ . .. . _ . . . . _ _ _          ..m  ..      _              . .
C                                                                      '*g .
                                                                . [%
N
: SEQ    T    CL      13NO      EQUIP DESCRIPTION            DRAWING          BLDG /  EVAL SSEL NOTE NORMf FWR SUFORT DW INTEBCXNES                            ,
R                                                                                                                                                    ,
N                                                                    EL                            DESERED 103'      13 ' RW48-FT    DECAY HEAT SEAWATER          302411-1    AUXILLARY    g.            IN USE          Y            - VBDP-1 I OR FUMP B DISCHARGE PRESSURE                  095                        IN USE                          VBDP-5 II 94        13 . RW49 FT    DECAY HEATSEAWATER            302411-1    AUXILLARY    g.            M USE          Y            . VBDP-2 i OR PUMP A DISCHARGE PRESSURE                  095                          IN USE -                        YEOP4 I4              '
,        ~ ..
.                                                                              66        .19      RW-12-TE DH SERVICE SEAWATER FUMP 302411-1          AUXIUARY      g            ' IN USE          Y;              17C                    ,
RWP-3B D SCHARGE                          095                          IN USE TEMPERATURE 63          19    RW-13-TE DECAY HEAT SEA WATER          302411-1    AUX 1UARY    S              M USE-        Y              TPC FUMP RWP-3A DISCHARGE                                                                                                          I 095                          IN USE TEMPERATURE 65          19    RW-19-TE NUC1. EAR SERVICE SEAWATER 302411-1        AUXILLARY    S              IN USE        Y              TPC FUMP RWP-2B DISCHARGE                      095                          IN USE TEMP 102        13    PW-23-rf NUCLEAR SERVICE SEAWATER 302411-1          AUX 111ARY    S              IN USE        Y              VBDP-11 OR PUMPS DISCHARGE PRESSURE                  095                          m USE                          VBDP-511 60          19    RW-32-TE DECAY HEAT COOLER DCHE-        302411-1    AUXIUARY      S              IN USE        Y              TPC IB SEA WATER OUTLET                        095                          IN USE i
61          19    RW-33-TE DECAY HEAT COOER DCHE.        302411-1    AUXIUARY      S              IN USE        Y              TFC IA SEA WATER OUTET                        095                          IN USE 73          19    RW-43-TE SEA WATER OUTLET NUCEAR 302 4 11-1          AUXIUARY    S                IN USE        Y            ' TFC .
SERVICE COOLERS                            095                          m USE 98          6    RWP-I    NORMALNUCLEAR SERVICES        302401-3    AUXIUARY    S                ON            N N/A        .NONE                    ;
SEA WATER PUMP MOTOR                        095                          OFF                                                  l COU.ER                                                                                                                        i 90          6    RWP-2A  NtILEAR SERVICE SEA WATER RWO2,302-        AUXILIARY    S              OFF          Y              ' DPDP.$A lo,          ,
PUMP 3A                        65 t-I 302-  095                          ON                          . MTSW-2C 601-3
                                                                                                                                                                                                                                          .Y Appendix B                                                                                                                                62 -
  .9~___      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ __ ___ ,_ _ _ ____ __.__ __                                  -              , , , .                      ~                        .        ,,,      ,~ m,,            ,    .~,
 
  ,                _ .                      ..                  .                                _    . . _ .-        = -      -  -.    .        .
        %                                                                  2  ,
seq            T CL .10NO    EQUIP DESCRIFFION            DRAWING          BLDG #  EVAL SSEL NOTE NORW PWR SUPORT DW INTERCONS y                                                            EL                            Dessern 6  RWP-2B  NUCLEAR SERVICE SEAWATER RWO3,302-          AUXHJARY    S                OFF        .Y        DPDP-5B 10 99 PUMP 3B                      611-1 302*    095                            ON                    AND W -
601-3                                                                2E' 91              6  RWP-3A  DECAY HEAT SERVICE SEA      RWO4,302-      AUXELARY    S                OFT          Y        DPDP-5A 10 WATER PUMP 3A                611-1 302-    095                            ON                    AND MTSW-      :
631-1                                                                2C
                                                                                                                                                  ~
100              6  RWP-38  DECAY HEAT SERVICE SEA      RWO5,302-      AUXILLARY    S                OFY          Y        DPDP-5B 10 WATER PUMP 3B                611-1 302-    095                            ON                    AND MTSW-      i 631-2                                                                2E 724              21  RWSP-IA CYCIDNE SEPARATOR A          302411-1      AUX 111ARY  S                IDLE        N        N/A 095                            IN USE -
21  RWSP-IB CYCIDNE SEPARATOR B          302411-1      AUX 111ARY  S                IDLE        N        N/A 725 095                            IN USE 101              7  RWV-150 RW RECIRCULATION FIDW        302411-1      AUXILIARY    S                CONTROL N CONTROLVALVE                                095                            CONTRE 21  SAHE-IA STATION AIRCOMPRESSOR        302-221-3      T1.1tBINE    S                OFF          N N/A    NONE 454 AFTER-COOLIR A                              095                            OFY 21  SAHE-IB STATION AIRECOMPRESSOR      302-221-3      RitBINE      S                  OFF        N N/A    NONE 455                                                                                    .
AfTERNR B                                  095                            OFF 451              12  SAP-I A STATION AIR COMPRESSOR I A    302-221-3    RitBINE      S                  OFF        -N  N/A    NONE 095                            OFF 452              12  SAP-IB  STATION AIR COMPRESSOR IB    302-221-3    RitBINE      S                  OFF        N N/A    NONE I
095                            OFF 855            N/A  SAV-5  AIR SUPPLY ISOLATION          302-271-2      TURBINE    N                  OPEN        N          N/A I                                    BETWEEN SA ANDIA                            095                            NED l
1 Appendix B                                                                                                                          63 i
 
      )                                                      ;
w/ .                                                          x.,                                                          a SEQ  T  CL    13NO      EQUIP DESCRIPTION        DRAWING      BLDGI    EVAL $$EL NOTE MOttM/  PM'R SUPORT DW INTERCONS EL                        DEtumm SCP-3    SECONDARY SERCIVES        SC08. 302- TLitBINE      S            OFF      Y                MTMC-12 438      '5 13C C1DSED CYCIICOOLINO        228-3      095                        ON BOOSTER PLMP 458        7    SCV M    IAP-1 A &1AHLIACOOLING    302-221-3  TLitBINE      S            CONTROL N                .N/A WATER CONTROLVALVE                    108                        CONTROL 459        7
* SCV-096 -  IAP-1B & IAHLIB COOLING    302-211-3  TURBINE      S            CONTROL N                  N/A WATT.R CONTROL VALVE                  108                        CONTROL 457      8B    SCV 099  IAP-I A & lAHLI A COOUNO  IA01.302-  TURBINE      g            CLOSED    Y                DPDP 3A ll WATER ISOIATION VALVE      211-3      107                        OPEN 8B    SCV-100  IAP-lB &lAHLIC COOUNG      IA02,302-  TURBINE      S            CIDSED    Y                DPDP-3B il 456 WATERISOIATION VALVE      211-3      107                      OPEN N/A SCV-530      SC FROM SW DOIATION VAVII 302-211-3  TURBINE      N            CIDSED    N                N/A 870 107                      OPEN SW FROM AIR COMPRESSORS    302-221-3  TURBINE      N            CLOSED    N                N/A 87i      N/A SCV-534 ISOLATION VALVE                        107                      OPEN N/A SCV-535      SC TO AlR COkiPRESSORS    302-2Il-3  TURBINE      N            OPEN      N                N/A 85I ISOIATION VALVE                      095                        C1DSED                                  .
N/A SCV-536      SC FROM AIR COMPRESSORS    302-211-3  TURBINE      N            OPEN      N                  N/A 852 ISO 1ATION VALVE                    095                        CIDSED N/A SCV-537      SW FROM AIR COMPRESSORS  302-211-3  TURBINE      N            CIDSED  N                  N/A 872 ISOLATION VALVE                      108                      OPEN                                    ,
1g    SF-9-FIT  SPENT FUEL COOLANT FIDW    302 421-1  AUXIUARY      S            IN USE  Y                  ACDP-515 193 TRANSMITTER                          I43                        IN USE 21    SFDM-1    SPENT FUEL COOLANT        302 421-1  AUX 111ARY    S            IN USE    N                N/A 124 DEMINERALIZER                        I19          -
IN USE Appendix B                                                                                                                    64 m
 
SEQ          T.      CL        IDNO        EQUlr DESCdIPTION        DRA%ING            BLDC/  EVAL . SEELNOTE NORW    PWR SUPORT DW INTERCONS-R-
N                                                                          EL                    . DESIRED 177                  .21        SFHE-1A    SPENT FUELCOOMR A        302 4 21-1    AUXIu'RY    S            IN USE    N              SW 119                      IN USE 173                  21        SFHE-1B    SPENT FUELCOOLER B        302421-1      AUXRIARY    S            IN USE . N              SW 119                      IN USE 136                    5        SFF-1A '  SPENT FUEL COOLANT PUMP A SF01,302-      AUXILIARY  S            RUN        Y              MTMC4 IID 621-1          119                      RUN 137                    5        SFP-1B    SPENT FUELCOOLANT PUMP B  SF02. 302-      AUXILIARY  S            RLH        */            MDec-5 3D 621 1          119                      RLH 766                    13      SP-17-LT  STEAM GENERATOR A LEVEL  302411-2        REACTOR    S            IN USE    Y              VBDP-8 095                      IN USE 767                    13      SP-Is-LT  STEAM GENERATOR AIIVEL    302 4 11-2      REACTOR    S            IN USE    Y              VBDP-10 095                      IN USE 768                    18      SP-19-LT  STEAM GENERATOR A LEVEL  302411-2      ' REACTOR    S            IN L4E    Y              \BDP-9 095                      IN USE 769                    1g      SP-20-LT  STEAM GENERATOR A LEVEL  3024Il-2        REACTOR    S            IN USE    Y              \BDP-11 095                      IN USE SP-21-LT  STEAM GENERATOR B LEVEL  302 4 11-2      REACIOR                  IN USE    Y              \BDP-s 770                    18                                                                        S 095                      IN USE 771                    13      SP-22-LT  STEAM GENERATOR B LEVEL  302-011-2      REACTOR    S            IN USE    Y              \BDP-10 095                      IN USE 772                    18      SP-23-LT  STEAM GENERATOR B IIVEL  3024Il-2        REACTOR    S              IN USE  Y              VBDP-9 095                      IN USE 773                    Ig      SP-24-LT  STEAM GENERATOR B LEVEL    302 4 11-2    REACTOR    S              IN USE  Y              VBDP-ll                '
095                      IN USE 774                    18      SP-25-LT  STEAM GENERATOR A LEVEL    302 4 11-2    REACTOR    S              IN LGE    Y              \BDP-8 095                        IN USE Appendix B                                                                                                                                      65
 
O                                                          v                                                    U see    T CL    ID NO      EQUIP DESCRIFTION        DRAWING      BLDGf  EVAL SSELNOTE NORM / PWR stPORT DW INTERCONS R
N                                                        EL                    DESIRED 775      1g    SP-2RT    STEAL! GENERATOR A LEVEL 3024II-2  REACTOR    S          IN USE -  Y            WDP-10 095                    IN USE 776      1g    sP-27-LT  STEAM GENERATOR A LEVEL  302411-2  REACTOR    S          IN USE    Y            VBDP-9 095                    IN USE 777.      I8    SP-2s-LT  STEAM GENERATOR A EVEL  3024Il-2  REACTOR    g          IN L5E    Y            VBDP-II 095                    IN USE 773      13    sP-29-LT  STEAM GENERATOR B EVEL  302 4 11-2 REACTOR    g          IN USE    Y            WDP-8 095                    IN USE 779      1g    SP-30-LT  STEAM GENERATOR BIIVEL  302-011-2  REACTOR    S          IN USE    Y            VBDP-10 095                    IN USE 780      13    SP-31-LT  STEAM GENERATOR B LEVEL  302-011-2  REACTOR    S            IN USE  Y            VBDP-9 095                    IN USE 781      Ig    SP-32-LT  STEAM GENERATOR B EVEL  302411-2  REACTOR    S            IN USE  Y            VBDP-II .
095                    IN USE 440      5    SSP-4A    CONDENSER A HOTWELL      302-181-1  TURBINE    S            OFT      N            N/A SAMPLE EXTRACTION PUMP              095                    Of7 441      5    SSP-4B    CONDENSER B HOTWELL      302-181-1  TURBINE    S            OFF      N            N/A SAMPI.IEXTRACTION PUMP              095                    OFF 442      5    SSP-4C    CONDENSER AB HOTWEll. 302-181-1  TURBINE    S            OFF      N            N/A-CROSSOVER SAMPLE                    095                    OFF EXTRACTION PUMP 443        5    SSP-4D    LP HEATER SAMPLE        302-181-1  TURBINE    S            OFF      N            N/A EXTRACTION PUMP                    095                    OFF                                i 95      1g    SW402-PT NUCLEAR SERVICE CCC PUMPS 302401-3  AUXIUARY  S            IN USE  Y            VBDP-1 1 OR DISCII/RGE PRESSURE                095                    IN USE                VBDP-5 II Appendix B                                                                                                          66
 
.n Q,
seq  T                        CL-                                          tono                            EQUIP DESCRIPTION        ORAWING        BUMM    EVAL SSEL NOTE NORW    FWIt SUPORT DW INTERCONS R
N                                                                                                                                            . EL                        ymm 105                                  13                                      SW-135-PT                  NUCEAR SERVICE COOllNG    NJ2401-3    AUXDlARY    g            N USE  ,Y                TPC WATER SURGE TANK PRESSURr              095                      IN USE 107                                  13                                      SW-139 LT NUCEAR SERVICE COOtlNO                      302401-3    AUXIUARY    S            N USE  Y                m WATER SURGE TANK EVEL                  095                      IN USE 302401-3    /lDGIJARY                  IN USE  N 108                                21
* SWHE-1A                                                          NUCLEAR SERVICE CCC HEAT EXCHANGER 3A s                                      RWP-2AOR RWP-28 095                      IN USE 21                                        SWHE IB                  NUCEAR SERVICE CCC HEAT    302401-3    AUXIUARY    S            IN USE  N                RWP-2A OR 109 EXCHANGER 3B                          095                      IN USE                    RWPM i
l10                                21                                        Sw.tE IC                  NUCLEAR SERVICE CCC HEAT  302401-3    ALNIllARY    S            IN USE  N.                R%?-2AOR EXCHANGER 3C                          095                        IN USE                    RWP-2B 1II                                21                                        SWHE-1D                    NUCLEAR SERVICE CCC HEAT  302401-3    AUXILLARY    $            N USE  N                R%?-2A OR EXCHANGER 3D                          095                        IN USE                    RWP-2B 21                                        SWHE-2                    SW SUPPLY TO PASS SAMPE  302401-4    AUXILIARY    S            OFF    N N/A            NONE 119 COOERS                    302-756-1    108                      OFF i
89                                      5                                    SWP-IA                    EMERGENCY NUCLEAR        SWO2.M 302- AUXILLARY    S            OFF    Y                DPDP-5A lt SERVICE CCC PUMP 3A      601 3      095                        ON                        AND MTSW-2C 97                                      5                                      SWP-IB                    EMERGENCY NUCEAR          SWO3,302-    AUXILLARY  S              OFF    Y                  DPDP-5B 10 SERVICE CCC PUMP 3B      601-3        095                      ON                        AND MTSW-2E 5                                      SWP-IC                    NORMALNUCLEAR SERVICE      302401-3    AUXILIARY  S              ON    N N/A              NONE 104 CLOSED CYCLE COOLING PUMP              095                      OFF                                        I 5                                      SWP-2A                    NUCEAR SERVICE BOOSTER    302401-1    AUXILLARY    S            ON    N    N/A          NONE 57 PUMP A        8                      095                        W Appendix B                                                                                                                                                                                                  67
 
                      ,m                                                                                                                            ,m
(%J )                                                                                                                          (
w/
                                                                                                                                                                          )                                                                                                (n
                                                                                                                                                                                                                                                                            %/
sea                                    T  CL    ID NO    EQUlF DESCRIFTION                                  DRAWING                            BLDG /  EVAL SSEL NOTE NORM / FWR SUPORT DW INTERCONS R
N                                                                                                        EL                        DESIRED 5    SWP-2B  NUCIIAR SERVICE BOOSTER                            30240I-1                          AUXILLARY                ON        N N/A                                                  NONE 58                                                                                                                                                S PUMPB                                                                                095                      OFF 106                                  21    SWT-1    NUCIIAR SERVICE CIDSED                            302401-3                          AUXILLARY    S            IN USE    N                                                      N/A CYCLE SUROETANK                                                                      095                      IN USE 174                                  7 ' SWV412    SEAL REWRN COOLERS                                302401-4                          AUX 1UARY    S            OPEN      N                                                      IA SUPPLYISOLA110N VALVE                                                                I19                      OPEN 165                                21    SWV412-  SWV-12 CONTROL                                    308-802                          AUXIUARY    S            IN USE  N                                                      N/A AR                                                                                            119                      IN USE 163                                8B    SWV-012  SWV-12 CovrROL                                    SWO6                              AUXIMARY    S                      Y                                                      DPDP-SA 14 SVI                                                                                          gi, 164                                8B    SWV-012- SWV-12 CONTROL                                    SWO6                              AUXIUARY    S                      Y                                                      DPDP-5B 15 SV2                                                                                            gg9 47                                7    SWV-035  INLETISOLATION FOR AHHL                            3024011,                          AUXIUARY    S            OPEN    Y                                                      DPDP-5421, 31A AND AHHL32A                                    SW-06                            095                        OPEN                                                            IA 48                                7    SWV-037  INIITISOIATION FOR AHHL                            302401-1                        AUXILIARY    S            OPEN    Y                                                      DPDP-IB 6, 31B AND AllHL32B                                    SW47                            095                        OPEN                                                            IA '
49                                7    SWV439  INLETISOlATION FOR AHHL                            302401-1,                        AUXIUARY    S              OPEN    Y                                                      DPDP-3B 21, 31C AND AllHE-32C                                  SW-07                            095                        OPEN                                                            IA 167                                7    SWV-041  ISOLATION FROM OUTLETS OF                          302401-1                        AUXILIARY    S              OPEN    Y                                                      DPDP-5A 21 AilllL31 A AND AllHL32A                            SW 08                            119                      OPEN                                                            IA 50                                7    SWV-043  OUnITISOLATION FOR AlllIL 302401-1,                                                  AUX 1UARY    S            OPEN    Y                                                      DPDP-lB 6, I                                                                                      31B AND AHHL32B                                    SW-08                            095                        OPEN                                                            IA 51                              7    SWV-045  OurLETISOLATION FOR AllllL 302401-1,                                                  AUXILIARY    S            OPEN    Y                                                      pppp.5B 21, 31C AND AllHE-32C                                  SW-09                            095                        OPEN                                                            IA l
I Appendix B                                                                                                                                                                                                                                    68 e__ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                          _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _        - - _ _ _ _ _ _ _ _ _ _ _                  __
 
n.
(,x\
    .NJ                                                                                                                                  d'                                                        (m)
V-seq    T        CL    DNO                  . EQUIP DESCRIFTION -                                                          DRAWING .      BLDGf    EVAL SSEL MOTE NORW PH1L SUFORT DW INTERCONS A
EL                        nessman
            'N 52              7    SWV447                ISOLATION TO MUHE-lB AND                                                      302401-1    AUX 111ARY  $            OPEN      Y            DPDP-5A 14 WDHE1                                                                          SW-10      - 095                      OPEN                  OR DPDP-5B 15,lA 53              7 - SWV448                  LE1DOWN COOER 3BINLET                                                          302401-1    AUXILLARY    $            OPEN      Y          . DPDP-5A I5 ISOIA110N VALVE                                                                SW-11        095                      OPEN                  OR DPDP-5B 14 IA 54              7    SWV-049                LETDOWN COOER 3B                                                              302401-1    AUXIUARY    S            OPEN      Y            DPDP-5A 15 DISCHARGEISOLATION VALVE SW-13                                                            095                      OPEN                  M DPM-5B 14,IA 55              7    SWV450                OtnHTISOIATION FOR MUHE- 302401-1                                                          AUXIUARY    S            OPEN    Y            pror-5A I4 I A AND WDHE-1                                                                SW-12        095                      OPEN                    OR DPDP-5B 15,IA N/A SWV-103                  SC FROkt SWISOIATION VALVE 302401-4                                                        INTER        N            CIDSED  N            N/A 842 095                        OPEN SW TO SCISOLATION                                                              302401-4    INTER        N            CIDSED  N            N/A 843            N/A SWV-104 095                        OPEN 7    SWV-151              IC FROh! RB FAN COOLERS                                                        SW29,302-  AUX 111ARY    S            OPEN    N            SW-151-SV 118 ISOLATION VALVE                                                                601-1        100                      CIDSED 21    SWV-15 l-            AIR RESERVOIR FOR SWV-151                                                      308-802      AUXILLARY    S            N USE    N            N/A 116 AR                                                                                                                100                    ' IN USE 8B    SWV-151-SV SWV-ISI CONTROL                                                                          SW29        AUXILIARY    S                      Y            DPDP-5A 16 '
80 095 7    SWV-152              IC TO RB RAN COOLERS                                                          302401-1    AUXIUARY    S            OPEN    N            S%T-152-117 ISOLATION VALVE                                                                            100                      CIDSED                  SVIOR SWV-152 SV2 SWV-152-              AIR RESERVOIR FOR SWV-152                                                      308-802      AUXIUARY    S            IN USE  N            N/A
,      115            21 I                            AR                                                                                                                100                        IN USE 1
1 Appendix B                                                                                                                                                                                      69.
 
