{{#Wiki_filter:-s i-VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH October YEAR 1984 m
i-VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH       October     YEAR 1984 m
APPROVED:
4                            APPROVED:
4 STATION MANAGER I
STATION MANAGER I
)
          ^ 8412110508 841031
8412110508 841031 DRADOCK05000g
                                                                        )
^
DRADOCK05000g
\\
                                                                        \\
\\


m                                             <
m OPERATING DATA REPORT DOCKET NO. 50-338 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS 1.
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS
Unit Name:
: 1. Unit Name:               North Anna 1
North Anna 1 2.
: 2. Reporting Period:       October, 1984
Reporting Period:
: 3. Licensed Thermal Power (HWt):                 2775
October, 1984 3.
: 4. Nameplate Rating (Gross MWe):                 947 5.- Design Electrical Rating (Net MWe):             907
Licensed Thermal Power (HWt):
: 6. Maximum Dependable Capacity (Gross MWe):       937
2775 4.
: 7. Maximum Dependable Capacity (Net HWe):         890
Nameplate Rating (Gross MWe):
: 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
947 5.- Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe):
937 7.
Maximum Dependable Capacity (Net HWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net HWe):
N/A
N/A
: 9. Power Level To Which Restricted, If Any (Net HWe):                      N/A
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:                                         N/A This Month       Yr.-to-Date       Cumulative
N/A This Month Yr.-to-Date Cumulative 11.
: 11. Hours In Reporting Period                         745           7,320             55,761
Hours In Reporting Period 745 7,320 55,761 12.
: 12. Number of Hours Reactor Was Critical             742.4         3,342.3           36,928.8__
Number of Hours Reactor Was Critical 742.4 3,342.3 36,928.8__
: 13. Reactor Reserve Shutdown Hours                       48.5             55:6           3,084.2
: 13. Reactor Reserve Shutdown Hours 48.5 55:6 3,084.2
: 14. Hours Generator On-Line                             678.2         3,137             35,825.6
: 14. Hours Generator On-Line 678.2 3,137 35,825.6 15.
: 15. Unit Reserve Shutdown Hours                         0               0                   0
Unit Reserve Shutdown Hours 0
: 16. Gross Thermal Energy Generated (HWH)       1,619,344       8,253,820         93,305,593
0 0
: 17. Gross Electrical Energy Generated (MWH)     541,437       27,901,132         30,174,322
16.
: 18. Net Electrical Energy Generated (MWH)       510,955       2,646,351         28,477,525
Gross Thermal Energy Generated (HWH) 1,619,344 8,253,820 93,305,593 17.
: 19. Unit Service Factor                               91.0             42.8               64.2
Gross Electrical Energy Generated (MWH) 541,437 27,901,132 30,174,322 18.
: 20. Unit Availability Factor                           91.0             42.8               64.2
Net Electrical Energy Generated (MWH) 510,955 2,646,351 28,477,525 19.
: 21. Unit Capacity Factor (Using MDC Net)               77.1             40.6               57.4
Unit Service Factor 91.0 42.8 64.2 20.
: 22. Unit Capacity Factor (Using DER Net)               75.6             39.8               56.3
Unit Availability Factor 91.0 42.8 64.2 21.
: 23. Unit Forced Outage Rate                             9.0             26.7               15.5
Unit Capacity Factor (Using MDC Net) 77.1 40.6 57.4 22.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit Capacity Factor (Using DER Net) 75.6 39.8 56.3 23.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Unit Forced Outage Rate 9.0 26.7 15.5 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast           Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


