ML20097G304: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.                    .                                _                                . _ .
{{#Wiki_filter:.
i
i Log # TXX 96055 P9 File # 916 (6.0) 2
_                  Log # TXX 96055 P9                         File # 916 (6.0) 2         :                                            l
=
                                                            =           =                                           l M7 ELECTRIC l                                                                                        February 15, 1996 C. Lance Terry Gnmp % e President U. S. Nuclear Regulatory Commission                                                                       ]
=
Document Control Desk                                                                                       i Washington, DC 20555
l M7 ELECTRIC February 15, 1996 C. Lance Terry Gnmp % e President U. S. Nuclear Regulatory Commission
]
Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446-                                                         ;
DOCKET NOS. 50 445 AND 50 446-REVISED INFORMATION ON RELOCATION OF CPSES TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS i
REVISED INFORMATION ON RELOCATION OF CPSES TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS                                       i REF: 1) TU Electric letter logged TXX 94216 from William J. Cahill, Jr. to NRC dated August 12, 1994 i       Gentlemen:
REF: 1) TU Electric letter logged TXX 94216 from William J. Cahill, Jr. to NRC dated August 12, 1994 i
In the referenced letter, TV Electric submitted License Amendment Request (LAR) 94 014 which proposed a revision to the Administrative Controls Section of the CPSES Technical Specifications (TS). On page 5 of                                           j Attachment 2. " Description and Assessment " TU Electric provided a table which identified selected TS Administrative Controls and listed the CPSES controlled documents where TU Electric proposed to relocate each of these                                 :
Gentlemen:
TS Administrative Controls.                                                                               t I       Subsequently, the NRC staff and TU Electric have discussed the referenced                                 i LAR and the proposed administrative control relocations. Based on the                                       ,
In the referenced letter, TV Electric submitted License Amendment Request (LAR) 94 014 which proposed a revision to the Administrative Controls Section of the CPSES Technical Specifications (TS).
discussions between the NRC and TU Electric and recent guidance provided                                   ]
On page 5 of j. " Description and Assessment " TU Electric provided a table which identified selected TS Administrative Controls and listed the CPSES controlled documents where TU Electric proposed to relocate each of these TS Administrative Controls.
in NRC Administrative Letter 95 06, " Relocation of Technical                                               l Administrativ~e Controls Related to Quality Assurance," dated December 12,                                 i 1995 TV Electric has chosen to relocate certain TS Administrative i       Controls to CPSES controlled documents different from those identified in                                 !
t I
reference 1.
Subsequently, the NRC staff and TU Electric have discussed the referenced i
4 This letter provides a revised relocation table. The revised table simply clarifies where selected TS Administrative Controls are to be relocated and does not affect any of the marked up Technical Specification pages                                     ;
LAR and the proposed administrative control relocations.
submitted with the referenced LAR or the determination of no significant                                   :
Based on the discussions between the NRC and TU Electric and recent guidance provided
hazards. Selected controls are being relocated as noted below:                                             !
]
in NRC Administrative Letter 95 06, " Relocation of Technical Administrativ~e Controls Related to Quality Assurance," dated December 12, i'
1995 TV Electric has chosen to relocate certain TS Administrative i
Controls to CPSES controlled documents different from those identified in reference 1.
4 This letter provides a revised relocation table. The revised table simply clarifies where selected TS Administrative Controls are to be relocated and does not affect any of the marked up Technical Specification pages submitted with the referenced LAR or the determination of no significant hazards.
Selected controls are being relocated as noted below:
I J
I J
9602210163 960215 PDR       ADOCK 05000445                                                                                   >
9602210163 960215 PDR ADOCK 05000445 P
P                            pop Energy Plaza 1601 Bryan Street Dallas, Texas 75201 3411             O
pop O
                                                                                                              'l 0 ;
Energy Plaza 1601 Bryan Street Dallas, Texas 75201 3411
4
'l 0 4