                                                ~
SEQ  T    CL  ID NO      EQUlF DESCRIPTION        DRA%TNG      BLDG /  EVAL ' SSELNOTE ' NORM / FWR SUFORTDW INTERCONS R
N                                                            EL                                                                                                          DESIRED 81        88  SWV-152  SWV-152 CONTROL            SW30        AUXILLARY    S                                                                                                        Y  SPSP-3A 16 SVI                                            095 82        8B  SWV-152- SWV-152 CONTROL            SW30        AUXILLARY    S                                                                                                        Y  DPDP-5B 17 SV2                                            095 92        7
* SWV-353  SW TO RB FAN COOLERS ISOLATION VALVE 302401-1    AUXIUARY    S                                                                                              CLOSED    N  SWV-353 SVIOR 095                                                                                                        OPEN 5%T-353-SV2 96        2[  SWV 353- AIR RESERVOIR FOR SWV-353  308-802    AUXIUARY    S                                                                                              IN USE    N  N/A .
AR                                              095                                                                                                          IN USE 93        SB  SWV-353- SWV-353 CONTROL            SW24        AUXIUARY    S                                                                                                        Y  DPDP-5A 17 SVI                                            095 83        8B  SWV-353- SWV-353 CONTROL            SW24        AUXILIARY    S                                                                                                        Y  ~ DPDP-IB6 SV2                                            095 78        7  SWV-354  SW FROh! RB FAN COOLERS    302-601 1  AUXIUARY    S                                                                                                CLOSED  N  SwT-354-ISOLATION VALVE                        095                                                                                                          OPEN          SV1OR SWV-354-SV2 87        21  SWV-354-  AIR RESERVOIR FOR SWV 354  308-802    AUXIUARY    S                                                                                                IN USE  N  N/A AR                                              095                                                                                                          IN USE 84        8B  SWv.354-  SWV-354 CONTROL            SW25        AUXIUARY    S                                                                                                        Y    DPDP-5A 17 SVI                                              095 85        8B  SWV-354-  SWV 354 CONTROL            SW25        AUXIUARY    S                                                                                                        Y    DPDP-IB 6 SV2                                              995 79        7  SWV-355  IC FROkt RB FAN COOLERS    302 4 01-1  AUXILIARY    S                                                                                                OPEN    N  S%T-355-SV ISOLATION VALVE                        095                                                                                                          CIDSED Appendix B                                                                                                                                                                                        70 a -      ._                                                _            __        _ - _ _ _ _ _ _ _ . - _ - _ _ - - -_- _ _ __ _ - - - - - - - - . - _ - _ _ - - - - - - - --
 
  ,,~.                                                                                                                                                                                                                                                    .
t    I                                                                                                                                                                                                                                                          l
  %)                                                                                    %                                                                                                                                                                    _J SEQ  T    CL'  IDNO        EQUIP DESCRIFTION                              DRA%1No                    BLDGf  EVAL SSEL NOTE.                                    NORM /                F%R SUFORT DW INTERCDM5 R
N                                                                                                  EL                                                        DESERED 88        21    SWV-355-  AIR RESERVOIR FOR SWV-355                        308-802                AUXILLARY          S                                      IN USE                        N                                                      N/A' AR                                                                                  095                                                        IN USE 86        3B    SWV-355-SV SWV-355 CONTROL                                  SW26                    AUXILJARY          S                                                                      Y                                                      DPDP-5B 16 095 607        20    TPC        TitANSMITTER POWER SUPPLY                                                CONTROL            $                                      N/A                            N
                  .            CABINETS A & B                                                          124                                                        N/A 686        14    VBDP41    REOUIATEDINSTRUMENT BUS 206-041                                          CONTROL            S                                      IN USE                        Y                                                      VBTR-IA 3A                                                                      145                                                        IN USE 687        14    VBDP42    REGULATED INSTRUMENT BUS 206441                                          CONTROL            S                                      IN USE                        Y                                                      VBTR-1B 3B                                                                      145                                                        IN USE 6gg        14    VBDP-03    \TTAL BUS A                                      206-017                CONTROL              S                                      IN USE                        Y                                                      VBXS-IA 145                                                        IN USE 689        14    VBDP-04    \TFAL BUS B                                      206 4 17                CONTROL              5                                      IN USE                        Y                                                      VBXS-la 145                                                        IN USE 690        14    VBDP-05    VITAL BUS C                                      206-017                CON 11tOL            S                                      IN USE                        Y                                                      VBXS-IC 145                                                        IN USE 691        20    VBDP    120 VOLT VITAL BUS 3C                                                  CONTROL              S SIP        STAlVS INDICATION PANEL                                                  145 692        14    VBDP46    VITAL BUS D                                      206417                  CONTROL              S                                      IN USE                        Y                                                    \BXS-ID 145                                                        IN USE 693        20    VBDP46-    120 VOLT \TTAL BUS 3D                                                  CONTROL              S SIP        STATUS INDICATION PANEL                                                  g43 694        14    VBDP-07    CohlPtTFER l20 VAC                                206-041                CONTROL              S                                      IN USE                        Y                                                    \BXS-lE DISTRIBUTION PANEL                                                        I45                                                        IN USE 612      14    VBDP-08    EFIC \TTAL BUS A                                  206-017                CONTROL              S                                      IN USE                        Y                                                    VBXS-3A 124                                                        IN USE Appendix B                                                                                                                                                                                                                                                  71 l
_ _ - - - - - , - - - - -      -___----__------w            - - - - - - - - - - - - - - - - - - - - - - - -        -------s-- - " - - - - - - - ^ - - - - - ----------------------------'-------i
 
7~                                                        p
  .h,m,                                                                (_)                                                      .O sEn    T  CL    ID NO          EQUlf DESCRIFTION        . DRAWINC      . BLDG / EVAL' SSELNOTE NORW PH1t SUPORT DW ' INTERO0NES R
          .N                                                                    EL                      DESERED                              l,
  ~613        20    VBDP-        \TTAL BUS STATUS                        CNTROL      S 08/12/13-SIP INDICATION PANEL A FOR                    124 VBDP-5/12/13 VBDPM        EFIC VITAL BUS C            206 017      CONTROL. S            IN USE            Y      VBX53C 614        14 124                      IN USE 615        20 .VBDP&-          VITAL BUS STATUS                        CWTROL      5 SIP          INDICATION PANELC FOR                    334 VBDP-9 608        -14    VBDP-10      EFIC \TTAL BUS B            206417      CONTROL    3            IN USE          Y      VBX53B 124                      IN USE 609        20    VBDP-        %TTAL BL5 STATUS                        CONTROL    S 10/14/15-SIP INDICATION PANEL B FOR                    124 VBDP-10/14/I5 610        14    VBDP-lI      EFIC VTTAL BUS D            206 417      CONTROL    5            IN USE          Y      VBXS-3D 124                      IN USE 611        20    VBDP-lI-      %TTAL BUS STATUS                        CONTROL    5 SIP          INDICATION PANEL D FOR                  124 VBDP-11 517        14    VBDP-12        120 VOLT REGUIATED                      CONTROL    S DISTRIBUTION Ps.NEL                      108 518        14    VBDP-13        120 VOLT REGUIATED                      CONTROL    S DISTRIBUTION PANEL                      gog 519        14    VBDP-14        120 VOLT REGULATED                      CONTROL    S DISTRIBLRION PANEL                      los 520        14    VBDP-I5        120 VOLT REGULATED                      CONTROL    S DISTRIBUTION PANEL                      .gog Appendix B                                                                                                                        72
 
N. .
SEQ  T    CL    ID NO    EQUIF DESCRIFTION        DRAWLW      BLDCI  EVAL SSEL NOTE NORM / P%R SUFORY DW INTERCONS R
N                                                        EL                      DESIRED 201        16 ' VBIT-IA  DUALINIUTINVERTER 3A    206417  .COhTROL    5            IN USE    Y          MTMC-3 108.                    IN USE                3AL* '
DPDP-1A4 N USE~    Y          MTMC4        i 207        16    VBir-1B DUALINPUTINVERTER3B      206-017  CONTROL    5 108                      IN USE                4ALOR DPDP-1B 15 208        16    VBIT-lC DUALINPUTINVERTER3C      206417  Coh*IltOL  S            IN USE    Y          MTMC-3        i-los                      IN USE                2ALOR DPDP-1 A 5 209        16    VBir-ID DUALINPUTINVERTER 3D    206-017  CONTROL    S            IN USE    Y          MDeC4 108                    IN USE                4AR M DPDP-1B 16 210        16    VBIT-lE DUALINPUTINVERTER 3E    206416  CO!(FROL    S            IN USE    Y            MTMC18 108                      IN USE                OR DPDP-IC 616        4    VBTR-IA CONSTANT VOLTAGE        206 441  COVFROL    S            IN USE    Y.          MTMC-1 TRANSFORMER A                      124                      IN USE 4    VBTR-1B CONSTANT VOLTAGE        206441  CONTROL      S            IN USE  Y            MTMC-2 617 TRANSFORMER B                      124                      IN USE 521        4    VBTR-2E 480/120V REDUNDANT POWER 206416    CONTROL    S            IN USE  Y            MTMC-18 SUPPLY TRANSFORMER 3E              10s                      IN USE 522        4    VBTR-3E REDUNDANT POWER SUPPLY    206416  CONTROL    S            IN USE  Y            VBTR-2E SOIATRON 3E                        108                      IN USE
-618        4    VBTR-4A REGULATmO TRANSFORMER A 206 4 17  CONTROL    S            STANDBY  Y            MTMC-4 5BL 124                      STANDBY 619        4    VBTR-4B REGULATING TRANSFORMER B 206417    CONTROL    S            STANDBY  Y            MTMC-5 3BL 124                      STANDBY Appendix B                                                                                                        73
 
f            .
                                                                                                                  %s                                                                                %                                                                                                %s -
SEQ                      T CL  ID NO      EQUIP DESCRIPTION      DRA%1NG                BLDG  EVAL SSEL NOTE NORMt FWR SUFOstT DW INTEDCOPts R
N                                                                EL                      DESIRED i                                                                                                                              620                    4    VBTRAC  REGULATNG TRANSFORMER C 206417                CONTROL    S            STANDBY    Y-                                    MTMC4 SBR '
124                    STANDBY 621                      4    M 4D    REGULATmo TRANSMRMER D 2064 17                CONTROL    S            STANDBY    Y,                                    MTMC-5 3BR 124                    STANDBY 523                    2    \ M IA  \TTAL BUS TRANSFER S%TTCH 206417              CONTROL    3            IN USE    Y                                    VBIT-IAOR A                                              108                    IN USE                                          N-4A 524                    2    VBXS-1B \TTAL BUS TRANSFER S%TTCH 206417              CONTROL    S            IN USE    Y                                  . VBIT-lB OR B                                              108                    IN USE                                          M4 525                    2    VBXS-IC VTTAL BUS TRANSFER SWITCH 206417              CONTROL    S            IN USE    Y                                    VBIT-IC OR                [
C                                              108                    IN USE                                          M-4C 526                    2    VBXS-1D VITAL BUS TRANSFER SWTTCH 206417              CONTROL    5            IN USE    Y                                      VBIT-1D OR D                                              108                    IN USE                                            M-4D 527                    2  VBXS-1E MANUALTRANSFER 5%TTCH    206415              CONTROL    S            IN USE    Y                                      VBTR-3E OR 108                      IN USE                                          VBfT-lE 695                    20  VBXS-2A AUTO TRANSFER S%TICH FOR  209-058 VB-          CONTROL    S            IN USE    Y                                      VBDP-I II NNI                      08                  145                      IN USE                                          OR VBDP-5 7 696                    20  \ M 2B  AUTO TRANSFER SWITCH FOR  209458 VB-          CONTROL    S              IN USE  Y                                      VBDP-2 4 OR ICS                      08                    145                    D4USE                                            VBDP-4 23 528                    2  VBXS-3A Ef1C VITAL BUS TRANSFER  206-017              CONTROL    S            IN USE  Y                                      VBfT-I A OR 5%TTCH A                                        108                    IN USE                                          VBTR-4A 2  VBXS-3B  EFIC VITAL BUS TRANSFER  206-017            CONTROL                  IN USE    Y                                      VBfT-1B OR 529                                                                                          S SWTTCH B                                        108                      IN USE                                          VBTR-4B 2  VBXS-3C  EFIC VITAL BUS TRANSFER  206-017            CONTRO!    S            IN USE    Y                                      VBIT-IC OR 530 SWITCll C                                      108                      IN USE                                          VBTR E Appendix B                                                                                                                                                                        74
 
p Q                                                                                                                    . /~')
k_)                                                                                                                  b/-
sEn  T-  CL  In No    EQUIF DESCRIPTION      DRAWING        BLDCI  EVAL . SSELNOTE NORM / ' FWR - SUFORT DW INTERCONS 3                                                        EL                        nruman 531        2  N3D    EE VITAL BW TRANSFER -  206417      CONTROL    3            E USE      Y              VBrT-ID OR SWITCH D                            108                      IN USE                    N4 782        21  %NI    REACTOR COOLANT DRAIN  3024 01-1    REACTOR    S            IN USE    N              SW TANK N                              095                      IN USE 16        12 , WDF-1A  WASTEGASCOMPRESSOR A    302401-4    AUXILIARY  S            OFF        N N/A          NONE 095                      OFF 17        12  WDF-1B  WASTE GAS CX&lFRESSOR B 3024 01-4    AUXILLARY  g            OFF        N N/A          NONE 095                      OFF 883        21  WDT-IA  WASTEGAS DECAY TANK IA  M4I22 Rev.4 AUXHJARY 095 gg4        21  WDT-IB  WASTE GAS DECAY TANK iB M4122 Rev. 4 AUXILIARY 095 885        21  WDT-lC  WASTE GAS DECAYTANK IC  M4122 Rev 4 AUXILLARY 095 18        21  WDT-3A  RC BLEED TANK 3A        302 4 81-4  AUXHJARY    S              IN USE    N              N/A 095                        IN USE 46        2I  WDT-3B  RC BLEED TANK 3B        302441-4    AUXILLARY    S            IN USE    N              N/A 095                        IN USE 21  WDT-3C  RC BLEED TANK 3C        302481-4    AUXILIARY                  IN USE  N              N/A 59                                                                      S 095                        IN L4E 783        2I  WDT-5  REACTOR COOLANT DRAIN    302491-3    REACTOR      S            IN USE  N              N/A TANK                                095                        IN USE Appendix B                                                                                                              75 O
C
 
i i
!O i
;                                                                                                                                  e e                                                                                                            o                      e j
ese                                                            l J
i                                                                                                FLORIDA POWER CORPORATION '
l                                                                                                    CRYSTAL RIVER UNIT 3 lo i
!                                                                                                                  APPENDIX C l
1 i
l                                                                                  SCREENING VERIFICATION DATA SHEETS l                                                                                                    .
(SVDS) l l                                                                                                                                                                                        1 iO i                                                                                                                                                                                        ;
 
                ,~
(d APPENDIX C: Screening Verification Data Sheets (SVDS)
December 15,1995 CLASS ID NO                                  EQUIP DESCRIPTION          BLDG    E  ROOM    BASE CAP CAV ANCH INTER EQUIP L  RC        EL OK  OK OK            OK                            OK 14                        ACDP-05      DIESEL ROOM 480 VOLT      DIESEL  119          119  Y  Y    Y              Y                            Y DISTRIBUTION PANEL 3A
                                                            ~
14                        ACDP-06      DIESEL ROOM 480 VOLT      DIESEL  119          119  Y  Y    Y              Y                            Y DISIRIBUTION PANEL 3B 14                        ACDP-51      CONTROL COMPLEX            CONTROL  145 302/H    095  Y  Y    Y              Y                            Y DIS ~IRIBUTIONPANEL A 4                          ACDP-51-T    CONTROL COMPLEX            CONIROL  124 302/H    095  Y  Y    Y              Y                            Y DISTRIBlJTION PANEL A TRANSFORMER 14                        ACDP-52      CONTROL COMPLEX            CONTROL  145 302/H    095  Y  Y    Y              Y                            Y DISTRIBUTION PANEL B 4                          ACDP-52-T    CONTROL COMPLEX            CONIROL  124 302/H    095  Y  Y    Y              Y                          Y DISTRIBUTION PANEL B TRANSFORMER 14                          ACDP-68      ES DISTRIBUTION PANEL 3AB CONTROL  124 303/G    095  Y  Y    Y              Y                          Y 4                          ACDP-68-T    ES DISTRIBUTION PANEL      CONTROL  124 303/G    095  Y  N    Y              Y~                          N 3AB TRANSFORMER 8B                          AH-033-ASV  AHD-1, AHD-ID, AHD-2, &    CONTROL  164 302/H    095  Y  Y    N/A            Y                          Y' AHD-3 CONTROL 8B                          AH-033-SV  AHD-1, AHD-1D, AHD-2, &    CONTROL  164 302/H    095  Y Y    N/A            Y                          Y AHD-3 CONTROL 8B                          AH-194-SV  AHD-13 & AHD-14 CONTROL CONTROL    164 303/G    095  Y Y    N/A            Y                          Y 8B                          AH-195-SV  AHD-15 & AHD-16 COMTROL CONIROL    164 303/G    095  Y Y    N/A              Y                          Y 10                          AH-l%-POSI  AHD-1 CONTROL              CONIROL  160  301/1 _  095  N N    Y                Y                          N Appendix C                                                                                                                                                    1 n __ _ _ _ _ _ _  _    . - _ _ - _ _ _ _ _ _ _ _                            _-      .                                        . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - __-            .__
 
  ..  .                    -                                                              . .      ~-      -            --
        ,/ 3                                                                                            m                                                .(-
l                                                                                                                                                          Gl l        CLASS ID NO          EQUIF DESCRIPTION                                                BLDG      E  ROOM        BASE CAF CAV ANCH' INTER EQUIP L  RC            EL OK  OK OK      OK      OK 10  AH-l%POS2      AHD-2 CONIROL                                                    CONIROL    108  303/G        095  Y  N    Y    Y      N 10  AH-l%POS3      AHD-3 CONTROL                                                    CONIROL    164  302/H        095  Y  N    Y    Y      N
,          10  AH-l%POS4      AHD-ID CONIROL                                                    AUXILIARY 160  307/H        095  Y  Y    Y    Y      Y i
8B  AH-1%SV        AHD-1, AHD-1D, AHD-2, &                                          CONIROL    164  302/H        095  Y  Y    N/A  Y      Y AHD-3 CONIROL 8B  AH-199-SV      AHD-4 & AHD-5 CONTROL -                                          CONTROL    164  302/H        095  Y  Y    N/A  Y      Y 8B  AH-200-SV      AHD4 & AHD-7 CONTROL                                              CONTROL    164  303/H        095  Y  Y    N/A  Y        Y 8B  AH-246-SV      AHD-12 CONTROL                                                    CONIROL    164  302/H        095  Y  Y    N/A  Y        Y 8B  AH-250-SV      AHD-17 & AHD-22 POST-                                            AUXILIARY I19  303/1        095  Y  Y    N/A  Y        Y ACCIDENT CONTROL 8B  AH-310-SV      AHD-87 CONTROL                                                    AUXILIARY I19  304/1        095  Y  Y    N/A  Y        Y 8B  AH-311-SV      AHD-88 CONIROL                                                  . AUXILIARY 119  304/1        095  Y  Y    N/A  Y      .Y 8B  AH-355-'SV    AHD43 CONTROL                                                    DIESEL      i19 HVAC CAB 20  119  Y  Y-  N/A  Y        Y 8B  AH-356-SV      AHD43 CONIROL                                                    DIESEL      119 HVAC CAB 20  119  Y  Y    N/A  Y        Y 8B  AH-357-SV      AHD41 CONTROL                                                    DIESEL      119 HVAC CAB 20  119  Y  Y    N/A  Y        Y 8B  AH-358-SV      AHD-62 CONTROL                                                    DIESEL    119  HVAC CAB 20  119  Y  Y    N/A  Y        Y 88  AH-365-SV      AHD40 CONIROL                                                      DIESEL    119  HVAC CAB 19  119  Y  Y    N/A  Y        Y 8B  AH-366-SV      AHD40 CONTROL                                                      DIESEL    119  HVAC CAB 19  119  Y  Y    N/A  Y        Y 8B  AH-367-SV      AHD-58 CONTROL                                                    DIESEL    119  HVAC CAB 19  119 Y  Y    N/A  Y        Y 8B  AH-368-SV      AHD-59 CONTROL                                                    DIESEL    119  HVAC CAB 19  119  Y  Y  i"A  Y        Y 8B  AH-381-ASV    AHD-1, AHD-ID, AHD-2, &                                            CONTROL    164  302/H        095  Y  Y  N/A    Y      Y AHD-3 CONTROL                                                                            ,
Appendix C                                                                                                                                        2
 
                                                                                                                                                                                      ,c .
C                                                                                                                                                                          k                                                                              h,,
        - CLASS ID NO                                                                                            EQUIP DESCRIPTION                                            BLDG      E          ROOM      BASE ' CAF CAV ANCH LMIER EQUIP L          RC          EL OK    OK OK        OK                  OK 8B          AH-381-SV                                                                AHD-1, AHD-ID, AHD-2,&                                              CONIROL    164        302/H      095    Y  Y    N/A    Y                      Y AHD-3 CONIROL 12      AH-506-PS                                                                AHP-1A A AHP-1B CONTROL CONTROL                                                164        303/F      095    Y  Y    Y'    Y                      Y 12      AH-508-PS                                                                AHP-IC & AHP-ID CONTROL CONTROL                                                164        303/F      095    Y  Y    Y      Y                      Y 8B        AH-517-SV -                                                                                                                                  CONIROL    164        303/F      095    Y  Y    N/A    Y                      Y 8B        AH-518-SV                                                                                                                                    CONTROL    164        303/F      095    Y  Y    N/A    Y'                      Y 8B        AH-648-ASV                                                                AHD-1, AHD-ID, AHD-2, &                                            CONTROL    164        302/H      095  Y  Y    N/A    Y                      Y AHD-3 CONTROL 8B        AH-648-SV                                                                AHD-1, AHD-ID, AHD-2, &                                            CONIROL    164        302/H      095  Y  Y    N/A    Y                        Y AHD-3 CONIROL 8B        AH-649-ASV                                                                AHD-1, AHD-ID, AHD-2, A                                            CONIROL    164        302/H      095  Y  Y    N/A    Y                        Y AHD-3 CONTROL 8B        AH-953-SV                                                                  AHD-99 CONTROL                                                    CONIROL    164        HVAC CAB    095  Y  Y    N/A    Y                        Y 9AB 8B        AH-966-SV                                                                  AHD-1 CONIROL                                                      CONIROL    164        302/1      095    Y  Y    N/A    Y                        Y 8B        AH-%7-SV                                                                    AHD-1 & AHD-ID CONTROL                                            AUXILIARY 160          302/1      095    N  Y    N/A    Y                        N 8B        AH-%8-SV                                                                    AHD-2 CONTROL                                                    CONTROL    164        303/H      095    Y  Y    N/A    Y-                        Y 8B        AH-%9-SV                                                                    AHD-3 CONTROL                                                    CONTROL    164        302/H      095    Y  Y    N/A    Y                          Y 8B      AH-970-SV                                                                  AHD-99 CONTROL                                                    CONIROL      164        303/H      095    Y  Y    N/A    Y                        Y 8B      AH-971-SV                                                                    AHD-12 CONTROL                                                  CONIROL      108        304/G      095    Y  Y    N/A    Y                        Y 20      AHCP-4                                                                      SCR CABINET FOR AIDE-4A CONIROL                                              164        302/G      095    Y  Y    Y      Y                          Y AND AHIE-4B 10  AHD-01                                                                        CONTROL COMPLEX MAKE. CONTROL                                                164        301/1      095  Y  Y    Y      Y                          Y UP AIR Appendix C                                                                                                                                                                                                                                                                    3
 
f'                  -
l                  %                                                      O                                          U i
CLASS ID NO              EQUIP DESCRIPTION    BLDG      E    ROOM      BASE CAP CAV ANCH INTER EQUIP L    RC          EL OK  OK OK    OK    OK 10  AHD41D          CONTROL COMPLEX MAKE- AUXILIARY 160  307M      095  N. Y    Y    Y    N UP AIR 10  AHD-02          PNEUMATIC RELIEF TO  CON 2OL    164  302M      095  Y  Y    Y    Y-  _Y AD40 SPHERE 10  AHD-03          CONTROL COMPLEX FANS  CONIROL    164  302-H      095  Y  Y    Y    Y    Y INTAKE 10  AHD-04          AHF-17A INTAKE        CONIROL    164  302M      095  Y  Y    Y    Y    Y 10  AHD-05          AHF-17A DISCHARGE    CONIROL    164  304/H      095  Y  Y    Y    Y    Y 10  AHD-06          AHF-17B INTAKE        CONIROL    164  303/H      095  Y  Y    Y    Y    Y 10  AHD-07          AHF-17B DISCHARGE    CONTROL    170  302/H      095  Y  Y    Y    Y    Y      ;
10  AHD-12          SUPPLY TO CHEMLAB    CONTROL    108  303/G      095  Y  Y    Y    Y    Y 10    AHD-13        AHF-19A INTAKE        CONIROL    164  302/G      095  Y  Y    Y    Y    Y 10    AHD-14        AHF-19A DISCHARGE    CONIROL    164  302/H      095  Y  Y    Y    Y    Y 10    AHD-15        AHF-19B INTAKE        CONIROL    164  302/G      095  Y  Y    Y    Y    Y-10    AHD-16        AHF-19B DISCHARGE    CONTROL    164  302/H      095  Y  Y    Y    Y    Y 10    AHD-17        95* ELEVATION RETURN  CONTROL    103  303/H      095  Y  Y    Y    Y    Y 10    AHD-22        SECONTARY PLANT LAB  CONTROL    104  303/F      095  Y  Y    Y    Y    Y HOOD SUPPLY 10    AHD-58          AHF-22C DISCHARGE    DIESEL    124  300B/Q      119  Y Y    Y    Y    Y 10    AHD-59          AHF-22D DISCHARGE    DESEL      120  300B/Q      119  Y Y    Y    Y    Y 10    AHD-60          EGDG-1B INTER-ROOM    DESEL      124  300B/P      119  Y  Y  Y    Y    Y 10    AHD-61          AHF-22A DISCHARGE    DIESEL    124  300A/P      119  Y  Y  Y    Y    Y-Y        Y    Y 10  AHD-62          AHF-22B DISCHARGE    DESEL      124  300A/P '-
119  Y      Y_
Appendix C                                                                                            4 m ---- _ -_ --_ ____--_ ---- ---_-------_
 