DCCKET NO.       50-338 UNIT SHUTDOWNS AND POWER REDUCTIONS                         UNIT NAME         North Anna 1 DATE       11-05-84 COMPLETED BY       Joan Lee REPORT MONTH October, 1984 TELEPHONE   (703) 894-5151 X2527 Licensee     System   Component     Cause & Corrective Date          Typel Duration Reason        Method of                                Code               Action to N 3.
DCCKET NO.
(Hours)       Shutting 3
50-338 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME North Anna 1 DATE 11-05-84 COMPLETED BY Joan Lee REPORT MONTH October, 1984 TELEPHONE (703) 894-5151 X2527 N 3.
                                                                                        ''"              *4           5 Prevent Recurrence Down Reactor     Report #
Date Type Duration Reason Method of Licensee System Component Cause & Corrective l
NA      NA          Continuation of Reactor trip 3              NA 84-16 840930                   F           4.0 A                                                             due to Lo-Lo Level in steam generator. Ended month of September with Unit 1 in Mode
Code Action to (Hours)
: 2. At 0401 October 1, 1984 Unit 1 on line.
Shutting
NA      NA            Reactor tripped due to loss of 62.8 H         3               LER-84-18 84-17 841012                  F                                                                              power supply to the EHC System.     '
*4 5
Prevent Recurrence 3
Down Reactor Report #
84-16 840930 F
4.0 A
3 NA NA NA Continuation of Reactor trip due to Lo-Lo Level in steam generator. Ended month of September with Unit 1 in Mode 2.
At 0401 October 1, 1984 Unit 1 on line.
84-17 841012 F
62.8 H
3 LER-84-18 NA NA Reactor tripped due to loss of power supply to the EHC System.
Repairs were made and Unit 1 returned to 100%. Ended this month with unit at 100% power.
Repairs were made and Unit 1 returned to 100%. Ended this month with unit at 100% power.
I i
I i
j l
j l
I I
I I
l 3                         4 1                               2 Method:              -  Exhibit F - Instructions
l 4
:                  F: Forced                    Reason:
3 1
1-Manual                 for Preparation of Data S: Scheduled A-Equipment Failure (Explain)                                                           Entry Sheets for Licdasee B-Maintenance or Test                        2-Manual Scram.
2 Exhibit F - Instructions Method:
3-Automatic Scram         Event Report (LER) File C-Refueling 4-Continuations           (NUREG-0161)
1-Manual for Preparation of Data F: Forced Reason:
S: Scheduled A-Equipment Failure (Explain)
Entry Sheets for Licdasee 2-Manual Scram.
B-Maintenance or Test 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continuations (NUREG-0161)
D-Regulatory Restriction E-Operator Training & License Examination 5-Load Reduction l
D-Regulatory Restriction E-Operator Training & License Examination 5-Load Reduction l
F-Administrative                               9-Other l                                                                                                                       5 G-Operational Error (Explain)                                           Exhibit H - Same Ssucce l                                                H-Other (Explain) i
l F-Administrative 9-Other 5
l G-Operational Error (Explain)
Exhibit H - Same Ssucce H-Other (Explain) i


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT   NA-1 DATE   11-05-84 COMPLETED BY'   Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH         October DAY     AVERAGE DAILY POWER LEVEL                       DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                         (MWe-Net) 1               150                                   17                           890 2               216                                   18                           890 3               233                                   19                           893 4               236                                   20                           895 5               275                                   21                           893 6               596                                   22                           896 7               699                                   23                           893 8               852                                   24                           892 9               884                                   25                           891 10                 885                                   26                           892 11                 885                                   27                           889 12                 579                                   28                           886 13                     0                               29                           887 14                     0                               30                           886 15                 514                                   31                           887 i           16                 891 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
          , - + -            -      ,e,     ,-  , , .    , _ , - - - . p,-- ,-- --,,--,m           ,- y     y   ---- w-- 9m-
50-338 UNIT NA-1 DATE 11-05-84 COMPLETED BY' Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 150 17 890 2
216 18 890 3
233 19 893 4
236 20 895 5
275 21 893 6
596 22 896 7
699 23 893 8
852 24 892 9
884 25 891 10 885 26 892 11 885 27 889 12 579 28 886 13 0
29 887 14 0
30 886 15 514 31 887 i
16 891 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
, - +
7
,e, p,--
--,,--,m y
y w--
9m-


Page   1   of     1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET                               DOCKET No. 50-338 REPORT MONTH                         October       UNIT NAME     MA-1 YEAR                           1984           DATE     11-05-84                           .
Page 1
COMPLETED BY                 Joan Lee 84-17 (F)           (1) Reactor tripped on October 12, 1934, at 1546. The trip was caused by loss of power supply in the EHC System. Repairs were made and Unit I was on line October 15, 1984 at 0629 Ended this month with unit at 100% power.
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET No.
50-338 REPORT MONTH October UNIT NAME MA-1 YEAR 1984 DATE 11-05-84 COMPLETED BY Joan Lee 84-17 (F)
(1)
Reactor tripped on October 12, 1934, at 1546. The trip was caused by loss of power supply in the EHC System.
Repairs were made and Unit I was on line October 15, 1984 at 0629 Ended this month with unit at 100% power.
l I
l I
i a
i a


