ML20096B328: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. _ , | {{#Wiki_filter:. _, | ||
a | a t to TXX 96007 i | ||
Page 1 of 1 TABLE 3.3 5 REMOTE SHUTDOWN MONITORING INSTRUMENTATION TOTAL NO. | |||
TABLE 3.3 5 REMOTE SHUTDOWN MONITORING INSTRUMENTATION TOTAL NO. | MINIMUM READ 0UT OF CHANNELS INSTRUMENT LOCATION CHANNELS OPERABLE 1. | ||
Neutron Flux Monitors HSP 2 | |||
1 2. | |||
Wide Range RCS Temp.-T, HSP 1/ Loop 1/ Loop 3. | |||
Wide Range RCS Temp. Tn HSP 1/ Loop 1/ Loop | |||
* 4. | |||
Pressurizer Pressure HSP 1 | |||
1 5. | |||
Pressurizer Level HSP 2 | |||
Rate to Steam Generator | 1 6. | ||
Steam Generator Pressure HSP 1/SG 1/SG 7. | |||
Steam Generator Level HSP 1/SG 1/SG 8. | |||
Flow Indication | Auxiliary Feedwater Flow HSP 2/SG 1/SG Rate to Steam Generator 9. | ||
Condensate Storage Tank Level HSP 2 | |||
1 10. | |||
-Charging Pump to CVCS HSP 1 | |||
1 Charging and RCP Seals - | |||
COMANCHE PEAK | Flow Indication 1 | ||
PDR | Hot Shutdown Panel HSP | ||
= | |||
SG Steam Generator | |||
= | |||
' :The~ requirements for-Minimum Channels OPERABLE for Wide Range RCS Temp. Tiremote shutdown' indication for Unit 2 are revised to 1/ Loop for three (3) of.the four (4),RCS Loops. This revision is to remain in effect until CPSES Unit 2 enters; MODE 4 at;the:beginning of.the second refueling outage-for Unit 2. | |||
COMANCHE PEAK UNITS 1 AND 2 3/4 3 43 9601160199 960105 PDR ADOCK 05000445 P | |||
PDR | |||
-}} | |||
Latest revision as of 08:10, 13 December 2024
| ML20096B328 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/05/1996 |
| From: | TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20096B321 | List: |
| References | |
| NUDOCS 9601160199 | |
| Download: ML20096B328 (1) | |
Text
. _,
a t to TXX 96007 i
Page 1 of 1 TABLE 3.3 5 REMOTE SHUTDOWN MONITORING INSTRUMENTATION TOTAL NO.
MINIMUM READ 0UT OF CHANNELS INSTRUMENT LOCATION CHANNELS OPERABLE 1.
Neutron Flux Monitors HSP 2
1 2.
Wide Range RCS Temp.-T, HSP 1/ Loop 1/ Loop 3.
Wide Range RCS Temp. Tn HSP 1/ Loop 1/ Loop
- 4.
Pressurizer Pressure HSP 1
1 5.
Pressurizer Level HSP 2
1 6.
Steam Generator Pressure HSP 1/SG 1/SG 7.
Steam Generator Level HSP 1/SG 1/SG 8.
Auxiliary Feedwater Flow HSP 2/SG 1/SG Rate to Steam Generator 9.
Condensate Storage Tank Level HSP 2
1 10.
-Charging Pump to CVCS HSP 1
1 Charging and RCP Seals -
Flow Indication 1
Hot Shutdown Panel HSP
=
=
' :The~ requirements for-Minimum Channels OPERABLE for Wide Range RCS Temp. Tiremote shutdown' indication for Unit 2 are revised to 1/ Loop for three (3) of.the four (4),RCS Loops. This revision is to remain in effect until CPSES Unit 2 enters; MODE 4 at;the:beginning of.the second refueling outage-for Unit 2.
COMANCHE PEAK UNITS 1 AND 2 3/4 3 43 9601160199 960105 PDR ADOCK 05000445 P
-