(-                                                                                                                                                    .
V                                                                                                    b                                              b.  -_
CLASS ID NO                                                          EQUIP DESCRIPTION      BLDG      E  ROOM        BASE CAP CAV ANCH INTER EQUIP L  RC            EL OK  OK OK    OK    OK 10                      AHD-63                                  EGDG-IA DGER-ROOM      DIESEL    124  300A/P        119  Y  Y    Y    Y    Y 10                      AHD-87                                  AHF-8A DISCHARGE        AUXILIARY 128  303/J        095  Y  Y    Y    Y    Y 10                      AHD-88                                  AHF-8B DISCHARGE        AUXILIARY 124  303/J        095  Y  Y    Y    Y    Y 10                      AHD-99                                  VENTILLATION EQUIPMENT CONIROL    164  303/H        095  Y  Y    Y    Y    Y ROOM SUPPLY AIR 21                      AHDR-1A                                  CONTROL COMPLEX HVAC    CONIROL    164  303/F        095  Y  Y    N/A  N/A  Y COMPRESSED AIRDRYER A 21                      AHDR-1B                                  CONIROL COMPLEX HVAC    CONIROL    164  303/F        095  Y  Y    N/A  N/A  Y COMPRESSED AIRDRYERB 9                      AHF-01 A                                REACTORBUILDING AIR    REACTOR    126  319/RB        095  Y  Y    Y    Y    Y HANDLING FAN A 9                      AHF-01B                                  REACTORBUILDING AIR    REACTOR    103  319/RB        095  Y  Y    Y    Y    Y HANDLING FAN B 9                      AHF-01C                                REACTORBUILDING AIR    REACTOR    103  323/RB        095  Y  Y    Y    Y    Y HANDLING FAN C 10                      AHF-08A                                SPENT FUEL COOLANT PUMP AUXILIARY I19  304/J        095  Y  Y    Y    Y    Y A AIR HANDLING 10                      AHF-088                                SPENT FUEL COOLANT PUMP AUXILIARY I19  304/J        095  Y  Y    Y    Y    Y B AIRliANDLING 9                      AHF-17A                                CONTROL COMPLEX        CONTROL    164  302/H        095  Y  N    N    U    N~
NORMAL SUPPLY FAN A 9                      AHF-17B                                CONTROL COMPLEX        CONTROL    164  302A/H      095  Y  N    N    U    N NORMAL SUPPLY FAN B                                                                  ,
9                      AHF-19A                                CONTROL COMPLEX        CONTROL    164  302/H        095  Y Y    Y    Y    Y      ,
RETURN FAN A 9                        AHF-19B                                CONTROL COMPLEX        CONTROL    164  302A/H      095  Y  Y  Y    Y    Y RETL'RN FAN B Appendix C                                                                                                                                            5 i
m_____________.______    _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
 
CLASS ID NO        EQUIP DESCRIPTION              BLDG        E  ROOM            -BASE CAF ICAV ANCH INTER ' EQUIP L    RC                EL OK      OK OK                OK  OK 9  AHF-22A    DIESEL GENERATOR ROOM          DIESEL      137                    i!9    Y  Y              Y    Y    Y A SUPPLY
: 9. AHF-22B    DIESEL GENERATOR ROOM          DIESEL      131                    119    Y  Y              Y    .Y  Y A SUPPLY 9  AHF-22C    DIESELGENERATORROOMB DIESEL                137                    !!9    Y  Y              Y    Y    Y
                                                                                      ~
SUPPLY 9  AHF-22D    DIESEL GENERATOR ROOM B DIESEL              131                    119    Y  Y              Y      Y    Y SUPPLY 10  AHF-54A    EFIC ROOMS COOLING A            CONTROL    124  EFIC ROOM A    095      Y-  Y              Y      Y  .Y 10  AHF-54B    EFIC ROOMS COOLING B            CONTROL    124  EFIC ROOM B    095      Y  Y              Y      Y    Y 10  AHHE-04A    HEATING UNIT A FOR              CONTROL    170  302/G          095      Y  Y              Y-    Y    Y CONTROL COMPLEX 10  AHHE-04B    HEATING UNIT B FOR              CONIROL    170 .302A/G            095    Y  Y.            .Y      Y    Y-CONTROL COMPLEX 10  AHHE-05A    COOLING UNIT A FOR              CONTROL    170  302/F            095    Y  Y              Y      Y    Y CONTROL COMPLEX                                                                                                ,
10  AIDIE-OSB  COOLING UNIT B FOR              CONTROL    170  302A/F          095    Y  Y              Y      Y    Y CONIROL COMPLEX 21  AHHE-13A    COOLING COILS FOR              INTER      095  305/G            119    Y  Y              N/A    N/A  Y REACTOR BUILDING PENETRATIONS A 21  AHHE-13B    COOLING COILS FOR              INIER      095  305/G            119    Y  Y              N/A    N/A  Y REACTOR BUIDLING                                                                                  .
PENETRATION B 10  AHHE-29A    COOLING UNIT FOR SFP-1 A        AUXILIARY l19    304/J            095    Y  .Y              Y      Y    Y l
10  AHHE-29B    COOLING UNIT FOR SFP-1B        AUXILIARY I19    304/J            095    Y  Y              Y      Y    Y 21  AHHE-30A    COOLING UNIT FOR DCP-1 A        AUXILIARY 095    306/T            095    Y  Y              N/A    N/A  Y Appendix C                                                                                                                    6
 
  . ,y O                                                  V                                                                                          b,,
CLASS ID NO      EQUIP DESCRIPTION        BLDG      E      ROOM        BASE CAF    CAV ANCH INTER EQUIP L      RC                EL OK  OK OK                  OK                            OK 21  AHHE-30B  COOLING UNIT FOR DCP-1B  AUXILLARY 095      306/T          095    Y  Y      N/A              N/A                          Y 10  AHHE-31 A COOLING UNIT A FOR        REACTOR    126    RB-319, AHF-  095    Y  Y      Y                Y                            Y REACIORBUILDING                              1A 10  AHHE-31B  COOLING UNIT B FOR        REACTOR    126    RB-319, AHF-  095    Y  Y      Y                Y                            Y REACTOR BUILDING                            IB 10  AHHE-31C  COOLING UNIT C FOR        REACTOR    103    RB-323, AHF-  095    Y  Y      Y                Y                            Y REACIOR BUILDING                            1C 10  AHHE-32A  MOTORCOOLERFOR AHF-1A REACTOR        126    RB-323, AHF-    095  Y  Y      Y                Y                            Y lA 10  AHHE-32B  MOTOR COOLER FOR AHF-1B REACTOR      103    RB-319, AHF-    095  Y  Y      Y                Y                            Y IB 10  AHHE-32C  MOTOR COOLER FOR AHF-IC REACTOR      103    RB-319, AHF-    095  Y  Y      Y                Y                            Y IC 10  AHHE-43  COOLING UNIT A FOR EFIC  CONTROL    124    EFIC ROOM        095  Y  Y      Y                Y                            Y ROOMS 10  AHHE-44  COOLING UNIT B FOR EFIC  CON 1ROL  124    EFIC ROOM        095  Y  Y      Y                  Y                            Y ROOMS 12  AHP-01 A  CONTROL COMPLEX HVAC      CONTROL    164    EQUIP ROOM-      095  Y  N      N                  Y                            N AIR COMPRESSOR A 12  AHP-OlB  CONTROL COMPLEX HVAC      CONTROL    164      EQUIP ROOM      095  Y  N      N                  Y                            N AIR COMPRESSOR B 12  AHP-01C  CONTROL COMPLEX HVAC      CONIROL    164    EQUIP ROOM      095  Y  N      N                  Y                            N AIR COMPRESSOR 12 AHP41D    CONTROL COMPLEX HVAC      CONTROL    164    EQUIP ROOM      095  Y  N    N                  Y                            N AIR COMPRESSOR D 20  AHPL-1    PANEL                    CONTROL    164    302/11          095  Y  Y    Y                  Y                            Y.
TURBINE    I19                          Y  Y    N/A                                              Y 8A  ARV-48    VACUUM BREAKER RELIEF                                  -
095                                Y-FOR CDHE-4A Appendix C                                                                                                                                                    -7
=_                                                                            ___              -    . _ _ _ _ . _ _ - - _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _
 
  ,.-                                                  ,,~,                                                                                                            ,,
CLASS ID NO      EQUIP DESCRIPTION          BLDG        E    ROOM            BASE CAF            CAV ANCH INTER EQUIP L    RC                EL OK            .OK OK                                            OK              OK 8A ARV-49    VACUUM BREAKER RELIEF      TURBINE    127    308/E          095        Y        Y                N/A                              Y            Y FOR CDIE-4B SA ASV-005  EFIB-1 STEAM ADMISSION    INTER      095    308/H            119        Y        Y                N/A                              Y            Y 0  ASV-050  EFIB-1"IRIP &111ROTTLE    INTER      095    308/H            119        Y        Y                N/A                              Y            Y 8A ASV-204  EFIB-1 STEAM ADMISSION    INIT_R      095    308/H            I19        Y        Y-                N/A                              Y            Y 20  ATCP-1  ANTICIPATED TRANSENT      CONIROL    124    EFIC ROOM C    095        Y        Y                Y                                N            N W11110UT SCRAM LOGIC CABINET 5  BSP-IA  REACTOR BUILDING SPRAY AUXILIARY 075          305/N          095        Y        Y                Y                                Y            Y PUMP A 5  BSP-1B  REACTOR BUILDING SPRAY AUXILIARY 075          305/N            095        Y        Y                Y                                Y            Y PUMP B 19  CA-10-TE BOTTOM BORIC ACID          AUXILIARY 119      302/O            095        Y        Y                N/A                              Y            Y STORAGE TANK CAT-5A 18  CA-11-LT BORIC ACID STORAGETANK AUXILIARY I19          302/O            095        Y        Y                Y                                Y            Y A
19  CA-12-TE BOTTOM BORIC ACIT          AUXILIARY 119      302/O            095        Y      -Y                N/A                              Y            Y STORAGE TANK CAT-5B i
;    18  CA-13-LT BORIC ACID STORAGE TANK AUXILIARY 119        302/O            095        Y        Y                  Y                                Y          Y B
21  CAHE-1  PRESSURIZER SAMPLE        AUXILIARY 095      304/H            095        Y        Y                  N/A                              N/A        Y l                  COOLER
!    21  CAHE-2A  STEAM GENERA 1DR A          AUXILIARY 095      304/H          095        Y        Y                  N/A                              N/A        Y l                  SAMPLE COOLER l    21  CAHE-2B  STEAM GENERATOR B          AUXILIARY 095      304/H          095        Y        Y                  N/A                              N/A        Y SAMPLE COOLER l
i    2i  CAFE-5  PASS RC SAMPLE COOLER      INTER      095              -
119      Y        Y                  N/A                              N/A        Y l
Appendix C                                                                                                                                                            8 N                                  _ - - - _        _        -_        __  ___    _ _ _ .  , _ _    _-. . . - - . _ _ - - _ _ _ _ - _ - _ _ . - - _ _ _ _ - - - _
 
CLASS -ID MO            EQUIP DESCRIPTION        BLDG-      E  ROOM        BASE . CAF CAV ANCH INTER EQUIP-L  RC            EL  OK- OK OK    OK    OK 21  CAHE-6          PASS DECAY HEAT SAMPLE AUXILIARY 095                  095    Y  Y    N/A  N/A  Y-COOLER 21  CAHE-8          PASS RC SAMPLE PRE-      INER      095                  119  'Y-  Y    N/A  N/A    Y COOLER
      -5  CAP-IA          BORIC ACID PUMP A        AUXILIARY I19    302/O        095    Y  Y    Y. Y      YL 5  CAP-1B          BORIC ACID PUMP B        AUXILIARY 119    302/O        095  Y  N    N    Y      N 21  CAT-5A          BORIC ACID STORAGE A    AUXILIARY I19    302/O        095  Y  Y    N/A  N/A    Y 21- CAT-5B -        BORIC ACID STORAGE-TANK AUXILIARY l19    303/O        095  Y  Y    N/A  N/A'    Y B
8B - CAV-002        PZR AND LETDOWN          DUER      095    305/H        I19    Y  Y    N/A  Y      Y OIRSIDE PENETRATION SAMPLE ISOLATION 7    CAV-057        BORIC ACID PUMP TO MAKE- AUXILIARY 119    304/M        095    Y  Y    N/A  Y      Y UP TANK 8B    CAV-057-SV    CAV-57 CONTROL          AUX 1LIARY 119 . 304/M        095    Y  Y    N/A Y      Y 7    CAV-060        BORIC ACID PUMP TO MAKE- AUXILIARY 121    304/M        095    Y  Y    N/A Y      Y UP TANK 8B    CAV-060-SV    CAV-60 CONTROL          AUXILIARY l19    304/M        095  -Y  Y    N/A Y      Y 8A CAV-126          RC LETDOWN SAMPLE        REACTOR      095  305/K        095    Y                            ,
INSIDE PENETRATION ISOLATION VALVE 20  CCBT          CENTRAL CONTROL BOARD CONTROL        145  302/H        095  'Y  Y    Y    Y      Y        :
TERMINATION CABINET 18    CD-067-LT1    CONDENSATE STORAGE      TURBINE      I19  311/C        095  Y  Y  .Y    Y      Y TANK LEVEL 18    CD-100-LT    CONDENSER CDIE-4A        TURBINE    095  306A/Cl ^-. 095  Y  Y    Y    Y      Y        -
HOTWELL LEVEL
* Appendix C                                                                                                  9
 
                                                        ~
U                                                    N                                                N CLASS ID NO          EQUIF DESCRIFTION        BLDG      E    ROOM          BASE CAF CAV ANCH INTER EQUIP L    RC              EL OK  OK- OK    OK    OK 18  CD-101-LT    CONDENSER CDHE-4B        WRBINE  095    306A/E          095  Y  Y    Y    Y    Y HOTWELL LEVEL 21  CDHE-4A      MAIN CONDENSER A        TURBINE  095    306/D          095  Y  Y    N    Y    N
* 21  CDHE-4B      MAIN CONDENSER B        TURBINE  095  307/D          095  Y  Y    N    Y    N 6  CDP-1A CONDENSATE PUMP A        TURBINE  095  305/B2          095  Y  Y    Y    Y '' Y 6  CDP-1B      CONDENSAT1! PUMP B      TURBINE  095  308/B2          095  Y  Y    Y    Y    Y 21  CDT-1        CONDENSATE STORAGE      WESTBERM 119    311/D          119  Y  Y    N/A  N/A  Y TANK 0  CEILING      CONIROL ROOM CEILING    CONIROL  145  301-303/F-1    095  Y  N/A  N    N    N 8A CFV-5        CORE FLOOD TANK A        REACTOR    119  308/J          095  Y  Y    N/A  Y    Y DISCHARGE ISOLATION 8A CFV-6        CORE FLOOD TANK B        REACTOR    I19  305/L          -095  Y  Y    N/A  Y    Y DISCHARGE ISOLATION 18  CH-378-LYT  CHV-68 CONTROL OF CHHE- CONTROL    164  301/F          095  Y  Y    Y    Y    Y IA 18  CH-379-PT    CHV-69 CONTROL OF CHHE- CONIROL    164  301/G          095  Y  Y    Y    Y    Y IB 11 CHHE-IA      CONTROL COMPLEX          CONIROL    164  301/F          095  Y  Y    Y    -Y    Y CHILLER A 11 CHHE-1B      CONTROL COMPLEX          CONTROL    164  301/G          095  Y  Y    Y    Y    Y CIIILLER B 5  CHP-lA      CHILLED WATER PUMP A      CONIROL    164  NEAR CHHE-      095 Y  Y  Y    .Y    Y 1A 5 CHP-1B      CHILLED WATER PUMP B      CONTROL    164  NEAR CHHE-      095  Y  Y  Y    Y    Y IB 21 CHT-1        CHILLED WATER            CONTROL    181  302/G      ~-
095  Y  Y  N/A  N/A  Y EXPANSION TANK Appendix C                                                                                            10 m
 
O                                                        O                                            O CLASS ID NO.              EQUIP DESCRIPTION      BLDG      E  ROOM      BASE' CAF  CAV ANCH INTER EQUIP L  RC          EL OK    OK OK    OK    OK' 7 ' CHV-068            SERVICE WATERTO CHHE-  CONIROL    172  301/F    095    Y  Y    N/A  Y    .Y l A CONTROL VALVE 7    CHV-068-POS      CHV-68 CONTROL          CONIROL    164  302/F    095    Y  Y    N/A  Y    Y 7    CHV-069          SERVICE WA7ER TO CHHE-  CONTROL    172  301/F    095    Y  Y    N/A  Y    Y-
                              . IB CONTROL VALVE 7  CHV-069-POS      CHV-69 CONTROL          CONIROL    164  302/G      095    Y  Y    N/A  Y    Y 8B CHV-090            NORMAL COOLING TO AHHE CONTROL    124  304/G      095    Y  Y    N/A  Y    Y 44 ISOLATION VALVE 8B CHV-097            APPX. R COOLING FROM    CONTROL    125  304/G      095    Y  Y    N/A  Y    Y AHHE-44 ISOLATION VALVE 7  CHV-100          AHHE-44 (EFIC ROOMS)    CCNTROL    125  304/G      095    Y  Y-  N/A  Y    Y CONTROL VALVE 7  CHV-100-POS      CHV-100 CONTROL          CONTROL  124  303/F      095    Y  Y    N/A  Y    Y 8B CHV-100-SV          CHV-LOO CONTROL          CONTROL  124  303/F    095    Y  Y    N/A  Y    Y 8B  CHV-101          NORMAL COOLING FROM      CONTROL  124  304/G    095    Y  Y    N/A  Y    Y AHHE-44 ISOLATION VALVE 8B  CliV-108          NORMAL COOLING TO AHHE- CONTROL    131  304/G    095    Y  Y    N/A  Y    Y-43 ISOLATION VALVE 7  CHV-113          AHHE-43 (EFIC ROOMS)    CONTROL    130  304/G    095    Y  Y  N/A  Y    Y CONTROL VALVE 7  CHV-Il3-POS      CHV-Il3 CONTROL          CONIROL    124  304/G    095    Y  Y  N/A  Y    Y 8B CHV-Il3-SV          CHV-Il3 CON 1ROL        CONIROL    124  304/G      095  Y  Y  N/A  Y    Y 18  DC-05-PT          DCP-I A DISCHARGE        AUXILIARY 095  306/S      095  Y  Y  Y    Y    Y 18  DC-06-PT          DCP-1B DISCHARGE        AUXILIARY 095  306/S      095    Y  Y  Y    Y    Y PRESSURE                                      ..
Appendix C                                                                                                11-
 
(
                                                      ' h, ~.                                                                  b i
CLASS 'ID NO                EQUIF DESCRIPTION      BLDG      E    ROOM            BASE CAF    CAV ANCH INTER EQUEF L  'RC                EL OK      OK OK    OK      OK .
18    DC-50-LT      DC SURGE TANK DCT-IA    AUXILIARY 095    306/S          095    Y    Y    Y  Y        Y-LEVEL 18    DC-54-LT      DC SURGE TANK DCT-1B    AUXILIARY 095    306/T          095    Y    Y    Y  Y        Y-Ir s 21    DCHE-1A      DECAY HEAT CLOSED      AUXILIARY 095    304/P          095    Y    Y    N/A  N/A    Y
                                                                                            - CYCLE COOLING A 21    DCHE-1B      DECAY HEAT CLOSED      AUXILIARY 095    306/P          095    Y    Y    N/A  N/A  -Y CYCLE COOLING B 5    DCP-1 A      DECAY HEAT CLOSED      AUXILIARY 095    306/S          095    Y    Y    Y    Y      Y CYCLE COOLING PUMP A 5    DCP-1B        DECAY HEAT CLOSED      AUXILIARY 095    306fr          095    Y    N    Y    Y      N CYCLE COOLING PUMP B 21    DCT-1 A      DECAY HEAT CCC SURGE    AUXILIARY 095    306/S          095    Y    Y    N/A  N/A    Y TANK A 21    DCT-1B        DECAY HEAT CCC SURGE    AUXILIARY 095    306/S          095    Y    Y    N/A  N/A    Y TANK B 7    DCV-186      NITROGEN SUPPLY TO DCT- AUXILIARY 095    307/S          095    Y    Y    N/A  Y      Y IA 7    DCV-188      NITROGEN SUPPLY TO DCT- AUXILIARY 095    307/S          095    Y    Y    N/A  Y      Y IB 7    DCV-190      DCT-I A OVERPRESSURE    AUXILIARY 095    306/S          095    Y    Y    N/A  Y      Y CONTROL VALVE                                                                                    1 7    DCV-191      DCT-1B OVERPRESSURE    AUXILIARY 095    306/S          095    Y    Y    N/A  Y        Y CONTROL VAVLE 18  DF-1-LS      DIESEL GENERATOR FUEL  DIESEL    I19                    119  Y    Y    Y'  Y        Y OIL DAY TANK A LEVEL SWITCH Appendix C                                                                                                      12  ,
i t_-. _ - _ . _ -. _ _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ _ - - _ - - - -                                      -_
                                                                                                                                                                                    ~
 
r b                                                              b                                                                                  b CLASS ID NO                  EQUIP DESCRIPTION        BLDG        E  ROOM      BASE CAP .CAV ANCH INTER EQUIF L  RC          EL OK    OK OK                      OK                        OK 18 DF-2-LS              DIESEL GENERATOR FUEL    DIESEL    119            119    Y  Y    Y                        Y                        Y OIL DAY TANK A LEVEL SWITCH 18 DF-3-LS              DIESEL GENERATOR FUEL    DIESEL    i19            119    Y  Y  Y                        Y                        Y OIL DAY TANK B LEVEL SWITCH 18 DF-4-LS              DIESEL GENERATOR FUEL    DIESEL    119            119  Y  Y  Y                        Y                        Y OIL DAY TANK B LEVEL SWITCH
                  $ DFP-1A              AS MOTOR DRIVEN FUEL OIL DIESEL      119            119  Y  Y  Y                        Y                        Y TRANSFER PUMP A 5 DFP-1B              AC MOTOR DRIVEN FUEL OIL DIESEL      119            119  Y. Y  Y                        Y                        Y TRANSFER PUMP B 5 DFP-IC              DC MOTOR DRIVEN FUEL OIL AUXILIARY I19              095    Y  Y  Y                        Y                        Y TRANSFER PUMP C 5 DFP-ID              DC DRIVEN FUEL OIL        AUXILIARY. 119            095    Y  Y  Y                        Y                        Y TRANSFER PUMP D 21 DFT-IA              DIESEL GENERATOR FUEL    SOUTli      105            105  Y  Y  N/A                        N/A                    Y OIL STO$tAGE TANK A      BERM 21 DFT-1B              DIESEL GENERATOR FUEL    SOUTil      105            105  Y  Y  N/A                        N/A                    Y OIL STORAGE TANK B        BERM 21 DFT-3A              DIESEL GENERATOR FUEL    DIESEL      i19            119  Y  N  N/A                        N/A                    N OIL DAY TANK A 21 DFT-3B              DIESEL GENERATOR FUEL    DIESEL      119            119  Y  N  N/A                        N/A                    N OIL DAY TANK B 18 DH-07-LT            BORATED WATER STORAGE BWST            119 307/Q      119  Y  Y  Y                          Y                      Y TANK LEVEL 18 DH-07-LTI            BORATED WATER STORAGE BWST            119 307/P ..,
119  Y  Y  Y                          Y                      Y TANK LEVEL Appendix C                                                                                                                                          13
 