VIRGINIA ELECTRIC AND. POWER COMPANY NORTH ANNA POWER STATION UNIT NO.         1 MONTH         October
VIRGINIA ELECTRIC AND. POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
1 MONTH October


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
TIME                           DATA DATE October 1, 1984       0000   Began this nonth with Unit in Mode 2.
DATE TIME DATA October 1, 1984 0000 Began this nonth with Unit in Mode 2.
0350   Entered Mode 1.
0350 Entered Mode 1.
0401   Unit one on line.
0401 Unit one on line.
0530   Holding at 25% (220 Mu) due to problems with FCV-1483, 1917   Commenced increasing power to 30% (245 MW) power.
0530 Holding at 25% (220 Mu) due to problems with FCV-1483, 1917 Commenced increasing power to 30% (245 MW) power.
1923   Stabilized power at 30% (245 MW).
1923 Stabilized power at 30% (245 MW).
October 5, 1984         1300   Commenced ramp up at 3% per hour.
October 5, 1984 1300 Commenced ramp up at 3% per hour.
                                    '1835   Stabilized power at 40% (435 MU) to perform flux napping.
'1835 Stabilized power at 40% (435 MU) to perform flux napping.
October 6, 1984         0317   Stabilized power at 60% (534 Hu) for flux y                                            mapping.
October 6, 1984 0317 Stabilized power at 60% (534 Hu) for flux mapping.
0403   Commenced ramp up to 70% (623 Mu).
y 0403 Commenced ramp up to 70% (623 Mu).
0700   Stabilized power at 69% (614 HW)       for flux mapping.
0700 Stabilized power at 69% (614 HW) for flux mapping.
0744   Corrienced ramp up to 75% (663 ent) .
0744 Corrienced ramp up to 75% (663 ent).
October 7, 1934         1100   Continued ramp up at 3% per hour to 100%.
October 7, 1934 1100 Continued ramp up at 3% per hour to 100%.
October 3, 1934         1620   Unit at 100% (926 M*.1) power.
October 3, 1934 1620 Unit at 100% (926 M*.1) power.
October 12, 1984       1546   Reactor trip from 100% power due to loss of power supply in the EHC System.
October 12, 1984 1546 Reactor trip from 100% power due to loss of power supply in the EHC System.
1731   Reactor critical.
1731 Reactor critical.


VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.                         I MONTH             October
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
I MONTH October


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE                       TIME                                         DATA October 15, 1934               0530     Latched turbine - commenced rolling power level at 4% per hour.
DATE TIME DATA October 15, 1934 0530 Latched turbine - commenced rolling power level at 4% per hour.
0629     Unit 1 on line.
0629 Unit 1 on line.
0713     liolding at 30% (245 tul) power to verify chemistry in steam gene,rator.
0713 liolding at 30% (245 tul) power to verify chemistry in steam gene,rator.
0730     Commenced ramp up at 150 ft'l per hour.
0730 Commenced ramp up at 150 ft'l per hour.
1330   Holding at 90% (874 ml) for Calorimetric.
1330 Holding at 90% (874 ml) for Calorimetric.
1640     Calorinatric complete - Unit at 100% (936 int) power.
1640 Calorinatric complete - Unit at 100% (936 int) power.
October 31, 1984               2400     Ended this month with Unit at 100% power.
October 31, 1984 2400 Ended this month with Unit at 100% power.
i l
i l
I                                                                                                                 ,
I 1
1 l
i i
l i
l i
i l
i


