i Log # TXX 96055 P9 File # 916 (6.0) 2
=
=
l M7 ELECTRIC February 15, 1996 C. Lance Terry Gnmp % e President U. S. Nuclear Regulatory Commission
]
Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446-REVISED INFORMATION ON RELOCATION OF CPSES TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS i
REF: 1) TU Electric letter logged TXX 94216 from William J. Cahill, Jr. to NRC dated August 12, 1994 i
Gentlemen:
In the referenced letter, TV Electric submitted License Amendment Request (LAR) 94 014 which proposed a revision to the Administrative Controls Section of the CPSES Technical Specifications (TS).
On page 5 of j. " Description and Assessment " TU Electric provided a table which identified selected TS Administrative Controls and listed the CPSES controlled documents where TU Electric proposed to relocate each of these TS Administrative Controls.
t I
Subsequently, the NRC staff and TU Electric have discussed the referenced i
LAR and the proposed administrative control relocations.
Based on the discussions between the NRC and TU Electric and recent guidance provided
]
in NRC Administrative Letter 95 06, " Relocation of Technical Administrativ~e Controls Related to Quality Assurance," dated December 12, i'
1995 TV Electric has chosen to relocate certain TS Administrative i
Controls to CPSES controlled documents different from those identified in reference 1.
4 This letter provides a revised relocation table. The revised table simply clarifies where selected TS Administrative Controls are to be relocated and does not affect any of the marked up Technical Specification pages submitted with the referenced LAR or the determination of no significant hazards.
Selected controls are being relocated as noted below:
I J
9602210163 960215 PDR ADOCK 05000445 P
pop O
Energy Plaza 1601 Bryan Street Dallas, Texas 75201 3411
'l 0 4
TXX 96055 Page 2 of 2 TS Section Descriotion,
New Location t
6.2.2d &
Detailed composition and responsibilities of FSAR 13.1 Table 6.21 the minimum shift crew 6.2.3 Independent Safety Engineering Group (ISEG)
FSAR 17.2*
6.5 Review and Audit FSAR 17.2 6.5.3.1f.
Review of Security Plan (SP). Emergency Plan SP: EP (EP) im)lementing procedures 6.6 Reporta)le Event Action FSAR 17.2 6.8.1c.
Security Plan Implementing Procedures SP 6.8.1d.
Emergency Plan Implementing Procedures EP 6.8.le.
PCP Implementing procedures FSAR 17.2 6.8.2 Review and approval of procedures and FSAR 17.2 revisions 6.8.3b.
In Plant Radiation Monitoring FSAR III.D.3 6.8.3f.
Radiological Environmental Monitoring Program ODCM**
6.9.1.1 Startup Report FSAR 4.6.6 6.10 Record Retention FSAR 17.2 6.11 Radiation Protection Program FSAR 12.5.3 6.13 Process Control Program (PCP)
FSAR 17.2 FSAR Chapter 17.2 is TU Electric's Quality Assurance Plan
If there are any questions concerning this revised table, please contact Mr. Connie L. Wilkerson at 214 812 8819.
Sincerely, i
C. L. Terry By:
D. R. Woodlan Docket Licensing Manager CLW/grp cc:
Mr. L. J. Callan. Region IV Mr. W. D. Johnson. Region IV Mr. T. J. Polich. NRR Resident Inspectors 1