                                                          .- ~                                                              - f.
CLASS ID NO      EQUIP DESCRIPTION          BLDG        E  ROOM            BASE CAF      CAV ANCH IN11R . EQUIP                                                    '
L  RC                EL - OK '  OK~ OK            OK      OK-18  DH-37-LT  BORATED WATER STORAGE NAOHTANK 119                          119  Y      Y    Y            Y-      Y TANK LEVEL 21  DHHE-IA    DECAY HEAT REMOVAL        AUXILIARY 075    304/P4          095    Y    Y    N/A          N/A    Y HEATEXCHANGER A 21  DHHE-1B    DECAY HEAT REMOVAL        AUXILIARY 075    306/P-Q        095    Y    Y    N/A          N/A    Y HEAT EXCHANGER B                                                                                                                                    ,
5  DHP-IA    DECAY HEAT PUMP A          AUXILIARY 075    305/Q          095    Y    Y    Y            Y      Y 5  DHP-1B    DECAY HEAT PUMP B          AUXILIARY 075_ 305/Q            095    Y    Y    Y            Y      Y-21  DHT-1      BORATED WATER STORAGE SOUTH            119                  119    Y    N    N/A          - N/A' - N TANK                      BERM 21  DLHE-IA    DIESEL GENERATOR LUBE      DIESEL      119  301/Q            119    Y    Y    N/A          N/A      Y OIL COOLER I A 21  DLHE-1B    DIESEL GENERATOR LUBE      DIESEL      119  301/Q            119    Y    Y    N/A          N/A    Y OIL COOLER IB 21  DLHE-2A    DIESEL GENERATOR LUBE      DIESEL      119  301/Q            l19    Y    Y    N/A          N/A      Y OIL COOLER 2A 21  DLHE-2B    DIESEL GENERATOR LUBE      DIESEL      119  301/Q          l19    Y    Y    N/A            N/A    Y OIL COOLER 2B 15  DPBA-I A  250/125V BATTERY A        CONTROL      108  301/F          095    Y    N    Y              Y      N 15 DPBA-1B    250/125V BATTERY B        CONTROL      108  302/F          09',    Y    N    Y              Y      N 15 DPBA-IC    250/125V BATTERY C        TURBINE    095  304/A          095    Y    N    Y              U      N 16 DPBC-IA    BATTERY CHARGER A          CONTROL      108  301/G          095    Y    Y  Y            .Y      Y 16 DPBC-1B    BATTERY CHARGER B          CONTROL      108  302/G          095    Y    Y  Y            ~Y      'Y 16 DPBC-IC    BATIERY CHARGER C          CONTROL      108  301/G          095  .- Y    Y  Y              Y      Y 16 DPBC-ID    BATTERY CHARGER D          CONTROL      108  302/G  '
095      Y    Y  Y              Y      Y                                            ,
Appendix C                                                                                                                                        14
 
n                                                  yw (m                                                    N]                                                    /
CIJ s ID NO      EQUIF DESCRIPTION          BLDG      E  ROOM      BASE CAF CAV . ANCH INTER EQUIF L  RC          EL OK  OK OK ,OK              OK 16  DPBC-lE  BATIERY CHARGER E          CONTROL    108  302/G      095    Y Y    Y    Y            Y 16  DPBC-IF  BATIERY CHARGERF          CON 1ROL  108  302/G      095    Y Y    Y    Y            Y 16  DPBC-lG  BATIERY CHARGER G          TURBINE    095  304/B      095    Y U    U    N-          N 16  DPBC-lH  BATIERY CHARGER H          TURBINE    095  304/B      095    Y U    U    N            N
      '16  DPBC-1I  BATIERY CHARGERI          TURBINE    095  304/B      095    Y U    U    N            N 14  DPDP-1A  250/125V DC MAIN PANEL 3A CONTROL    108  301/G      095  Y Y    Y    Y          'Y 14  DPDP-1B  250/125V MAIN PANEL 3B    CONIROL    108  303/G      095  Y Y    Y    Y          -Y 14  DPDP-1C  250/125V DC MAIN PANEL 3C TURBINE    095  304/A      095  'Y Y    Y    N            N 14  DPDP-3A  250/125V DC TURBINE        TURBINE    095  301/C      095  Y Y    Y    Y            Y BUILDING PANEL A 14  DPDP-3B  250/125V DC TURBNIE        TURBINE    I19  309/F      095  Y Y    Y    Y            Y-BUILDING PANEL B 14  DPDP-4B  CONTROL COMPLEX DC        CONIROL    124  302/G      095  Y Y    Y    Y            Y l                      PANEL 3B l      14  DPDP-5A  250/125V DC ES PANEL A    CONTROL    124  303/H      095  Y Y    Y    Y            Y 14  DPDP-5B  250/125V DC ES PANEL B    CONTROL    124 303/H      095  Y Y    Y    Y            Y 14  DPDP4A    250/125V DC ES DIESEL      DIESEL      119              119  Y Y    Y    Y            Y GENERATOR PANEL A 14  DPDP-6B  250/125V DC ES DIESEL      DIESEL      119              119  Y Y    Y      Y          Y GENERATOR PANEL B 14  DPDP-8A  250/125V DC ESSENTIAL      CONIROL    108 303/H      095  Y  Y    Y    .Y          Y SERVICES PANEL A 14  DPDP-8B  250/125V DC ESSENTIAL      CONIROL    108  303/I      095  Y  Y    Y    Y          Y SERVICES PANEL B l    Appendix C                                                                                                    15 i
V-                                                                                                  -- -- __          _ _ _ _ - _ _ _ _ _ _ _ .
 
          .      _.    .                                                    ..      _ _.    . .      . . . _ . . _ .                                _ . . . _ . .          m._
O                                                                                                              O                                                                                  O CIASS ID NO              EQUEF DESCRIPTION                                                    BLDG                          E                  ROOM                BASE' CAP. _CAV ANCli INTER EQUEF L                  RC                    EL OK    OK OK 'OK-      OK 14    DPDP4C          250/125 VOLT DC EFIC PANEL CONTROL                                                                124                  303/1              095      Y Y    Y    Y'    Y D
;      14    DPDP4D          250/125 VOLT DC EFIC PANEL CONTROL                                                                124                  104-H              095 .' Y    Y    Y    Y    Y D
14    DPDS-IA        BA~ITERY 3A DISCONNECT                                              CONIROL                      108                  301/G              095      Y Y    Y      Y    Y SWITCH 14    DPDS-1B        BATTERY 3B DISCONNECT                                                CONIROL                      108                  302/G              095      Y Y    Y    -Y    Y SWITCH 14    DPDS-lC        BATTERY 3C DISCONNECT                                                TURBINE                      095                  304/A              095      Y Y    Y      N    N SWITCH 20    DFIP-5A        ENGINEERED SAFEGUARDS CONTROL                                                                      124                303/H              095      Y Y  -Y      Y    Y DC TEST PANEL 20    DPTP-5B        ENGINEERED SAFEGUARDS CONTROL                                                                      124                303/H                095      Y Y    Y      Y    Y DC ~EST PANEL 20    DFP?4A          ENGINEERED SAFEGUARDS                                                DIESEL                        i19                                      119      Y Y    Y-    Y    Y
                            ' DIESEL GENERATOR DC TEST PANEL 20    DirrP 4 B      ENGINEERED SAFEGUARDS                                                DIESEL                        I19                                      119    'Y Y    Y      Y    Y DIESEL GENERATOR DC TEST PANEL 20    DFTP4A          ENGINEERED SAFEGUARDS                                                CONTROL                        108                303/H                095      Y Y    Y      Y    Y DC TEST PANEL l      20    DFIP4B          ENGINEERED SAFEGUARDS                                                CONTROL                        108                303/I                095      Y Y    Y      Y. Y DC TEST PANEL 2    DPXS-1          MAN XFER SWITCH FOR                                                  AUXILIARY 095                                      303/J              095'    Y Y    Y      Y    Y POWERTO MUP-3B AND MUP-SB                                                            ,
i      14    DPXS-IC        DPBC-I INPUT POWER                                                  TURBINE                        095                  304/A          ..,
095      Y N    N      Y    N i                              TRANSFER SWITCH Appendix C                                                                                                                                                                                          16 l
 
O                                                  O                                                            O CLASS ID NO      EQUIP DESCRIPTION        BLDG        E          ROOM            L BASE ' CAF CAV ANCH INTER EQUIP L          RC                  EL OK  OK OK    OK    OK 20  DRRD42    CRD DC BREAKER CABINET CONTROL      124          302/H              095    Y  Y    Y    Y    Y 20  DRRD-10  CRD AC BREAKER CABINET CONIROL      124          301/H              095    Y  Y    Y    Y    Y A - UNIT 10 20  DRRD-11 ' CRD ACBREAKERCABINET CONIROL        124          301/H              095  .Y  Y    Y    Y-    Y B - UNIT 11 20  DRRD-2-1  CRD DC BREAKER CABINET CONTROL      124          302/G              095    Y  Y    Y    N    N UNIT I & 2 20  DRRD-2-2  CRD DC BREAKER CABINET CONTROL        124          302/G              095    Y. Y    Y    U    U UNIT 3 & 4 20  DRRD-2-3  CRD DC BREAKER CABINET CONTROL        124          302/G              095    Y  Y    Y    U    U TRIP RESET 18  EF-23-FT  EFP-1 TO OTSG-B FLOW      INTER    095            308/H              I19  Y  Y    Y    Y    Y 18  EF-24-FT  EFP-2 TO OTSG B FLOW      INTER    095            307/H              I19  Y  Y    Y'  Y    Y 18  EF-25-FT  EFP-1 TO OTSG A FLOW      NER      095            308/H              I19  Y  Y    Y    Y    Y 18  EF-26-FT  EFP-2 TO OTSG A FLOW      INTER      095          307/H              I19  Y  Y    Y    Y    Y 18  EF-98-LT  EMERGENCY FEEDWATER      EFW TANK I19                                119  Y. Y    Y    Y    Y TANK LEVEL 18  EF-99-LT  EMERGENCY FEEDWATER      EFW TANK I19                                119  Y- Y    Y    Y    Y TANK LEVEL 20  EFIC-A    EMERGENCY FEEDWATER      CONTROL      124          303/F            095    Y  Y    Y    Y    Y-INITIATION AND CONTROL CABINET A 20  EFIC-B    EMERGENCY FEEDWATER      CONIROL      124        302/G              095  Y  Y    Y    Y    Y INITIATION AND CONTROL CABINET B Appendix C                                                                                                          17
 
O                                                                                                      O                                                      O CIASS ID NO                      EQUIP DESCRIPTION                                              BLDG    E  ROOM          BASE CAP - CAV - ANCH INTER EQUIP L    RC              EL OK        OK- OK      OK    OK 20 EFIC-C                  EMERGENCY FEEDWATER                                            CONTROL  124  302/F        095  Y      Y      Y    Y      Y INITIATION AND CONTROL 1
CABINET C 20 EFIC-D                  EMERGENCY FEEDWATER                                            CONTROL  124  303/G        095  Y        Y      Y-  Y      Y
:l                                                INITIATION AND CONTROL CABINET D 20 EFIC-EC-A                EMERGENCY FEEDWATER                                            CONIROL  124  303/F        095  Y'      Y      Y-  Y      Y AUXILIARY EQUIPMENT CABINET A 20 EFIC-EC-B                EMERGENCY FEEDWATER                                            CONTROL  124  302/G        095  Y        Y    'Y    Y      Y AUXILIARY EQUIPMENT CABINET B 20 EFIC-RC-IC              EMERGENCf FEEDWATER                                            CONIROL  124  302/F        095  Y        Y      Y    Y      Y AUXILIARY RELAY CABINET IC 20 EFIC-RC-ID              EMERGENCY FEEDWATER                                            CONIROL  124' 303/G          095  Y        Y    Y    Y      Y AUXILIARY RELAY CABINET ID 5 EFP-1                    MOTOR DRIVEN                                                    INTER    095  309/G          I19  Y        Y-    Y    Y      Y-EMERGENCY FEEDWATER PUMP 5 EFP-2                    TURBINE DRIVEN                                                  INTER    095  308/G          119  Y          Y    Y    Y    Y EMERGENCY FEEDWATER PUMP 21 EFT-2                    EMERGENCY FEEDWATER                                            EFW TANK 119                  119  Y          N    N/A    N/A  N TANK 8A EFV-01                  HOTWELL ISOLATION TO                                            INTER    095  308/H          I19  Y-        Y    N/A    Y    Y
                                                  'IURBINE DRIVEN EFP-2 8A EFV-02                  HOTWELL ISOLATION TO                                            INTER    095    308/H          I19 Y          Y  N/A    Y    Y MOTOR DRIVEN EFP-1 i
t Appendix C                                                                                                                                                        18 m            - .                    _ - . _ __          ._ __ - ___ _ _ . - _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _                            _ _            _ _ _ . . _ ___. _      . - - _ _ _ - - - -
 
CLASS ID NO      EQUIP DESCRIPTION        BLDG        E  ROOM      ' BASE CAF CAV ANCH INTER EQUIP' L  RC            EL OK  OK OK    OK-      OK 8A EFV-03    CDT-1 AND EFT-2 ISOLATION INTER        095  308/H      119  Y  Y    N/A  Y'      Y TO EFP-1 8A EFV-04    CDT-1 AND SFT-2 ISOLATION INIER        095  308/H      I19. Y  Y    N/A  Y-      Y
                'ID EFP-2 8B  EFV-55    EFP-2 TO OTSG B CONTROL    INIER      095  307/H      I19  Y  Y    N/A  Y        Y VALVE 8B  EFV-56    EFP-2 TO OTSG A CONTROL    INIER      095  306/H      I19  Y  Y    N/A  Y        Y VALVE 8B  EFV-57    EFP-1 TO OTSG B CONTROL    INTER      095  308/H      I19  Y  Y'  N/A  Y        Y VALVE 8B  EFV-58    EFP-I TO OTSG A CONTROL    INIER      I19  307/G        119  Y  Y    N/A  Y        Y-VALVE 20 EGCP-1A  EMERGENCY DIESEL          DIESEL      i19              119  Y  Y    Y    Y        Y GENERATOR A CONTROL PANEL 20 EGCP-1B  EMERGENCY DIESEL          DESEL      i19              I19  Y  Y    Y    Y        Y GENERATOR B CONTROL PANEL 20 EGCP-2A  EMERGENCY DIESEL GEN A DESEL          i19              119  Y  Y-  Y    N        N-ELECTRICAL EQUIPMENT CABINET 20  EGCP-2B    EMERGENCY DIESEL GEN B DIESEL'        119              119  Y  Y    Y    N        N ELECIRICAL EQUIPMENT CABINET 20 EGCP-3A    DIESEL GENERATOR A        DESEL        i19  /O        I19  Y  Y    Y    Y      Y CONTROL POWER RELAY CABINET 20 EGCP-3B    DIESEL GENERATOR B        DESEL        119  /O        I19  Y  Y    Y    Y      Y CONTROL POWER RELAY                              ...
CABINET Appendix C                                                                                              19 m                                                - - .                                --. _ - .    -    - _ - ___
 
s                                                                                                                                ,s                                              s    -
      't.)                                                                                                                                b)                                            b.
      . CLASS ID NO                                                                                        EQUIP DESCRIPTION        BLDG      E  ROOM      BASE CAP CAV ANCH INTER EQUIP L    RC          EL OK OK OK    OK      OK 20  EGCP4A                                                                                      DIESEL GENERATOR A      DIESEL    119    O        I19  Y Y    Y    Y        Y POWER CIRCUIT BITAKER PANEL 20  EGCP4B                                                                                      DIESEL GENERATOR B      DESEL    119    /0        119  Y Y    Y    Y        Y POWER CIRCUlT BREAKER PANEL 17 EGDG-1A                                                                                      DIESEL GENERATOR A      DESEL    119              119  Y Y    Y    Y        Y 17 EGDG-1B                                                                                      DIESEL GENERATOR B      DESEL    i19              119  Y Y    Y    N        N 21  EGT-IA                                                                                      EDG A AIR RECEIVER l A  DESEL    i19              119  Y Y    N/A  N/A      Y 21  EGT-1B                                                                                      EDG A AIR RECEIVER IB    DESEL    i19              119  Y Y    N/A  N/A      Y 21  EGT-2A                                                                                      EDG B AIR RECEIVER 2A    DESEL    i19              119  Y Y    N/A  N/A      Y 21  EGT-2B                                                                                      EDG B AIR RECEIVER 2B    DESEL    i19              119  Y Y    N/A  N/A      Y 8B  EGV-36                                                                                      EDG A AIR START SOLENOID DESEL    119  301/F      119  Y Y    N/A  Y        Y        !
VALVE 8B  EGV-37                                                                                      EDG A AIR START SOLENOID DESEL    119  301/P      119  Y Y    N/A  Y        Y VALVE                                                                                  .
8B  EGV40                                                                                        EDG B AIR START SOLENOID DESEL    119  301/P      119  Y Y    N/A  Y        Y VALVE 8B  EGV41                                                                                        EDG B AIR START SOLENOID DESEL    119  301/P      119  Y Y    N/A  Y        Y        ,
VALVE 7  EGV-52                                                                                      EDG A AIR START 3-WAY    DESEL    119' 301/P      119  Y Y    N/A  Y        Y VALVE                                                                                  '
7  EGV-53                                                                                      EDG A AIR START 3-WAY    DESEL    119  301/N      119  Y Y    N/A  Y        Y VALVE 7  EGV-54                                                                                      EDG B AIR START 3-WAY    DESEL    119  301/P      119  Y Y    N/A  Y        Y VALVE                                          ..,
Appendix C                                                                                                                                                                          20
._ _ -            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _                                                                  .        -  - ~
 
    ..x                                            fs
  -Cl                                              U                                          V CLASS ID NO      EQUIP DESCRIPTION      BLDG      E  ROOM    BASE CAF  CAV ANCH INTER EQUIP -
L  RC        EL ' OK    OK OK  OK    OK 7  EGV-55    EDG B AIR START 3-WAY  DIESEL    119 301/P    119  Y    Y. N/A  Y    Y VALVE 8B EGV-56    EDG A AIR STARTVALVE    DIESEL    119 301/P    119  Y    Y  N/A  Y    Y 8B  EGV-57    EDG A AIR START VALVE  DIESEL    119 301/P    119  Y      Y  N/A  Y    Y 8B  EGV-58  -
EDG B AIR START VALVE  DIESEL    119 301/P    119  Y      Y- N/A  Y    Y 8B  EGV-59    EDG B AIR START VALVE  DIESEL    119 301/P    119  Y      Y  N/A  Y    Y 20  ERI      EVENTS RECORDER        CONTROL  145 302/G  095    Y      N  N    Y    N CABINET 1 20  ER2      EVENTS RECORDER        CONTROL  145 302/G  095    Y      N  N    Y    N CABINET 2 20  ER3      EVENTS RECORDER        COKTROL  145 302/G  095    Y      N  N    Y    N CABINET 3 20  ER4      EVENTS RECORDER        CONTROL  I45 302/G    095  Y      N  N    Y    N CABINET 4 20  ER5      EVENTS RECORDER        CONTROL  145 302/G    095  Y      N  N    Y    N CABINET 5 20  ER6      EVENTS RECORDER        CONTROL  145 302/G    095  Y      N  N    Y    N CABINET 6 20  ER7      EVENTS RECORDER        CONTROL  145 302/G    095  Y      N  N    Y    N CABINET 7                                                                        >
20  ER8      EVENTS RECORDER        CONTROL  145 302/G    095  Y      N  N    Y    N CABINET 8 20  ESCC-1    ES SYSTEM CHANNEL TEST CONTROL    145 302/G    095  Y      Y  Y    Y    Y CABINET 1 20  ESCC-IA  ES SYSTEM CHANNEL8      CONIROL  I45 302/G    095  Y      Y  Y    Y    Y CABINET l A                                .
Appendix C                                                                                    21 L                                                                          . -        -  --    -- -
 
O                                                          O                                                                                              O CLASS ID NO            EQUIP DESCRIPTION          BLDG            E  ROOM                  . BASE ' CAP -- CAV ANCE INTER EQUIP L    RC                      EL OK. .OK OK                    OK                      OK 20  ESCC-1B        ES SYSTEM CHANNEL          CONTROL        145  302/G                  095  Y                Y      Y  .Y                      Y CABINET IB 20  ESCC-2          ES SYSHEM CHANNELDiST CONIROL              145  302/G                  095  Y                Y      Y  Y                      Y CABINET 2 20  ESCC-2A        ES SYSTEM CHANNEL          CON 1ROL        145  302/G                  095  Y                Y      Y  'Y                      Y CABINET 2A 20, ESCC-2B -        ES SYSTEM CHANNEL          CONTROL        I45  302/G                  095  Y,              .Y      Y-  Y                      Y CABINET 2B 20  ESCC-3          ES SYSTEM CHANNELTEST CONTROL              145- 302/G                    095  Y                Y      Y  Y                      Y CABINET 3 20  ESCC-3A        ES SYSTEM CHANNEL          CONTROL        145  302/G                  095  Y                Y      Y  Y                      Y CABINET 3A 20  ESCC-3B        ES SYSTEM CHANNEL          CONTROL        145  302/G                  095  Y                Y    'Y    Y                      Y CABINET 3B 20  ESCP-1          MECHANICALINTERLOCK        CONIROL        145  301/G                  095  Y                Y      Y  Y                      Y CONTROL BOX 20  ESCP-4A        ENGINEERED SAFEGUARDS      CONTROL        145  303/H                  095  Y                Y      Y  N                      N ACTUATION RELAY
,                              CABINET 4A                                                -
20  ESCP-4B        ENGINEERED SAFEGUARDS CONIROL              145  303/H                  095  Y-                Y      Y  N                      N ACTUATION RELAY CABINET 4B 20  ESCP-4C        ENGINEERED SAFEGUARDS CONTROL              145  303/H                  095  Y                Y      Y  N                      N ACIUATION RELAY CABINET 4C 20  ESCP-4D        ENGINEERED SAFEGUARDS      CONIROL          I45  303/H                  095  Y                Y      Y  N                      N ACTUATION RELAY CABINET 4D 1
Appendix C                                                                                                                                                  22-
 
                                                                                          ^            ~          ~                      ~
CLASS ID NO          EQUIP DESCRIPTION        BLDG        E        ROOM    BASE CAP .CAV ANCH INTER EQUIP L        RC        EL OK      OK OK              OK      OK                      ,
20  ESCP-5A      ENGINEERED SAFEGUARDS  CONTROL    145. 303/H          095  Y    -Y                Y  N        N ACTUATION RELAY CABINET 5A 20  ESCP-5B    . ENGINEERED SAFEGUARDS CCNIROL      145        303/H    095  Y      Y                Y  Y        Y ACTUATION RELAY CABINET 5B                                                                                                                'i 20  ESCP-5C      ENGINEERED SAFEGUARDS CONIROL      145        303/H    095  Y      Y'              Y  Y        Y ACIUATION RELAY CABINET SC 20  ESCP-5D      ENGINEERED SAFEGUARDS  CONIROL      145        303/H    095  Y-    Y                Y Y        Y ACTUATION RELAY CABINET SD 20  ESPSC-3Al    ENGINEERED SAFEGUARDS  INTER      095        305/H    I19  Y      Y                Y Y        Y PRESSURE SWITCH CABINET 3Al 20  ESPSC-3A2    ENGINEERED SAFEGUARDS INIER        095        305/H    I19  Y      Y                Y Y        Y PRESSURE SWITCH CABINET 3A2 20  ESPSC-3A3    ENGINEERED SAFEGUARDS INIDt        095        306/G    119  Y      Y                Y  Y        Y PRESSURE SWITCH CABINET 3A3 20  ESPSC-3A4    ENGINEERED SAFEGUARDS AUXILIARY 095            306/N    095  Y      Y                Y  Y        Y PRESSURE SWITCH CABINET 3A4 20  ESPSC-3B1    ENGINEERED SAFEGUARDS INTER          095        305/H    119  Y    -Y                  Y -Y        Y PRESSURE SWITCH CABINET 3B1 20  ESPSC-3B2    ENGINEERED SAFEGUARDS    INTER      095        305/H    I19  Y    Y                .Y  Y        Y PRESSURE SWTTCH CABINET 3B2 Appendix C                                                                                                                          23
 
