y Document Transmittal #: 41827                   Date: 3/2/96 Tc:     NRC RES INSPECTOR                         MAC: NSCC Destination:                                    
y Document Transmittal #: 41827 Date: 3/2/96 Tc:
NRC RES INSPECTOR MAC: NSCC Destination:


== Description:==
==
 
Description:==
Copy       Copy Totals             ;
Copy Copy Totals Document:
Document:                 Revision:       Comment:                               #      INFO CNTL MSTR OP0407D                   05               IMMEDIATE ISSUE 03/02/96                   8     1     0     0 1
Revision:
1 I
Comment:
1 l
INFO CNTL MSTR OP0407D 05 IMMEDIATE ISSUE 03/02/96 8
1 Instructions to the Addressee:
1 0
0 1
1 1
Instructions to the Addressee:
Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.
Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.
The signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated transmittal to Document Control within 20 days at mail code:
The signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated transmittal to Document Control within 20 days at mail code:
NA1C                                         j Florida Power Corporation                     l Document Control, NA1C                         l AMnnnPt                                                   Crystal River Energy Complex                   -
NA1C j
9603110346 960302                                             15760 W. Power Line St.                       l PDR     ADOCK 05000302                                       Crystal River, FL 34428-6708                   i P                       PDR                                                                                 i Signature of Addressee:                                                     Date:
Florida Power Corporation Document Control, NA1C AMnnnPt Crystal River Energy Complex 9603110346 960302 15760 W. Power Line St.
Independent Verification:                                                   Date:
PDR ADOCK 05000302 Crystal River, FL 34428-6708 i
00 (Control Room documents only)                                               .
P PDR i
O\
Signature of Addressee:
Date:
Independent Verification:
Date:
00 (Control Room documents only)
O\\


  .j                                                                                 Rev. 5 Effective Data cP//4/96   :
.j Rev. 5 Effective Data cP//4/96 S
S              Document Sectiai NFORM ATION ONL N C. R. Nuclear             .
Document Sectiai NFORM ATION ONL N C. R. Nuclear OPERATING PROCEDURE OP-407D FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l
OPERATING PROCEDURE OP-407D                                       '
OPERATION OF THE NISCELLANEOUS WASTE STORAGE TANK THIS PROCEDURE ADDRESSES SAFETY RELATED COMP 0NENTS
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l   OPERATION OF THE NISCELLANEOUS WASTE STORAGE TANK THIS PROCEDURE ADDRESSES SAFETY RELATED COMP 0NENTS
\\
                                                                    \
APPROVED BY:
APPROVED BY:   Interpretation Contact
Interpretation Contact
                                                                  $0 (SIGNATURE ON FILE)
$0 (SIGNATURE ON FILE)
DATE:       N/f/T INTERPRETATION CONTACT:   Supervisor, Nuclear Operations Administrative Shift
DATE:
N/f/T INTERPRETATION CONTACT:
Supervisor, Nuclear Operations Administrative Shift


I
I h.
: h.                                                                                                         i i
i i
O         "IMMEDIATE ISSUE" NOTIFICATION Procedure Number:         OP0407D l
O "IMMEDIATE ISSUE" NOTIFICATION Procedure Number:
Current Revision:               05                                     I Effective Date:     kb i
OP0407D Current Revision:
l PRR #:       11323                                       '
05 kb Effective Date:
7pwr?& of
i PRR #:
            ~~7~7//sS   ff/CNA6Q                   /S ,44 A&'53a& W                     G2/km'< -
11323 7pwr?& of
f22         ll Z8/           ffSU 6 D         0N         3 ~l~ $ h
~~7~7//sS ff/CNA6Q
/S,44 A&'53a& W G2/km'< -
f22 ll Z8/
ffSU 6 D 0N 3 ~l~ $ h
* VA ' ^ ' DA O
* VA ' ^ ' DA O
l I
l l
l 1
Page 1 of 1
l Page 1 of 1


! s ORIGINATOR'S CHECKLIST                           ENCLOSURE 1
! s ORIGINATOR'S CHECKLIST ENCLOSURE 1
      ^                                               Current l                              OPO407D             Rev #:       05             PRR #:       11323 V; Procedure #:
^
Current lV; Procedure #:
OPO407D Rev #:
05 PRR #:
11323


==Title:==
==Title:==
OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK                                                     .
OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK YES N/A 1.
YES     N/A
Obtain the current revision of the procedure from Document Control or x
: 1. Obtain the current revision of the procedure from Document Control or                     x electronically.     For temporary procedure changes, the working copy may be used.
electronically.
: 2. Obtain PRR#, new procedure #, or temporary procedure change (TPC)#                       x       q from Document Control or electronically. For work instructions,               use a work request number or use another identifying number.                                               ;
For temporary procedure changes, the working copy may be used.
: 3. Write a new procedure, work instruction, or mark the pages applicable                     x       $    l to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in                                       i AI-402B, Procedure Writing (Except for E0P/AP/VP).                                                     l
2.
            *4. Attach changed pages to the cover page of the procedure. Other pages *x                           g     l may be attached so the continuity of the changes will be understood by                                 l persons performing further reviews.         For new procedures or work instructions, all pages are included, l
Obtain PRR#, new procedure #, or temporary procedure change (TPC)#
: 5. Complete Enclosure 2, Procedure Description, Reasons, and References.                     x       sg 1
x q
          *6.     Obtain the Procedure Review Package (PRP) from Nuclear Licensing or                   *x         4     l g             electroni cally. For work instructions or new procedures, contact i
from Document Control or electronically.
Nuclear Licensing for any related commitments associated with the d             work instructions or new procedures.
For work instructions, use a work request number or use another identifying number.
: a. Complete the Procedure Cross Reference sheet.                                 *x
3.
* i l
Write a new procedure, work instruction, or mark the pages applicable x
: b. Ensure the NOCS commitments remain satisfied.                                 *x     *      !
to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in AI-402B, Procedure Writing (Except for E0P/AP/VP).
: 1.     Change the implementing references of the commitments                 *      *x as necessary.
*4.
: 7. Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.                       x       6
Attach changed pages to the cover page of the procedure.
          *8.     IF a 10 CFR 50.59 Evaluation is required, as determined by the                         *      *x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59, THEN complete Enclosure 4,10 C-R 50.59 Evaluation.
Other pages
          *9.     Complete Enclosure 6,10 CFR 50.54 Evaluation.                                         *x       de
*x g
          *10. IF this can affect plant safety, the core, reactivity control, the                         *      *x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test or Evolution _ Checklist.
may be attached so the continuity of the changes will be understood by persons performing further reviews.
l
For new procedures or work instructions, all pages are included, l
!          e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
5.
Page 1 of 3             AI 400C           Rev.17
Complete Enclosure 2, Procedure Description, Reasons, and References.
x sg 1
*6.
Obtain the Procedure Review Package (PRP) from Nuclear Licensing or
*x 4
g electroni cally.
For work instructions or new procedures, contact Nuclear Licensing for any related commitments associated with the i
d work instructions or new procedures.
a.
Complete the Procedure Cross Reference sheet.
*x l
b.
Ensure the NOCS commitments remain satisfied.
*x 1.
Change the implementing references of the commitments
*x as necessary.
7.
Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.
x 6
*8.
IF a 10 CFR 50.59 Evaluation is required, as determined by the
*x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59, THEN complete Enclosure 4,10 C-R 50.59 Evaluation.
*9.
Complete Enclosure 6,10 CFR 50.54 Evaluation.
*x de
*10. IF this can affect plant safety, the core, reactivity control, the
*x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test or Evolution _ Checklist.
l e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 1 of 3 AI 400C Rev.17


1 i
1 i
ORIGINATOR'S CHECKLIST                         ENCLOSURE 1 l
ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current i
Current                                                             i Procedure #:                 OPO407D         Rev #:         05           PRR #:       11323                   i
Procedure #:
OPO407D Rev #:
05 PRR #:
11323 i


==Title:==
==Title:==
OPERATION OF THE MISCELLANE0uS WASTE STORAGE TANK                                                       -
OPERATION OF THE MISCELLANE0uS WASTE STORAGE TANK e-Evo utic-Ched'ist.
e- Evol utic- Ched'ist.
l YES N/A
YES   N/A
*11.
            *11. IF any plant equipment tag numbers are being added to or deleted                     *      *X from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, to the Manager Nuclear Configuration Management.
IF any plant equipment tag numbers are being added to or deleted
          *12. Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)                   *X       wa by determining which Nuclear Operations departments need to be notified of the new procedure / permanent procedure change.
*X from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, to the Manager Nuclear Configuration Management.
1
*12.
            *13. IF this is a SP, new procedure, or an infrequently performed test                     *
Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)
* X     !
*X wa by determining which Nuclear Operations departments need to be notified of the new procedure / permanent procedure change.
or evolution, THEN complete and attach Enclosure 23, Procedure Review Checklist of AI-402B, Procedure Writing (Except for E0P/AP/VP) .
*13.
: 14. Ensure that correction techniques such as " white out," correction                       X     %;
IF this is a SP, new procedure, or an infrequently performed test
* X or evolution, THEN complete and attach Enclosure 23, Procedure Review Checklist of AI-402B, Procedure Writing (Except for E0P/AP/VP).
14.
Ensure that correction techniques such as " white out," correction X
tape, paste overs, or similar techniques have not been used.
tape, paste overs, or similar techniques have not been used.
            *15. Internal references to data sheets, enclosures, other sections
*15.
* X       $
Internal references to data sheets, enclosures, other sections
of the procedure, etc., have been verified to be correct.
* X of the procedure, etc., have been verified to be correct.
            *16. Ensure that Non-Quality documents are identified as " Optional                       *
*16.
* X g               Records Non-Quality" within the procedure as par AI-1100, Retention of Plant Operating Records.
Ensure that Non-Quality documents are identified as " Optional
            *17     Forward the original or copies of this document and supporting
* X g
* X enclosures to Qualified Reviewers, as determined from below, using Enclosure 10, Qualified Review / Technical Review,
Records Non-Quality" within the procedure as par AI-1100, Retention of Plant Operating Records.
: a.       A Qualified Review, independent of the originator, is                       *x       g:
*17 Forward the original or copies of this document and supporting
required by the department that the procedure's Interpretation Contact is a member of,
* X enclosures to Qualified Reviewers, as determined from below, using 0, Qualified Review / Technical Review, a.
: b.       IF interfacing departments' actions or procedures                           *      *x will be impacted, THEN the interfacing departments must perform a Qualified Review.
A Qualified Review, independent of the originator, is
: c.     IF any item on Enclosure 11, Guidelines for Identification of Design Changes, is applicable,                                           *[*X THEN Nuclear Engineering Design must perform a Qualified Review.
* x g:
: d.     Nuclear Quality Control must be a Qualified Review for fps,                 e
required by the department that the procedure's Interpretation Contact is a member of, b.
* X MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes to or additions of inspection points to ensure inspection
IF interfacing departments' actions or procedures
      .                      points are appropriate.
* x will be impacted, THEN the interfacing departments must perform a Qualified Review.
c.
IF any item on Enclosure 11, Guidelines for Identification
*[*X of Design Changes, is applicable, THEN Nuclear Engineering Design must perform a Qualified Review.
d.
Nuclear Quality Control must be a Qualified Review for fps, e
* X MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes to or additions of inspection points to ensure inspection points are appropriate.
O
O
* These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
* These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 2 of 3               AI 400C         Rev.17
Page 2 of 3 AI 400C Rev.17


s l
s ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current f D Procedure #:
l
OPO407D Rev #:
,                                                                                                                      1 ORIGINATOR'S CHECKLIST                           ENCLOSURE 1 Current                                                             l f D Procedure #:               OPO407D             Rev #:     05             PRR #:         11323                     j d(
05 PRR #:
11323 j
d(


==Title:==
==Title:==
OPERATION OF THE MISCELLANE305 WASTE STORAGE TANK                                                         -
OPERATION OF THE MISCELLANE305 WASTE STORAGE TANK
l l
*17.
        *17. Qualified Review (continued)                                                             YES N/A       l
Qualified Review (continued)
: e. IF this-                                                                       *
YES N/A e.
IF this-
* X
* X
: 1. Involves a change to an established scheduled                                                 i performance of'a procedure as listed in SP-443, Master Surveillance Plan, OR
: 1. Involves a change to an established scheduled i
: 2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.                                           l NOTE: EQ equipment is designated in CMIS as QQ.                                       *
performance of'a procedure as listed in SP-443, Master Surveillance Plan, OR
* x
: 2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.
: f. IF this involves repair, replacement, or alteration of EQ                                       l equipment, THEN a Qualified Review is required by Nuclear Configuration Management, EQ Group.
NOTE: EQ equipment is designated in CMIS as QQ.
: 1. IF this procedure involves repair, replacement, or                       *
* x f.
IF this involves repair, replacement, or alteration of EQ equipment, THEN a Qualified Review is required by Nuclear Configuration Management, EQ Group.
1.
IF this procedure involves repair, replacement, or
* X alteration of EQ equipment, THEN the cover page of the procedure must be designated
* X alteration of EQ equipment, THEN the cover page of the procedure must be designated
                              " Environmentally Qualified Related."                                                     l
" Environmentally Qualified Related."
        *18. Ensure Qualified Reviews are completed and any comments have been
*18.
* X     ?@
Ensure Qualified Reviews are completed and any comments have been
* X
?@
addressed.
addressed.
: 19. IF this is a temporary procedure change,                                                       x THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.
19.
        *20. Forward this enclosure and the preceding package of documentation.                     *X     $
IF this is a temporary procedure change, x
as applicable, to the Interpretation Contact 'for approval of Enclosure 13. Interpretation Contact's Checklist.-
THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.
*20.
Forward this enclosure and the preceding package of documentation.
*X as applicable, to the Interpretation Contact 'for approval of 3. Interpretation Contact's Checklist.-
I have completed this checklist, as applicable, and all appropriate YES or N/A blanks are completed.
I have completed this checklist, as applicable, and all appropriate YES or N/A blanks are completed.
Frank Dola                                                           3/2/96 Originator                                       Date O[. e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Frank Dola 3/2/96 Originator Date O[. e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 3 of 3             AI 400C           Rev.17
Page 3 of 3 AI 400C Rev.17


3 l
3 l
e                                                                                                                               ENCLOSURE 2         l A- .D..T
e ENCLOSURE 2 A D..T E T W A.T. n. D.. f r. """"..C M. T..C Proc #: OPO407D, PRR #: 11323 REV #:05 DESCRIN OMNb PROCEDURE OR CHANGE TDetailed) c d ePROCEDURE DESCRIPTION, REAS0NS, See Enclosure 2, Attachment 1 REASON ANO REFERENCES FOR PROCEDURE CHANGE See Enclosure 2, Attachment 1 Check as Appropriate:
_ _ . . E T W A.T. n. D.. f r. """"..C M. T. .C
Refefjence #:
_    Proc #: OPO407D,                                 PRR #: 11323                                             REV #:05 ePROCEDURE DESCRIPTION, REAS0NS, DESCRIN OMNb PROCEDURE OR CHANGE TDetailed) c d                                                                                           ,
Other Design Modification FCN Related Item Problem Report Precursor Card C NRC Violation ITS Amendment ITS Bases Change FSAR Change i
See Enclosure 2, Attachment 1 REASON ANO REFERENCES FOR PROCEDURE CHANGE See Enclosure 2, Attachment 1 Check as Appropriate:                                                                               Refefjence #:
')
Other Design Modification                 FCN                                 Related Item Problem Report               Precursor Card             C NRC Violation ITS Amendment                 ITS Bases Change                     FSAR Change i
Page 1 of 1 AI 400C Rev.17
I
)
Page 1 of 1               AI 400C                 Rev.17