I.'
I.'
                                            , OPERATING DATA REPORT DOCKET NO.       50-339 DATE         11-05-84 COMPLETED BY         Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS Notes:
, OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:               North Anna 2
50-339 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS Notes:
: 2. Reporting Period:         October, 1984
1.
: 3. Licensed Thermal Power (MWt):                   2775
Unit Name:
: 4. Nameplate Rating (Gross NWe):                     947
North Anna 2 2.
: 5. Design Electrical Rating (Net NWe):               907
Reporting Period:
: 6. Maximum Dependable Capacity (Gross MWe):         939
October, 1984 3.
: 7. Maximum Dependable Capacity (Net NWe):
Licensed Thermal Power (MWt):
890
2775 4.
: 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
Nameplate Rating (Gross NWe):
947 5.
Design Electrical Rating (Net NWe):
907 6.
Maximum Dependable Capacity (Gross MWe):
939 7.
Maximum Dependable Capacity (Net NWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
N/A
: 9. Power Level To Which Restricted, If Any (Net MWe):                        N/A
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, If Any:                                           N/A This Month       Yr.-to-Date           Cumulative
N/A This Month Yr.-to-Date Cumulative
: 11. Hours In Reporting Period                               745           7,320                 34,032
: 11. Hours In Reporting Period 745 7,320 34,032
: 12. Number of Hours Reactor Was Critical                       0         4,781.0               24,468.7
: 12. Number of Hours Reactor Was Critical 0
: 13. Reactor Reserve Shutdown Hours                             0             14.6               3,794.6
4,781.0 24,468.7
: 14. Hours Generator On-Line                                   0         4,713                 24,220.1
: 13. Reactor Reserve Shutdown Hours 0
: 15. Unit Reserve Shutdown Hours                               0             0       ~--
14.6 3,794.6
0
: 14. Hours Generator On-Line 0
: 16. Gross Thermal Energy Generated (MWH)                   0   12,215,461             62,632,502
4,713 24,220.1
: 17. Gross Electrical Energy Generated (MWH)               0     4,026,505             20,740,872
: 15. Unit Reserve Shutdown Hours 0
: 18. Net Electrical Energy Generated (MWH)                     0     3,812,307             19,664,389
0 0
: 19. Unit Service Factor                                       0             64.4                   71.2
~--
: 20. Unit Availability Factor                               0             64.4                   71.2
16.
: 21. Unit Capacity Factor (Using MDC Net)                       0             58.5                   64.9
Gross Thermal Energy Generated (MWH) 0 12,215,461 62,632,502 17.
: 22. Unit Capacity Factor (Using DER Net)                       0             57.4                   63.7
Gross Electrical Energy Generated (MWH) 0 4,026,505 20,740,872
: 23. Unit Forced Outage Rate                                   0             3.1                   15.2
: 18. Net Electrical Energy Generated (MWH) 0 3,812,307 19,664,389
: 19. Unit Service Factor 0
64.4 71.2 20.
Unit Availability Factor 0
64.4 71.2
: 21. Unit Capacity Factor (Using MDC Net) 0 58.5 64.9
: 22. Unit Capacity Factor (Using DER Net) 0 57.4 63.7
: 23. Unit Forced Outage Rate 0
3.1 15.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:             November 2, 1984
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
November 2, 1984
: 26. Units In Test Status (Prior to Commercial Operation):
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast               Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