O                                                  O                                                  O CLASS ID NO      EQUIP DESCRIPTION        BLDG      E    ROOM              BASE CAP- CAV ANCH INTER EQUIP L    RC                  EL OK    OK OK    OK  OK 20  ESPSC-3B3  ENGINEERED SAFEGUARDS INTER        095  306/G              119  Y    Y  Y    Y    Y PRESSURE SWITCH CABINET 3B3 20  FSCP-1    CONTROL PANEL WITH      COtGROL    145                      095  Y    Y  Y    Y    Y BATTERY RACK AND MODULES 20  FSCP-2    LEASED LINE ANNUNCIATOR AUXILIARY 095    303/1              095  Y    Y  Y. Y    Y 20  FSCP-3    LEASED LINE ANNUNCIATOR CONTROL    145                      095  Y    Y  Y    Y    Y 5  FWP-7      AUXILIARY FEEDWATER      1URBINE    095  307/F              095  Y    Y  Y    Y    Y PUMP 7 8A FWV-14      FEEDWATERPUMP A          TURBINE    121  309/E              095  Y    Y  N/A  Y    Y SUCTION ISOLATION VALVE 8A FWV-15      FEEDWATER PUMP B        TURBINE    121  309/E              095  Y    Y    N/A  Y    Y SUCTION ISOLATION VALVE 8A FWV-28      FEEDWATER PUMPS          TURBINE    109  307/F              095  Y    Y    N/A  Y    Y DISCHARGE CROSSTIE ISOLATION VALVE 8A FWV-29      OTSG B MAIN BLOCK VALVE INTER        142  309/G              119 Y    Y    N/A  Y    Y 8A FWV-30      OTSG A MAIN BLOCK VALVE INTER        136  310/G              119 Y    Y    N/A  Y    Y 8A  FWV-31    OTSG A LOW LOAD BLOCK    INTER      136  310/G              119 .Y    Y    N/A  Y    Y VALVE i
(        8A  FWV-32    OTSG B LOW LOAD BLOCK    INIER      136  309/G              119  Y    Y    N/A  Y  Y l
VALVE 8A  FWV-33    OTSG B STARTUP BLOCK    INTER      136  309/G              119  Y    Y    N/A  Y  Y l                        VALVE 8A FWV-36      OTSG A STARTUP BLOCK    INIER        136  309/G              119  Y    U    N/A  U  U VALVE                                              .._
Appendix C                                                                                                24
 
v                                              V CLASS ID NO    EQUIP DESCRIPTION        BLDG      E  ROOM    BASE - CAP- -CAV ANCH INTER EQUIP.
L  RC        EL OK      OK OK    OK    OK 5 GWP-IA  CONDENSNIEINJECTION    TURBINE    095  310/E    095    Y    Y  Y    Y-    Y PUMP 3A 5 GWP-1B  CONDENSATE INJECTION    TURBINE    095  310/E    095    Y    Y    Y    Y    Y-PUMP 3B 7  GWV-l%  GWP-1A CONTROL VALVE    TURBINE    095  311/E    095  .Y    Y    N/A  Y    Y 20 HTCP-2  EDG-B EMERGENCY LOAD    AUXILIARY 095  302/N    095    Y    Y    Y    Y    'Y SHEDDING -HEAT TRACING 20 ffrCP-3  EDG-B EMERGENCY LOAD    AUXILIARY I19  302/M    095    Y    Y    Y    Y    Y SHEDDING - HEAT TRACING 20 ifrCP-4  EDG-A EMERGENCY LOAD    AUXILIARY 095  301/L    095    Y    Y    Y    Y    Y SHEDDING - HEAT TRACING 20 HTCP-5  EDG-A EMERGENCY LOAD    AUXILIARY 119  301/M    095    Y    Y    Y    Y    Y SHEDDING -IEAT TRACING 20 HVAC-16A HVAC CONTROL CABINET    AUXILIARY 095  306/T    095    Y    Y    Y    Y    Y 16A 20 HVAC-16B HVAC CONTROL CABINET    AUXILIARY 095  306/r    095  Y    Y    Y    Y    Y 16B 20 HVAC-17A HVAC CONTROL CABINET    AUXILIARY 119  304/1    095  Y    Y    Y    Y    Y 17A 20 HVAC-17B HVAC CO!GROL CABINET    AUXILIARY I19  304/1    095  Y    Y    Y    Y    Y 17B 20 HVAC-19  HVAC CONTROL CABINET 19 DIESEL      119          119  Y    Y    Y    Y    Y 20 HVAC-20  HVAC CONTROL CABINET 20 DIESEL      I19          119  Y    Y    Y    Y    Y 18 IA-04-PT INSTRUMENT AIR HEADER    TURBINE  095  302/A    095  Y    Y    Y    Y    Y PRESSURE Appendix C                                                                                        25
 
CLASS ID NO                          EQUIF DESCRIPTION            BLDG    E  ROOM      BASE CAF -CAV ANCH INTER EQUEF -
L  RC          EL OK    OK. OK    OK  OK 18      IA-12-PS                INSTRUMENT AIR                TURBINE  095  303/A    095  Y    Y    Y    Y    Y COMPRESSOR LOAD /UNIDAD PRESS SWITCH 21      IADR-1                  INSTRUMENT AIR DRYER 1        TURBINE  095  302/A    095  Y    Y    N/A-      Y 21      IAHE-1A INSTRUMENT AIR AFTER-        TURBINE  095  302/A    095  Y    Y    N/A        Y COOLER A 21      IAHE-1B                  INSTRUMENT AIR AFIER-        TURBINE  095  302/A    095  Y    Y    N/A        Y COOLER B 12      IAP-1A                  INSTRUMENT AIR                TURBINE  095  302/A    095  Y    Y    Y    N    N COMPRESSOR A 12      IAP-1B                  INSTRUMENT AIR                TURBINE  095  302/A      095  Y. Y    Y    Y    Y COMPRESSOR B 21        IAT-1A                  INSTRUMENT AIR RECEIVER TURBINE        095  303/A      095  Y    Y    N/A        Y A
21        IAT-1B                  INSTRUMENT AIP. RECEIVER TURBINE      095  303/A    095  Y    Y    N/A        Y B
8B        IAV-188                IAP-IA LOADER / UNLOADER TURBINE      095  302/A    095  Y    Y    N/A  Y    Y VALVE                                                                                ,
8B        IAV-189                IAP-1B LOADER / UNLOADER TURBINE      095  302/A    095  Y    Y    N/A Y    Y VALVE 20        ICS                    MAIN CONTROL BOARD          CONIROL  145  302/F    095  Y  Y    Y    Y    Y 20        ICS-1                  INTEGRATED CONTROL            CONTROL  145  302/F    095  Y  Y    Y    Y    Y SYSTEM CABINET I 20          ICS-2                  INTEGRATED CONTROL            CONTROL  145  302/F    095  Y  Y    .Y    Y    Y SYSTEM CABINET 2 ,
20          ICS-3                  INTEGRATED CONTROL            CONTROL  I45  302/F    095  Y  Y    Y    Y    Y SYSTEM CABINET 3 Appendix C                                                                                                            26 m- _      - - - -- _ -_.- _ --.-------                _ _ _..____ _. _
 
O                                                                                    O                                                                                                                            O CLASS 'ID NO                EQUIP DESCRIPTION                      BLDG                        E  ROOM'          BASE CAP ~ CAV ANCH INTER . EQUIP L  RC-                  EL OK                OK OK                                                OK          OK' 20'    ICS-4            INTEGRA1ED CONTROL                      CONTROL                      145- 302/F          095      Y                Y  Y                                                -Y            Y SYSTEM CABINET 4 20    ICS-5            INIEGRATED CONTROL                      CONTROL                      145  302/F          095      Y                N  Y                                                      Y      .N SYSTEM CABINET 5 18    MS-106-PT        MAIN STEAM LINE A-2                    INIER                        I19  309/G          119      Y                Y. Y'                                                    Y      'Y
                        ~
PRESSURE TRANSMITIER 18    MS-107-Fr        MAIN STEAM LINE A-1                    INTER                        119  309MI            119    Y                Y  Y                                                      Y        Y PRESSURETRANSMITIER 18 - MS-108-FT          MAIN STEAM LINE A-2                    INTER                        119  309/G            119      Y              Y  Y                                                      Y-      Y PRESSURE TRANSMITTER
:-    18    MS-109-PT        MAIN STEAM LINE A-1                    INTER                        119  309MI            119    Y              Y  Y                                                      Y      Y PRESSURE TRANSMITTER
,      18    MS-110-PT        MAIN STEAM LINE B-2                    INIER                        119  310/I1            119      Y              Y  Y                                                      Y      Y PRESSURE TRANSMITIER 18    MS-Ill-PT        MAIN STEAM LINE B-1                    INTER                        119  310/12            119      Y              Y  Y                                                      Y      Y PRESSURE TRANSMITIER 18 . MS-Il2-PT          MAIN STEAM LINE B-2                    INTER                        119  310/11            119    Y              Y  Y                                                        Y      Y PRESSURE TRANSMITIER 18    MS-Il3-FF        MAIN STEAM LINE B-1                      INTER                        119 310/J2            119    Y              Y  Y                                                        Y      Y PRESSURE TRANSMrrIER 7    MSV-025          ATMOSPHERIC DUMP VALVE INTER                                          I19 309M                i19    Y              Y  N/A                                                      Y    Y A
7    MSV-026          ATMOSPHERIC DUMP VALVE INTER                                          119  310/K              119    Y              Y  N/A                                              .Y'          Y      .
B 7    MSV433            MAIN STEAM LINE A-2                    INTER                        I19  309M              119    Y              Y  N/A                                                        Y    Y SAFETY VALVE 7    MSV-034          MAIN STEAM LINE A-1                    INIER                        I19  309/K  '
119    Y              Y  N/A                                                        Y    Y SAFETY VALVE                                                                        -
Appendix C                                                                                                                                                                                                          27
                          -e1-
                            ,                    ,    - - , - - - _ -          - - - - - _ _ - - _ - -        -        ---        -----__--u-      - - - - _ - _ - - - _ - _ - - _ - - - _ - - - - - - - _ _ _
 
p                                                                                                                                      (y                                                                                                                                                                                                                ,-~
v                                                                                                                                      V                                                                                                                                                                                                                V CLASS ID NO                              EQUIP DESCRIPTION                                                                      BLDG    E  ROOM                                                                                                                BASE CAF                                                              CAV ANCH INTER EQUIP L  RC                                                                                                                                EL OK                                                  OK OK    OK    OK 7                MSV-035  MAIN STEAM LINE B-1                                                                          INTER    119  310/H                                                                                                                      I19                                                    Y      Y    N/A. Y    Y SAFETY VALVE 7                MSV-036  MAIN STEAM LINE B-2                                                                          INTER    I19  310E                                                                                                                        I19                                                    Y      Y    N/A  Y    Y SAFETY VALVE 7              MSV-037  MAIN STEAM LINE A-2                                                                          INTER    119  309/H                                                                                                                        I19                                                    Y      Y    N/A  Y    Y SAFETY VALVE 7              MSV-038  MAIN STEAM LINE A-1                                                                          INTER    I19  309E                                                                                                                        I19                                                    Y      Y    N/A  Y    Y SAFETY VALVE 7                MSV-039  MAIN STEAM LINE B-1                                                                          INIER    I19  310/H                                                                                                                        I19                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-040    MAIN STEAM LINE A-1                                                                          INTER    119  309K                                                                                                                          119                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-041    MAIN STEAM LINE B-2                                                                          INTER    119  310/K                                                                                                                        I19                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-042    MAIN STEAM LINE A-2                                                                          INTER    I19  309/H                                                                                                                          I19                                                  Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-043    MAIN STEAM LINE A-1                                                                          INTER  119  309/K                                                                                                                          119                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-044    MAIN STEAM LINE B-1                                                                          INTER    I19 310/H                                                                                                                          I19                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-045    MAIN STEAM LINE B-2                                                                          INTER    119 310/K                                                                                                                          119                                                    Y    Y    N/A  Y    Y SAFETY VALVE 7              MSV-046      MAIN STEAM LINE A-2                                                                        INTER    119 309/H                                                                                                                          I19                                                    Y  Y    N/A  Y    Y SAFETY VALVE 7              MSV-047      MAIN STEAM LINE B-1                                                                        INTER    I19  310/H                                                                                                                          I19                                                    Y  Y    N/A  Y    Y SAFETY VALVE 7            MSV-048      MAIN STEAM LINE B-2                                                                        INIER    I19  310/K                                                                                                                          119                                                    Y  Y    N/A  Y    Y
                                                                                                                                                                                                                  ^
SAFETY VALVE Appendix C                                                                                                                                                                                                                                                                                                                                                28 M_ __ __ _    _ _ _ _ _ .- . _ _ _
 
CLASS ID NO              EQUIF DESCRIPTION        BLDG    E          ROOM          BASE CAF CAV ANCH INTER EQUEF L            RC          EL' OK  OK OK    OK  OK 8A MSV-055            OTSG A TO EFTB-1 STOP  INTER    119          309/H        119  Y  Y    N/A  Y    Y CHECK 8A MSV-056            OTSG B TO EFIB-1 STOP  INTER    119          310/K        119  Y  Y    N/A- Y    Y CHECK 7    MSV411        MAIN STEAM LINE A-2    INTER    I19          309/G        119  Y  Y    N/A  N    N ISOLATION VALVE 21    MSV-411-ARI    MSV-411 AIR RESERVOIR I INTER    I19          309/G        119  Y  Y    N/A  N/A  Y 21    MSV-411-AR2    MSV-411 AIRRESERVOIR2  INTER    119          309/G        119  Y  Y    N/A  N/A  Y 21    MSV-411-AR3    MSV-411 AIRRESERVOIR3  INIER    I19            309/G      119  Y  Y    N/A  N/A  Y 119. 309/G                          Y        Y 8B    MSV-411-SV1    MSV-411 CONTROL        INTER                              119  Y      N/A      Y 8B    MSV-411-SV2    MSV-411 CONTROL        INIER    119            309/G      119  Y  Y    N/A  Y    Y 8B    MSV-411-SV4    MSV-411 CONTROL        INTER    119            309/G      119  Y  Y    N/A  Y    Y 8B    MSV-411/412-  MSV-411 & MSV-412      INTER    119            309/G      119  Y  Y    N/A  Y    Y SV5            CONTROL 8B    MSV-411/412-  MSV-411 & MSV-412      INTER    119            309/G      119  Y  Y    N/A  Y    Y SV6            CONTROL 7    MSV-412        MAIN STEAM LINE A-1    INTER    119            309/G      119  Y  Y    N/A  Y    Y ISOLATION VALVE 21    MSV-412-ARI    MSV-412 AIR RESERVOIR I  INIER  119            309/G      119  Y  Y  N/A  N/A    Y 21    MSV-412-AR2    MSV-412 AIR RESERVOIR 2  INTER    119          309/G      119  Y  Y  N/A  N/A    Y 21    MSV-412-AR3    MSV-412 AIR RESERVOIR 3  INTER    119          309/G        I19  Y  Y  N/A  N/A    Y 8B    MSV-412-SV1    MSV-412 CONTROL          INTER    119          309/G        119  Y  Y  N/A  Y    Y 8B    MSV-412-SV2    MSV-412 CONTROL          INIER    119          309/G        119  Y  Y  N/A  Y    Y 8B    MSV-412-SV4    MSV-412 CONTROL          INTER    119          309/G  ~-
119  Y  Y  N/A  Y    Y Appendix C                                                                                                      29 l
~
 
                                                      .s                                                        g
.)                                                                                                            Y CLASS ID N3          EQUIP DESCRIPTION      ELDG    E  ROOM    BASE CAF CAV ANCH INTER EQUIP L  RC        EL OK  OK OK                          OK  OK 7  MSV-413      MAIN STEAM LINE B-1    INTER    119  310/K    119  Y  Y                          N/A Y  Y ISOLATION VALVE 21  MSV-413-AR1  MSV-413 AIRRESERVOIR1  INTER    119  310/K    119  Y  Y                          N/A N/A Y 21  MSV-413-AR2  MSV-413 AIRRESERVOIR2  INIER    119  310/K    119  Y  Y                          N/A N/A Y 21  MSV-413-AR3  MSV-413 AIRRESERVOIR3  INTER    119  310/K    119  Y  Y                          N/A N/A Y 8B    MSV-413-SV1  MSV413 CONTROL          INIER    119  311/J2  119  Y  Y                          N/A Y  Y 8B    MSV-413-SV2  MSV-413 CONTROL        INTER    119  311/J2  119  Y  Y                          N/A Y  Y 8B    MSV-413-SV4  MSV-413 CONTROL        INTER    119  311/J2  119  Y  Y                          N/A Y  Y 8B    MSV-413/414- MSV-413 & MSV-414      INTER    119  311/J2  119  Y  Y                          N/A Y  Y SV5          CONTROL 8B    MSV-413/414- MSV-413 & MSV-414      INTER    119  311/J2  119  Y  Y                          N/A Y  Y SV6          CONTROL 7  MSV-414      MAIN STEAM LINE B-2      INTER  I19  310/J    l19  Y  Y                          N/A Y  Y ISOLATION VALVE 21  MSV-414-ARI  MSV-414 AIR RESERVOIR I  INTER  I19  310/J    l19  Y  Y                          N/A N/A Y 21  MSV-414-AR2  MSV-414 AIR RESERVOIR 2  INTER  I19  310/J    l19  Y  Y                          N/A N/A Y 21  MSV-414-AR3  MSV-414 AIR RESERVOIR 3  INTER  119  310/J    119  Y Y                          N/A N/A Y 8B  MSV-414-SV1  MSV414 CONTROL          INTER  119  311/J2  119  Y Y                          N/A Y  Y 8B  MSV-414-SV2  MSV-414 CONTROL          INIER  119  311/J2  119  Y Y                          N/A Y  Y 8B  MSV-414-SV4  MSV-414 CONTROL          INTER    119  311/J2  119  Y Y                          N/A  Y  Y 20  MTCP-1A      UNDERVOLTAGE TEST        CONTROL  108  303/H  095  Y  Y                        Y    Y  Y CABINET A 20  MTCP-1B      UNDERVOLTAGE TEST        CONIROL  108  303/H  095  Y  Y                        Y    Y  Y CABINET B Appendix C                                                                                                        30
 
j                                                                                                                    .
g                                                        .
3
!                G'                                                                                                        J                                                            ).
CLASS ID NO                        EQUE DESCRIPTION                        BLDG                            E  ROOM          BASE CAF      CAV - ANCH INTER EQUEF L  RC              EL - OK      OK. OK        OK      OK 1                      MTMC-03  480V ES MCC 3Al                        AUXILIARY 095                        301E          095    ,Y    Y        Y    Y        Y-          ;
Y    Y        Y    Y        Y 1                      MTMC-04  480V ES MCC 3A2                        AUXILIARY I19                        301/L        095 l                      MIMC45    480VES MCC3B1                          AUXILIARY I19                        301/0        095      Y-    Y        Y-    Y        Y l
1                      MIMC 480V ES MCC 3B2                        AUXILIARY 095                        304/N        095      Y    Y        Y    Y        Y 1                      MTMC-07  480V ES MCC 3AB                        AUXILIARY 119                        304/O        095      Y    Y        Y    Y        Y I                      MTMC-08  480V PRESSURIZER HEATER INTER                                            I19  307/G          119    Y    Y        Y    Y        Y MCC3A 1                      MTMC-09  480V PRESSURIZER HEATER INIER                                            I19  308/G          119    Y    N        N    Y        N
;                                                  MCC 3B                                                                                                                                          ;
I                      MIMC-12  480VTURBINE MCC 3A                      TURBINE                          I19  304/F          095    Y    N        N    U        N 1                      MTMC-18  480V REACTOR MCC-3A2                    AUXILIARY 095                        302K          095    Y    Y        Y    Y        Y I                      MTMC-21  480V ES MCC 3A3                        AUXILIARY 119                        301/K          095    Y-    -Y'      Y    Y        Y I                      MINC-22  480V ES MCC 3B3                        AUXILIARY 095                        302/1          095    Y      Y        Y-  Y        Y 3                      MTSW-2C  4160V ES 3A (NORT11)                    CONTROL                          108  302/G          095    Y      U        Y    N        N 3                      MTSW-2D  4160V ES 3A(SOUTH)                      CONTROL                          108  302/G          095    Y      U        Y    Y        U 3                      MTSW-2E  4160V ES 3B (NORTH)                    CONTROL                          108  302/H        095    Y      U        Y    Y        U 3                      MTSW-2F  4160V ES 3B (SOUTH)                    CONTROL                          108  303/H .      095    Y-    U        Y      N      N 2                      MTSW-3A  480VTURBINE AUXILIARY                  TURBINE                          095  301/C        095    Y      N        N      Y      N BUS A 2                      MTSW-3C  480V REACTOR AUXILIARY                  TURBINE                          095  301/D        095    Y      N      'N      Y-      N BUS A 2                      MTSW-3D  480V REACTOR AUXILIARY                  TURBINE                          095  302/D        095      Y    N        N      Y      N BUS B 2                      MTSW-3F  480V ES BUS 3A                          CONTROL                          124  302/H          095      Y    N      :Y      Y      N Appendix C                                                                                                                                                              31
 
O                                                      O                                          O CLASS ID NO          EQUIP DESCRIPTION          BLDG      E  ROOM      BASE CAP CAV AMCH INTER EQUEF L  RC          EL OK  OK OK      OK  OK 4  MTSW-3F-T    4160/480V ES BUS 3A        CON 1ROL  124  302M      095  Y. N      Y    Y  N TRANSFORMER 2  MTSW-3G      480V ES BUS 3B              CONTROL  124  303M      095  Y  N      Y    Y  N 4  hfrSW-3G-T  4160/480V ES BUS 3B        CONTROL  124  303M      095  Y  N'    Y    Y  N TRANSFORMER 2  MTSW-3J      480V PLANT AUXILIARY BUS TURBINE      095  301/E      095  Y  N      N    Y  N 4  MTSW-3J-T    4160/480V PLANT AUXILIARY TURBINE    095  301/E      095  Y  N      N    Y  N BUS TRANSFORMER 2  MTXS-1      ES MCC 3AB INPUT POWER      CONIROL    124 303M      095  Y  U      U    Y  U TRANSFER SWTTCH 18  MU-002-FT    PRESSURE TO RCP SEALS      AUXILIARY 095  304/K      095  Y  Y      Y    Y  Y 7  MU-003-POC  MUV-51 CONTROL              AUXILIARY 119  304B/L      095  Y  Y      N/A  Y  Y 8B  MU-003-SV    MUV-51 AIR FAIL LOCK        AUXILIARY 119  305/P      095  Y  Y    N/A .Y  Y 18 . MU-004-DPT  LET-DOWN FLOW              AUXILIARY I19  305/P      095  Y  Y    Y    Y  Y TRANSMITIER 18  MU-004-DPTl  LET-DOWN FLOW              AUXILIARY 119  305/O      095  Y  Y    Y    Y  Y TRANSMITIER 19  MU-005-TE    LETDOWN LINE                AUXILIARY I19  305/O      095  Y  Y    N/A  Y  Y TEMPERATURE 18  MU-007-DPTl  RCP 3Al SEALINJECTION      REACTOR    119  NE D-RING  095  Y  Y    Y    Y  Y FLOW TRANSMrlTER                            WALL 18  MU-007-DPT2  REP 3A2 SEAL INJECTION      REACTOR    I19  N D-RING  095  Y  Y    Y    Y  Y FLOW TRANSMITTER                            WALL 18    MU-007-DPT3 RCP 3B1 SEALINJECTION      REACTOR    119  S D-RING  095  Y  Y    Y    Y  Y FLOW TRANSMFITER                            WALL 18    MU-007-DFT4 RCP 3B2 SEAL INJECTION      REACTOR    I19  SW D-RING  095  Y .Y    Y    Y  Y FLOW TRANSMITTER                            WALL Appendix C                                                                                            32
 