      .      -.      -      -  . _      .-. .                  .- ..    ~_ . . _ - .           -
~_.. _ -.
  ~
~
ENCLOSURE 2 PROCEDURE DESCRIPTION, REASONS, AND REFERENCES             (ATTACHMENT 1)
ENCLOSURE 2 PROCEDURE DESCRIPTION, REASONS, AND REFERENCES (ATTACHMENT 1)
        -u Proc #: OPO407D             PRR #: 11323           REV #: 05
-u Proc #: OPO407D PRR #: 11323 REV #: 05
: 1. Description of new procedure or change:
: 1. Description of new procedure or change:
!              The flow path was changed from the revision that was immediately issued on 3-1-96 due to WDV-217 not being able to be closed. The flow path was changed to fill the CWSTs through the recirc line and spray header instead of through the fill valves on the top of the tank.
The flow path was changed from the revision that was immediately issued on 3-1-96 due to WDV-217 not being able to be closed. The flow path was changed to fill the CWSTs through the recirc line and spray header instead of through the fill valves on the top of the tank.
Reason and references for procedure change:
Reason and references for procedure change:
WDV-217 is stuck in the open position, l
WDV-217 is stuck in the open position,
                                                                                                          )
)
l l
l
l l
\\
  \
i Page 1 of 1 AI 400C Rev.17
i Page 1 of 1               AI 400C     Rev.17


1 1
1 ENCLOSURE 3 Scracning fcr Applicability of 10 CFR 50.59 Procedure #: OPO407D PRR #: 11323 REV#: 05
ENCLOSURE 3
()/
  ,                                          Scracning fcr Applicability of 10 CFR 50.59 I
f YES NO
Procedure #: OPO407D                                                   PRR #: 11323                                                       REV#: 05                                                             l f                                                                                                                                                                                                                                    '
: 1. Is this a change to the fat.ility as described in the FSAR7 (Use NOD-11 X
()/ . . . . . . . .          . . . . . . . . . . . . . . . . .  . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preparation of Safety. Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).
YES NO
: 1. Is this a change to the fat.ility as described in the FSAR7 (Use NOD-11                                                                                                                                           X Preparation of Safety. Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).
BECAUSE: (Explain your answer and list FSAR sections reviewed)
BECAUSE: (Explain your answer and list FSAR sections reviewed)
This change does not change the intent of the original revision to this procedure. This change represents an ammended change due to a component being out of service. This change does not change any                                                                                                                                                     ,
This change does not change the intent of the original revision to this procedure. This change represents an ammended change due to a component being out of service. This change does not change any evaluations made in the FSAR. This change will be transmitted with the original change. See attached package with cancelled PRR # 11281.
evaluations made in the FSAR. This change will be transmitted with the                                                                                                                                             I original change. See attached package with cancelled PRR # 11281.                                                                                                                                                   l
l
: 2. Does this affect or change the Improved Technical Specifications o- their                                                                                                                                         x bases? (If yes, contact the Manager, Nuclear Licensing before proceeding)                                                                                                                                           j i
: 2. Does this affect or change the Improved Technical Specifications o-their x
bases? (If yes, contact the Manager, Nuclear Licensing before proceeding) j i
BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)
BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)
There are no changes to Technical Specifications due to this ammended revision. See Attached Package for original Screening.
There are no changes to Technical Specifications due to this ammended revision. See Attached Package for original Screening.
: 3. Is this a change to the ODCM7 x
: 3. Is this a change to the ODCM7 x
: 4. A yes answer to any question above requires completion of Enclosure 4                                                                                                                                           X
: 4. A yes answer to any question above requires completion of Enclosure 4 X
      )             10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.
)
V'               Are these required?
10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.
: 5. Can this potentially reduce the level of safety of the plant? (If yes.                                                                                                                                           X provide contingency actions AND PRC/DNPO reviews are required prior to impl ementation)
V' Are these required?
: 5. Can this potentially reduce the level of safety of the plant? (If yes.
X provide contingency actions AND PRC/DNPO reviews are required prior to impl ementation)
BECAUSE: (Support Yes or No answers here)
BECAUSE: (Support Yes or No answers here)
This ammended change will not reduce the safety of the plant. See Attached package.
This ammended change will not reduce the safety of the plant. See Attached package.
: 6. Review Enclosure 5, Examples of Events Which Impact Plant Operations.                                                                                                                                           X Can this possibly lead to an event that would impact plant operation?
: 6. Review Enclosure 5, Examples of Events Which Impact Plant Operations.
X Can this possibly lead to an event that would impact plant operation?
(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
BECAUSE: (Support Yes or No answers here)
BECAUSE: (Support Yes or No answers here)
This ammeded change will not lead to an event that will impact plant                                                                                                                                               l operation. See attached package.
This ammeded change will not lead to an event that will impact plant operation. See attached package.
O Page 1 of 1                                       AI 400C                       Rev.17
O%
Page 1 of 1 AI 400C Rev.17


l ENCLOSURE 6 10 CFR 50.54 EVALUATION Procedure #:       OPO407D       PRR #:     11323         REV #:     05 A. Does this change what is described in any of the following plans / programs?
l ENCLOSURE 6 10 CFR 50.54 EVALUATION Procedure #:
YES NO Quality Program Description (FSAR Section 1.7)                                       X Licensed Operator Requalification Program (FSAR 12.2.3.4)
OPO407D PRR #:
[ ]
11323 REV #:
Physical Security Plan                                                               X Safeguards Contingency Plan
05 A. Does this change what is described in any of the following plans / programs?
                                                                                              ]   X Radiological Emergency Response Plin                                                 X Fire Protection Plan                                                                 X Offsite Dose Calculation Manual
YES NO Quality Program Description (FSAR Section 1.7)
                                                                                              ] [
X Licensed Operator Requalification Program (FSAR 12.2.3.4)
Primary Coolant Sources Outside Containment Program                                 X Post Accident Sampling Program
[
[   'X Containment Tendon Surveillance Program
]
                                                                                                  ]
Physical Security Plan X
Inservice Inspection Program                                                         X Steam Generator Tube Surveillance Program                                           X l
Safeguards Contingency Plan
i           Inservice Testing Program                                                           X
]
!    V     Secondary Water Chemistry Program                                                   X Ventilation Filter Testing Program
X Radiological Emergency Response Plin X
                                                                                              ]   ]
Fire Protection Plan X
Explosive Gas and Storage Tank Radioactivity Monitoring Program                     X Diesel Fuel Oil Testing Program
Offsite Dose Calculation Manual
                                                                                              ] ]
]
[
Primary Coolant Sources Outside Containment Program X
Post Accident Sampling Program
[
'X Containment Tendon Surveillance Program
]
Inservice Inspection Program X
Steam Generator Tube Surveillance Program X
i Inservice Testing Program X
V Secondary Water Chemistry Program X
Ventilation Filter Testing Program
]
]
Explosive Gas and Storage Tank Radioactivity Monitoring Program X
Diesel Fuel Oil Testing Program
]
]
Safety Function Determination Program
Safety Function Determination Program
                                                                                                  ]
]
l           Improved Technical Specifications Bases Control Program                             X l
l Improved Technical Specifications Bases Control Program X
Core Operating Limits Report
l Core Operating Limits Report
                                                                                              ] [
]
Reactor Coolant System Pressure Temperature Limits Report                           X l''          IF any of the above are yes, THEN:                                                                           YES N/A o   Contact the appropriate person (Attachment E of NOD-11, Preparation of         X Safety, Regulatory, and Environmental Compliance Reviews) to perform an evaluation and attach. Evaluation Complete and attached:
[
o   NRC approval received if needed and attached.
Reactor Coolant System Pressure Temperature Limits Report X
                                                                                              ]   X 1
l' IF any of the above are yes, THEN:
YES N/A o
Contact the appropriate person (Attachment E of NOD-11, Preparation of X
Safety, Regulatory, and Environmental Compliance Reviews) to perform an evaluation and attach.
Evaluation Complete and attached:
o NRC approval received if needed and attached.
]
X 1
J V
J V
Page 1 of 2         AI 400C       Rev.17 l
Page 1 of 2 AI 400C Rev.17 l
1
1


ENCLO W E 6 10 CFR 50.54 EVALUATION                                   ;
ENCLO W E 6 10 CFR 50.54 EVALUATION
(~'gProcedure#:             OPO407D       PRR #:         11323     REV #:   05
(~'gProcedure#:
  ' \w.,)                                                                                               l B. Environmental Protection Plan Review:
OPO407D PRR #:
Could this change affect:                                                       YES NO
11323 REV #:
: 1. 'The environment in a non-radiological way?                                     x
05
: 2. An increase in licensed power level?                                           X
' \\w.,)
: 3. An increase in non-radiological effluents (Volume or chemicals -               X liquid or gas)?
l B. Environmental Protection Plan Review:
: 4. A change in Circulating or Raw Water flows?                                   X
Could this change affect:
: 5. Dredging, filling, or new construction on previously undisturbed areas?       X YES N/A If yes to any of the above, x
YES NO
l                   THEN contact the Manager, Nuclear Licensing to perform an evaluation and attach. Evaluation Complete and attached:
: 1. 'The environment in a non-radiological way?
,            C. Review for Change to Radioactive Waste System (10 CFR 50.34a and Appendix I)
x 2.
YES NO l               Is this a change to a radioactive waste system Oiquid, gaseous, or solid)           x that could result in an increase of radioactive material released to the environment?
An increase in licensed power level?
NOTE:   The following is for reporting evaluation only and is not part of the approval process for the change.
X 3.
An increase in non-radiological effluents (Volume or chemicals -
X liquid or gas)?
4.
A change in Circulating or Raw Water flows?
X 5.
Dredging, filling, or new construction on previously undisturbed areas?
X YES N/A If yes to any of the above, x
l THEN contact the Manager, Nuclear Licensing to perform an evaluation and attach. Evaluation Complete and attached:
C. Review for Change to Radioactive Waste System (10 CFR 50.34a and Appendix I)
YES NO l
Is this a change to a radioactive waste system Oiquid, gaseous, or solid) x that could result in an increase of radioactive material released to the environment?
NOTE:
The following is for reporting evaluation only and is not part of the approval process for the change.
YES N/A IF the above is yes, x
YES N/A IF the above is yes, x
THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements. Submitted:
THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements.
            ~
Submitted:
~
l I'
l I'
l
l
\         .
\\
O Page 2 of 2         AI 400C       Rev.17
O Page 2 of 2 AI 400C Rev.17


1 1
1 1
i NOTIFICATION OF NEW/ REVISED PROCEDURE             ENCLOSURE 9 This procedure has been approved and issued for use. It is your responsibility             -
i NOTIFICATION OF NEW/ REVISED PROCEDURE ENCLOSURE 9 This procedure has been approved and issued for use. It is your responsibility to advise personnel in your organization affected by this new/ revised i
i      to advise personnel in your organization affected by this new/ revised
procedure of its contents.
!      procedure of its contents. Attached is a copy of the Procedure Description,                 <
Attached is a copy of the Procedure Description, l
l Reasons, and References (Enclosure 2).                                                       I l
Reasons, and References (Enclosure 2).
Procedure #: OPO407D                 PRR #: 11323               REV #:05                   )
Procedure #: OPO407D PRR #: 11323 REV #:05 l CHECK TO:
I l CHECK TO:           Manager, Nuclear Radiation Protection Manager, Nuclear Chemistry f       Manager, Nuclear Plant Operations l
Manager, Nuclear Radiation Protection Manager, Nuclear Chemistry f
l      Manager, Nuclear Configuration Management                                     '
Manager, Nuclear Plant Operations l
Manager, Nuclear Plant Technical Support Manager, Nuclear Security l
Manager, Nuclear Configuration Management Manager, Nuclear Plant Technical Support Manager, Nuclear Security l
Supervisor, Nuclear Document Control                                     ,
Supervisor, Nuclear Document Control Supervisor, Nuclear Records Management Manager, Nuclear Plant Maintenance Manager, Nuclear Quality Assessments Manager, Nuclear Engineering Design i
Supervisor, Nuclear Records Management Manager, Nuclear Plant Maintenance Manager, Nuclear Quality Assessments Manager, Nuclear Engineering Design                                       ;
Manager, Site Nuclear Services l
i' Manager, Site Nuclear Services l       Manager, Radiological Emergency Planning
Manager, Radiological Emergency Planning Manager, Nuclear Licensing l
              !      Manager, Nuclear Licensing l       Procedure Interpretation Contact b. k yb j     If this affects most personnel of Nuclear Operations besides your i
Procedure Interpretation Contact b. k yb j
department (for example: AI-413, Fitness for Duty Callout Procedure),
If this affects most personnel of Nuclear Operations besides your department (for example: AI-413, Fitness for Duty Callout Procedure),
THEN notify applicable personnel by describing the new procedure or describing the major changes made to the procedure.
i THEN notify applicable personnel by describing the new procedure or describing the major changes made to the procedure.
o This can be done using electronic mail (everyone) or other means.
o This can be done using electronic mail (everyone) or other means.
NOTE: For others below, state their name and address
NOTE: For others below, state their name and address Other:
    .        !    Other:
Other:
Other:                                                                       ,
O I
O         IOther:                                                                       l l V                                                                                             i I
Other:
Other:                                                                       i Page 1 of 1       AI 400C       Rev.17
l
<l V i
I Other:
i Page 1 of 1 AI 400C Rev.17


t s                                                                                         ENCLOSURE 10 Qualified Review /Techr.ical     . ww 1
t s
Procedure #: OPO4070                     PRR :: 11323               REV: 05 I
ENCLOSURE 10 Qualified Review /Techr.ical ww 1
                                                                                          . Conenents '   No QUALIFIED REVIEWERS                       Reviewed By       Date l Attached j Consnents
Procedure #: OPO4070 PRR :: 11323 REV: 05 I
                @ Nuclear Operations Department l
. Conenents '
i Q
No QUALIFIED REVIEWERS Reviewed By Date l Attached j Consnents
Nuclear Security Department                                           l j
@ Nuclear Operations Department l
i Nuclear Quality Control Nuclear Radiation Protection                                 '
Q i
l                                                                                I j
Nuclear Security Department l
j i
Nuclear Quality Control Nuclear Radiation Protection l
I j
Nuclear Chemistry l
Nuclear Chemistry l
Nuclear Maintenance Dept.
Nuclear Maintenance Dept.
l; Nuclear Configuration Management                                       1           -          i (EQ Croup)                                                             I           '
l Nuclear Configuration Management 1
l w/                                                                                               '
l (EQ Croup)
l                   Nuclear Engineering Design                                                         !
I i
l i                                                                                                       !
w/
Nuclear Plant Technical Support                                         l j           l
l Nuclear Engineering Design l
                                                                                          ,            i Other:                                                                      l           l Other:
i Nuclear Plant Technical Support j
TECHNICAL REVIEW       g                                                         e
l Other:
                                                    ,g                               ,
i l
l Other:
TECHNICAL REVIEW g
,g e
Other:
]
Other:
Other:
                                                                                                ]
l i
Other:                                                            l       i I                   '
I Raturn to: Frank Dola (Originator) t
Raturn to: Frank Dola (Originator) t
/~h.
      /~h. <
I V
I V
I l
I l
Ptge 1 of 1           AI 400C       Rev.17
Ptge 1 of 1 AI 400C Rev.17


l ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST
l ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST
    ; O Procedure #:         OPO407D       Rev #:     05           PRR #:   11323 V
; O Procedure #:
YES   N/A
OPO407D Rev #:
: 1. Originator's Checklist, Enclosure 1, is adequately completed,                   n
05 PRR #:
: 2. IF this is a new SP, a procedure that has received a major technical rewrite, or a procedure identified as an infrequent test or evolution.
11323 V
YES N/A 1.
Originator's Checklist, Enclosure 1, is adequately completed, n
2.
IF this is a new SP, a procedure that has received a major technical rewrite, or a procedure identified as an infrequent test or evolution.
THEN ensure a simulation, walk through (no manipulation of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.
THEN ensure a simulation, walk through (no manipulation of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.
: 3. IF this is a new SP, or is an SP that has received a major technical             ]
3.
rewrite, THEN notify the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling that the procedure must be walk through validated with an end-user on the next scheduled performance after the procedure is issued.
IF this is a new SP, or is an SP that has received a major technical
: 4. IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),
]
: rewrite, THEN notify the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling that the procedure must be walk through validated with an end-user on the next scheduled performance after the procedure is issued.
4.
IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),
THEN ensure adequate aministrative controls are in place to control the component positions.
THEN ensure adequate aministrative controls are in place to control the component positions.
: 5. IF the Procedure Cross Reference sheet had any questions answered yes, THEN forward the Procedure Cross Reference sheet to Records
5.
IF the Procedure Cross Reference sheet had any questions answered yes,
{
{
g       Management.
THEN forward the Procedure Cross Reference sheet to Records g
V 6. IF any commitments of the NOCS have any changes to the implementation section,                                                                         ]
Management.
THEN forward the applicable commitments to Nuclear Licensing.
V 6.
: 7. IF inspection planning is required per CP-113C, Inspection Planning, THEN ensure inspection planning methods are incorporated within this procedure or work instruction.
IF any commitments of the NOCS have any changes to the implementation
                                                                  \
]
: section, THEN forward the applicable commitments to Nuclear Licensing.
7.
IF inspection planning is required per CP-113C, Inspection Planning, THEN ensure inspection planning methods are incorporated within this procedure or work instruction.
\\
l l
l l
i l
i l
t s
t s n v
nv Page 1 of 2         AI 400C       Rev.17
Page 1 of 2 AI 400C Rev.17


l l
l l
ENCLOSURE 13 l                             INTERPRETATION CONTACT'S CHECKLIST i       Procedure #:         OPO4070       Rev #:       05           PRR #:       11323 v
l INTERPRETATION CONTACT'S CHECKLIST ENCLOSURE 13 i
Procedure #:
OPO4070 Rev #:
05 PRR #:
11323 v
l NOTE: The Interpretation Contacts can send any item to the PRC to review prior to inplementation, especially if the Interpretation Contact has a plant operation or safety concern.
l NOTE: The Interpretation Contacts can send any item to the PRC to review prior to inplementation, especially if the Interpretation Contact has a plant operation or safety concern.
: 1. Check ONE of the following:
: 1. Check ONE of the following:
All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are answered "No."   PRC or DNPO review is not required, procedure can be issued.             l I am forwarding all applicable completed enclosures to Document Control.
All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are answered "No."
PRC or DNPO review is not required, procedure can be issued.
I am forwarding all applicable completed enclosures to Document Control.
Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.
Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.
1                                                                                                             \
1
\\
: 2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:
: 2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:
Obtain PRR# from Document Control or electronically.         PRR#
Obtain PRR# from Document Control or electronically.
The activities as designated on Enclosure 1, Originator's Checklist,                         !
PRR#
!                including those on Enclosure 1 with an asterisk, have been completed and are attached.
The activities as designated on Enclosure 1, Originator's Checklist, including those on Enclosure 1 with an asterisk, have been completed and
{n}
{n}
are attached.
I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.
I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.
This and other applicable enclosures have been properly completed and are being forwarded as stated above.
This and other applicable enclosures have been properly completed and are being forwarded as stated above.
4
4
                                  + l Elf                   S     b l
+ l Elf S
( ' Int [rprgfation' Contact                 Date                                             4 PRC and DNPO Review
b
* l PRC Chairman                     Date       PRC Mtg No. DNPO                           Date
( ' Int [rprgfation' Contact Date l
      -
4 PRC and DNPO Review
* If required f3 O
* l PRC Chairman Date PRC Mtg No.
l l
DNPO Date
Page 2 of 2           AI 400C       Rev.17 I
-
* If required f3
, O l
l Page 2 of 2 AI 400C Rev.17 I


o O                                                     .
o O
I IMMEDIATE ISSUE" NOTIFICATION
IMMEDIATE ISSUE" NOTIFICATION
    ~
~
Procedure Number:   OfkO1 Current Revision:   5 Effective Date:   3!I / kk
Procedure Number:
                                      /
OfkO1 5
PRR #:     ll1b l
Current Revision:
3!I kk Effective Date:
/
/
ll1b l PRR #:
'O i
'O i
i i
i i
Line 345: Line 487:


~
~
i i
i 1
1 ORIGINATOR'S CHECKLIST                           ENCLOSURE 1 q                                             Current Procedure #:             OP0407D         Rev #:         05             PRR #:.       11281
ORIGINATOR'S CHECKLIST ENCLOSURE 1 q
Current Procedure #:
OP0407D Rev #:
05 PRR #:.
11281


==Title:==
==Title:==
OPERATION OF THE MISCELLANEDUS WASTE STORAGE TANK                                                     -
OPERATION OF THE MISCELLANEDUS WASTE STORAGE TANK YES N/A 1.
YES   N/A Obtain the current revision of the procedure from Document Control or 1.
Obtain the current revision of the procedure from Document Control or
electronically.       For temporary procedure changes, the working copy                 [
[
may be used.
electronically.
: 2. Obtain PRR#, new procedure #, or temporary procedure change (TPC)#                       x       g from Document Control or electronically. For work instructions, use a work request number or use another identifying nu,mber.
For temporary procedure changes, the working copy may be used.
: 3. Write a new procedure, work instruction, or mark the pages applicable                     x     g to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in AI-402B, Procedure Writing (Except for EOP/AP/VP).
2.
      *4.     Attach changed pages to the cover page of the procedure. Other pages *x                         g may be attached so the continuity of the changes will be understood by persons performing further reviews.         For new procedures or work instructions, all pages are included.
Obtain PRR#, new procedure #, or temporary procedure change (TPC)#
: 5. Complete Enclosure 2, Procedure Description, Reasons, and References.                     X       ,
x g
      *6.     Obtain the Procedure Review Package (PRP) from Nuclear Licensing or                   *x       a   l
from Document Control or electronically.
    -          electronically.       For work instructions or new procedures, contact Nuclear Licensing for any related commitments associated with the                                     !
For work instructions, use a work request number or use another identifying nu,mber.
work instructions or new procedures.                                                                 i
3.
: a.     Complete the Procedure Cross Reference sheet.                                 *x     *
Write a new procedure, work instruction, or mark the pages applicable x
: b.     Ensure the NOCS commitments remain satisfied.                                 *x     *
g to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in AI-402B, Procedure Writing (Except for EOP/AP/VP).
: 1.       Change the implementing references of the. commitments               *      *x as necessary.
*4.
: 7. Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.                       X     &
Attach changed pages to the cover page of the procedure. Other pages
      *8.     IF a 10 CFR 50.59 Evaluation is required, as determined by the                         *      *x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59,                               i THEN complete Enclosure 4,10 CFR 50.59 Evaluation.
*x g
      *9.     Complete Enclosure 6,10 CFR 50.54 Evaluation.                                         *x       W
may be attached so the continuity of the changes will be understood by persons performing further reviews.
      *10. IF this can affect plant safety, the core, reactivity control, the                         *      *x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test                               l or EvolutiorLCitecklist.
For new procedures or work instructions, all pages are included.
O     + These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
5.
Page 1 of 3             AI 400C         Rev.17
Complete Enclosure 2, Procedure Description, Reasons, and References.
X
*6.
Obtain the Procedure Review Package (PRP) from Nuclear Licensing or
*x a
electronically.
For work instructions or new procedures, contact Nuclear Licensing for any related commitments associated with the work instructions or new procedures.
i a.
Complete the Procedure Cross Reference sheet.
*x b.
Ensure the NOCS commitments remain satisfied.
*x 1.
Change the implementing references of the. commitments
*x as necessary.
7.
Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.
X
*8.
IF a 10 CFR 50.59 Evaluation is required, as determined by the
*x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59, i
THEN complete Enclosure 4,10 CFR 50.59 Evaluation.
*9.
Complete Enclosure 6,10 CFR 50.54 Evaluation.
*x W
*10. IF this can affect plant safety, the core, reactivity control, the
*x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test or EvolutiorLCitecklist.
O
+ These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 1 of 3 AI 400C Rev.17


1' l                                                                                                                       i ORIGINATOR'S CHECKLIST                           ENCLOSURE 1 Current OPO407D         Rev #:         05             PRR #:       I1281 OProcedure#:
1 l
i ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current OProcedure#:
OPO407D Rev #:
05 PRR #:
I1281


==Title:==
==Title:==
' OPERATION oF THE MISCELLANEOUS WASTE STORAcE TANK                                                   -
' OPERATION oF THE MISCELLANEOUS WASTE STORAcE TANK e-Eve'utier Check'ist YES N/A
e- Eve'utier Check'ist YES   N/A
*11.
        *11.       IF any plant equipment tag numbers are being added to or deleted                     *x
IF any plant equipment tag numbers are being added to or deleted
* from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, -to the Manager Nuclear Configuration Management.
*x from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, -to the Manager Nuclear Configuration Management.
        *12.       Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)                 *x       4 by determining which Nuclear Operations departments need to be                                     l notified of the new procedure / permanent procedure change.
*12.
l
Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)
        *13. ' IF this is a SP, new procedure, or an inf rec .:antly performed test                     *      *x     I or evolution, THEN complete and attach Enclosure 23, Procedue u Review                                           i Checklist of AI-402B, Procedure Writing         (Except for E0P/AP/VP).                           1
*x 4
: 14. Ensure that correction techniques such as " white out," correction                     x     g tape,. paste overs, or similar techniques have not been used.
by determining which Nuclear Operations departments need to be notified of the new procedure / permanent procedure change.
        *15.       Internal references to data sheets, enclosures, other sections                       *x       @
*13. ' IF this is a SP, new procedure, or an inf rec.:antly performed test
of the procedure, etc., have been verified to be correct.
*x or evolution, THEN complete and attach Enclosure 23, Procedue u Review i
        *16.       Ensure that Non-Quality documents are identified as " Optional                 -
Checklist of AI-402B, Procedure Writing (Except for E0P/AP/VP).
                                                                                                        *    *x Records Non-Quality" within the procedure as per AI-1100,                                           j Retention of Plant Operating Records.
1 14.
Ensure that correction techniques such as " white out," correction x
g tape,. paste overs, or similar techniques have not been used.
*15.
Internal references to data sheets, enclosures, other sections
*x of the procedure, etc., have been verified to be correct.
*16.
Ensure that Non-Quality documents are identified as " Optional
*x Records Non-Quality" within the procedure as per AI-1100, j
(n]
(n]
        *17       Forward the original or copies of this document and supporting                       *x       34 enclosures to Qualified Reviewers, as determined from below, using l                   Enclosure 10, Qualified Review / Technical Review,
Retention of Plant Operating Records.
: a.       A Qualified Review, independent of the originator, is                     *x       g required by the department that the procedure's Interpretation Contact is a member of,
*17 Forward the original or copies of this document and supporting
: b.       IF interfacing departments' actions or procedures                         *x will be impacted,                                                               *]
*x 34 enclosures to Qualified Reviewers, as determined from below, using l 0, Qualified Review / Technical Review, a.
THEN the interfacing departments must perform a Qualified Review.
A Qualified Review, independent of the originator, is
I
*x g
: c.     IF any item on Enclosure 11, Guidelines for Identification
required by the department that the procedure's Interpretation Contact is a member of, b.
                                                                                                        *[*
IF interfacing departments' actions or procedures
l                           of Design Changes, is applicable, THEN Nuclear Engineering Design must perform a Qualified
*x
!                            Review.
*]
: d.       Nuclear Quality Control must be a Qualified Review for fps,               *    *x       .
will be impacted, THEN the interfacing departments must perform a Qualified Review.
i                            MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes l
I c.
to or additions of inspection points to ensure inspection
IF any item on Enclosure 11, Guidelines for Identification
      .                      points are appropriate.
*[*
I O
l of Design Changes, is applicable, THEN Nuclear Engineering Design must perform a Qualified Review.
U    e These steps should not be performed and the YE5 or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
d.
Page 2 of 3               AI 400C       Rev.17 l
Nuclear Quality Control must be a Qualified Review for fps,
*x MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes i
l to or additions of inspection points to ensure inspection points are appropriate.
I OU e These steps should not be performed and the YE5 or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 2 of 3 AI 400C Rev.17 l


r 1                                                                                                                                   -;
r 1
l=    .      .
ORIGINATOR'S CHECKLIST ENCLOSURE 1 l=
ORIGINATOR'S CHECKLIST                           ENCLOSURE 1                 ;
i.G Current Procedure #:
i .G Procedure #:                                           Current
-OPO407D g y g:
                                          -OPO407D         g y g:               05     PRR #:       11281
05 PRR #:
11281


==Title:==
==Title:==
- OPERATION OF THE NIsCELLANE005 WASTE STORAGE TANK                                                           --
- OPERATION OF THE NIsCELLANE005 WASTE STORAGE TANK
                *17. Qualified Review (continued)                                                               YES     N/A     l
*17.
                                                                                                                                      'l
Qualified Review (continued)
: e.       IF this-                                                                       *      *X         i l                                 1. Involves a change to an established scheduled                                                   j performance of a procedure as listed in SP-443, Master l                                     Surveillance Plan, OR
YES N/A l
e.
IF this-
*X i
l
: 1. Involves a change to an established scheduled j
performance of a procedure as listed in SP-443, Master l
Surveillance Plan, OR
: 2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.
: 2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.
NOTE: EQ equipment is designated in CMIS as QQ.                                           *
NOTE: EQ equipment is designated in CMIS as QQ.
* x
* x f.
: f.       IF this involves repair, replacement, or alteration of EQ equipment, THEN a Qualified Review is required by Nuclear Configuration l                                 Management, EQ Group.
IF this involves repair, replacement, or alteration of EQ equipment, THEN a Qualified Review is required by Nuclear Configuration l
                                                                                                                                      ]
Management, EQ Group.
: 1. IF this procedure involves repair, replacement, or                         *
]
* x         i alteration of EQ equipment,                           .
1.
l                                      THEN.the cover page of the procedure must be designated
IF this procedure involves repair, replacement, or
                                        " Environmentally Qualified Related."
* x i
      ''        *18.     Ensure Qualified Reviews are completed and any comments have been                       *4 addressed.
alteration of EQ equipment, l
: 19. IF this is a temporary procedure change,                                                           x THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.
THEN.the cover page of the procedure must be designated
l           - *20.       Forward this. enclosure and the preceding package of. documentation,
" Environmentally Qualified Related."
* 2 l                         as applicable, to the Interpretation Contact for approval of
*18.
: l.                       Enclosure 13, Interpretation Contact's Checklist.
Ensure Qualified Reviews are completed and any comments have been
I have completed this checklist, as applicable,. and all appropriate YES or
*4 addressed.
                    ~
19.
l              N/A blanks are. completed.
IF this is a temporary procedure change, x
                      $s
THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.
                        ~
l
                                        =s;% A                                       3 j-fj l                                       Or'i gi nator -                               .Date 1
- *20.
O
Forward this. enclosure and the preceding package of. documentation, 2
* These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
l as applicable, to the Interpretation Contact for approval of
Page 3 of 3                 AI 400C         Rev.17 r
: l. 3, Interpretation Contact's Checklist.
I have completed this checklist, as applicable,. and all appropriate YES or l
N/A blanks are. completed.
~
$s
=s;% A 3 j-fj l
~
Or'i gi nator -
.Date O
* These steps should not be performed and the YES or N/A blanks should not be checked for a temporary 1
procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.
Page 3 of 3 AI 400C Rev.17 r