UNIT SHUTDOWNS AND POWER REDUCTIONS                       DOCKET NO.       50-339 UNIT NAME         North Anna 2 DATE       11-05-84 REPORT MONTH   October                           COMPLETED BY         Joan Lee TELEPHONE     (703) 894-5151 12527 No. Date   Type Duration Reason     Method of     Licensee     System   Component   Cause & Corrective (Hours)             Shutting     Event         Code ,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
Code             Action to Down Reactor Report #                               Prevent Recurrence 84-34 840802   S     745       D/C       1         LER-006         NA       NA         On August 2, 1984 at 1834 Unit 2 commenced ramping down due to unqualified protective coating on Containment Venti-lation Ductwork. Unit 2 remained
50-339 UNIT NAME North Anna 2 DATE 11-05-84 REPORT MONTH October COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 12527 No.
                            .                                                                off line for scheduled refueling outage. Outage continued this month. Ended this month with Unit 2 in Mode 4. Expected on line date is November 2, 1984.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)
1               2                                           3                       4
Shutting Event Code,
. F: Forced     Reason:                                     Method:                 Exhibit F - Instructions j   S: Scheduled A-Equipment Failure (Explain)                 1-Manual               for Preparation of Data 2-Manual Scram.
Code Action to Down Reactor Report #
B-Maintenance or Test                                              Entry Sheets for Licensee C-Refueling                                 3-Automatic Scram       Event Report (LER) File D-Regulatory Restriction                   4-Continuations         (NUREG-0161)
Prevent Recurrence 84-34 840802 S
E-Operator Training & License Examination 5-Load Reduction F-Administrative                           9-Other G-Operational Error (Explain)                                       5 H-Other (Explain)                                                   Exhibit H - Same Source
745 D/C 1
LER-006 NA NA On August 2, 1984 at 1834 Unit 2 commenced ramping down due to unqualified protective coating on Containment Venti-lation Ductwork. Unit 2 remained off line for scheduled refueling outage. Outage continued this month. Ended this month with Unit 2 in Mode 4.
Expected on line date is November 2, 1984.
1 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions j
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-339 UNIT   NA-2 DATE     11-05-84 COMPLETED BY       Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH           October DAY     AVERAGE DAILY POWER LEVEL           DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                     (MWe-Net)                   -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
1             0                           17                   0 2               0                           18                   0 3               0                           19                   0 4               0                         20                   0 5               0                         21                   0 6               0                         22                   0 7               0                         23                   0 8               0                         24                   0 9               0                         25                   0 10               0                         26                   0 11               0                         27                   0 12               0                         28                   0 13               0                         29                   0 14               0                           30                   0 15               0                         31                   0 16               0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, u_____________
50-339 UNIT NA-2 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, u


Page     1   of         1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET       DOCKET NO.             50-339 REPORT MONTH     October   UNIT NAME             NA-2 YEAR       1984       DATE             11-05-84 COMPLETED BY         Joan Lee No entries this month.
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.
50-339 REPORT MONTH October UNIT NAME NA-2 YEAR 1984 DATE 11-05-84 COMPLETED BY Joan Lee No entries this month.
O t
O t


VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.     2 MONTH   October
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
2 MONTH October


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE               TIME                     DATA October   1, 1984   0000     Began this month with Unit 2 in Mode 5 for continuation of scheduled Refueling Outage.
DATE TIME DATA October 1, 1984 0000 Began this month with Unit 2 in Mode 5 for continuation of scheduled Refueling Outage.
October 29, 1984     0720     Entered Mode 4.
October 29, 1984 0720 Entered Mode 4.
October 31, 1984     2400     Ended this month with Unit in Mode 4.
October 31, 1984 2400 Ended this month with Unit in Mode 4.
i
i I
                                    ,          I


'O. _
'O.
VimonexA ELucTanc Ann Powan CoxPANY ,
VimonexA ELucTanc Ann Powan CoxPANY,
RicnwoNo,VImOINIA 20261 v.L.seawmar vic e.     . .e                       November 15, 1984 Nuca..A. or..arvos.
RicnwoNo,VImOINIA 20261 v.L.seawmar vic e.
Mr. Maurice' R. Beebe                                       Serial No. 671 Office of Resource Management                               N0/JHL:aca U. S. Nuclear Regulatory Commission                         Docket Nos. 50-338 Washington, D. C. 20555                                                   50-339 License Nos. NPF-4 NPF-7
.e November 15, 1984 Nuca..A. or..arvos.
Mr. Maurice' R. Beebe Serial No. 671 Office of Resource Management N0/JHL:aca U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Washington, D. C. 20555 50-339 License Nos. NPF-4 NPF-7


==Dear Mr. Beebe:==
==Dear Mr. Beebe:==
Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of October, 1984.
Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of October, 1984.
Very truly yours,
Very truly yours,
                                                                          !  -\     l
-\\
                                                                                    .u.%
l.u.%
                                                                            . M W. L. Stewart Enclosure (3 copies) cc:   Mr. R. C. DeYoung, Director (12 copies)
M W. L. Stewart Enclosure (3 copies) cc:
Mr. R. C. DeYoung, Director (12 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)
Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)
Regional Administrator Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station}}
Regional Administrator Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station}}

Latest revision as of 05:36, 13 December 2024

Monthly Operating Repts for Oct 1984
ML20100L239
Person / Time
Site: North Anna  
Issue date: 10/31/1984
From: Jun Lee, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
671, NUDOCS 8412110508
Download: ML20100L239 (13)


Text

-s i-VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH October YEAR 1984 m

APPROVED:

4 STATION MANAGER I

)

8412110508 841031 DRADOCK05000g

^

\\

\\

m OPERATING DATA REPORT DOCKET NO. 50-338 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS 1.