TXX 96055 Page 2 of 2 TS Section Descriotion ,        ,                  ,
TXX 96055 Page 2 of 2 TS Section Descriotion,
New Location t
New Location t
6.2.2d &     Detailed composition and responsibilities of       FSAR 13.1 Table 6.21 the minimum shift crew 6.2.3         Independent Safety Engineering Group (ISEG)         FSAR 17.2*
6.2.2d &
6.5           Review and Audit                                   FSAR 17.2 6.5.3.1f. Review of Security Plan (SP). Emergency Plan       SP: EP (EP) im)lementing procedures 6.6           Reporta)le Event Action                             FSAR 17.2 6.8.1c.       Security Plan Implementing Procedures               SP 6.8.1d.       Emergency Plan Implementing Procedures             EP 6.8.le.       PCP Implementing procedures                         FSAR 17.2 6.8.2         Review and approval of procedures and               FSAR 17.2 revisions 6.8.3b.       In Plant Radiation Monitoring                       FSAR III.D.3 6.8.3f.       Radiological Environmental Monitoring Program       ODCM**
Detailed composition and responsibilities of FSAR 13.1 Table 6.21 the minimum shift crew 6.2.3 Independent Safety Engineering Group (ISEG)
6.9.1.1       Startup Report                                     FSAR 4.6.6 6.10         Record Retention                                   FSAR 17.2 6.11         Radiation Protection Program                       FSAR 12.5.3 6.13         Process Control Program (PCP)                       FSAR 17.2
FSAR 17.2*
* FSAR Chapter 17.2 is TU Electric's Quality Assurance Plan
6.5 Review and Audit FSAR 17.2 6.5.3.1f.
              ** Offsite Dose Calculation Manual (0DCH)
Review of Security Plan (SP). Emergency Plan SP: EP (EP) im)lementing procedures 6.6 Reporta)le Event Action FSAR 17.2 6.8.1c.
Security Plan Implementing Procedures SP 6.8.1d.
Emergency Plan Implementing Procedures EP 6.8.le.
PCP Implementing procedures FSAR 17.2 6.8.2 Review and approval of procedures and FSAR 17.2 revisions 6.8.3b.
In Plant Radiation Monitoring FSAR III.D.3 6.8.3f.
Radiological Environmental Monitoring Program ODCM**
6.9.1.1 Startup Report FSAR 4.6.6 6.10 Record Retention FSAR 17.2 6.11 Radiation Protection Program FSAR 12.5.3 6.13 Process Control Program (PCP)
FSAR 17.2 FSAR Chapter 17.2 is TU Electric's Quality Assurance Plan
** Offsite Dose Calculation Manual (0DCH)
If there are any questions concerning this revised table, please contact Mr. Connie L. Wilkerson at 214 812 8819.
If there are any questions concerning this revised table, please contact Mr. Connie L. Wilkerson at 214 812 8819.
Sincerely, i
Sincerely, i
C. L. Terry                       )
C. L. Terry By:
By:                 -
D. R. Woodlan Docket Licensing Manager CLW/grp cc:
D. R. Woodlan Docket Licensing Manager CLW/grp cc:   Mr. L. J. Callan. Region IV Mr. W. D. Johnson. Region IV Mr. T. J. Polich. NRR Resident Inspectors 1
Mr. L. J. Callan. Region IV Mr. W. D. Johnson. Region IV Mr. T. J. Polich. NRR Resident Inspectors 1
I
I
                                                      .                               I}}
.}}

Latest revision as of 07:24, 13 December 2024

Forwards Revised Info on Relocation of TS Administrative Controls
ML20097G304
Person / Time
Site: Comanche Peak  
Issue date: 02/15/1996
From: Terry C, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-96055, NUDOCS 9602210163
Download: ML20097G304 (2)


Text

.

i Log # TXX 96055 P9 File # 916 (6.0) 2

=

=

l M7 ELECTRIC February 15, 1996 C. Lance Terry Gnmp % e President U. S. Nuclear Regulatory Commission

]

Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446-REVISED INFORMATION ON RELOCATION OF CPSES TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS i

REF: 1) TU Electric letter logged TXX 94216 from William J. Cahill, Jr. to NRC dated August 12, 1994 i

Gentlemen:

In the referenced letter, TV Electric submitted License Amendment Request (LAR) 94 014 which proposed a revision to the Administrative Controls Section of the CPSES Technical Specifications (TS).

On page 5 of j. " Description and Assessment " TU Electric provided a table which identified selected TS Administrative Controls and listed the CPSES controlled documents where TU Electric proposed to relocate each of these TS Administrative Controls.

t I

Subsequently, the NRC staff and TU Electric have discussed the referenced i

LAR and the proposed administrative control relocations.

Based on the discussions between the NRC and TU Electric and recent guidance provided

]

in NRC Administrative Letter 95 06, " Relocation of Technical Administrativ~e Controls Related to Quality Assurance," dated December 12, i'

1995 TV Electric has chosen to relocate certain TS Administrative i

Controls to CPSES controlled documents different from those identified in reference 1.

4 This letter provides a revised relocation table. The revised table simply clarifies where selected TS Administrative Controls are to be relocated and does not affect any of the marked up Technical Specification pages submitted with the referenced LAR or the determination of no significant hazards.

Selected controls are being relocated as noted below:

I J

9602210163 960215 PDR ADOCK 05000445 P

pop O

Energy Plaza 1601 Bryan Street Dallas, Texas 75201 3411

'l 0 4

TXX 96055 Page 2 of 2 TS Section Descriotion,

New Location t

6.2.2d &

Detailed composition and responsibilities of FSAR 13.1 Table 6.21 the minimum shift crew 6.2.3 Independent Safety Engineering Group (ISEG)

FSAR 17.2*

6.5 Review and Audit FSAR 17.2 6.5.3.1f.

Review of Security Plan (SP). Emergency Plan SP: EP (EP) im)lementing procedures 6.6 Reporta)le Event Action FSAR 17.2 6.8.1c.

Security Plan Implementing Procedures SP 6.8.1d.

Emergency Plan Implementing Procedures EP 6.8.le.

PCP Implementing procedures FSAR 17.2 6.8.2 Review and approval of procedures and FSAR 17.2 revisions 6.8.3b.

In Plant Radiation Monitoring FSAR III.D.3 6.8.3f.

Radiological Environmental Monitoring Program ODCM**

6.9.1.1 Startup Report FSAR 4.6.6 6.10 Record Retention FSAR 17.2 6.11 Radiation Protection Program FSAR 12.5.3 6.13 Process Control Program (PCP)

FSAR 17.2 FSAR Chapter 17.2 is TU Electric's Quality Assurance Plan

If there are any questions concerning this revised table, please contact Mr. Connie L. Wilkerson at 214 812 8819.

Sincerely, i

C. L. Terry By:

D. R. Woodlan Docket Licensing Manager CLW/grp cc:

Mr. L. J. Callan. Region IV Mr. W. D. Johnson. Region IV Mr. T. J. Polich. NRR Resident Inspectors 1

I

.