O                                                    O                                      O CLASS ID NO            EQUIP DESCRIPTION    BLDG      E  ROOM  BASE CAP CAV ANCH INTER EQUIP L  RC      EL OK  OK OK    OK    OK 0  MU-012-Fr    MAKE-UP FLOW            AUXILIARY 119  304/M  095  Y  N/A  N/A  Y    Y TRANSMITER 7  MU-012-POC    MUV-108 CONTROL          AUXILIARY 119  304/M  095  Y  Y    N/A  Y    Y 18  MU-014-LTl    MAKE-UP TANK LEVEL      AUXILIARY 'I19 301/L  095  Y  Y    Y    Y    Y "IRANSMITTER 18  MU-014-LT2    MAKE-UP TANK LEVEL      AUXILIARY 119  301/L  095  Y  Y    Y    Y    Y TRANSMITTER 7  MU-015-POC    MUV-16 CONTROL          AUXILIARY 095  303/K  095-  Y- Y    N/A  Y    Y 8B MU-015-SV      MUV-16 AIR FAIL LOCK    AUXILIARY 095  304/K  095  Y  Y    N/A  Y    Y 18  MU-017-FT    MAKE-UP TANK PRESSURE    AUXILIARY 119  301/L  095  Y  Y    Y    Y    Y    ,
TRANSMITTER 18  MU-018-DPT    LET-DOWN FILTER DELTA-P AUXILIARY 119  303/L  095  Y  Y    Y    Y    Y TRANSMITER 18  MU-023-DPTl    HI PRESS INECTION FLOW  AUXILIARY 095  304/J  095  Y  Y    Y    Y    Y LOOP B-1 18  MU-023-DFF2    HI PRESS INECTION FLOW  AUXILIARY 095  304/J  095  Y  Y    Y    Y    Y LOOP A-2 18  MU-023-Dirt 3  HI PRESS INECTION FLOW  AUXILIARY 095  304/J  095  Y  Y    Y    Y    Y LOOP B-2 I        18  MU-023-DFr4    HI PRESS INJECTION FLOW AUXILIARY 095  304/J  095  Y  Y    Y    Y    Y LOOP A-1
;        18  MU-023-Dirr5  HI PRESS INECTION FLOW  AUXILIARY 095  304/J  095  Y  Y    Y    Y    Y l
LOOP B 18  MU-023-DFF6    HI PRESS INECTION FLOW  AUXILIARY 095  304/J  095  Y Y    Y    Y    Y l                          LOOP A l        18  MU-023-DPT7    HI PRESS INECrlON FLOW  AUXILIARY 095  304/J  095  Y  Y  Y    Y    Y l                          LOOP B i
Appendix C                                                                                    33
 
G                                                                                                    NJ CLASS ID NO        EQUIP DESCRIPTION        BLDG      E    ROOM        BASE CAF CAV ANCH INTER EQUIP L    RC            EL OK  OK OK    OK    OK 18  MU-023-DFT8 HIPRESS INJECTION FLOW    AUXILIARY 095    304/J        095  Y  Y    Y    Y    Y LOOP A 18  MU-024-DPT  MAKE-UP FLOW              AUXILIARY 095    304/K        095  Y  Y    Y    Y    Y TRANSMITTER 18  MU-024-DPT2 MAKE-UP FLOW              AUXILIARY 095    304/K        095  Y  Y    Y    Y    Y TRANSMITTER 7  MU-025-POC  MUV-31 CONTROL            AUXILIARY 095    303/K        095  Y  Y    N/A  Y    Y 8B  MU-025-SV  MUV-31 AIR FAIL LOCK      AUXILIARY 095    304/K        095  Y  Y    N/A  Y    Y 18  MU-027-DFT  RCP TOTAL SEALINJECTION AUXILIARY 095      304/J        095  Y  Y    Y    Y    Y FLOW TRANSMITTER 18  MU-031-FTl  RCP 3Al SEAL RETURN FLOW REACTOR    119  N D-RING      095  Y  Y    Y    Y    Y TRANSMITTER                                WALL 18  MU-031-FT2  RCP 2A2 SEAL RETURN FLOW REACTOR    119  N D-RING      095  Y  Y    Y    Y    Y TRANSMITTER                                WALL 18  MU-031-FT3  RCP 3B1 SEAL RETURN FLOW REACTOR    119  S SW D-RING  095  Y  Y    Y    Y    Y TRANSMITTER                                WAL 18  MU-031-FT4  RCP 3B2 SEAL RETURN FLOW REACTOR    I19    SW D-RING    095  Y  Y    Y    Y    Y TRANSMITTER                                WALL 18  MU-081-DFT  LET-DOWN PRE-FILTER      AUXILIARY I19    305/O        095  Y  Y    Y    Y    Y DELTA-P TRANSMITTER 18 MU-102-DPI  RCP SEAL INJECTION FILTER AUXILIARY 095    305/N        095  Y  Y    Y    Y    Y DELTA-P INDICATOR 21  MUDM-IA    MAKE-UP AND              AUXILIARY 119    304/L        095  Y  Y  Y    Y    Y PURIFICATION DEMINERALIZER 1 A 21  MUDM-1B    MAKE-UP AND              AUXILIARY l19    304/L        095  Y  Y  Y    Y    Y PURIFICATION DEMINERALIZER IB Appendix C                                                                                              34
 
l p                                                                                                    %                                              -
LJ                                                                                                  (0                                                )
CLASS ID NO                                                  EQUIP DESCRIPTION              BLDG      E  ROOM          BASE CAF    CAV ANCH INTER EQUIP L  RC                EL OK  OK  OK  OK    OK 21    MUHE-1A                                            LET-DOWN COOLER 3A            REACTOR  095 E OlJTSIDE D- 095    Y RIN l  21    MUHE-1B                                            LET-DOWN COOLER 3B            REACTOR  095 E OUTSIDE D-  095    Y RIN 21    MUHE-IC                                            LET-DOWN COOLER 3C            REACTOR  095 E OLTTSIDE D- 095    Y RIN 21    MUHE-2A                                            RCP SEAL RETURN COOLER AUXILIARY I19        302/L-M        095    Y  Y    N/A  N/A  Y 3A 21    MUHE-2B                                            RCP SEAL RETURN COOLER AUXILIARY I19        302/L-M        095    Y  Y    N/A  N/A  Y 3B 5    MUP-1 A                                            MAKE-UP AND                    AUXILIARY 095 303/J          095    Y  Y    Y    N    N PURIFICATION PUMP 3A 5    MUP-1B                                              MAKE-UP AND                    AUXILIARY 095 303/J          095    Y  Y    Y    Y    Y PURIFICATION PUMP 3B 5      MUP-IC                                            MAKE-UP AND                    AUXILIARY 095 303/K          095    Y  Y    Y    Y    Y PURIFICATION PUMP 3C 5      MUP-2A                                            MUP-1A MAIN OIL PUMP          AUXILIARY 095 303/J          095    Y  Y    Y    Y    Y 5      MUP-2B                                            MUP-1B MAIN OIL PUMP          AUXILIARY 095 303/K          095    Y  Y    Y    Y    Y 5      MUP-2C                                            MUP-IC MAIN OIL PUMP          AUXILIARY 095  303/K          095  Y  Y    Y    Y    Y 5      MUP4A                                            MUP-1A GEAR OIL PUMP          AUXILIARY 095  303/J          095  Y  Y    Y    Y    Y 5      MUP4B                                            MUP-1B GEAR OIL PUMP          AUXILIARY 095  303/K          095  Y  Y    Y    Y    Y 5      MUP-4C                                            MUP-1C GEAR OIL PUMP          AUXILIARY 095  303/K          095  Y    Y  Y    Y    Y 21      MlJT-1                                            MAKE-UP TANK                  AUXILIARY 119  302/L          095  Y  Y  N/A  N/A  Y 7        MUV-016                                          RCP SEALINJECTION FLOW        AUXILIARY 095  304/K          095  Y  Y  N/A  Y. Y CONTROL VALVE 8A MUV-018                                                RCP SEAL ISOLATION VALVE AUXILIARY I19        305/N          095  Y  Y  N/A  Y    Y Appendix C                                                                                                                                              35
 
O                                                              O                                      O CLASS ID NO        EQUIP DESCRIPTION                  BLDG      E  ROOM  BASE CAF CAV ANCH INTER EQUIP L  RC      EL OK  OK  OK  OK    OK 8A MUV-023      HPINJ CONTROL VALVETO AUXILIARY 095                304/K  095  Y  Y    N/A  Y-    Y RCS INLET LINES LOOP A 8A MUV-024      HPINJ CONTROL VALVE 1D AUXILIARY 095              304/K  095  Y  Y    N/A  Y    Y RCX INLET LINT.S LOOP A 8A MUV-025      HP INJ CONTROL VALVE TO AUXILIARY 095              304/K  095  Y- Y    N/A  Y    Y RCS INLET LINES LOOP B 8A MUV-026      HP INJ CONTROL VALVE TO AUXILIARY 095              304/L  095  Y  Y    N/A  Y    Y RCS INLET LINES LOOP B 8A MUV-027      HPI CONTROL VALVE TO RCS AUXILIARY 095            304/K  095  Y  Y    N/A  Y    Y LOOP A 7  MUV-031    MAKE-UP FLOW CONIROL                AUXILIARY 095 304/K  095  Y  Y    N/A  Y    Y VALVE 7  MUV-049    LET-DOWN FLOW ISOLATION AUXILIARY 095              304/K  095  Y  Y    N/A  Y    Y VALVE 8B  MUV-049-SV  MUV-49 CONIROL                      AUXILIARY 095 304/i. 095  Y  Y    N/A  Y    Y 7  MUV-050    LET-DOWN BLOCK OROFICE AUXILIARY I19              304/L  095  Y  Y    N/A  Y    Y ISOLATION VALVE EB  MUV-050-SV  MUV-50 CONTROL                      AUXILIARY 108        095  Y  Y    N/A  Y    Y 7  MUV-051    LET-DOWN FLOW CONTROL AUXILIARY I19                304/L  095  Y  Y    N/A  N    N VALVE 8A  MUV-058    HI PRESS INJECTION                  AUX!LIARY 095  306/P  095  Y  Y    N/A    Y'  Y SUCTION FROM BWST 8A  MUV-073    BWST TO MUP-1 A & MUP-1B AUXILIARY 095              305/O  095  Y Y    N/A    Y  Y ISOLATION VALVE 7  MUV-090    LETDOWN FILTER MUFL-1B AUXRJARY I19                303/L  095  Y  Y  N/A    Y  Y TO MUT-1 ISOLATION VALVE 7  MUV-091      LETDOWN FILTED MUFL-l A AUXILIARY I19              303/L  095  Y  Y  N/A    Y  Y TO MUT-1 ISOLATION VALVE Appendix C                                                                                              36
 
r3                                                  's                                  eg CLASS ID NO        EQUIP DESCRIPTION      BLDG      E  ROOM  BASE CAF CAV ANCH INTER EQUIP L  RC      EL OK  OK  OK  OK    OK 7  MUV 096    LE7DOWN FILTER MUFL-1 A AUXIIJARY 119  303/L  095  Y  Y    N/A  Y    Y INlETISOLATION VALVE 7  MUV-097    LETDOWN FILTER MUFL-1B  AUXILIARY I19  303/L  095  Y  Y    N/A  Y    Y INLETISOLATION VALVE 8A MUV-100    MUFL-I A/MUFL-1B BYPASS  AUXILLARY 119  303/L  095  Y  Y    N/A  Y    Y VALVE 7  MUV-103    BORIC ACID PUMP TO MAKE- AUXILIARY I19  304/M  095  Y  Y    N/A  Y    Y UP TANK ISOLATION VALVE 8B  MUV-103-SV MUV-103 CONTROL          AUXILIARY I19  304/M  095  Y  Y    N/A  Y    Y 7  MUV-108    BORIC ACID PUMP TO MUT-1 AUXILIARY 119  304/M  095  Y  Y    N/A  Y    Y FLOW CONTROL VALVE 8A  MUV-112    LETDOWN TO MUT-1 OR WD AUXILIARY I19    304/M  095  Y  Y    N/A  Y    Y DIVERTER 7  MUV-116    DEMINERALIZER MUDM-IA    AUXILIARY 122  304/L  095  Y  Y    N/A  Y    Y ISOLATION VALVE TO LETDOWN FILTER 7  MUV-117    DEMINARALIZER MUDM-1B    AUXILIARY 122  304/L  095  Y Y    N/A  Y    Y ISOLATION VALVE TO LE7DOWN FILTER 7  MUV-124    ISOLATION VALVE TO      AUXILIARY 124  304/L  095  Y Y    N/A  Y    Y PURIFICATION DEMINERALIZER MUDM-I A 7  MUV-133    ISOLATION VALVE TO      AUXILIARY 124  304/M  095  Y Y    N/A  Y    Y DEMINERALIZER MUDM-1B 8A  MUV-194    MUFL-2A/MUFL-2B BYPASS  AUXILIARY 123  305/O  095  Y  Y  N/A  Y    Y VALVE 7  MUV-200    LETDOWN ISOLATION      AUXILIARY 124  304/L  095  Y  Y  N/A  N    N VALVE TO DEMINERALIZER MUDM-1A Appendix C                                                                                  37
 
O                                                        O                                          O CLASS ID NO          EQUIP DESCRIPTION          BLDG        E  ROOM      BASE CAF CAV ANCH INTER EQUIP L  RC.          EL OK  OK OK    OK    OK
: 7. MUV-201      IEIDOWN ISOLATION          AUXILIARY 128    304/L      095  Y  Y    N/A  Y    Y-VALVE TO DEMihT. RAT.TZER MUDM-1B 7  MUV-242 -    PREFIL'ER MUFL-2A INLET    AUXILIARY ' 123  305/P      095  Y  Y    N/A  Y    Y ISOLATION VALVE 7  MUV-243      PREFILTER MUFL-2A          AUXILIARY 121    305/O      095  Y  Y    N/A  Y    Y DISCHARGE ISOLATION VALVE 7  MUV-244      PREFILTER MUFL-2B          AUXILIARY 121    305/O      095  Y  Y    N/A  Y    Y DISCHARGE ISOLATION VALVE 7  MUV-245      PREFILTER MUFL-2B INLET    AUXILIARY 123    305/P      095  Y  Y    N/A  Y    Y ISOLATION VALVE 7  MUV-253      REALTOR COOLANT PUMP        AUXILIARY I19    305/N      095  Y  Y    N/A  Y    Y SEAL BLEEDOFFISOLATION VALVE 3  MUXS-1        4160V ISOLATION SWITCH      AUXILIARY 095    303/K      095  Y  U    Y    Y    U 21  NGT-XX        ADV BACKUP NITROGEN        TURBINE    095              095  Y  N              N SUPPLY TANKS (10) 18  NGV-299      ADV BACKUP NITROGEN        TURBINE    095  311/G      095  Y Y    Y    Y    Y SUPPLY VALVE 18  NGV-308      ADV BACKUP NITROGEN        TURBINE    095  310/G      095  Y Y    Y    Y    Y SUPPLY VALVE 20  NI&P-Al      NI&P SYSTEM                CONIROL      I45 303/G      095  Y Y    Y    Y    Y SUBASSEMBLY A CABINET 1 20  NI&P-A2      NI&P SYSTEM                CONTROL      I45  303/G      095  Y Y    Y    Y    Y SUBASSEMBLY A CABINET 2 20  NI&P-BI      NI&P SYSTEM                CONIROL      145  303/G      095  Y  Y  Y-    Y    Y SUBASSEMBLY B CABINET 1 Appendix C                                                                                              38
 
O                                                                O                                          O CLASS ID NO                      EQUIP DESCRIPTION        BLDG      E    ROOM  BASE ' CAF  CAV ANCH EUER EQUIP L    RC      EL OK    OK  OK  OK-  OK 20  NIAP-B2                    NIAP SYSTEM              CONTROL '145    303/G  095    Y    Y    Y  Y    Y SUBASSEMBLY B CABINET 2 20  NI&P-Cl                    NIAP SYSTEM              CONIROL  145  303M  095    Y    Y    Y. Y'    Y SUBASSEMBLY C CABINET 1 20  NIAP-C2                    NIAP SYSTEM              CONTROL  145  303M  095    Y    Y    Y  Y    Y SUBASSEMBLY C CABINET 2                                                              +
20  NIAP-D1                    NIAP SYSTEM              CONIROL  145  303M  095    Y    Y    Y  Y    Y SUBASSEMBLY D CABINET I 20  NIAP-D2                    NI&P SYSTEM              CONTROL  145  303M  695    Y    Y    Y-  N      N SUBASSEMBLY D CABINET 2 20  NI-1-A3                    PROPORTIONAL COUNTER    REACTOR  140          095  Y                              +
ASSEMBLY 20  NI-2-B3                    PROPORTIONAL COUNTER    REACTOR  140          095  Y ASSEMBLY 20  NI-3-C3                    COMPENSATED ION          REACTOR  140          095  Y CHAMBER / ASSEMBLY 20  NI-4-D3                    COMPENSATED ION          REACTOR  140          095  Y-CHAMBER / ASSEMBLY 20  NNI-I                      AUXILIARY CONTROL        CONTROL  145  302/F  095  Y    Y    Y    Y    Y SYSTEM CABINET 1 20  NNI-2                      AUXILIARY CONTROL        CONTROL  145  302/F  095    Y  Y    Y    Y    :Y SYSTEM CABINET 2 20  NNI-3                      AUXILIARY CONTROL        CONTROL  145  302/F  095    Y  Y    Y    Y    Y        '
SYSTEM CABINET 3                                                                      1 20  NNI-4                      AUXILIARY CONTROL        CONIROL    I45  302/F  095    Y  Y    Y    Y    Y SYSTEM CABINET 4 t
20  NNI-5                      AUXILIARY CONTROL        CONTROL    145  302/F  095    Y  N. Y    Y    N        !
SYSTEM CABINET 5                                                                      <
Appendix C                                                                                                    39
 
m                                                                                          es J-                                              pd                                        D.
CLASS ID NO        EQUIP DESCRIPTION      ELDG      E  ROOM'      BASE CAF CAV ANCH INTER EQUEF L  RC          EL OK  OK OK    OK    OK 20  N NI-6      AUXILIARY CONTROL      CONTROL  145  302/F      095  Y  N    Y    Y    N SYSTEM CABINET 6 20  NNI-7      AUXILIARY CONTROL      CONTROL  145  302/F      095  Y  Y    Y    Y    Y SYSTEM CABINET 7 20  NNI-8      AUXILIARY CONTROL      CONTROL    145 302/F      095  Y  Y    Y-    Y    Y SYSTEM CABINET 8 20  NSP        NUCLEAR SAMPLE PANEL    AUXILIARY 095  304B/H    095  Y  Y    Y    Y    Y 20  PORV/ TEMP  PORV & TEMPERATURE      CONIROL    108 304/H      095  Y  N    Y    U    N SATURATION CABINET 18  RC-001-LTl  PRESSURIZER LEVEL      REACTOR  095  RB-330    095  Y  Y    Y    Y    Y TRANSMITTER 18  RC-001-LT2  PRESSURIZER LEVEL      REACTOR  095  RB-330      095  Y  Y    Y    Y    Y TRANSMTrFER 18  RC-001-LT3  PRESSURIZER LEVEL      REACTOR  095  RB-331, NR  095  Y  Y    Y    Y    Y TRANSMITTER                            ELEV 19  RC-002-TEI  PRESSURIZERTEMPERATURE REACTOR    139 302/G      095  Y 19  RC-002-TE2  PRESSURIZERTEMPERATURE REACTOR    139 303/H      095  Y 18  RC-003A-PTl REACTORCOOLANTSYSTEM REACTOR      095 RB-330      095  Y Y    Y    Y    Y PRESSURE TRANSMITTER 18  RC-003A-PT2 REACTOR COOLANT SYSTEM REACTOR    095 RC-331      095  Y Y    Y    Y    Y PRESSURE TRANSMITTER 18  RC-003A-PT3 REACTORCOOLANTSYSTEM REACTOR      095  RC-330    095  Y Y    Y    Y    Y PRESSURE TRANSMrITER 18 RC-003A-PT4 REACTOR COOLANT SYSTEM REACTOR    095  RB-331 NR  095  Y Y    Y    Y    Y PRESSURETRANSMITTER                    ELEV 18 RC-003B-PTl REACTORCOOLANTSYSTEM REACTOR      095  RB-326    095'  Y  Y  Y    Y    Y PRESSURE TRANShETTER Appendix C                                                                                      40
 
O                                                          O                                                                                                          O CLASS ID NO          EQUIF DESCRIPTION            BLDG        E    ROOM                    BASE CAF        CAV ANCH INTER EQUEF L    RC                        EL OK        .OK OK                                          OK  OK 18  RCA)3B-Pr2    REACTORCOOLANTSYSTEM REACTOR              095    RB-328                  095          Y-  Y-                                  Y          Y    Y PRESSURETRANSMITIER 18  RC-003B-PT3  REACTORCOOLANTSYSTEM REACTOR              095    RB-326                  095 . Y-        Y                                    Y.        Y    Y~
PRESSURETRANSMITTER 19  RC-004A-TEl - REACTOR COOLANT SYSTEM REACTOR            119    S OF RCSG-1A            095          Y  Y                                    N/A        Y    Y.
HOT LEG A TEMPERATURE 19  RC-004A-TE2  REACTORCOOLANTSYSTEM REACTOR              119    S OF RCSG-I A            095          Y  Y                                    N/A-      Y    Y HOTLEG ATEMPERATURE 19  RC-004A-TE3  REACTORCOOLANTSYSTEM REACTOR              I19    S OF RCSG-1 A            095          Y  Y                                    N/A-      Y    Y' HOTLEG ATEMPERATURE 19  RC-004A-TE4  REACTOR COOLANT SYSTEM REACTOR            119    S OF RCSG-IA              095        Y  Y                                    N/A. Y        Y HOTLEG ATEMPERATURE 19  RC-004B-TEI  REACTORCOOLANTSYSTEM REACTOR              119    N OF RCSG-1B              095        Y  Y                                    N/A      Y    Y            '
HOT LEG B TEMPERATURE 19  RC-004B-TE2  REACTORCOOLANTSYSTEM REACTOR              I19    N OF RCSG-1B              095        Y  Y                                    N/A        Y-  Y HOT LEG B TEMPERATURE 19  RC-004B-TE3  REACTOR COOLANT SYSTEM REACTOR              119  N OF RCSG-1B              095        Y  Y                                    N/A        Y  Y-HOT LEG B TEMPERATURE 19  RC-004B-TE4  REACTORCOOLANTSYSTEM REACTOR                119  N OF RCSG-1B              095        Y  Y                                      N/A      Y  Y I                            HOT LEG B TEMPERATURE l          19  RC-005A-TEI  REACTORCOOLANTSYSTEM REACTOR                I19  RCP-1 A                  095        Y  Y                                      N/A-      Y    Y          _,
l                            COLD MG A TEMPERATURE 19  RC-005A-TE2  REACTOR COOLANT SYSTEM REACTOR              119    RCP-IA                  095        Y  Y                                      N/A'    Y    Y COLD MG B TEMPERATURE                                                                                                                                          i l
  ~
19  RC-005A-TE3  REACTORCOOLANTSYSTEM REACTOR                119    RCP-1B                  095        Y  Y                                      N/A      Y    Y COLD EG B TEMPERATURE 19  RC-005A-TE4  REACTOR COOLANT SYSTEM REACTOR              I19    RCP-1B                  095        Y  Y                                      N/A      Y    Y COLD LEG A TEMPERATURE Appendix C                                                                                                                                                                41 i
: s.                                                  7-.
()
d                                                      V CLASS ID NO              EQUIP DESCRIPTION      BLDG      E  ROOM            BASE CAF  CAV ANCH INTER - EQUIP L  RC                  EL OK  OK OK 'OK            OK 19    RC-005B-TEI    REACTORCOOLANTSYSTEM REACTOR      119  RCP-IC            095  Y  Y-    N/A Y          Y COLD LEG B TEMPERATURE 19    RC-005B-TE2    REACTORCOOLANTSYSTEM REACTOR      119 RCP-IC            095  Y  Y      N/A Y          Y COLD EG B TEMPERATURE 19    RC-005B-TE3    REACTORCOOLANTSYSTEM REACTOR      119 RCP-ID            095  Y  Y      N/A Y          Y COLD LEG B TEMPERATURE 19    RC-005B-TE4    REACTOR COOLANT COLD  REACTOR    119 RCP-ID            095  Y  Y      N/A Y          Y LEG B TEMPERATURE 18    RC-014A-DFTl REACTORCOOLANTSYSTEM REACTOR        095  SE OF RB-330      095  Y  Y      Y  Y          Y HOT EG A FLOW 18    RC-014A-DFT2 REACTOR COOLANT SYSTEM REACTOR      095  SE OF RB-331      095  Y  Y      Y  Y          Y HOTEG A FLOW 18    RC-014A-DFT3 REACTORCOOLANTSYSTEM REACTOR        095  SE OF RB-331      095  Y  Y      Y  Y          Y HOT LEG A FLOW 18    RC-014A-DFF4 REACTOR COOLANT SYSTEM REACTOR      095  N D-RING          095  Y  Y      Y  Y          Y HOTLEG A FLOW                          WALL 18    RC-014B-DPTl REACTOR COOLANT SYSTEM REACTOR      095  RB-326            095  Y  Y      Y  Y          Y                  ,
HOT LEG B FLOW 18    RC-014B-DPT2 REACTOR COOLANT SYSTEM REACTOR      095  RB-328            095  Y Y      Y  Y          Y HOT LEG B FLOW                                                                                              I 18    RC-014B-DFT3 REACTORCOOLANTSYSTEM REACTOR        095  RB-328            095  Y Y      Y  Y          Y                  '
HOT LEG B FLOW 18    RC-014B-DPT4 REACTORCOOLANTSYSTEM REACTOR        095  RB-326            095  Y Y      Y  Y          Y HOT LEG B FLOW 18    RC-131-FT      REACTORCOOLANTSYSTEM REACTOR      095  N D-RING          095  Y  Y.'  Y  Y-        Y PRESSURE                                WALL 18    RC-131-PTl    REACTOR COOLANT SYSTEM REACTOR    095  N D-RING          095  Y  Y    Y  Y          Y PRESSURE                                WALL Appendix C                                                                                                        42
 