Unit Name:

North Anna 1 2.

Reporting Period:

October, 1984 3.

Licensed Thermal Power (HWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.- Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

937 7.

Maximum Dependable Capacity (Net HWe):

890 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net HWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745 7,320 55,761 12.

Number of Hours Reactor Was Critical 742.4 3,342.3 36,928.8__

13. Reactor Reserve Shutdown Hours 48.5 55:6 3,084.2
14. Hours Generator On-Line 678.2 3,137 35,825.6 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (HWH) 1,619,344 8,253,820 93,305,593 17.

Gross Electrical Energy Generated (MWH) 541,437 27,901,132 30,174,322 18.

Net Electrical Energy Generated (MWH) 510,955 2,646,351 28,477,525 19.

Unit Service Factor 91.0 42.8 64.2 20.

Unit Availability Factor 91.0 42.8 64.2 21.

Unit Capacity Factor (Using MDC Net) 77.1 40.6 57.4 22.

Unit Capacity Factor (Using DER Net) 75.6 39.8 56.3 23.

Unit Forced Outage Rate 9.0 26.7 15.5 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DCCKET NO.

50-338 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME North Anna 1 DATE 11-05-84 COMPLETED BY Joan Lee REPORT MONTH October, 1984 TELEPHONE (703) 894-5151 X2527 N 3.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective l

Code Action to (Hours)

Shutting

  • 4 5

Prevent Recurrence 3

Down Reactor Report #

84-16 840930 F

4.0 A

3 NA NA NA Continuation of Reactor trip due to Lo-Lo Level in steam generator. Ended month of September with Unit 1 in Mode 2.

At 0401 October 1, 1984 Unit 1 on line.

84-17 841012 F

62.8 H

3 LER-84-18 NA NA Reactor tripped due to loss of power supply to the EHC System.

Repairs were made and Unit 1 returned to 100%. Ended this month with unit at 100% power.

I i

j l

I I

l 4

3 1

2 Exhibit F - Instructions Method:

1-Manual for Preparation of Data F: Forced Reason:

S: Scheduled A-Equipment Failure (Explain)

Entry Sheets for Licdasee 2-Manual Scram.

B-Maintenance or Test 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continuations (NUREG-0161)

D-Regulatory Restriction E-Operator Training & License Examination 5-Load Reduction l

l F-Administrative 9-Other 5

l G-Operational Error (Explain)

Exhibit H - Same Ssucce H-Other (Explain) i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-338 UNIT NA-1 DATE 11-05-84 COMPLETED BY' Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 150 17 890 2

216 18 890 3

233 19 893 4

236 20 895 5

275 21 893 6

596 22 896 7

699 23 893 8

852 24 892 9

884 25 891 10 885 26 892 11 885 27 889 12 579 28 886 13 0

29 887 14 0

30 886 15 514 31 887 i

16 891 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

, - +

7

,e, p,--

--,,--,m y

y w--

9m-

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET No.

50-338 REPORT MONTH October UNIT NAME MA-1 YEAR 1984 DATE 11-05-84 COMPLETED BY Joan Lee 84-17 (F)

(1)

Reactor tripped on October 12, 1934, at 1546. The trip was caused by loss of power supply in the EHC System.

Repairs were made and Unit I was on line October 15, 1984 at 0629 Ended this month with unit at 100% power.

l I

i a

VIRGINIA ELECTRIC AND. POWER COMPANY NORTH ANNA POWER STATION UNIT NO.

1 MONTH October

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE TIME DATA October 1, 1984 0000 Began this nonth with Unit in Mode 2.

0350 Entered Mode 1.

0401 Unit one on line.

0530 Holding at 25% (220 Mu) due to problems with FCV-1483, 1917 Commenced increasing power to 30% (245 MW) power.

1923 Stabilized power at 30% (245 MW).

October 5, 1984 1300 Commenced ramp up at 3% per hour.