lr                                                                                                                                                               l l
lr l
l l
l l
ENCLOSURE 2
ENCLOSURE 2 PROCEDURE DESCRIPTION, REASONS, AND REFERENCES l-Proc #: OPO407D PRR #: 11281 REV #:05 t
,                                        PROCEDURE DESCRIPTION, REASONS, AND REFERENCES l-t          Proc #: OPO407D                                       PRR #: 11281                                       REV #:05 1
1 DESCRIPTION OF NEW PROCEDURE OR CHANGE (Detailed)
DESCRIPTION OF NEW PROCEDURE OR CHANGE (Detailed)                                                                                                       --
See Enclosure 2, Attachment 1 REASON AND REFERENCES FOR PROCEDURE CHANGE See Enclosure 2, Attachment 1 j
See Enclosure 2, Attachment 1 REASON AND REFERENCES FOR PROCEDURE CHANGE l
Check as Appropriate:
See Enclosure 2, Attachment 1                                                                                                                           l j
Reference #:
l Check as Appropriate:                                                                                   Reference #:
Other Design Modi fi cation FCN Related Item i
Other Design                                                                 ,
I Problem Report Precursor Card NRC Violation ITS Amendment ITS Bases Change FSAR Change l
Modi fi cation               FCN                               Related Item                                                                 !
! C e
i I
Problem Report               Precursor Card                   NRC Violation                                                                 '
ITS Amendment               ITS Bases Change                 FSAR Change                                                                   ,
l
!                                                                                                                                                                 l C
e 1
l 1
l 1
i i
i t
t                                                                                                                         .
l                                                                                                                                                                !
l 1
l 1
1
l i
!                                                                                                                                                                  l l
i I
l
l
    ~
~
i 1
i 1
1 Page 1 of 1                       AI 400C                 Rev 17 l                                                                                                                                                                  l
Page 1 of 1 AI 400C Rev 17 l


g-'s                                                                               ENCLOSURE 2 j                     PROCEDURE DESCRIPTION, REASONS, AND REFERENCES           (ATTACHMENT 1)
g-'s ENCLOSURE 2 j
Proc #: OPO407D           PRR #: 11281             REV #:05
PROCEDURE DESCRIPTION, REASONS, AND REFERENCES (ATTACHMENT 1)
Proc #: OPO407D PRR #: 11281 REV #:05
: 1. Description of new procedure or change:
: 1. Description of new procedure or change:
Coversheet - remove statement pertaining to safety related equipment.
Coversheet - remove statement pertaining to safety related equipment.
                  - Change the title of the Interpretation Contact.
- Change the title of the Interpretation Contact.
Reason and references for procedure change:
Reason and references for procedure change:
The statement for safety related equipment is no longer required .     NOCS commitment 40027 which pertained to the statement has been deleted.
The statement for safety related equipment is no longer required.
l The title of the Interpretation Contact has changed due to department                   i reorganization.
NOCS commitment 40027 which pertained to the statement has been deleted.
The title of the Interpretation Contact has changed due to department i
reorganization.
: 2. Description of new procedure or change:
: 2. Description of new procedure or change:
Added four new sections to the table of contents.
Added four new sections to the table of contents.
Line 480: Line 682:
The new sections were written to move the water from the MWST to the CWSTs and the CBASTs for storage of highly contaminated water. This will provide
The new sections were written to move the water from the MWST to the CWSTs and the CBASTs for storage of highly contaminated water. This will provide
(''
(''
storage for the water to allow for decay before releasing.
V}
V}
storage for the water to allow for decay before releasing.
: 3. Description of new procedure or change:
: 3. Description of new procedure or change:
* Four new sections were added to this procedure. Each section is written to transfer water to a specific tank.
Four new sections were added to this procedure.
Each section is written to transfer water to a specific tank.
Reason and references for procedure change:
Reason and references for procedure change:
The flow path provided by this procedure will reduce the time required for transferring water from the MWST to the CWSTs and the CBASTs. The original flow path used transferred water from the MWST to the Evaporator. Then the water was transferred from the Evaporator to the desired tank. This flow path will be directly from the MWST to the desired tank. This flow path will use a hose connecting two flanges in the yellow room to create the desired flow path.
The flow path provided by this procedure will reduce the time required for transferring water from the MWST to the CWSTs and the CBASTs. The original flow path used transferred water from the MWST to the Evaporator. Then the water was transferred from the Evaporator to the desired tank. This flow path will be directly from the MWST to the desired tank.
A (V   I Page 1 of 1           AI 400C       Rev.17
This flow path will use a hose connecting two flanges in the yellow room to create the desired flow path.
A I
(V Page 1 of 1 AI 400C Rev.17


                                                  ~ . _ . _ . _ _ . . . _ _ _ _ . _ _ _ _ _ _ - . _ _ _ .                      _ _ _ _ . _ _ _ _ _ _ .
~. _. _. _ _... _ _ _ _. _ _ _ _ _ _ -. _ _ _.
I
I
                                                                                                                                                                  \
\\
ORIGINATOR COMMENTS                                                                                             I 1
ORIGINATOR COMMENTS 1
i l
i PRR # 11281 Procedure: OP0407D Rev#: 05
PRR # 11281                         Procedure: OP0407D                                                 Rev#: 05                                     .
\\
l
Originator: Frank Dola coments:
                                                                                                                                                                  \
Originator: Frank Dola I
coments:
t i
t i
4 5
4 5
!      s l
s l
Page 1 of 1.     AI 400C               Rev.17 l
Page 1 of 1.
AI 400C Rev.17 l


a i
a i
ENCLOSURE 3
ENCLOSURE 3 Scrc:ning fcr ApplicCbility cf 10 CFR 50.59 Procedure #: OPO407D PRR #: 11281 REVf: 05
;                                                  Scrc:ning fcr ApplicCbility cf 10 CFR 50.59 Procedure #: OPO407D                                                                         PRR #: 11281                                                                       REVf: 05
(
(   )                                                                                                                                                                                                                                                                                   :
)
  \~~/                                                                                                                                                                                                                                           YES                   NO
\\~~/
: 1. Is this a change to the facility as described in the FSAR7 (Use NOD-11,                                                                                                                                                                                       X Preparation of Safety, Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).
YES NO
: 1. Is this a change to the facility as described in the FSAR7 (Use NOD-11, X
Preparation of Safety, Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).
BECAUSE: (Explain your answer and list FSAR sections reviewed)
BECAUSE: (Explain your answer and list FSAR sections reviewed)
The changes made to OP-407D will not change any evaluations made in the FSAR. Four new sections have been added to this procedure to allow for                                                                                                                                                                                                 i the temporary storage of contaminated liquid to decay prior to release                                                                                                                                                                                                 '
The changes made to OP-407D will not change any evaluations made in the FSAR. Four new sections have been added to this procedure to allow for i
to the discharge canal. These sections move water from the Miscellaneous Waste Storage Tank (MWST, WDT-4) to the Concentrated Waste Storage Tanks (CWST, WDT-7A/B) and the Concentrated Boric Acid Storage Tanks (CBAST WDT-8A/B). These evolutions have been performed                                                                                                                                                                                                   j in the past by pumping the MWST to the Evaporator Feedtanks and then pumping the Evaporator Feedtanks to the CBASTs and CWSTs. The instructions provided by this procedure will not require the use of the abandon Evaporators. The lineup will require the use of a temporary hose in the yellow room similar to the one presently used for processing the MWST through the NUS Demins. The hose will connect the downstream side of the MWST to a header which can be aligned to direct flow to the CBASTs or the CWSTs as needed. The flanges used for this connection already exist on the piping. There will be no need to modify any plant equipment for the use of the new sections being added to this procedure. The hose to connect the systems will be installed by Maintenance. The use of the hose will not affect any evaluations
the temporary storage of contaminated liquid to decay prior to release to the discharge canal. These sections move water from the Miscellaneous Waste Storage Tank (MWST, WDT-4) to the Concentrated Waste Storage Tanks (CWST, WDT-7A/B) and the Concentrated Boric Acid Storage Tanks (CBAST WDT-8A/B). These evolutions have been performed j
  ,-ws            made in the FSAR. The hose will connect two nonsafety related systems
in the past by pumping the MWST to the Evaporator Feedtanks and then pumping the Evaporator Feedtanks to the CBASTs and CWSTs. The instructions provided by this procedure will not require the use of the abandon Evaporators. The lineup will require the use of a temporary hose in the yellow room similar to the one presently used for processing the MWST through the NUS Demins. The hose will connect the downstream side of the MWST to a header which can be aligned to direct flow to the CBASTs or the CWSTs as needed. The flanges used for this connection already exist on the piping. There will be no need to modify any plant equipment for the use of the new sections being added to this procedure. The hose to connect the systems will be installed by Maintenance. The use of the hose will not affect any evaluations
('- /)         which are not required for the safe shutdown of this plant. FSAR sections reviewed: 4.2, 9.2, 9.4, 9.5, 11.2, 11.4, 11.5, 11.6 and 11.14
,-w made in the FSAR. The hose will connect two nonsafety related systems s
: 2. Does this affect or change the Improved Technical Specifications or their                                                                                                                                                                                     X bases? (If yes, contact the Manager, Nuclear Licensing before proceeding)
(
)
which are not required for the safe shutdown of this plant. FSAR
'- /
sections reviewed:
4.2, 9.2, 9.4, 9.5, 11.2, 11.4, 11.5, 11.6 and 11.14
: 2. Does this affect or change the Improved Technical Specifications or their X
bases? (If yes, contact the Manager, Nuclear Licensing before proceeding)
BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)
BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)
The changes made to OP-407D will not affect or require the change to any Technical Specifications. Nor will these changes affect the ODCM.
The changes made to OP-407D will not affect or require the change to any Technical Specifications. Nor will these changes affect the ODCM.
The changes made to this procedure do not release any radioactive liquid to the environment. The changes allow for storage of liquid to allow the liquid to decay prior to being released. Technical Specifications reviewed:                                                     5.0 and the ODCM.
The changes made to this procedure do not release any radioactive liquid to the environment. The changes allow for storage of liquid to allow the liquid to decay prior to being released. Technical Specifications reviewed:
5.0 and the ODCM.
: 3. Is this a change to the ODCM7 X
: 3. Is this a change to the ODCM7 X
: 4. A yes answer to any question above requires completion of Enclosure 4,                                                                                                                                                                                       X 10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.
: 4. A yes answer to any question above requires completion of Enclosure 4, X
10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.
Are these required?
Are these required?
: 3. Can this potentially reduce the level of safety of the plant? (If yes,                                                                                                                                                                                       X provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
: 3. Can this potentially reduce the level of safety of the plant? (If yes, X
provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
{)
{)
g BECAUSE: (Support Yes or No answers here)
BECAUSE: (Support Yes or No answers here) g The changes made to this procedure do not affect any systems required for accident mitigation. The changes provide a flow path from the MWST to the CBASTs and the CWSTs. If a failure were to occur in any Page 1 of 2 AI 400C Rev.17
The changes made to this procedure do not affect any systems required for accident mitigation. The changes provide a flow path from the MWST to the CBASTs and the CWSTs. If a failure were to occur in any Page 1 of 2                                             AI 400C                                   Rev.17


s
s
  /                                     Scr;;ning for Applicchility of 10 CFR 50.59                                                                                             ENCLOSURE 3 l                 Procedure #: OPO407D                                                 PRR #: 11281                                                   REV#: 05 0
/
(         associated equipment used for this evolution, the safety of the plant would not be jepordized.                                                                                                                                                          .
Scr;;ning for Applicchility of 10 CFR 50.59 ENCLOSURE 3 l
: 6. Review Enclosure 5. Examples of Events Which Impact Plant Operations.                                                                                                             X Can this possibly lead to an event that would impact plant operation?
Procedure #: OPO407D PRR #: 11281 REV#: 05 0
(
associated equipment used for this evolution, the safety of the plant would not be jepordized.
: 6. Review Enclosure 5. Examples of Events Which Impact Plant Operations.
X Can this possibly lead to an event that would impact plant operation?
(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)
BECAUSE: (Support Yes or No answers here)
BECAUSE: (Support Yes or No answers here)
The use of this procedure will not impact plant operations. The normal use of this procedure will not affect any safety related equipment. If a compt.sent in the system were to fail it would not jepordize the operation of the plant. The use of the temporary hose is in a location where other hoses are currently used for transferring liquid. If a leak were to occur the liquid could easily be contained and there are floor drains in the room which go to the Auxiliary Building Sump.
The use of this procedure will not impact plant operations. The normal use of this procedure will not affect any safety related equipment. If a compt.sent in the system were to fail it would not jepordize the operation of the plant. The use of the temporary hose is in a location where other hoses are currently used for transferring liquid. If a leak were to occur the liquid could easily be contained and there are floor drains in the room which go to the Auxiliary Building Sump.
I l
l OV l
O V
l v
l l
Page 2 of 2 AI 400C Rev.17
v Page 2 of 2                                 AI 400C                     Rev.17


    ?
?
ENCLO%RE 6                         j l                                                       10 CFR 50.54 EVALUATION Procedure #:         OPO407D                       PRR #:   .11281         REV #:                 05 A.' Does this change what'is described in any of the following plans / programs?
ENCLO%RE 6 l
YES NO             ;
10 CFR 50.54 EVALUATION j
Quality Program Description (FSAR Section 1.7)                                                                           X l
Procedure #:
: Licensed Operator Requalification Program (FSAR 12.2.3.4)                                                         -  ]
OPO407D PRR #:
Physical Security Plan -                                                                                           ] ]
.11281 REV #:
Safeguards Contingency Plan                                                                                             X
05 A.' Does this change what'is described in any of the following plans / programs?
: Radiological Emergency Response Plan                                                                                     X i           Fire. Protection Plan                                                                                                 ].
YES NO Quality Program Description (FSAR Section 1.7)
Offsite Dose Calculation Manual                                                                                     ]   ]
X
Primary Coolant Sources Outside Containment Program                                                                     X i
: Licensed Operator Requalification Program (FSAR 12.2.3.4)
Post Accident Sampling Program                                                                                         ]
]
Containment Tendon Surveillance Program                                                                                 X Inservice Inspection Program                                                                                         [-
l Physical Security Plan -
Steam Generator Tube Surveillance Program                                                                           ]               .
] ]
                                                                                                                                                  )
Safeguards Contingency Plan X
Inservice Testing Program                                                                                               X Secondary Water Chemistry Program                                                                                 _
: Radiological Emergency Response Plan X
X Ventilation Filter Testing Program
i Fire. Protection Plan
                                                                                                                                    ]-
].
Explosive Gas .and Storage Tank Radioactivity' Monitoring Program                                                       X           l Diesel Fuel Oil Testing Program                                                                                         X Safety Function Determination Program                                                                                 ]
Offsite Dose Calculation Manual
Improved Technical Specifications Bases Control Program                                                           [
]
X Core Operating Limits Report                                                                                           [
]
Reactor Coolant System Pressure Temperature Limits Report                                                               X IF any of the above are yes, THEN:                                                                                                             YES N/A I
Primary Coolant Sources Outside Containment Program X
o ' Contact the appropriate person (Attachment E of NOD-11, Preparation of                                     .        X
i Post Accident Sampling Program
                , Safety, Regulatory, and Environmental Compliance Reviews) to perform                                                           i
]
                .an evaluation and attach. Evaluation Complete and attached:
Containment Tendon Surveillance Program X
                      ~
Inservice Inspection Program
        ..o     NRC' approval received if needed and attached.                                                                     X
[
\
Steam Generator Tube Surveillance Program
l LO Page.1 of 2         AI 400C                       Rev.17-
]
                                                                            - + , ,- b-                             , , - - -          ep
)
Inservice Testing Program X
Secondary Water Chemistry Program X
Ventilation Filter Testing Program
]-
Explosive Gas.and Storage Tank Radioactivity' Monitoring Program X
Diesel Fuel Oil Testing Program X
Safety Function Determination Program
]
Improved Technical Specifications Bases Control Program
[
X Core Operating Limits Report
[
Reactor Coolant System Pressure Temperature Limits Report X
IF any of the above are yes, THEN:
YES N/A I
o ' Contact the appropriate person (Attachment E of NOD-11, Preparation of X
, Safety, Regulatory, and Environmental Compliance Reviews) to perform i
.an evaluation and attach.
Evaluation Complete and attached:
~
..o NRC' approval received if needed and attached.
X
\\
l LO Page.1 of 2 AI 400C Rev.17-
--w-r
- +,,-
b-ep