_ g.  .
l k._.)                                                                                                                                                                                          O CLASS ID NO                                              EQUIP DESCRIPTION                                                          BLDG      E    ROOM              BASE CAF CAV ANCH INTER EQUIP L    RC                  EL OK  OK OK    OK    OK 20  RCCP-1                                    PRESSURIZER HEATER SCR                                                            INTER      I19  308/G              119  Y  Y    Y    Y    Y CONTROL PANEL 20  RCITS-A                                  REACTOR COOLANT                                                                  CONTROL    124  302/H            095  Y  Y    Y    Y    Y INVENTORYTRACKING SYSTEM CABINET A 20  RCITS-B                                  REACTOR COOLANT                                                                  CONIROL    124  303/1            095  Y  Y    Y    Y    Y INVENTORY TRACKING SYSTEM CABINETi' 20  RCITS-C                                  REACTOR COOLANT                                                                  CONTROL    124  302/H            095  Y  Y    Y    Y    Y INVENTORY TPACKING SYSTEM CABINET C 20  RCPM-3A                                    REACTOR COOLANT PUMP                                                            CONIROL    108  303/1              095  Y  U    N/A  N/A  U POWER MONTTORING CABINET A 20  RCPM-3B                                    REACTOR COOLANT PUMP                                                            CONTROL    108  303/1              095  Y  U    N/A  N/A-  U POWER MONITORING CABINET B 20  RCTR-1                                      RCP-1C TRANSFORhER                                                              INTER      I19  310/H1            119  Y  Y    Y    Y    Y CABINET 20  RCTR-2                                      RCP-ID TRANSFORhER                                                              INTER      119  310/H1            119  Y  Y    Y    Y    Y CABINET 20  RCTR-3                                      RCP-1 A TRANSFORhER                                                              AUXILIARY 119    306/H            095  Y Y    Y    Y    Y CABINET 20  RCFR-4                                      RCP-1B TRANSFORhER                                                              INER      119  306/G1            119  Y Y    Y    Y    Y CABINET 8B  RCV-10                                      PRESSURIZER POWER                                                                REACTOR    168  307/I            095  N Y    N/A  Y    N OPERATED RELIEF VALVE 8A RCV-11                                        PRESSURIZER BLOCK VALVE REACTOR                                                            168  307/1            095  N  Y  N/A  Y    N Appendix C                                                                                                                                                                                          43
 
(
b,-~                                                                                                                                                                                                                                                  d,m CLASS ID NO      EQUIP DESCRIPTION                                                                    BLDG    E  E.O O M          BASE CAF      CAV AMCH INTER ~ EQUIP L  MC                  EL OK      OK' OK                                                                                          OK OK 8A RCV-13    FRESSURIZERINLET                                                                    REACTOR 145  307/I            095        Y                                                                                                    U-AUXILIARY SPRAY ISOLATION VALVE 8A RCV-53    DH TO PRESSURIZER                                                                    REACTOR 145  307/1            095        Y Y                                                  N/A                                          Y  Y AUXILIARY SPRAY ISOLATION VALVE 20  RFL MPLXR RFL MULTIPLEXER FOR 500                                                              CONIROL I45  302/H            095        Y N                                                  Y                                            Y  N KV SWITCHYARD 20  RNR      RECORDER NEST RACK                                                                  CONIROL 145                    095        Y Y                                                  Y                                            Y  Y 20  RR-HV    AUXILIARY RELAY RACK                                                                CONTROL  124  301/F            095        Y Y                                                  Y                                            Y  Y HEATING AND VENTILATION 20  RR-PSA    AUXILIARY RELAY RACK                                                                CONTROL  124  301/F            095        Y Y                                                  Y                                            Y  Y 20  RR1      AUXILIARY RELAY RACK                                                                CONTROL  124  301/F            095        Y Y                                                  Y                                            Y  Y 20  RRIA      ENGINEERED SAFEGUARD                                                                CONTROL  124  301/F            095        Y Y                                                  Y                                            Y  Y AUXILIARY RELAY RACK RRIA                                                                                                                                                                                                                                        -
20  RRIAB    ENGINEERED SAFEGUARD                                                                CONTROL  124  301/F            095        Y Y                                                  Y                                            Y  Y AUXILIARY RELAY RACK RRIAB                                                                                                                                                                                                                                        ,
20  RRIB      ENGINEERED SAFEGUARD                                                                CONIROL  124  302/F            095        Y Y                                                    Y                                          Y  Y AUXILIARY RELAY RACK RRIB 20  RR2      AUXILIARY RELAY RACK                                                                CONTROL  124  301/F            095        Y Y                                                    Y                                          Y  Y 20  RR2A      ENGINEERED SAFEGUARD                                                                CONTROL  124  301/F            095        Y Y                                                    Y                                          Y  Y AUXILIARY RELAY RACK NA 20  RR2AB    ENGINEERED SAFEGUARD                                                                CONTROL  124  301/F            095        Y Y                                                    Y                                          Y  Y AUXILIARY RELAY RACK RR2AB Appendix C                                                                                                                                                                                                                                                44 l
 
g s.
                                -V                                                                                                                                        V                                      ()
CLASS ID NO                                                                                                      EQUIP DESCRIPTION      BLDG    E  ROOM  BASE CAF CAV ANCH INTER EQUIP L  RC      EL OK  OK OK    OK    OK 20                              RR2B                                                            ENGINEERED SAFEGUARD    CONTROL 124  302/F  095  Y  Y    Y    N    N AUXILIARY RELAY RACK RR2B 20                              RR3                                                              AUXILIARY RELAY RACK    CONTROL 124  301/F  095  Y  Y    Y    Y    Y 20                              RR3A                                                            ENGINEERED SAFEGUARD    CONIROL 124  301/F  095  Y  Y    Y    Y    Y AUXILIARY RELAY RACK RR3A 20                              RR3B                                                            ENGINEERED SAFEGUARD    CONTROL  124 301/F  095  Y  Y    Y    Y    Y AUXILIARY RELAY RACK RR3B 20                              RR4A                                                            POST-ACCIDENT          CONTROL  124 303/F  095  Y  Y    Y    Y    Y MONITORING PANEL 4A 20                              RR4B                                                            POST-ACCIDENT          CONTROL  124 302/G  095  Y  Y    Y    Y    Y MONITORING PANEL 4B 20                              RR5BI                                                            ENGINEERED SAFEGUARD    CONTROL  124 302/G  095  Y  Y    Y    Y    Y AUXILIARY RELAY RACK RR5BI 20                              RR5B2                                                          ENGINEERED SAFEGUARD    CONIROL  124 302/G  095  Y  Y    Y    Y    Y AUXILIARY RELAY RACK RR5B2 20                              RSA                                                            REMOTE SHUTDOWN RELAY CONIROL    108 303/G  095  Y  Y    Y    N    N CABINET A 20                              RSA-1                                                          REMOTE SHUrDOWN RELAY CONTROL    108 303/G  095  Y  Y    Y    N    N CABINET A-1 20                              RSACA                                                          REMOTE SHUTDOWN        CONIROL  108 302/G  095  Y  Y    Y    Y    Y AUXILIARY CABINET A 20                              RSACB                                                          REMOTE SHUTDOWN        CONTROL  108  303/G  095  Y  Y    Y    Y    Y AUXILIARY CABINET B -
Appendix C                                                                                                                                                                            45
 
CLASS ID NO                                                                                        EQUIP DESCRIPTION        ELDG      E    ROOM  BASE CAF    CAV ANCH INTER EQUP L    RC        EL - OK OK OK    OK-  OK 20                                  RSB                                                          REMOTE SHUIDOWN RELAY ' CONTROL    108  304/G  095      Y  Y    Y    Y    Y CABINET B 20                                  RSB-1                                                        REMOTESHUTDOWNRELAY CONTROL        108  303/G  095    ~Y- Y    Y    Y. Y CABINET B-1 20                                  RSPA                                                        REMOTE SHUTDOWN          CONTROL  108  304/G  095      Y  Y    Y    Y    Y PANEL-SECI1ON A 20                                  RSPAB                                                        REMOTE SHUTDOWN          CONTROL  108  304/G  095      Y  Y    Y    Y'    Y PANEL-SECTION AB 20                                  RSPB                                                        REMOTE SHUrDOWN          CONTROL    108  304/G  095      Y  Y-  Y    Y    Y PANEL - SECTION B 18                                  RW48-FT                                                      DECAY HEAT SEA WATER    AUXILLARY 095  307/R  095      Y  Y    Y    Y    Y PUMP B DISCHARGE PRESSURE                                                                                  ,
18                                  RW-09-FT                                                    DECAY HEAT SEA WATER    AUXILIARY 095  307/P  095    Y  Y    Y    Y    Y PUMP A DISCHARGE PRESSURE 19                                  RW-12-TE                                                    DH SERVICE SEA WATER    AUXILIARY 095  306/R  095    Y  Y    N/A  Y      Y PUMP RWP-3B DISCHARGE TEMPERATURE 19                                  RW-13-TE                                                    DECAY HEAT SEA WATER    AUXILIARY 095  306/P  095    Y  Y    N/A  Y      Y PUMP RWP-3A DISCHARGE TEMPERATURE 19                                  RW-19-TE                                                    NUCLEAR SERVICE SEA      AUXILIARY 095  306/Q    095    Y  Y    N/A  Y      Y WATER PUMP RWP-2B DISCHARGE TEMP 18                                  RW-23-FT                                                    NUCLEAR SERVICE SEA      AUXILIARY 095  307/R    095  Y  Y    Y    Y    Y WATER PUMPS DISCHARGE PRESSURE 19                                  RW-32-TE                                                    DECAY HEAT COOLER DCHE- AUXILIARY 095    305/T    095  Y  Y    N/A  Y      Y IB SEA WATER OUTLET Appendix C                                                                                                                                                                            46
 
O                                              O                                          O CLASS ID NO    EQUIP DESCRIPTION      BLDG      E  ROOM      BASE CAF CAV ANCH INTER EQUIP L  ~RC          EL OK  OK OK    OK    OK 19  RW-33-TE DECAY HEAT COOLER DCHE. AUXILIARY 095  305/r    095  Y  Y    N/A  Y    Y 1A SEA WATEROUILET 19  RW-43-TE SEA WATER OUTLET        AUXILIARY 095  306/S    095  Y  Y'  N/A  Y    Y NUCLEAR SERVICE COOLERS 6  RWP-1    NORMAL NUCLEAR          AUXILIARY 095  307Q      095  Y  N    Y    Y    N SERVICES SEA WATER PUMP MOTOR COLLER 6  RWP-2A  NUCLEAR SERVICE SEA    AUXILIARY 095  307/P    095  Y  N    Y    Y    N WATER PUMP 3A 6  RWP-2B  NUCLEAR SERVICE SEA    AUXILIARY 095  307/Q      095  Y  N    Y    Y    N WATER PUMP 3B 6  RWP-3A  DECAY HEAT SERVICE SEA  AUXILIARY 095  307/P      095  Y  N    Y    Y    N WATER PUMP 3A 6  RWP-3B  DECAY HEAT SERVICE SEA  AUXILIARY 095  307/R      095  Y  N    Y    Y    N WATER PUMP 3B 21  RWSP-IA  CYCLONE SEPARATOR A    AUXILIARY 095  SEA WATER  095  Y  Y    N/A  N/A  Y ROOM 21  RWSP-1B  CYCLONE SEPARATOR B    AUXILIARY 095  SEA WATER  095  Y  Y    N/A  N/A  Y ROOM 7  RWV-150  RW RECIRCULATION FLOW  AUXILIARY 095  307/R      095  Y  Y    N/A  Y    Y CONTROL VALVE 21  SAHE-1 A STATION AIR COMPRESSOR TURBINE    095            095  Y  Y              Y AFTER-COOLER A 21  SAHE-1B  STATION AIRE COMPRESSOR TURBINE    095            095  Y  Y              Y AFTER-COOLER B 12  SAP-1A  STATION AIR COMPRESSOR TURBINE    095            095  Y  Y    Y    Y    Y 1A 12  SAP-1B  STATION AIRCOMPRESSOR TURBINE      095            095  Y  Y    Y    Y    Y IB Appendix C                                                                                  47 L
 
J                                                                                                                    R.;
CLASS ID NO                        EQUIP DESCRIPTION          BLDG              E    ROOM        BASE CAF    CAV ANCH INTER EQUIP L    RC            EL' OK    OK  OK        OK    OK 5 SCP-3    SECONDARY SERCIVES          TURBINE            095  304/G      095    Y    Y    Y          Y    Y.
CIDSED CYCLE COOLING BOOSTER PUMP 7 SCV-095  IAP-1 A & 1AHE-I A COOLING TURBINE            108  302/lB      095    Y    Y    N/A        Y    Y WATER CONTROL VALVE 7 SCV-0%  IAP-1B & IAHE-1B COOLING    TURBINE            108  302/B      095    Y    Y    N/A        Y    Y WATER CONTROL VALVE 8B    SCV-099  IAP-1A & IAHE-1 A COOLING TURBINE              107  302/B        095  Y    Y    N/A        Y    Y WATER ISOLATION VALVE 8B    SCV-100  1AP-1B &lAHE-IC COOLING    TURBINE            107  302/B        095  Y    Y    N/A        Y    Y WATER ISOLATION VALVE 18  SF-9-FIT SPENT FUEL COOLANT FLOW AUXILIARY 143                304/K        095  N    Y    Y            Y  N TRANSMITTER 21    SFDM-1  SPENT FUEL COOLANT          AUXILIARY I19            302/J        095  Y    Y    N/A          N/A Y DEMINERALIZER 21    SFHE-1A  SPENT FUEL COOLER A        AUXILIARY 119            302/J        095  Y    Y    N/A          N/A Y 21    SFHE-1B  SPENT FUEL COOLER B        AUXILIARY I19            302/J        095  Y    Y    N/A          N/A Y 5 SFP-IA  SPENT FUEL COOLANT PUMP AUXILIARY 119                303/J        095  Y    Y    Y            Y  Y A
5 SFP-1B  SPENT FUEL COOLANT PUMP AUXILIARY I19                303/J        095  Y    Y    Y            Y  Y B
18  SP-17-LT STEAM GENERATOR A LE'dL REACTOR                095  N D-RING    095  Y    Y    Y            Y  Y WALL 18  SP-18-LT STEAM GENERATOR A LEVEL REACTOR                095    N D-RING    095  Y    Y    Y            Y  Y WALL 18  SP-19-LT STEAM GENERATOR A LEVEL REACTOR                095    N D-RING    095  Y    Y    Y            Y  Y WALL Appendix C                                                                                                                              48
_ - _ - _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _                                            - _ _ _ _ _ _                _    _. __-    _    _ _ . = _        _ _ _ _ _ _ _ _ _ - _ _ _-
 
                                  .                                                                                                      g~s
                                                                                                                                          '%                                                V CLASS ID NO                                                                                              EQUIP CESCRIPTION      F:LDG    E  ROOM          . BASE CAF CAV - ANCH INTER EQUIP L  RC                EL OK  OK OK      OK    OK 18                                    SP-20-LT                                                        STEAM GENERATOR A LEVEL REACTOR  095  N D-RING        095  Y  Y    Y    Y    Y WALL 18                                    SP-21-LT                                                        STEAM GENERATOR B LEVEL REACTOR  095  S D-RING        095  Y  Y    Y    Y    Y WALL 18' SP-22-LT                                                                                          STEAM GENERATOR B LEVEL REACTOR .095  RB-328          095  Y  Y    Y    Y      Y 18                                    SP-23-LT                                                        STEAM GENERATOR B LEVEL REACTOR  095  S D-RING        095  Y  Y    Y    Y    Y WALL I8                                    SP-14-LT                                                        STEAM GENERATOR B LEVEL REACFOR  095  RB-328          095  Y  Y    Y    Y    Y 18                                    SP-25-LT                                                        STEAM GENERATOR A LEVEL REACTOR  095  N D-RING        095  Y  Y    Y    Y    Y WALL 18                                    SP-26-LT                                                        STEAM GENERATOR A LEVEL REACTOR  095  M D-RING        095  Y  Y    Y    Y    Y WALL 18                                    SP-27-LT                                                        STEAM GENERATOR A LEVEL REACTOR  095  N D-RING        095  Y  Y    Y    Y    Y WALL 18                                    SP-28-LT                                                        STEAM GENERATOR A LEVEL REACTOR  095  N D-RING        095  Y  Y    Y    Y    Y WALL 18                                    SP-29-LT                                                        STEAM GENERATOR B LEVEL REACTOR  095  S D-RING        095  Y  Y    Y-    Y    Y' WALL 18                                    SP-30-LT                                                        STEAM GENERATOR B LEVEL REACTOR  095  S "Y" STATION 095    Y  Y    Y    Y    Y 18                                    SP-31-LT                                                        STEAM GENERATOR B LEVEL REACTOR  095  S D-RING      095  Y  Y    Y    Y    Y WALL 18                                      SP-32-LT                                                      STEAM GENERATOR B LEVEL REACTOR  095  RB-328        095  Y  Y    Y    Y    Y 5                                      SSP-4A                                                        CONDENSER A HOTWELL      TURBINE  095  306/E          095  Y  Y    Y    Y'    Y SAMPLE EXTRACTION PUMP 5                                      SSP-4B                                                        CONDENSER B HOTWELL      TURBINE  095  306/E          095  Y  Y    Y    Y    Y SAMPLE EXTRACTION PUMP Appendix C                                                                                                                                                                                    49
 
O                                                                                                                                        O                                          O  _
CLASS ID NO                      EQUIP DESCRIPTION                                                                              BLDG      E  ROOM      BASE CAF CAV ANCH INTER EQUIP L  RC          EL OK  OK OK    OK    OK 5  SSP-4C                    CONDENSER AB HOTWELL                                                                          TURBINE  095 306/E      095  Y  Y    Y    Y    .Y CROSSOVER SAMPLE EXTRACTION PUMP 5  SSP-4D                    LP HEATER SAMPLE                                                                              TURBINE  095 306/E      095  Y  Y    Y    Y      Y EXTRACTION PUMP 18  SW-002-PT                  NUCLEAR SERVICE CCC                                                                            AUXILIARY 095 307/P      095  Y  Y    Y    Y      Y PUMPS DISCHARGE PRESSURE 18  SW-135-PT                  NUCLEARSERVICECOOLING AUXILIARY 095                                                                          307/S      095  Y  Y    Y    Y      Y WATER SURGE TANK PRESSURE 18  SW-139-LT                  NUCLEAR SERVICE COOLING AUXILIARY 095                                                                        307/T      095  Y  Y    Y    Y      Y WATER SURGE TANK LEVEL 21  SWHE-1 A                  NUCLEAR SERVICE CCC                                                                            AUXILIARY 095 SEA WATER  095  Y  Y    N/A  N/A    Y HEAT EXCHANGER 3A                                                                                            ROOM 21  SWHE-1B                    NUCLEAR SERVICE CCC                                                                            AUXILIARY 095 SEA WATER  095  Y  Y    N/A  N/A    Y IEAT EXCHANGER 3B                                                                                            ROOM 21  SWHE-1C                    NUCLEAR SF"VICE CCC                                                                            AUXILIARY 095 SEA WATER  095  Y  Y    N/A  N/A    Y HEAT EXC' JGER 3C                                                                                            ROOM 21  SWlE-1D                    NUCLEAR SERVICE CCC                                                                            AUXILIARY 095  SEA WATER  095  Y  Y    N/A  N/A    Y HEAT EXCHANGER 3D                                                                                            ROOM 21  SWHE-2                    SW SUPPLY TO PASS SAMPLE AUXILIARY 108                                                                        305/H      095  Y  Y    N/A  N/A    Y COOLERS S  SWP-i A                    EMERGENCY NUCLEAR                                                                              AUXILIARY 095  307/P      095  Y  U    U    Y    U SERVICE CCC PUMP 3A 5  SWP-lB                    EhERGENCY NUCLEAR                                                                              AUXILIARY 095  307/Q      095  Y  U  U    N    N SERVICE CCC PUMP 3B Appendix C                                                                                                                                                                            50
 
G                                                  J                                        O CLASS ID NO        EQUIP DESCRIPTION        BLDG      E ROOM      BASE CAF CAV ANCH INTER EQUIP L RC          EL OK- OK OK    OK    OK 5  SWP-1C      NORMALNUCLEARSERVICE AUXILIARY 095      307/S      095. Y  U    U    Y. U CLOSED CYCLE COOLING PUMP 5  SWP-2A      NUCLEAR SERVICE BOOSTER AUXIIJARY 095  305/P      095  -Y  Y    Y    Y    Y PUMP A 5  SWP-2B      NUCLEAR SERVICE BOOSTER AUXILIARY 095  305/P      095  Y  Y    Y    Y    Y PUMP B 21  S W T-1    NUCLEAR SERVICE CLOSED AUXILIARY 095    307/S      095  Y  Y    N/A  N/A  Y CYCLE SURGE TANK 7  SWV-012    SEAL RETURN COOLERS      AUXILIARY I19 PRE-FILTER  095  Y  Y    N/A  Y    Y SUPPLY ISOLATION VALVE                  AREA 21  SWV-012-AR  SWV-12 CONTROL            AUXILIARY 119 304/P      095  Y  Y    Y    Y    Y.
8B  SWV-012-SVI SWV-12 CONTROL            AUXILIARY 119 304/P      095  Y  Y    N/A  Y    Y SB  SWV-012-SV2 SWV-12 CONTROL            AUXILIARY 119 304/P      095  Y  Y    N/A  Y    Y 7  SWV-035    INLET ISOLATION FOR AIDE- AUXILIARY 095 305/N      095  Y  Y  'N/A  Y    Y 31A AND AHHE-32A 7  SWV-037    INLETISOLATION FOR AHHE- AUXILIARY 095  305/N      095  Y  Y    N/A  Y    Y 31B AND AIDE-32B 7  SWV-039    INLET ISOLATION FOR AIDE. AUXILIARY 095  305/N      095  Y  Y    N/A  Y    Y 31C AND AIDE-32C 7  SWV-041    ISOLATION FROM OUTLETS    AUXILIARY 119  305/N      095  Y  Y    N/A  Y    Y OF AIDE-31A AND AHIE-32A 7  SWV-043    OUTLETISOLATION FOR      AUXILIARY 095  305/N      095  Y  Y    N/A  Y    Y AIDE-31B AND AIDE-32B 7  SWV-045    OUTLET ISOLATION FOR      AUXILIARY 095  305/N      095  Y  Y  N/A  Y    Y AIDE-31C AND AHHE-32C 7  SWV-047    ISOLATION TO MUHE-1B      AUXILIARY 095  305/N      095  Y  Y  N/A  Y    Y AND WDHE-1 Appendix C                                                                                        51
 