'1835 Stabilized power at 40% (435 MU) to perform flux napping.

October 6, 1984 0317 Stabilized power at 60% (534 Hu) for flux mapping.

y 0403 Commenced ramp up to 70% (623 Mu).

0700 Stabilized power at 69% (614 HW) for flux mapping.

0744 Corrienced ramp up to 75% (663 ent).

October 7, 1934 1100 Continued ramp up at 3% per hour to 100%.

October 3, 1934 1620 Unit at 100% (926 M*.1) power.

October 12, 1984 1546 Reactor trip from 100% power due to loss of power supply in the EHC System.

1731 Reactor critical.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.

I MONTH October

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE TIME DATA October 15, 1934 0530 Latched turbine - commenced rolling power level at 4% per hour.

0629 Unit 1 on line.

0713 liolding at 30% (245 tul) power to verify chemistry in steam gene,rator.

0730 Commenced ramp up at 150 ft'l per hour.

1330 Holding at 90% (874 ml) for Calorimetric.

1640 Calorinatric complete - Unit at 100% (936 int) power.

October 31, 1984 2400 Ended this month with Unit at 100% power.

i l

I 1

l i

i l

i

I.'

, OPERATING DATA REPORT DOCKET NO.

50-339 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X2527 OPERATING STATUS Notes:

1.

Unit Name:

North Anna 2 2.

Reporting Period:

October, 1984 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross NWe):

947 5.

Design Electrical Rating (Net NWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

939 7.

Maximum Dependable Capacity (Net NWe):

890 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745 7,320 34,032
12. Number of Hours Reactor Was Critical 0

4,781.0 24,468.7

13. Reactor Reserve Shutdown Hours 0

14.6 3,794.6

14. Hours Generator On-Line 0

4,713 24,220.1

15. Unit Reserve Shutdown Hours 0

0 0

~--

16.

Gross Thermal Energy Generated (MWH) 0 12,215,461 62,632,502 17.

Gross Electrical Energy Generated (MWH) 0 4,026,505 20,740,872

18. Net Electrical Energy Generated (MWH) 0 3,812,307 19,664,389
19. Unit Service Factor 0

64.4 71.2 20.

Unit Availability Factor 0

64.4 71.2

21. Unit Capacity Factor (Using MDC Net) 0 58.5 64.9
22. Unit Capacity Factor (Using DER Net) 0 57.4 63.7
23. Unit Forced Outage Rate 0

3.1 15.2

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

November 2, 1984

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 11-05-84 REPORT MONTH October COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 12527 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting Event Code,

Code Action to Down Reactor Report #

Prevent Recurrence 84-34 840802 S

745 D/C 1

LER-006 NA NA On August 2, 1984 at 1834 Unit 2 commenced ramping down due to unqualified protective coating on Containment Venti-lation Ductwork. Unit 2 remained off line for scheduled refueling outage. Outage continued this month. Ended this month with Unit 2 in Mode 4.

Expected on line date is November 2, 1984.

1 2

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions j

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)

Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-339 UNIT NA-2 DATE 11-05-84 COMPLETED BY Joan N. Lee TELEPHONE 703-894-5151X2527 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, u

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.

50-339 REPORT MONTH October UNIT NAME NA-2 YEAR 1984 DATE 11-05-84 COMPLETED BY Joan Lee No entries this month.

O t

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.

2 MONTH October

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE TIME DATA October 1, 1984 0000 Began this month with Unit 2 in Mode 5 for continuation of scheduled Refueling Outage.

October 29, 1984 0720 Entered Mode 4.

October 31, 1984 2400 Ended this month with Unit in Mode 4.

i I

'O.

VimonexA ELucTanc Ann Powan CoxPANY,

RicnwoNo,VImOINIA 20261 v.L.seawmar vic e.

.e November 15, 1984 Nuca..A. or..arvos.

Mr. Maurice' R. Beebe Serial No. 671 Office of Resource Management N0/JHL:aca U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Washington, D. C. 20555 50-339 License Nos. NPF-4 NPF-7

Dear Mr. Beebe:

Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of October, 1984.

Very truly yours,

-\\

l.u.%

M W. L. Stewart Enclosure (3 copies) cc:

Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station