1
.. ~
  ..~                                                                                                     !
ENCLOSURE 6 10 CFR 50.54 EVALUATION (h
ENCLOSURE 6 10 CFR 50.54 EVALUATION (h                                                                 REV #:
(,7rocedure'#:
( ,7rocedure'#:             OPO407D-       PRR #:     11281                 05 j
OPO407D-PRR #:
11281 REV #:
05 j
: 8. Environmental Protection Plan Review:
: 8. Environmental Protection Plan Review:
Could this change' affect:                                                     YES   NO
Could this change' affect:
: 1. The environment in a non-radiological way?                                           x
YES NO 1.
: 2. An increase in licensed power level?                                               X     ;
The environment in a non-radiological way?
: 3. An' increase in non-radiological effluents (Volume or chemicals -                 X l
x 2.
liquid or gas)?
An increase in licensed power level?
                                                                                                          ]
X 3.
                                                                                                          )
An' increase in non-radiological effluents (Volume or chemicals -
: 4. A change in Circulating or Raw Water flows?                                     .
X liquid or gas)?
X
]
: 5. Dredging, filling, or new construction on previously undisturbed areas?           X YES   N/A If yes to any of the above, x
)
THEN contact the Manager, Nuclear Licensing to perform an evaluation                     4 and attach. Evaluation Complete and attached:
4.
l p )C. Review (10 CFRfor 50.34a Change andto Appendix Radioactive I) Waste System                              YES   NO Is this a change to a radioactive waste system (liquid, gaseous, or solid)             x that could result in an increase of radioactive material released to the environment?
A change in Circulating or Raw Water flows?
i NOTE:     The following is for reporting evaluation only and is not                         i part of the approval process for the change.
X 5.
YES   N/A   !
Dredging, filling, or new construction on previously undisturbed areas?
?                                                                                                         l IF the above is yes,                                                                       l x
X YES N/A If yes to any of the above, x
l             THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements. Submitted:
THEN contact the Manager, Nuclear Licensing to perform an evaluation 4
and attach. Evaluation Complete and attached:
p )C. Review for Change to Radioactive Waste System l
(10 CFR 50.34a and Appendix I)
YES NO Is this a change to a radioactive waste system (liquid, gaseous, or solid) x that could result in an increase of radioactive material released to the environment?
i NOTE:
The following is for reporting evaluation only and is not i
part of the approval process for the change.
YES N/A
?
IF the above is yes, x
l THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements.
Submitted:
i
i
                                                                  \
\\
QkJ Page 2 of 2         AI 400C         Rev.17                                                   I l                                                                                                          l
Q kJ Page 2 of 2 AI 400C Rev.17 l


O A                             NOH FICATION OF NEW/ REVISED PROCEDURE                     ENCLO5URE 9 U       This procedure has been approved and issued for use. It is your responsibility                   -
O A
to advise personnel in your organization affected by this new/ revised procedure of its contents. Attached is a copy of the Procedure Description,                       I Reasons, and References (Enclosure 2).
NOH FICATION OF NEW/ REVISED PROCEDURE ENCLO5URE 9 U
Procedure #: OPO407D                   PRR #: 11281                     REV #:05 jCHECK TO:  ,
This procedure has been approved and issued for use. It is your responsibility to advise personnel in your organization affected by this new/ revised procedure of its contents. Attached is a copy of the Procedure Description, Reasons, and References (Enclosure 2).
Manager, Nuclear Radiation Protection                                           l
Procedure #: OPO407D PRR #: 11281 REV #:05 jCHECK Manager, Nuclear Radiation Protection TO:
                  ;          Manager, Nuclear Chemistry L
Manager, Nuclear Chemistry L
Manager, Nuclear Plant Operations Manager, Nuclear Configuration Management I C Manager, Nuclear Plant Technical Support
Manager, Nuclear Plant Operations Manager, Nuclear Configuration Management I C Manager, Nuclear Plant Technical Support Manager, Nuclear Security Supervisor, Nuclear Document Control i
                  ;          Manager, Nuclear Security Supervisor, Nuclear Document Control                                             i l         Supervisor, Nuclear Records Management                                           ;
l Supervisor, Nuclear Records Management f
f          Manager, Nuclear Plant Maintenance f         Manager, Nuclear Quality Assessments l         Manager, Nuclear Engineering Design                                         ,  l Manager, Site Nuclear Services Manager, Radiological Emergency Planning f         Manager, Nuclear Licensing Procedure Interpretation Contact       h, kh IE this affects most personnel of Nuclear Operations besides your               i department (for example: AI-413, Fitness for Duty Callout Procedure),
Manager, Nuclear Plant Maintenance f
                  .          TliEN notify applicable personnel by describing the new procedure or         ,
Manager, Nuclear Quality Assessments l
                  !          describing the major changes made to the procedure.
Manager, Nuclear Engineering Design Manager, Site Nuclear Services Manager, Radiological Emergency Planning f
                  !              o This can be done using electronic mail (everyone) or other means.
Manager, Nuclear Licensing Procedure Interpretation Contact h, kh IE this affects most personnel of Nuclear Operations besides your department (for example: AI-413, Fitness for Duty Callout Procedure),
I                                                                                       i
TliEN notify applicable personnel by describing the new procedure or describing the major changes made to the procedure.
                  ' NOTE: For others below, state their name and address
o This can be done using electronic mail (everyone) or other means.
        ,          1      Other:
I i
' NOTE: For others below, state their name and address 1
Other:
l Other:
l l
l Other:
\\.
l Other:
l Other:
l l  ,              l      Other:                                                                          !
l Page 1 of 1 AI 400C Rev.17
    \.
l      Other:                                                                          l Page 1 of 1           AI 400C       Rev.17


/3 ENCLOSURE 10 Qualified Review / Technical Review Procedure #: OPO407D PRR #: 11281 REY: 05 Conments No QUALIFIED REVIEWERS Reviewed By Date Attached :Conments Nuclear Operations Department Nuclear Security Department l
Nuclear Quality Control l
Nuclear Radiation Protection r
[ Nuclear Chemistry i
+
g il/29/yg
/
\\
O Nuclear Maintenance Dept.
I
I
      /3                                                                                        ENCLOSURE 10 Qualified Review / Technical Review                                .
! p
Procedure #: OPO407D                    PRR #: 11281                    REY: 05 Conments        No QUALIFIED REVIEWERS                        Reviewed By        Date    Attached :Conments Nuclear Operations Department Nuclear Security Department l
] Nuclear Configuration Management (EQ Group) l I
Nuclear Quality Control                                                              l Nuclear Radiation Protection r
Nuclear Engineering Design
[ Nuclear Chemistry i                                                                              +
]
                                                      ,        g              il/29/yg Nuclear Maintenance Dept.            .
i l
                                                                  /            \
l Nuclear Plant Technical Support i
                                                                                ;                            O
l l
! p         ] Nuclear Configuration Management (EQ Group)
4 l
I l
Other:
I Nuclear Engineering Design                                     !
Other*
                                                                                                            ]
1 l
i                       !
TECHNICAL REVIEW l
l Nuclear Plant Technical Support         i l
l k;d q h n -7, d n M Y2MV4
l                                                       l l         Other:                                       ,
\\
4 Other*
l Other:
1 l                                                       !                                              .
l
!                      TECHNICAL REVIEW                   l l
[
k;d q                             h n -7 , d n M       Y2MV4
!                                      \                                         l
!          Other:                                         '
l                         [
l Return to: Frank Dola I
l Return to: Frank Dola I
(originator) l l
(originator) l l
l l
l l
Page 1 of 1           AI 400C       Rev.17
Page 1 of 1 AI 400C Rev.17


ENCLOSURE Qualified Review / Technical Review                                 ..
ENCLOSURE Qualified Review / Technical Review Procedure #: OPO407D PRR #: 11281 REV: 05 Consnents No QUALIFIED REVIEWERS Reviewed By Date
Procedure #: OPO407D                       PRR #: 11281                       REV: 05 Consnents     No QUALIFIED REVIEWERS                             Reviewed By         Date   , Attached conenent s Nuclear Operations Department Nuclear Security Department                                                       i Nuclear Quality Control                                                                                 ,
, Attached conenent s Nuclear Operations Department Nuclear Security Department i
                                                                                                                      )
Nuclear Quality Control
          ] Nuclear Radiation Protection Nuclear Chemistry Nuclear Maintenance Dept.
)
Nuclear Configuration Management O       (EQ Group)
] Nuclear Radiation Protection Nuclear Chemistry Nuclear Maintenance Dept.
Nuclear Engineering Design NO T bu/                                       9 2 79           G es   G     V Nuclear Plant Technical Support               g-     ~
Nuclear Configuration Management O
g , j' y     g/y9f 9g         S 6       :                        ,
(EQ Group)
Other:                                                                   !
NO T bu/
Other:                                       !
9 Nuclear Engineering Design 2 79 G
i
es G
                                                                                      '                      i TECHNICAL REVIEW Other:
V Nuclear Plant Technical Support g-g, j' y g/y9f 9g S
~
6 Other:
Other:
i i
TECHNICAL REVIEW Other:
Other:
Other:
Return to: Frank Dola hk (Originator)                                         h         b     h6 M w w-                     asewa                   vse -run u 3 -i-94 I              4.// M       . W#4Ae                 ]           Q w@pv.s.47 Mt T at
hk Return to: Frank Dola (Originator) h b
* Srv64
h6 M w w-asewa vse -run u 3 -i-94 4.// M W#4Ae
                                                                                        **f
]
* s-2-91
Q @ Mt
        'd               -          -                -            -
**f
mp                                M g g 7.a m w w/7W               t. ass,c 3 bg
* s-2-91 I
[                                                                                             # " c""**
mp w pv.s.47 T at
* Srv64 M
'd g g 7.a m w w/7W t. ass,c 3 bg
[
# " c""**
e,+jg, g.,,
e,+jg, g.,,
Page 1 of 1           AI 400C           Rev.17
Page 1 of 1 AI 400C Rev.17


i                                                                                                                 i
i i
  /                                                                                             ENCLOSURE 10 k                                     Qualified Review / Technical Review                                 .-
/
Procedure #: OP0407D                     PRR #: 11281                   REV: 05 f                       I         l Conenents j   No QUALIFIED REVIEWERS               j           Reviewed By     Date j Attached ; Consnents l
ENCLOSURE 10 k
geift q)                       j           .
Qualified Review / Technical Review Procedure #: OP0407D PRR #: 11281 REV: 05 f
[NuclearOperationsDepartment                                                   j
I l Conenents j No QUALIFIED REVIEWERS j
                                                        -    , A_. ,
Reviewed By l
                                                            -            n     24 Nuclear Security Department           !
Date j Attached ; Consnents geift q) j
I         '
[NuclearOperationsDepartment j
Nuclear Quality Control Nuclear Radiation Protection           !
, A_.,
I                                   :
24 n
Nuclear Chemistry Nuclear Maintenance Dept.                                                 !            !
Nuclear Security Department I
(s         Nuclear Configuration Management                                           !
Nuclear Quality Control Nuclear Radiation Protection I
(EQ Group)
Nuclear Chemistry Nuclear Maintenance Dept.
Nuclear Engineering Design             l                                   l i                                   i Nuclear Plant Technical Support                                 l           l Other:                                                               l i           ,
(s Nuclear Configuration Management (EQ Group)
Other:                                                                           l TECHNICAL REVIEW 7                         :
Nuclear Engineering Design l
Other:                                       l I
l i
Other:                                                               f l
i Nuclear Plant Technical Support l
l Other:
l i
Other:
l TECHNICAL REVIEW 7
Other:
l I
l f
Other:
l I
l I
l       Return to: Frank Dola (Originator) b O MME41             950 IV t pA                                                            2 -zm
l Return to: Frank Dola (Originator) b O MME41 950 IV t 2 -zm pA
                  /06Yt. &   '720t Mt. M c-thmedsk & 3-2-96 & 1~e su b v- E/ *7 srud eM       uvr-rw wou. u nut s v+*0 rae Rseau som -mn em l                               w% %sw%% w/ >~. Wo**W/P 7tR YtA c& . He, p Md fAee9M**.?                   .
/06Yt. &
was von t. M . 3-J'!L g Page 1 of 1           AI 400C         Rev.17
'720t Mt. M c-thmedsk & 3-2-96 &
1~e su b v-E/ *7 srud eM uvr-rw wou. u nut s v+*0 rae Rseau som
-mn em l
w% %sw%% w/ >~. Wo**W/P 7tR YtA c&. He, p Md fAee9M**.?
was von t. M. 3-J'!L g Page 1 of 1 AI 400C Rev.17


.s ENCLOSURE 13 INTERPRETATION CONTACT'S CHECKLIST O
.s INTERPRETATION CONTACT'S CHECKLIST ENCLOSURE 13 O
Q Procedure #:         OPO407D       Rev #:     05         PRR #:     11281 YES   N/A
Q Procedure #:
: 1. Originator's Checklist. Enclosure 1, is adequately completed.                     tr 1
OPO407D Rev #:
: 2. IF this is a new SP, a procedure that has received a m;or technical               y rewrite, or a procedure identified as an infrequent test or evolution, THEN ensure a simulation, walk through (no manipula. tion of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.
05 PRR #:
: 3. IF this is a new SP, or is an SP that has received a major technical.
11281 YES N/A 1.
rewri te ,                                                                                 i THEN notify the Senior Nuclear Scheduling Coordinator                                     j responsible for surveillance scheduling that the procedure must be walk                   !
Originator's Checklist. Enclosure 1, is adequately completed.
through validated with an end-user on the next scheduled performance                       I after the procedure is issued.
tr 2.
: 4. IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),
IF this is a new SP, a procedure that has received a m;or technical y
rewrite, or a procedure identified as an infrequent test or evolution, THEN ensure a simulation, walk through (no manipula. tion of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.
3.
IF this is a new SP, or is an SP that has received a major technical.
rewri te,
i THEN notify the Senior Nuclear Scheduling Coordinator j
responsible for surveillance scheduling that the procedure must be walk through validated with an end-user on the next scheduled performance after the procedure is issued.
4.
IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),
THEN ensure adequate aministrative controls are in place to control the component positions.
THEN ensure adequate aministrative controls are in place to control the component positions.
: 5. IF the Procedure Cross Reference sheet had any questions answered yes, THEN forward the Procedure Cross Reference sheet to Records
5.
IF the Procedure Cross Reference sheet had any questions answered yes,
[
[
O       Management.
THEN forward the Procedure Cross Reference sheet to Records O
O   6. IF any comniitments of the NOCS have any changes to the implementation section.                                                                         ]
Management.
O 6.
IF any comniitments of the NOCS have any changes to the implementation
]
section.
THEN forward the applicable commitments to Nuclear Licensing.
THEN forward the applicable commitments to Nuclear Licensing.
: 7. IF inspection planning is required per CP-113C, Inspection Planning, THEN ensure inspection planning methods are incorporated within this             [
7.
procedure or work instruction.
IF inspection planning is required per CP-113C, Inspection Planning,
[
THEN ensure inspection planning methods are incorporated within this procedure or work instruction.
I i
I i
1 A
1 A
I l                                                                                               ~
I l
l' Page 1 of 2       AI 400C       Rev.17
~
l' Page 1 of 2 AI 400C Rev.17


r                                                                                                       i l
r i
ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST                                             j
ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST j
{OjProcedure #:           OPO407D         Rev #:       05           PRR #:       11281 NOTE: The Interpretation Contacts can send any item to the PRC to review prior to ing,lementation, especially if the Interpretation Contact has a plant operation or safety concern.
{OjProcedure #:
1 1
OPO407D Rev #:
: 1. Check ONE of the following:                                                                   1 All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are             l answered "No."     PRC or DNPO review is not required, procedure can be issued.
05 PRR #:
11281 NOTE: The Interpretation Contacts can send any item to the PRC to review prior to ing,lementation, especially if the Interpretation Contact has a plant operation or safety concern.
1
: 1. Check ONE of the following:
All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are answered "No."
PRC or DNPO review is not required, procedure can be issued.
I am forwarding all applicable completed enclosures to Document Control.
I am forwarding all applicable completed enclosures to Document Control.
Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.
Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.
: 2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:
: 2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:
Obtain PRR# from Document Control or electronically.         PRR#
Obtain PRR# from Document Control or electronically.
The activities as designated on Enclosure 1, Originator's Checklist, Q         including those on Enclosure 1 with an asterisk, have been completed and i
PRR#
V          are attached.
The activities as designated on Enclosure 1, Originator's Checklist, Q
I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.
including those on Enclosure 1 with an asterisk, have been completed and V
are attached.
i I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.
This and other applicable enclosures have been properly completed and are being forwarded as stated above.
This and other applicable enclosures have been properly completed and are being forwarded as stated above.
O)f I e7pretat' Ton Contact               Date j c z>,n w w. c. m e.u s s 1 m w s/ /f+ 'PM "'W ~ WW yueg sm.a. mas m ms w e:w nP<a ~rtucw w s-a-u -go PRC and DNPO Review
O)f I e7pretat' Ton Contact Date j c z>,n w w. c. m e.u s s 1 m w s/ /f+ 'PM "'W ~ WW yueg sm.a. mas m ms w e:w nP<a ~rtucw w s-a-u -go PRC and DNPO Review
* PRC Chairman                     Date     PRC Mtg No. DNPO                         Date
* PRC Chairman Date PRC Mtg No.
        ~
DNPO Date
~
* If required
* If required
'\
'\\
l       Page 2 of 2           AI 400C       Rev.17 1
l Page 2 of 2 AI 400C Rev.17 1