(n                                                        ~
                                                                                                        ,s a                                                                                                  m.
CLASS ID NO          EQUIP DESCRIPTION          BLDG      E  ROOM            BASE CAP CAV ANCH INTER EQUIP L  RC                EL OK  OK OK    OK    OK 7  SWV-048    LETDOWNCOOLER3BINLET AUXILIARY 095      305/N            095  Y  Y    N/A Y    Y ISOLATION VALVE 7    SWV-049    LETDOWN COOLER 3B          AUXILIARY 095 305/N            095  Y  Y    N/A Y    Y DISCHARGE ISOLATION VALVE 7    SWV-050    OUTLETISOLATION FOR        AUXILIARY 095 305/N            095  Y  Y    N/A Y    Y MUHE-1 A AND WDHE-1 7    SWV-151    IC FROM RB FAN COOLERS    AUXILIARY 100 SEA WATER        095  Y  Y    N/A Y    Y ISOLATION VALVE                          ROOM 21    SWV-151-AR  AIRRESERVOIRFORSWV-151 AUXILIARY 100    307/O            095  Y  Y    N/A N/A  Y 3B    SWV-151-SV  SWV-151 CONTROL            AUXILIARY 095 307/O            095  Y  Y    N/A Y    Y 7    SWV-152    IC TO RB RAN COOLERS      AUXILIARY 100 307/P            095  Y  Y    N/A Y    Y ISOLATION VALVE 21    SWV-152-AR  AIR RESERVOIR FOR SWV-152 AUXILIARY 100  305/O            095  Y  Y    N/A N/A  Y 8B    SWV-152-SV1 SWV-152 CONTROL            AUXILIARY 095 307/O            095  Y  Y    N/A Y    Y 8B    SWV-152-SV2 SWV-152 CONTROL            AUXILIARY 095 307/O            095  Y  Y    N/A Y    Y 7    SWV-353    SW TO RB FAN COOLERS      AUXILIARY 095 307/P            095  Y  Y    N/A Y    Y ISOLATION VALVE 21    SWV-353-AR  AIR RESERVOIR FOR SWV-353 AUXILIARY 095  307/P            095  Y  Y    N/A N/A  Y 8B    SWV-353-SV1 SWV-353 CONTROL            AUXILIARY 095 307/P            095  Y  Y    N/A Y    Y 8B    SWV-353-SV2 SWV-353 CONTROL            AUXILIARY 095 307/O            095  Y  Y    N/A Y    Y 7    SWV-354    SW FROM RB FAN COOLERS AUXILIARY 095    307/O            095  Y  Y    N/A  Y    Y ISOLATION VALVE 21    SWV-354-AR  AIRRESERVOIRFORSWV-354 AUXILIARY 095    307/O            095  Y  Y    N/A  N/A  Y 8B    SWV-354-SV1 SWV-354 CONTROL            AUXILIARY 095 307/O            095  Y  N    N/A  Y    N Appendix C                                                                                                  52
 
                                -                      .        -                                                        ~=
p U
l O                                                                                                (-).
L l
CLASS ID NO            EQUIP DESCRIPTION      BLDG        E  ROOM  BASE CAP CAV ANCH INTER EQUIP L  RC      EL OK  OK OK      OK- OK 8B  SWV-354-SV2    SWV-354 CONIROL          AUXILIARY 095    307/O  095  Y  N    N/A    Y  N 7 SWV-355        IC FROM RB FAN COOLERS  AUXILIARY 095    307/O  095  Y  Y. N/A    Y  Y ISOLATION VALVE 21 SWV-355-AR    AIR RESERVOIR FOR SWV-355 AUXILIARY 095  307/O  095  Y  Y    N/A    N/A Y 8B  SWV-355-SV    SWV-355 CONTROL          AUXILIARY 095    307/O  095  Y  Y    N/A    Y  Y 20 TPC            TRANSMITIERPOWER        CONTROL    124  302/F  095  Y  N    N      Y  N SUPPLY CABINETS A & B 14 VBDP-01        REGULATED INSTRUhENT    CONTROL    145  302/H  095  Y  Y    Y      Y  Y BUS 3A 14 VBDP-02        REGULATED INSTRUhENT    CONTROL    145  302/H  095  Y  Y    Y      Y  Y BUS 3B 14 VBDP-03        VITAL BUS A              CONTROL    145  302/H  095  Y  Y    Y      Y  Y 14 VBDP-04        VITAL BUS B              CONTROL    I45  302/H  095  Y  Y    Y      Y  Y 14 VBDP-05        VITAL BUS C              CONTROL    145  302/H  095  Y  Y    Y      Y  Y 20 VBDP-05-SIP    120 VOLT VITAL BUS 3C  CONTROL    145  302/H  095  Y  Y    Y      Y  Y STATUS INDICATION PANEL 14 VBDP-06        VITAL BUS D              CONTROL    145  302/H  095  Y  Y    Y      Y  Y 20 VBDP-06-SIP    120 VOLT VITAL BUS 3D    CONTROL    145  302/H  095  Y  Y    Y      Y  Y STATUS INDICATION PANEL 14 VBDP-07        COMPUTER 120 VAC          CONTROL    145  302/F  095  Y  Y    Y      Y  Y DISTRIBUTION PANEL 14 VBDP-08        EFIC VITAL BUS A          CONTROL    124  303/F  095  Y Y    Y      Y  Y 20 VBDP-08/12/13- VITAL BUS STATUS          CONTROL    124  303/F  095  Y  Y    Y      Y  Y SIP            INDICATION PANEL A FOR VBDP-8/12/13 Appendix C                                                                                        53
 
CLASS ID NO                        EQUIF DESCRIPTION                BLDG      E  ROOM        ' BASE CAF  CAV ANCH INTER EQUIP i                                                                                      L  RC              EL' OK  OK OK    OK    OK-
        -14  VBDP419                    EFIC VITAL BUS C                  CONTROL    124  302/F          095    Y Y    Y    Y    Y 20  VBDP-09-SIP                VITAL BUS STATUS                  CONTROL    124  302,7          095    Y Y    Y    Y    Y INDICATION PANEL C FOR VBDP-9 14  VBDP-10                    EFIC VITAL BUS B                  CONTROL    124  303/G          095    Y Y    Y    Y    Y 20  VBDP-10/14/15- VITAL BUS STATUS                              CONIROL    124  303/G          095    Y Y    Y    Y    Y SIP                        INDICATION PANEL B FOR VBDP-10/14/15 14  VBDP-11                    EFIC VITAL BUS D                  CONIROL    124  303/G          095    Y Y    Y    Y    Y 20  VBDP-11-SIP                VITAL BUS STATUS                  CONTROL    124  303/G          095    Y Y    Y    Y    Y. ~
INDICATION PANEL D FOR VBDP-Il 14  VBDP-12                    120 VOLT REGULATED              CONTROL    108  301/H          095    Y Y    Y    Y    Y DISTRIBUTION PANEL 14  VBDP-13                    120 VOLT REGULATED              CONIROL    108  301/H          095    Y Y    Y    Y    Y DISTRIBUTION PANEL 14  VBDP-14                    120 VOLT REGULATED              CONTROL    108  302/I          095    Y Y    Y    Y    Y DISTRIBUTION PANEL 14  VBDP-15                    120 VOLT REGULATED              CONIROL    108  302/I          095    Y Y    Y    Y    Y DISTRIBUTION PANEL 16  VBIT-1A                    DUAL INPUTINVERTER 3A            CONTROL    108  301/G          095    Y Y    Y    N    N 16  VBIT-1B                    DUAL INPUT INVERTER 3B          CONTROL    108 302/H          095    Y Y    Y    Y    Y 16 VBIT-IC                    DUAL INPUTINVERTER 3C            CONIROL    108  302/H          095    Y Y    Y    Y    Y 16 VBIT-ID                    DUAL INPUTINVERTER 3D            CONTROL    108  302/H          095    Y Y    Y    Y    Y 16 VBIT-lE                    DUAL INPUT INVERTER 3E          CONIROL    108  302/H          095    Y Y    Y    Y    Y Appendix C                                                                                                                      54
 
M (v)                                            (w.                                                                .
CLASS ID NO    EQUIP DESCRIPTION      BLDG      E  ROOM    BASE CAP CAV ANCH INTER EQUIP L  RC        EL OK  OK OK                              OK    OK 4  VBTR-1A CONSTANT VOLTAGE        CONIROL  124  302/H  095  Y  Y      Y                              Y Y TRANSFORhER A 4  VBTR-1B CONSTANT VOLTAGE        CONTROL  124  302/H  095  Y  Y      Y                              Y Y TRANSFORMER B 4  VBTR-2E 480/120V REDUNDANT      CONTROL  108  302/H  095  Y  Y      Y                              Y Y-POWER SUPPLY TRANSFORhER 3E 4  VBTR-3E REDUNDANTPOWERSUPPLY CON 110L    108  302/H  095  Y  Y      Y                              Y Y SOLATRON 3E 4  VBTR-4A REGULATING              CONTROL  124  303/G  095    Y Y      Y                              Y Y TRANSFORNER A 4  VBTR-4B REGULATING              CONTROL  124  303/G    095  Y  Y      Y                              Y Y TRANSFORNER B 4  VBTR-4C REGULATING              CONTROL  124  303/G    095  Y  Y      Y                              Y Y TRANSFORhER C 4  VBTR-4D REGULATING              CONTROL  124  303/G . 095  Y  Y      Y                              Y Y TRANSFORhER D 2  VBXS-IA VITAL BUS TRANSFER      CONTROL  108  302/1    095  Y  Y    Y                              Y Y SWITCH A 2  VBXS-1B VITAL BUS TRANSFER      CONTROL  108  302/H    095  Y  N    Y                              Y N SWITCH B 2 VBXS-lC VITAL BUS TRANSFER      CONIROL  108  301/H  095  Y    N    Y                              Y N SWITCH C 2 VBXS-ID VITAL BUS TRANSFER      CONIROL  108  302/1  095  Y    N  Y                              Y N SWTTCH D 2 VBXS-1E hiANUAL TRANSFER SWITCH CONTROL    108  302/1  095  Y    Y  Y                              Y Y 20 VBXS-2A AtTTO TRANSFER SWITCH    CONIROL  145  302/H  095  Y    Y  Y                              Y Y FOR NNI Appendix C                                                                                                          55
 
CLASS ID NO        EQUIP DESCRIPTION      BLDG      E  ROOM        BASE CAF    CAV ANCH INTER EQUIP l                                                                              L  RC            .EL OK      OK    OK    OK  OK i                        20  VBXS-2B      AUTOTRANSFER SWTTCH    CONIROL    145 302/H        095  Y      Y    Y    Y    Y FORICS 2  VBXS-3A      EFIC VITAL BUS TRANSFER CONIROL    108 301/1        095  Y      Y    Y    Y    Y-SWTTCH A 2  VBXS-3B      EFIC VITAL BUS TRANSFER CONTROL    108 302/G        095  Y      N    Y    Y    N-SWITCH B 2  VBXS-3C      EFIC VITAL BUS TRANSFER CONIROL    108 301/1        095  Y      Y    Y    Y    Y SWITCH C 2  VBXS-3D      EFIC VITAL BUS TRANSFER CON 1ROL  108 302/G        095  Y      N    Y    Y    N SWITCH D 21  WDHE-1      REACTOR COOLANT DRAIN  REACTOR    095              095  Y      N/A  N/A  N/A  Y TANK COOLER 12  WDP-1A      WASTE GAS COMPRESSOR A AUXILIARY 095  303/O        095  Y      Y    Y    Y    Y 12  WDP-1B      WASTE GAS COMPRESSOR B AUXILIARY 095  303/P        095  Y      Y    Y    Y    Y 21  WDT-1A      WASTE GAS DECAY TANK 1 A AUXILIARY 095  302/Q        095  Y 21  WDT-1B      WASTE GAS DECAY TANK IB AUXILIARY 095  302/O        095 Y 21  WDT-lC      WASTE GAS DECAY TANK IC AUXILIARY 095  303/R        095 Y 21  WDT-3A      RC BLEED TANK 3A        AUXILIARY 095  303/Q        095 Y      N    N/A  N/A  N 21  WDT-3B      RC BLEED TANK 3B        AUXILIARY 095  304B/Q        095 Y      N    N/A    N/A N 21  WDT-3C      RC BLEED TANK 3C        AUXILIARY 095  305/Q        095 Y      N    N/A    N/A N 21  WDT-5        REACTOR COOLANT DRAIN    REACTOR  095  NW OF D-RING 095  Y      Y    U      Y  U TANK Appendix C                                                                                              56
 
O                                                                            O                                                                                                        O CLASS D NO                      EQUIP DESCRIPTION                        CLDG                ROOM                                  MASE CAF                          CAV ANCH INTER EQUIP RC                                    EL ' OK                          OK  OK  OK    OK CERTIFICATION:                                                                              CERTIFICATION:
All the information contained on this Screening Verification Dats                            The inforunation provided to the Seisanic C ;--il;y Eagnacers Sheet (SVDS) is, to the best of our knowledge and belief, cornet and                        regarding systems and operations of the equipment contained on this accurate. "All Information" includes each entry and conclusion                              SVDS is, to the best of our knowledge and behef, cornet and (whether vertified to be seismically adequate or not).
Appmed: (One signatuit of Systems or Operations Engineer is Approved (Signatures of all Seismic Capability Engineers on the required if the Seisanic Capabehty Engineers deena it Seismic Review Team (SRT) are required: there should be necessary.)
at least two on the SRT. All signatories should agree with all of the entries and conclusions. One signatory should be a licensed professional engineer.)
Signatures below att for the specific items rniewed by each of the signatories. Documentation of the SRT members for each specific item is prmided on the SEWS for the item. All SEWS have been signed by at least two SCEs, at least one of which is a Registered Professional Engineer.
PADL 5 M(TH                      QOL                    \2/t 9/CIS Print or type name              Signature                        Date                      Print or type name                                      Signature                    Date C6LEW R47l                              n                      /2  0 PF Print or type name              Signature                        Date                      Print or type name                                      Signature                    Date HAWf 3DHM                      '
j,                    12Rr/9r Print or type manic                  sh                          Date                      Print or type name                                      Signature                    Date
  %d                                  # di absk Print or type name              Signature  [                    Date                      Print or type name                                      Signature                    Date Print or type name              Signature                        Date                      Print or type name                                      Signature                    Date Appendix C                                                                                                                                                                              57
 
l lO L
e i
4 e          e ese                                                          i i
\
l            FLORIDA POWER CORPORATION ^ '
l                                      CRYSTAL RIVER UNIT 3 i
l
!                                                              APPENDIX D l                          THIRD PARTY AUDIT REPORT 1
l
)
O                                                                                                                      i
  !                                                                                                                            1
 
Y
:          VECTRA.
October 27,1995 2
0092-00239.000-LTR001 Mr. C. Glenn Pugh (MAC : NAIE) .
'          Florida Power Corporation
* Crystal River Energy Complex 15760 W. Power Line St.
Crystal River, FL 34428-6708 e
i         
 
==Subject:==
          ' PEER Review of Crystal River Unit 3 A-46 Program l-4 Dear Mr. Pugh!
,                                                                                                                            s This letter is intended to document the results of the A-46 reviews and walkdowns that I i          conducted the week of September 11 at Crystal River.
Attachment A details the observations which I had discussed with you and the walkdown team during the exit meeting on September 15,1995.
As was discussed, the implementation of your plant specific procedure is being performed in a thorough and competent manner. The results and findings from the completed effort appear
[          to be reasonable and are consistent with expectations for a plant of CR3's vintage. The I
!.          equipment and raceway distributed systems were found to be rugged owing to conservative
;            original design and upgrades which have been implemented over the life of the plant. With very few exceptions, the equipment observed was found to be well maintained and having g            good material conditions; while some improvements for seismic considerations are required, the general housekeeping practices appear to be well controlled and effective.
If you have any questions or comments, please do not hesitate to contact me at (508) 647-1050.
Very truly yours,
[Mf$%J Charbel M. Abou-Jaoude, P.E.
GA _
Project Manager
            - Attachments cc:    ;Mr. Anthony Petrowsky Mr. Al Friend VECTRATechnologies 'nc        12 Michigan Drive                Natick. MA 01760 Tet (508)6471000      FaE(508)6474294 lb
 
i V      '
Attrchmtnt A to Letter 0092-00239.000-LTR001                  l i
l i(
ygg                    Seismic Peer Review of the CR3 A-46 Program l
This attachment provides a summary of the seismic reviews of the Crystal River A-46 program. An overview of the review process is first presented, general observations and comments are then discussed.
The Crystal River plant specific procedure and the supporting technical basis report were first reviewed. An electronic database containing a listing of all equipment within the A-46 scope                    l was then obtained and manipulated to generate a spreadsheet to serve for documenting the peer reviewer's field observations; the format used is similar to the GIP Screening Verification              !
Data Sheets (SVDS) with an additional field for walkdown notes. A two day plant walk-                          !
through of all accessible areas excluding containment and high-rad areas was then                              !
conducted. The equipment that was covered is close to 40% of the total A-46 items. The l
inspections focused on assessing the seismic capability of equipment by reviewing the                          ;
component design characteristics, anchorages, and potentia! interactions; representative                        !
electrical items were reviewed using the assistance of plant maintenance personnel to gain?
access to the intemals and anchorages of cabinets. The areas covered included:
                  - Mechanical and Electrical components in the Aux. Bldg. between elevations 75' and 119'
                  - Electrical control and distribution equipment in the Control Bldg. between elev 108'                i f                and 145'
                  - Diesel Generator Sets, Turbine Bldg areas, and Tanks in the Yard Review of the above areas provided a broad sampling of each of the 20 SQUG classes, tanks and heat exchangers, and electrical raceways.
Subsequent to the plant visit, the peer reviewer compared his field observations with those of the seismic review team as documented on completed SEWS. Also data packages which contained supporting drawings were sampled.
Based on the above reviews, the seismic assessments at CRS are being conducted in a thorough and competent fashion. The findings are consistent witn the observations and expectations of the peer reviewer. The majority of the conditions identified by the reviewer as requiring further evaluations or upgrades had been previously noted by the SRT. The completed SEWS were adequately documented and the appropriate judgment and conclusions were recorded in accordance with the CR3 PSP. The equipment list was very comprehensive and appears to include more equipment than is typically used or relied upon at other PWR's for the A-46 shutdown. The equipment reviewed was typically rugged and reasonably well anchored. A few instances for electrical cabinets were noted with irregular anchorage installations or configurations; however, in most cases the top entry conduit                        I configurations or existing anchorage pattern would be sufficient to support the low inertial demand levels. The cable tray supports were typically angle iron trapeze frames or rod hung in the turbine area; the conduit supports were unistrut frames or rod hung trapezes.
O Page A-1                                                                  October 27,1995
[
 
_                                                            -          . . . _            _ _    ~ . . . . _ . _ _ .                    ___ ... _              ____              . _ _. -
V                                                                                                      Attachment A to Lattgr 0092-00239.000-LTR001 Seismic Peer Review of the CR3 A-46 Program VECTRA The distributed systems are generally well designed and very rugged for a low seismicity site.
A number of upgrades to equipment and distributed systems were observed; these have been performed over the life of the plant and have resulted in increased margins. Good housekeeping and material conditions were observed throughout the plant, the only visible corrosion issue that was noted was for the D.G. fuel transfer pumps.
Based on the peer reviewers experience, plant walkdowns are the most valuable element of any seismic assessment program; very often, extensive documentation and analytical efforts only tend to reconfirm the field judgment. Given the low seismicity for a Florida plant, the streamlined GlP based program being implemented is appropriate and will enable FPC to capture any seismic vulnerabilities at CR3.
OBSERVATIONS / COMMENTS.
u General comments on the technical basis document are first discussed. These are primarily intended as suggestions to reinforce the FPC arguments and position. Then observations related to field inspections are presented. Allissues summarized here have been identified
                                                            . during the site visit and were discussed with the SRT.
                                                              - Technical Basis Reoort:
Seismic Demand The key argument for the streamlined or prescreening approach developed by FPC is the one relative to low seismicity and low demand (in Structure Spectra). The point being made in Appendix A gets a bit diluted when the emphasis is shifting to address the few components located at elevation 162' of the Aux. Bldg. Instead,
,                                                                        the thrust should be on establishing a large comfortable margin between realistic in-l                                                                        structure spectra and the SSRAP reference spectrum. If one fails to prove this i                                                                        point and the conclusion is that the in-structure response spectra is only enveloped by the reference spectrum, then indirectly it could be inferred that the demand is so high that the full GIP requirements now need to be addressed.
l                                                                        On page A-4 first paragraph line 7 (..., or a total amplification of about 1.3): the total amplification is more likely equal to 2.5 x 1.4 (not 0.53) = 3.5.
!                                                                        Some of the arguments being presented in the introduction in relation to the 0.1g j                                                                        could be 'made by using the Mercalli intensity to substantiate some of the qualitative i
statements made (0.1g corresponds to MM VI where as the SQUG data base sites l                                                                        had a MM Vill or IX).
in generalit would be preferable to present the arguments in a positive light. For
: i.                                                                      example, on page 4 the discussion about the 8Hz rule could be stated as an area
:                                                                        where the GlP rule was generically satisfied instead of stating "CR3 PSP does not l                                                                        have to explicitly address the GIP issue., ",
I-                                                            Page A-2                                                                                      October 27,1995
_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _                          _ _ _ . _      ._-  .          _ _ . _ _ . _ _ _ _ _.. .-          , + - , . . -                          - -
 
i
                    'V      '
Attachmsnt A to Lettsr 0092-00239.000-LTR001 4
Seismic Peer Review of the CR3 A-46 Program VECTRA Raceways Much of the discussion in this section and in Appendix B is aimed at addressing the GlP 3DL screening criteria for nonductile support configurations. Here again the arguments are presented with the optics of justifying a deviation from the GIP analytical screening guidelines. While the GIP provides this 3DL check as one screening option, further analytical steps are available for evaluation of configurations that do not satisfy this simple check. It is probably just as easy to demonstrate that the CR3 configurations which do not screen to the 3DL check may very well meet other GIP analytical screening options. Most of these options do factor in the actual demand level and allow for relief based on the margin between the site SSE and the bounding spectrum.
Finally for the inclusion rules, on page B-9 a statement is made that the CR3 safety-related raceways do not use beam clamps. During the field walk through a conduit support detail which uses a friction clamp was identified at various locations. In all                        I cases observed, it was judged that enough redundancy existed in the conduit support configuration that reliance on the friction clamp was not necessary. This detail should be explicitly addressed preferably based on field inspections.                                  ,
I O                                  Relays A very detailed argument is presented in Appendix C to justify relief in this area.
The most defendable position is the performance of a screening for bad actors, and quantification of the low probability for loss of offsite power (see Finding 5 page C-5). From various PRA studies, a lower bound median value for damage to switchyards is 0.3g; therefore tnere is a high confidence of a low probability of a loss of offsite power below 0.1g. Without the loss of offsite power the operators are offered considerably more flexibility in shut-down/ manual options, hence reducing the importance of any relay chatter consequences.
Anchorage The CR3 position could be easily reinforced by performing a couple bounding anchorage evaluations. This would serve as a vehicle to support the SRT's judgments and illustrates the low level of demand on the CR3 installations.
                          - Field Reviews The walRdowns observed were being conducted in a thorough and well organized fashion. The SRT has exercised appropriate judgments and documented the walkdown results in accordance with the CR3 PSP.
Only a few minor comments are made here oased on the comparisons between the peer reviewer's walkdown observations and the SRT's SEWS. Cases where the peer reviewer's conclusions were different than the SRT's are presented based on O                      ,            the component ID.
Page A-3                                                                              October 27,1995 0
 
V                                                                          Attachm:nt A to Lettsr 0092-00239.000-LTR001 Seismic Peer Review of the CR3 A-46 Program                                        .
VECTRA DPBA-18: These newly installed station batteries have instances where a 3/8" gap exists between the batteries and the side rails; this was not identified in the SEWS.
Also based on the review of the data package, there is no evidence of the cell weight; the SRT concluded that the battery weight was within the GIP limits. A positive confirmation that the weight is less than 450 lbs. is required. These newer vintage batteries are large and may be more than 450 lbs. Note however, that the battery racks were tracked as outliers because of an anchorage concern.
AHF-54A: EFIC Rooms Cooling, these fan coil units are being tracked as equipment class 9. SQUG class 10 is more appropriate for these components (same applies to AHF-54B, AHF-17A&B).
DCP-1B: A long run of piping connected to this pump has an axial pipe support which uses a pipe clamp without any axiallugs that could be visually confirmed from a distance. This needs further review.
Finally for the beam clamps see the earlier discussion on raceways.
i l
l 1
1 O                                                                                                              l Page A-4                                                                October 27,1995 i}}

Latest revision as of 08:16, 13 December 2024

Seismic Evaluation Rept for USI A-46, Rev 0
ML20095L146
Person / Time
Site: Crystal River 
Issue date: 01/02/1996
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20095L145 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR NUDOCS 9601020070
Download: ML20095L146 (242)


Text