_ ~.       . _ _ .  -  .      -  -    --..- -._        .  .- -
_ ~.
1 l
1
                                                                                                    \
\\
l Rev. 5 V                                                       Effective Date         02/16/95     l l
Rev. 5 V
\
Effective Date 02/16/95 l
\\
f OPERATING PROCEDURE OP-407D FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK
f OPERATING PROCEDURE OP-407D FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK
                                                                                    \
\\
APPROVED BY:     Interpretation Contact
APPROVED BY:
          ~
Interpretation Contact
~
(SIGNATURE ON FILE)
(SIGNATURE ON FILE)
DATE:
DATE:
(                           INTERPRETATION CONTACT:         Superviscr, Nuclecr Operctiona l A tir.istrctive Shift Manager, Nuclear Operations Support
(
INTERPRETATION CONTACT:
Superviscr, Nuclecr Operctiona l
A tir.istrctive Shift Manager, Nuclear Operations Support


e                                                                                                 1 l
e 1
l                                                                                                     l
l l
?     .
?
l TABLE OF CONTENTS                                   !
l TABLE OF CONTENTS
      \   SECTION                                                                               PAGE l l
\\
1.0     PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 1 l
SECTION PAGE 1.0 PURPOSE............................
1


==2.0     REFERENCES==
==2.0 REFERENCES==
          ..........................                                  2 2.1             IMPLEMENTING REFERENCES . . . . . . . . . . . . . . .           2 2.2             DEVELOPMENTAL REFERENCES             ..............            2 3.0     PERSONNEL INDOCiRINATION               ...................                      3 3.1             S ET PO I NIS . . . . . . . . . . . . . . . . . . . . . .       3 3.2             LIMITS AND PRECAUTIONS             ...............              4 4.0     INSTRUCTIONS         .........................                                  5 4.1             MWST PRE-FILTER OPERATION . . . . . . . . . . . . . .           5 l l                 4.2             SYSTEM OPERATION         ..................                    7 i 4.3             NWST RECIRC FOR SAMPLING ..............                        18 '
2 2.1 IMPLEMENTING REFERENCES...............
4.4             TRANSFERRING MWST TO WDT-7A (A-CWST) . . .             20 l
2 2.2 DEVELOPMENTAL REFERENCES 2
4.5             TRANSFERRING MWST TO WDT-7B (B-CWST) . . .             25 4.6             TRANSFERRING MWST TO WDT-8A (A-CBAST) . .             30 4.7             TRANSFERRING MWST TO WDT-8B (B-CBAST) . .             35 5.0     FOLLOW-UP ACTIONS . . . . . . . . . .                     .............        20 l
3.0 PERSONNEL INDOCiRINATION 3
6.0     RESTORATION INSTRUCTIONS               ...................                    21 l 1
3.1 S ET PO I NIS......................
1 i
3 3.2 LIMITS AND PRECAUTIONS 4
i l
4.0 INSTRUCTIONS 5
i 1
4.1 MWST PRE-FILTER OPERATION..............
                                                                                                      \
5 l
l 4.2 SYSTEM OPERATION 7
4.3 NWST RECIRC FOR SAMPLING 18 l
4.4 TRANSFERRING MWST TO WDT-7A (A-CWST)...
20 4.5 TRANSFERRING MWST TO WDT-7B (B-CWST)...
25 4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST)..
30 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST)..
35 5.0 FOLLOW-UP ACTIONS..........
20 l
6.0 RESTORATION INSTRUCTIONS 21 1
i i
l i
1
\\
l l
l l
!                                                                                                    l 1
l
l
      \
\\
OP-407D                                       Rev. 5                               Page i l
OP-407D Rev. 5 Page i l
l
l


1 1:
1 1 :
1.0     PURPOSE 1.1     The purpose of this procedure is to control the disposition of liquid   -
1.0 PURPOSE 1.1 The purpose of this procedure is to control the disposition of liquid contained in the MWST.
contained in the MWST.
l l
l l
l j
l j
i l
i O
O OP-407D                           Rev. 5                                 Page 1
OP-407D Rev. 5 Page 1


1 t.
1t.!.-
l            
l
 
==2.0              REFERENCES==


1t
==2.0 REFERENCES==
,                                                                                                                                                                              i j-            2.1             INPLENENTING REFERENCES 1
1t i
i
2.1 INPLENENTING REFERENCES 1
;                              None l
j-i None l
l             2.2             DEVELOPNENTAL REFERENCES 1
l 2.2 DEVELOPNENTAL REFERENCES 1
!              2.2.1           FD-302-681, Liquid Waste Disposal Spent Resin Transfer System i
2.2.1 FD-302-681, Liquid Waste Disposal Spent Resin Transfer System i
l' l
l' l
3 a
3 a
Line 785: Line 1,112:
i i
i i
i 4
i 4
e .
e.
i e                                                                                                                                                                               !
i e
]
]
1 4
1 4i f
i l
l 4
4' i
i i
4 s
L 1
l 4
i 4
i 4
s      .
i OP-407D Rev. 5 Page 2
L                                                                                                                                                                              !
1 l
4 i
4 i
OP-407D                                                     Rev. 5                                                                           Page 2             !


_..__....-..._._____________._..___._.__....._.-___._._.e.__._
_..__....-..._._____________._..___._.__....._.-___._._.e.__._
3.0         PERSONNEL INDOCTRINATION DESCRIPTION                                                                                     VALUE 3.1         SETPOINTS l                                       None 1
3.0 PERSONNEL INDOCTRINATION DESCRIPTION VALUE 3.1 SETPOINTS l
None 1
l l
l l
l l
l l
O l
O l
O OP-407D                                                       Rev. 5                                                                                                 Page 3
O OP-407D Rev. 5 Page 3


'.                                                                                        1 3.2     LINITS AND PRECAUTIONS LIMIT                                     BASIS
1 3.2 LINITS AND PRECAUTIONS LIMIT BASIS
                                                                                        ~
~
3.2.1   For Work located in Radiation           Personnel Protection Controlled Areas, due consideration must be given to the ALARA program I
3.2.1 For Work located in Radiation Personnel Protection Controlled Areas, due consideration must be given to the ALARA program l
l O
l
\\
l l
l l
l i
I lo j
O l
OP-407D Rev. 5 Page 4 l.
                                                            \
l        .
l I
lo j         OP-407D                                 Rev. 5                       Page 4
: l.     .    --      . . . - .          , _ _ . . _ ._,    . . _ ,


.~
.~
l 4.0     INSTRUCTIONS ACTIONS                                       DETAILS 4.1     NWST PRE-FILTER OPERATION 4.1.1   E desired to align MWST             o E WDFL-3A, influent thru a Prefilter,             THEN perform following valve JJHiIH perform the associated           alignment:
l 4.0 INSTRUCTIONS ACTIONS DETAILS 4.1 NWST PRE-FILTER OPERATION 4.1.1 E desired to align MWST o E WDFL-3A, influent thru a Prefilter, THEN perform following valve JJHiIH perform the associated alignment:
valve lineup,                               Close WDV-1004, WDFL-3B Vent Otherwise NA this step                       Valve Close WDV-1002, WDFL-38 Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent Valve Close WDV-996, Filter Bypass Close WDV-999, WDFL-38 Inlet     ,
valve lineup, Close WDV-1004, WDFL-3B Vent Otherwise NA this step Valve Close WDV-1002, WDFL-38 Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent Valve Close WDV-996, Filter Bypass Close WDV-999, WDFL-38 Inlet Close WDV-1000, WDFL-3B Outlet Open WDV-997, WDFL-3A Inlet Open WDV-998,'WDFL-3A Outlet o E WDFL-38,
Close WDV-1000, WDFL-3B Outlet Open WDV-997, WDFL-3A Inlet Open WDV-998,'WDFL-3A Outlet o E WDFL-38,
(
(                                                     THEN perform following valve alignment:
THEN perform following valve alignment:
Close WDV-1004, WDFL-3B Vent Valve Close WDV-1002, WDFL-3B Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent
Close WDV-1004, WDFL-3B Vent Valve Close WDV-1002, WDFL-3B Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent Valve Close WDV-996, Filter Bypass Close WDV-997, WDFL-3A' Inlet Close WDV-998, WDFL-3A Outlet Open WDV-999, WDFL-3B Inlet Open WDV-1000, WDFL-3B Outlet
      "                                                      Valve Close WDV-996, Filter Bypass Close WDV-997, WDFL-3A' Inlet Close WDV-998, WDFL-3A Outlet Open WDV-999, WDFL-3B Inlet Open WDV-1000, WDFL-3B Outlet
/
                                                                                        /
Initial /Date OP-407D Rev. 5 Page 5
Initial /Date OP-407D                               Rev. 5                                 Page 5


;                      4.1                 MWST PRE-FILTER OPERATION (Cont'd)
4.1 MWST PRE-FILTER OPERATION (Cont'd)
;O ACTIONS                                               DETAILS i
;; O ACTIONS DETAILS i
4-                     4.1.2               If desired to bypass MWST                       o     Open WDV-996, Filter Bypass pre-filters,                                           Close WDV-997, WDFL-3A Inlet                                   :
4-4.1.2 If desired to bypass MWST o
:                                            IBEN perform the associated                             Close WDV-998, WDFL-3A                                     -l
Open WDV-996, Filter Bypass pre-filters, Close WDV-997, WDFL-3A Inlet IBEN perform the associated Close WDV-998, WDFL-3A
;                                            valve lineup,                                           Outlet
-l valve lineup, Outlet Otherwise NA this step Close WDV-999, WDFL-3B Inlet Close WDV-1000, WDFL-3B l
;                                            Otherwise NA this step                                 Close WDV-999, WDFL-3B Inlet Close WDV-1000, WDFL-3B l                                                                                                   Outlet i
Outlet i
:                                                                                                                                  /
/
4 Initial /Date 4
4 Initial /Date 4
4 4-i t
4 4-i t
I d
I d
~.G iO i
O OP-407D Rev. 5 Page 6
1 4.2 SYSTEM OPERATION ACTIONS DETAILS 4.2.1 If desired to transfer MWST
: 1. Close the following:
to Neutralizer Tank via WDV-164, Cation Demin 3A WDP-6A, Inlet Isolation THEN perform required Valve WDV-166, Cation Demin 3B Alignment Inlet Isolation 4
Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation
: 2. Open the following:
WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge Valve 4
WDV-129, Neutralizer Tank Inlet Isolation WDV-157, WDP-6A Recirc 4
Isolation
~
~
.G iO i
l O
OP-407D                                                        Rev. 5                                    Page 6
1 4.2          SYSTEM OPERATION
:                                  ACTIONS                                                                DETAILS 4.2.1        If desired to transfer MWST                1. Close the following:
to Neutralizer Tank via                                    WDV-164, Cation Demin 3A WDP-6A,                                                      Inlet Isolation THEN perform required Valve                                WDV-166, Cation Demin 3B Alignment                                                    Inlet Isolation 4
Otherwise N/A this step                                      WDV-172, MW Evap Inlet
                                                                            .            Isolation WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation
:                                                                      2. Open the following:
WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge 4
Valve WDV-129, Neutralizer Tank Inlet Isolation WDV-157, WDP-6A Recirc 4~                                                                                        Isolation
: 3. GO TO Step 4.2.9
: 3. GO TO Step 4.2.9
:                                                                                                                                            /
/
Initial /Date 1
Initial /Date 1
a j
a j
1 t
1 t
O OP-407D                                         Rev. 5                                                                     Page 7
O OP-407D Rev. 5 Page 7 r
                                                ,..-          ,          ,                  - ~ , -
- ~, -


ii 4.2     SYSTEM OPERATION (Cont'd) l     U ACTIONS                                     DETAILS                     .
ii 4.2 SYSTEM OPERATION (Cont'd) l U ACTIONS DETAILS 1
1 4.2.2   E desired to transfer MWST           1. Close the following:
4.2.2 E desired to transfer MWST
to Neutralizer Tank via                     WDV-164, Cation Demin 3A 20P-68, .                                   Inlet Isolation THEN perform required Valve                 WDV-166, Cation Demin 3B           l Alignment                                   Inlet Isolation Otherwise N/A this step                     WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet             ,
: 1. Close the following:
Isolation                         i WDV-680, Nuclear Waste Demins Isolation
to Neutralizer Tank via WDV-164, Cation Demin 3A 20P-68,.
Inlet Isolation THEN perform required Valve WDV-166, Cation Demin 3B Alignment Inlet Isolation Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation i
WDV-680, Nuclear Waste Demins Isolation
: 2. Open the following:
: 2. Open the following:
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-129, Neutralizer Tank Inlet Isolation WDV-158, WDP-6B Recirc Isolation   -
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-129, Neutralizer Tank Inlet Isolation WDV-158, WDP-6B Recirc Isolation
: 3. GO TO Step 4.2.9 C                                                                                     /
: 3. GO TO Step 4.2.9 C
Initial /Date 4.2.3   E desired to transfer MWST           1. Close the following:
/
directly to MW Evap via                     WDV-164, Cation Demin 3A WDP-6A,                                     Inlet Isolation
Initial /Date 4.2.3 E desired to transfer MWST
_THfB H    perform required Valve               WDV-166, Cation Demin 3B Alignment                                   Inlet Isolation Otherwise N/A this step                     WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation WDV-129, Neutralizer Tank Inlet Isolation
: 1. Close the following:
directly to MW Evap via WDV-164, Cation Demin 3A WDP-6A, Inlet Isolation
_THfB perform required Valve WDV-166, Cation Demin 3B H
Alignment Inlet Isolation Otherwise N/A this step WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation WDV-129, Neutralizer Tank Inlet Isolation
: 2. Open the following:
: 2. Open the following:
WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge Valve WDV-172, MW Evap Inlet
WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge Valve WDV-172, MW Evap Inlet Isolation
            ~
~
Isolation WDV-157, WDP-6A Recirc Isolation
WDV-157, WDP-6A Recirc Isolation
: 3. GO TO Step 4.2.9
: 3. GO TO Step 4.2.9
                                                                                            /
/
      \
\\
Initial /Date OP-407D                               Rev. 5                                 Page 8
Initial /Date OP-407D Rev. 5 Page 8


1 l
1 4.2 SYSTEM OPERATION (Cont'd)
4.2     SYSTEM OPERATION (Cont'd)
ACTIONS DETAILS.
ACTIONS                                   DETAILS.
4.2.4 IE desired to transfer MWST
4.2.4   IE desired to transfer MWST       1. Close the following:
: 1. Close the following:
to MW Evap via WDP-6B,                   .WDV-164, Cation Demin 3A ItB perform required Valve               Inlet Isolation Alignment                                 WDV-166, Cation Demin 3B Otherwise N/A this step                   Inlet Isolation WDV-154, RC Evap Inlet             i Isolation                         l WDV-680, Nuclear Waste             .
to MW Evap via WDP-6B,
Demins Isolation                   !
.WDV-164, Cation Demin 3A ItB perform required Valve Inlet Isolation Alignment WDV-166, Cation Demin 3B Otherwise N/A this step Inlet Isolation WDV-154, RC Evap Inlet i
WDV-129, Neutralizer Tank Inlet Isolation
Isolation WDV-680, Nuclear Waste Demins Isolation WDV-129, Neutralizer Tank Inlet Isolation
: 2. Open the following:
: 2. Open the following:
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-172, MW Evap Inlet j
      .                                                  WDV-172, MW Evap Inlet             j Isolation                         1 WDV-158, WDP-6B Recirc             ;
Isolation 1
Isolation                         i
WDV-158, WDP-6B Recirc Isolation
: 3. GO TO Step 4.2.9 Initial /Date I
: 3. GO TO Step 4.2.9 Initial /Date OP-407D Rev. 5 Page 9 F
l l
m
OP-407D                             Rev. 5                                 Page 9 F


f-    4.2     SYSTEM OPERATION (Cont'd)
4.2 SYSTEM OPERATION (Cont'd) f-ACTIONS DETAILS 4.2.5 J.E desired to transfer MWST
ACTIONS                                   DETAILS 4.2.5   J.E desired to transfer MWST       1. Close the following:
: 1. Close the following:
to MW Evap thru Cation "A"                 WDV-680, Nuclear Waste Demin via WDP-6A,                         Demins Isolation IllEN perform required Valve               WDV-129, Neutralizer Tank       !
to MW Evap thru Cation "A" WDV-680, Nuclear Waste Demin via WDP-6A, Demins Isolation IllEN perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation WDV-44, Cation Demin 3A Inlet Isolation from CBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A i
Alignment                                 Inlet Isolation Otherwise N/A this step                   WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation WDV-44, Cation Demin 3A Inlet Isolation from CBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A       i Drain Valve                     l WDV-366, Cation Demin 3A       ;
Drain Valve WDV-366, Cation Demin 3A Drain Valve Q
Drain Valve Q
WDV-170, Cation Demin 3A Q
Q WDV-170, Cation Demin 3A Outlet to MWST                 i WDV-49, Cation Demin 3A         '
Outlet to MWST i
Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System WDV-55, Cation Demins Outlet to RC Evap WDV-58, MW Evap Inlet from     :
WDV-49, Cation Demin 3A Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System WDV-55, Cation Demins Outlet to RC Evap WDV-58, MW Evap Inlet from RCBT's WDV-173, MW Evap Inlet from Neutralizer Tank O
RCBT's WDV-173, MW Evap Inlet from Neutralizer Tank O
OP-4070 Rev. 5 Page 10
OP-4070                             Rev. 5                             Page 10


1 1
()
()
I 4.2           SYSTEM OPERATION (Cont'd)
4.2 SYSTEM OPERATION (Cont'd)
\                                                                                                                           .
\\
ACTIONS                                       DETAILS I                                                                                                                                 i
ACTIONS DETAILS I
!                4.2.5         (Continued)                                 2. Open the following:
i 4.2.5 (Continued)
WDV-155, WDP-6A Suction Valve                                         l l                                                                                    WDV-159, WDP-6A Discharge                     !
: 2. Open the following:
l Valve WDV-164, Cation Demin 3A
WDV-155, WDP-6A Suction Valve l
,                                                                                    Inlet Isolation l                                                                                     WDV-57, Cation Demins Outlet                 1 to MW Evap l                                                                                     WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A l                                                                                     Outlet WDV-54, Cation Demins Outlet X-tie
WDV-159, WDP-6A Discharge l
                                                                                    -WDV-157, WDP-6A Recirc Isolation
Valve WDV-164, Cation Demin 3A Inlet Isolation l
: 3. GO TO Step 4.2.9                                   ;
WDV-57, Cation Demins Outlet 1
              )                                                                                       Initial /Date 1
to MW Evap l
l
WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A l
                                                                                                    \
Outlet WDV-54, Cation Demins Outlet X-tie
                                                                                                                                'I 1 l
-WDV-157, WDP-6A Recirc Isolation
: 3. GO TO Step 4.2.9
)
Initial /Date
\\
'I l
f I
f I
OP-407D                                             Rev. 5                                     Page 11
OP-407D Rev. 5 Page 11


_ - - _    .        _ -        __  . - - - ---      ~       .      .-.          ...      . __-
~
4.2     SYSTEM OPERATION (Cont'd)
4.2 SYSTEM OPERATION (Cont'd)
: i. (g' s \
. (g' s
ACTIONS                                           DETAILS
\\
]                   4.2,6   1E desired to transfer MWST               1. Close the following:
i ACTIONS DETAILS
to MW Evap thru Cation "A"                       WDV-680, Nuclear Waste Demin via WDP-68,                                 Demins Isolation IHfH perform required Valve                       WDV-129, Neutralizer Tank Alignment                                         Inlet Isolation Otherwise N/A this step                           WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet             4 Isolation                           '
]
WDV-154, RC Evap Inlet 2
4.2,6 1E desired to transfer MWST
Isolation
: 1. Close the following:
:                                                                            WDV-44, Cation Demin 3A Inlet Isolation from RCBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A
to MW Evap thru Cation "A" WDV-680, Nuclear Waste Demin via WDP-68, Demins Isolation IHfH perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet 4
:                                                                            Drain Valve
Isolation WDV-154, RC Evap Inlet 2
,                                                                            WDV-366, Cation Demin 3A Drain Valve                         J
Isolation WDV-44, Cation Demin 3A Inlet Isolation from RCBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A Drain Valve WDV-366, Cation Demin 3A Drain Valve J
      <-'s WDV-170, Cation Demin 3A
<-'s WDV-170, Cation Demin 3A f
:    f                                                                        Outlet to MWST
Outlet to MWST WDV-49, Cation Demin 3A Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System WDV-55, Cation Demins Outlet to RC Evap WDV-58, MW Evap Inlet from RCBT's WDV-173, MW Evap Inlet from Neutralizer Tank e
;                                                                            WDV-49, Cation Demin 3A Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System
d OP-4070 Rev. 5 Page 12
,                                                                            WDV-55, Cation Demins Outlet to RC Evap
;                                                                            WDV-58, MW Evap Inlet from RCBT's WDV-173, MW Evap Inlet from         ,
.                                                                            Neutralizer Tank e
d OP-4070                                   Rev. 5                                 Page 12


  .r 4.2     SYSTEM OPERATION (Cont'd)
.r 4.2 SYSTEM OPERATION (Cont'd)
ACTIONS                                 DETAILS                       -
ACTIONS DETAILS 4.2.6 (Continued)
4.2.6   (Continued)                     2. Open the following:
: 2. Open the following:
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-164, Cation Demin 3A Inlet Isolation WDV-57, Cation Demins Outlet to MW Evap WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A Outlet WDV-54, Cation Demins Outlet X-tie WDV-158, WDP-6B Recirc Isolation
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-164, Cation Demin 3A Inlet Isolation WDV-57, Cation Demins Outlet to MW Evap WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A Outlet WDV-54, Cation Demins Outlet X-tie WDV-158, WDP-6B Recirc Isolation
: 3. GO TO Step 4.2.9
: 3. GO TO Step 4.2.9
                                                                                      /
/
Initial /Date O
Initial /Date O
OP-4070                           Rev. 5                                 Page 13
OP-4070 Rev. 5 Page 13


e 4.2     SYSTEM OPERATION (Cont'd) v                                                                                         l ACTIONS                                     DETAILS                 -
e 4.2 SYSTEM OPERATION (Cont'd) v ACTIONS DETAILS 4.2.7 IE desired to transfer MWST
l 4.2.7   IE desired to transfer MWST         1. Close the following:
: 1. Close the following:
to MW Evap thru Cation "B"                 WDV-680, Nuclear Waste Demin via WDP-6A,                         Demins Isolation JHEN H    perform required Valve               WDV-129, Neutralizer Tank Alignment                                 Inlet Isolation Otherwise N/A this step                   WDV-172, NW Evap Inlet Isolation                         I WDV-154, RC Evap Inlet Isolation WDV-173, MW Evap Inlet from Neutralizer Tank                 q WDV-164, Cation Demin 3A Inlet Isolation WDV-45, Cation Demin 38 Inlet Isolation from RCBT's       !
to MW Evap thru Cation "B" WDV-680, Nuclear Waste Demin via WDP-6A, Demins Isolation JHEN perform required Valve WDV-129, Neutralizer Tank H
WDV-117, Cation Demin 38           !
Alignment Inlet Isolation Otherwise N/A this step WDV-172, NW Evap Inlet Isolation I
Inlet Isolation from MU           !
WDV-154, RC Evap Inlet Isolation WDV-173, MW Evap Inlet from Neutralizer Tank q
System WDV-108, Cation Demin 3B Drain Valve (3                                                     WDV-367, Cation Demin 3B U                                                       Drain Valve WDV-171, Cation Demin 3B Outlet to MWST WDV-51, Cation Demin 3B           l Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's O
WDV-164, Cation Demin 3A Inlet Isolation WDV-45, Cation Demin 38 Inlet Isolation from RCBT's WDV-117, Cation Demin 38 Inlet Isolation from MU System WDV-108, Cation Demin 3B Drain Valve (3
OP-407D                             Rev. 5                             Page 14
WDV-367, Cation Demin 3B U
Drain Valve WDV-171, Cation Demin 3B Outlet to MWST WDV-51, Cation Demin 3B l
Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's O
OP-407D Rev. 5 Page 14


9 4.2             SYSTEM OPERATION (Cont'd)
9 4.2 SYSTEM OPERATION (Cont'd)
ACTIONS                                                                   DETAILS                               -
ACTIONS DETAILS 1
1 i
i 4.2.7 (Continued)
4 4.2.7           (Continued)                                                 2. Open the following:
: 2. Open the following:
WDV-155, WDP-6A Suction Valve
4 WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge
+
+
WDV-159, WDP-6A Discharge i                                                                                                 Valve
i Valve WDV-166, Cation Demin 3B L
;                                                                                                WDV-166, Cation Demin 3B L
Inlet Isolation i
Inlet Isolation                                     i
WDV-57, Cation Demins Outlet to MW Evap WDV-369, Cation Demin 3B Outlet Isolation WDV-53, Cation Demin 3B Outlet WDV-157, WDP-6A Recirc Isolation
,                                                                                                WDV-57, Cation Demins Outlet                       !
: 3. GO TO Step 4.2.9 l
to MW Evap                                         l WDV-369, Cation Demin 3B Outlet Isolation WDV-53, Cation Demin 3B Outlet WDV-157, WDP-6A Recirc Isolation
/
: 3. GO TO Step 4.2.9 l                                                                                                                                       /
Initial /Date
;                                                                                                                              Initial /Date
!O i
!O i
4 I
4 I
i 4
i 4
l j         _
l j
i
i
!o 4
!o 4
;            OP-407D                                                         Rev. 5                                                   Page 15
OP-407D Rev. 5 Page 15


l5 I
l5 I
I 4.2       SYSTEM OPERATION (Cont'd)
I 4.2 SYSTEM OPERATION (Cont'd)
O ACTIONS                                           DETAILS 4.2.8     IE desired to transfer MWST               1. Close the following:
O ACTIONS DETAILS 4.2.8 IE desired to transfer MWST
to MW Evap thru Cation "B"                       WDV-680, Nuclear Waste Demin via WDP-6B,                                 Demins Isolation TJiB perform required Valve                       WDV-129, Neutralizer Tank Alignment                                         Inlet Isolation Otherwise N/A this step                           WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet
: 1. Close the following:
,                                                                      Isolation l                                                                       WDV-173, MW Evap Inlet from l                                                                       Neutralizer Tank WDV-164, Cation Demin 3A Inlet Isolation l                                                                       WDV-45, Cation Demin 3B l                                                                       Inlet Isolation from RCBT's WDV-117, Cation Demin 3B l                                                                       Inlet Isolation from MU System WDV-108, Cation Demin 3B Drain Valve l f-                                                                   WDV-367, Cation Demin 3B
to MW Evap thru Cation "B" WDV-680, Nuclear Waste Demin via WDP-6B, Demins Isolation TJiB perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation l
; i Drain Valve WDV-171, Cation Demin 3B
WDV-173, MW Evap Inlet from l
:                                                                      Outlet to MWST l                                                                       WDV-51, Cation Demin 3B Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's l
Neutralizer Tank WDV-164, Cation Demin 3A Inlet Isolation l
WDV-45, Cation Demin 3B l
Inlet Isolation from RCBT's WDV-117, Cation Demin 3B l
Inlet Isolation from MU System WDV-108, Cation Demin 3B Drain Valve l
f-WDV-367, Cation Demin 3B
; i Drain Valve WDV-171, Cation Demin 3B Outlet to MWST l
WDV-51, Cation Demin 3B Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's l
1
1
{
{
l
l
      ~
~
:O i         0P-407D                                     Rev. 5                               Page 16 l
: O i
0P-407D Rev. 5 Page 16 l
l l
l l


  ~
~
1 4.2     SYSTEM OPERATION (Cont'd)
1 4.2 SYSTEM OPERATION (Cont'd)
ACTIONS                                         DETAILS                             -
ACTIONS DETAILS 4.2.8 (Continued)
4.2.8   (Continued)                           2. Open the following:                                     '
: 2. Open the following:
WDV-156, WDP-6B Suction                           !
WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-166, Cation Demin 3B Inlet Isolation WDV-57,. Cation Demins Outlet to MW Evap WDV-369,. Cation Demin 3B Outlet Isolation WDV-53, Cation Demin 3B Outlet WDV-158, WDP-6B Recirc.
Valve                                             !
Isolation
WDV-160, WDP-6B Discharge                         !
/
Valve WDV-166, Cation Demin 3B Inlet Isolation WDV-57,. Cation Demins Outlet to MW Evap                                         !
\\
WDV-369,. Cation Demin 3B Outlet Isolation                                   i WDV-53, Cation Demin 3B Outlet WDV-158, WDP-6B Recirc.                           l Isolation                                         !
Initial /Date 3
                                                                                                      /               \
4.2.9 Start transfer of MWST
Initial /Date           l l
: 1. Start Aligned WDP WDP-6A 0_B WDP-6B 2.
3    4.2.9   Start transfer of MWST                 1. Start Aligned WDP WDP-6A 0_B WDP-6B
Throttle WDV-157 (158),
: 2.       Throttle WDV-157 (158),                           .
WDP-6A (6B) recirc.
WDP-6A (6B) recirc.                               I isolation valves, as required, to obtain a discharge pressure of approximately 55 psig
isolation valves, as required, to obtain a discharge pressure of approximately 55 psig
                                                                                                      /
/
Initial /Date           ]
Initial /Date
I i
]
4.2.10 WHEN transfer of MWST is               1.       Stop WDP-6A/6B                                     l completed,                             2. Close the following as required:
i 4.2.10 WHEN transfer of MWST is 1.
THEN stop MWST Transfer Pump,                 WDV-155                 WDV-156 AND restore system to Standby                 WDV-159                 WDV-160 Condition                                     WDV-129                 WDV-164 WDV-166                 WDV-172 WDV-57                   WDV-48 WDV-368                 WDV-369 WDV-53                   WDV-54 i
Stop WDP-6A/6B completed,
O                                                                                                 /
: 2. Close the following as required:
O                                                                                       Initial /Date OP-4070                             Rev. 5                                             Page 17
THEN stop MWST Transfer Pump, WDV-155 WDV-156 AND restore system to Standby WDV-159 WDV-160 Condition WDV-129 WDV-164 WDV-166 WDV-172 WDV-57 WDV-48 WDV-368 WDV-369 WDV-53 WDV-54 i
O
/
O Initial /Date OP-4070 Rev. 5 Page 17


1-'
1-'
4.3     MWST RECIRC FOR SAMPLING lO ACTIONS                                   DETAILS l
lO 4.3 MWST RECIRC FOR SAMPLING l
i
ACTIONS DETAILS i
'          4.3.1   E recirculating MWST with           1.     Close/ ensure closed WDV-156, WDP-6A,                                   WDP-6B Suction
4.3.1 E recirculating MWST with 1.
,                  I!iB perform the following-         2. Close WDV-159, WDP-6A l                   valve lineup                               Discharge Isolation
Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction I!iB perform the following-2.
!                  Otherwise N/A this step             3. Close WDV-160, WDP-6B f                                                             ' Discharge Isolation i                                                     .4. Open WDV-155, WDP-6A Suction
Close WDV-159, WDP-6A l
: 5. Open/ ensure open WDV-157, WDP-6A Recirc.
valve lineup Discharge Isolation Otherwise N/A this step 3.
Close WDV-160, WDP-6B f
' Discharge Isolation i
.4.
Open WDV-155, WDP-6A Suction 5.
Open/ ensure open WDV-157, WDP-6A Recirc.
^
^
                                                                                          /
/
4 Initial /Date l
Initial /Date 4
j          4.3.2   E recirculating MWST with           1. Close/ ensure closed WDV-155, j                   WDP-68,                                   WDP-6A Suction
l j
;                  Ili$ perform the following         2.     Close WDV-159, WDP-6A valve lineup                               Discharg'e Isolation Otherwise N/A this step             3. Close WDV-160, WDP-6B T                                                       Discharge Isolation
4.3.2 E recirculating MWST with 1.
: 4. Open WDV-156, WDP-6B Suction
Close/ ensure closed WDV-155, j
: 5. Open/ ensure open WDV-158, WDP-6B Recire.
WDP-68, WDP-6A Suction Ili$ perform the following 2.
                                                                                          /
Close WDV-159, WDP-6A valve lineup Discharg'e Isolation Otherwise N/A this step 3.
Initial /Date 4.3.3   Determine MWST tank level and       o Record MWST level-reco.rd
Close WDV-160, WDP-6B T
                                                                                          /
Discharge Isolation 4.
Initial /Date 4.3.4   Start required Misc. Rad           o       Start WDP-6A Waste Transfer Pump OE o       Start WDP-6B o     Record start time
Open WDV-156, WDP-6B Suction 5.
                                                                                          /
Open/ ensure open WDV-158, WDP-6B Recire.
Initial /Date OP-407D                             Rev. 5                                 Page 18
/
Initial /Date 4.3.3 Determine MWST tank level and o Record MWST level-reco.rd
/
Initial /Date 4.3.4 Start required Misc. Rad o
Start WDP-6A Waste Transfer Pump OE o
Start WDP-6B o
Record start time
/
Initial /Date OP-407D Rev. 5 Page 18


4.3     NWST RECIRC FOR SAMPLING (Cont'd)
4.3 NWST RECIRC FOR SAMPLING (Cont'd)
ACTIONS                                                               DETAILS 1
ACTIONS DETAILS l
l                                                                                                                                       I l                    NOTE: Chemistry will draw periodic samples from the MWST. A sample i
l NOTE: Chemistry will draw periodic samples from the MWST. A sample request form and sample due time are not needed.
request form and sample due time are not needed.
i 4.3.5 Notify Chemistry that MWST is o
4.3.5   Notify Chemistry that MWST is                     o         Chemistry Technician l                     on recirc for sampling                                       notified:
Chemistry Technician l
on recirc for sampling notified:
i
i
                                                                                                                      /
/
l                                                                                                         Initial /Date 4.3.6   WHEN Chemistry notifies                             1.       Stop WDP-6A Operations that sample is                                   Close WDV-155 complete, Ili@ restore the lineup                                     08
l Initial /Date 4.3.6 WHEN Chemistry notifies 1.
: 2.       Stop WDP-6B Close WDV-156 l                                                                                                                     /
Stop WDP-6A Operations that sample is Close WDV-155
;                                                                                                          Initial /Date i
: complete, Ili@ restore the lineup 08 2.
l                                                                                                                                     i i
Stop WDP-6B Close WDV-156 l
l l
/
I l
Initial /Date i
l i
i l
l lO l
l lO l
0P-407D                                             Rev. 5                                         page 19
0P-407D Rev. 5 page 19


f 4.4     TRANSFERRING MWST TO WDT-7A (A-CWST)
f 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST)
ACTIONS                                     DETAILS l         4.4.1   Perform the following valve         1. Close/ ensure closed:
ACTIONS DETAILS l
l                 lineup                                     WDV-1134, Isolation to Waste l                                                             Processing Demineralizers WDV-657, Waste Drum Fill
4.4.1 Perform the following valve
!                                                            WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE i                                                            WDV-653, Drum Waste Fill l                                                             Shut 0ff WDV-327, WDP Back Flush WDV-220, WDP-12B Discharge WDV-206, WDT-7A Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-28 Inlet WDV-218, WDT-78 Recycle l                       .
: 1. Close/ ensure closed:
WDV-212, WDT-7A Outlet       -
l lineup WDV-1134, Isolation to Waste l
WDV-215, WDT-7B Outlet WDV-210, WDT-7A Demin Water
Processing Demineralizers WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill i
(                                                       Inlet WDV-129, WDT-9 Isolation l
l Shut 0ff WDV-327, WDP Back Flush WDV-220, WDP-12B Discharge WDV-206, WDT-7A Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-28 Inlet WDV-218, WDT-78 Recycle l
l WDV-153, Misc Waste Evap Isolation WDV-829, Inlet to WDT-7A From the Desuperheater WDV-878, CW Return to Evaporator
WDV-212, WDT-7A Outlet WDV-215, WDT-7B Outlet WDV-210, WDT-7A Demin Water
                                                                                          /
(
Initial /Date 4.4.2   Ensure hose is installed that       1. Close/ ensure closed WDV-678, connects the blind flange at               suction to WDP-27 WDV-678 to the blind flange         2. Close/ ensure closed WDV-661, at WDV-661. (located in                     isolation to alternate yellow room)                               liquid waste fill line
Inlet WDV-129, WDT-9 Isolation l
: 3. Ensure one end of hose is           i installed at WDV-678               i
WDV-153, Misc Waste Evap Isolation WDV-829, Inlet to WDT-7A From the Desuperheater WDV-878, CW Return to Evaporator
: 4. Ensure the other end of hose       i' is installed at WDV-661
/
                                                                                          /       l Initial /Date   l I'
Initial /Date 4.4.2 Ensure hose is installed that 1.
!                                                                                                l OP-407D                             Rev. 5                                 Page 20   ,
Close/ ensure closed WDV-678, connects the blind flange at suction to WDP-27 WDV-678 to the blind flange 2.
Close/ ensure closed WDV-661, at WDV-661. (located in isolation to alternate yellow room) liquid waste fill line 3.
Ensure one end of hose is installed at WDV-678 i
4.
Ensure the other end of hose i
is installed at WDV-661
/
Initial /Date I'
OP-407D Rev. 5 Page 20


I             4.4     TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd)
I 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd)
ACTIONS                                   DETAILS-                     i
ACTIONS DETAILS-i
                                                                                                    ~
~
4.4.3   Place MWST on recirc via WDP-       o E recirculating via WDP-6A, 6A or WDP-68.                         M GO T0 step 4.4.4.
4.4.3 Place MWST on recirc via WDP-o E recirculating via WDP-6A, 6A or WDP-68.
l                                                         o E recirculating via WDP-68, l                                                             M GO T0 step 4.4.5 l                                                                                             /
M GO T0 step 4.4.4.
l                                                                                   Initial /Date l
l o E recirculating via WDP-68, l
4.4.4   E recirculating MWST with           1. Close/ ensure closed WDV-156, WDP-6A,                                   WDP-6B Suction THEN perform the following:         2. Close WDV-159, WDP-6A Discharge Isolation
M GO T0 step 4.4.5 l
: 3. Close WDV-160, WDP-6B Discharge Isolation
/
: 4. Open WDV-155, WDP-6A Suction
l Initial /Date l
: 5. Open/ ensure open WDV-157,           j WDP-6A Recirc.                       1
4.4.4 E recirculating MWST with 1.
: 6. Start WDP-6A
Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction THEN perform the following:
: 7. GO T0 step 4.4.6 D
2.
(V               .
Close WDV-159, WDP-6A Discharge Isolation 3.
                                                                                              /
Close WDV-160, WDP-6B Discharge Isolation 4.
l                                                                                   Initial /Date l
Open WDV-155, WDP-6A Suction 5.
4.4.5   E recirculating MWST with           1. Close/ ensure closed WDV-155,       .
Open/ ensure open WDV-157, j
WDP-68,                                   WDP-6A Suction                       l THEN perform the following:         2. Close WDV-159, WDP-6A Discharge Isolation
WDP-6A Recirc.
: 3. Close WDV-160, WDP-6B Discharge Isolation
1 6.
: 4. Open WDV-156, WDP-6B Suction
Start WDP-6A 7.
: 5. Open/ ensure open WDV-158, WDP-6B Recirc.
GO T0 step 4.4.6 D(V
: 6. Start WDP-6B
/
                                                                                              /       ,
l Initial /Date l
4.4.5 E recirculating MWST with 1.
Close/ ensure closed WDV-155, WDP-68, WDP-6A Suction THEN perform the following:
2.
Close WDV-159, WDP-6A Discharge Isolation 3.
Close WDV-160, WDP-6B Discharge Isolation 4.
Open WDV-156, WDP-6B Suction 5.
Open/ ensure open WDV-158, WDP-6B Recirc.
6.
Start WDP-6B
/
Initial /Date l
Initial /Date l
t i
t i
0P-407D                             Rev. 5                                 Page 21
0P-407D Rev. 5 Page 21


p.
p.
I
I 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) bv i
  .                                                                                                                            1 4.4     TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) b v
ACTIONS DETAILS l
i                                ACTIONS                                           DETAILS                                     l l                                                                                                                              i
i 4,4,6 Perform the following valve o Open/ ensure open:
!        4,4,6   Perform the following valve                       o Open/ ensure open:
i lineup to transfer from MWST WDV-219, WDP-12A Discharge to WDT-7A WDV-661, Isolation'To l
i                 lineup to transfer from MWST                             WDV-219, WDP-12A Discharge to WDT-7A                                               WDV-661, Isolation'To l                                                                           Alternate Liquid Waste Fill l                                                                           Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming WDV-678, Drumming Station Isolation l
Alternate Liquid Waste Fill l
Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming WDV-678, Drumming Station Isolation l
WDV-217, WDT-7A Recycle WDV-295, Spray Header Isolation
WDV-217, WDT-7A Recycle WDV-295, Spray Header Isolation
                                                                                                                  /
/
Initial /Date
Initial /Date
: s/h.                                                                                                                          I l         4.4.7   Determine MWST tank level and                     Record MWST level record
. h.
                                                                                                                  /
: s/
Initial /Date 4.4.8   Determine A-CWST (WDT-7A)                         Record WDT-7A tank level tank level and record
I l
                                                                                                                  /
4.4.7 Determine MWST tank level and Record MWST level record
/
Initial /Date 4.4.8 Determine A-CWST (WDT-7A)
Record WDT-7A tank level tank level and record
/
Initial /Date l
Initial /Date l
l l     .
l l
:O l
: O l
OP-4070                                         Rev. 5                                               Page 22
OP-4070 Rev. 5 Page 22 1.
: 1. _                    _                _


i l      4.4     TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) 3 (V
i 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) l 3(V ACTIONS DETAILS CAUTION:
ACTIONS                                     DETAILS                 -
The loop seals will need to be monitored while filling the tank.
CAUTION:     The loop seals will need to be monitored while filling the tank.
4.4.9 Open appropriate Waste o
4.4.9   Open appropriate Waste             o     J1 recirculating via WDP-6A, l               Transfer pump discharge                   THEN open WDV-159, WDP-6A valve.                                     Discharge Isolation M
J1 recirculating via WDP-6A, l
o     J1 recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation
Transfer pump discharge THEN open WDV-159, WDP-6A valve.
                                                                                      /
Discharge Isolation M
Initial /Date 4.4.10 When transfer from MWST to           o     Stop WDP-6A WDT-7A is complete, stop the               Close WDV-155 transfer pump M
o J1 recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation
o     Stop WDP-6B Close WDV-156
/
                                                                                      /
Initial /Date 4.4.10 When transfer from MWST to o
Initial /Date 4.4.11 Determine MWST tank level and         Record MWST Tank level record
Stop WDP-6A WDT-7A is complete, stop the Close WDV-155 transfer pump M
                                                                                      /
o Stop WDP-6B Close WDV-156
Initial /Date l     4.4.12 Determine A-CWST (WDT-7A)             Record WDT-7A tank level i               tank level and record l                                                                                     /
/
'p                                                                           Initial /Date OP-407D                               Rev. 5                               Page 23
Initial /Date 4.4.11 Determine MWST tank level and Record MWST Tank level record
/
Initial /Date l
4.4.12 Determine A-CWST (WDT-7A)
Record WDT-7A tank level i
tank level and record l
/
'p Initial /Date OP-407D Rev. 5 Page 23


1:
1:
l I
l I
i 4.4           TRANSFERRING MWST TO WDT-7A (A-CWSTl (Cont'd)
i 4.4 TRANSFERRING MWST TO WDT-7A (A-CWSTl (Cont'd)
ACTIONS                                         DETAILS                         '-
ACTIONS DETAILS 4.4.13 Restore the lineup o Close the follolwing: -
4.4.13 Restore the lineup                         o Close the follolwing: -
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-219, WDP-12A Discharge
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone
/
                                          .                                  WDV-660, Isolation to Alternate Liquid Waste Fill
:                                                                              Line to Truck Load Zone
!                                                                              WDV-658, Liquid Waste to Truck Load Zone WDV-219, WDP-12A Discharge
                                                                                                                /
Initial /Date I
Initial /Date I
i
i
()%
()%
u l
u l
l i
i l
l i
i OP-4070 Rev. 5 Page 24 I,
OP-4070                                 Rev. 5                                         Page 24 I,


4
4 4.5 TRANSFERRING MWST TO WDT-7B (B-CWST)
      -s\  4.5     TRANSFERRING MWST TO WDT-7B (B-CWST)
-s
    . (O                   ACTIONS                                       DETAILS
. (O
;            4.5.1   Perform the following valve           1. Close/ ensure closed:
\\
lineup                                       WDV-1134, Isolation to Waste
ACTIONS DETAILS 4.5.1 Perform the following valve
;                                                                  Processing Demineralizers WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-327, WDP Back Flush WDV-208, WDT-7B Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDT-211, WDT-7B DW Isolation WDV-212, WDT-7A Outlet WDV-215, WDT-7B Outlet WDV-129, WDT-9 Isolation WDV-153, MW Evap Isolation
: 1. Close/ ensure closed:
;                                                                WDV-830, Inlet to WDT-7B x _,)g                                                       From the Desuperheater WDV-219, WDP-12A Discharge
lineup WDV-1134, Isolation to Waste Processing Demineralizers WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-327, WDP Back Flush WDV-208, WDT-7B Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDT-211, WDT-7B DW Isolation WDV-212, WDT-7A Outlet WDV-215, WDT-7B Outlet WDV-129, WDT-9 Isolation WDV-153, MW Evap Isolation WDV-830, Inlet to WDT-7B x _,)g From the Desuperheater WDV-219, WDP-12A Discharge
                                                                                              /
/
Initial /Date 4.5.2   Ensure hose is installed to           1. Close/ ensure closed WDV-678, connect from the blind flange                 suction to WDP-27 at WDV-678 to the blind               2. Close/ ensure closed WDV-661, flange at WDV-661. (located                   isolation to alternate in yellow room)                               liquid waste fill line
Initial /Date 4.5.2 Ensure hose is installed to 1.
: 3.     Ensure one end of hose is installed at WDV-678
Close/ ensure closed WDV-678, connect from the blind flange suction to WDP-27 at WDV-678 to the blind 2.
: 4.     Ensure the other end of hose is installed at WDV-661
Close/ ensure closed WDV-661, flange at WDV-661. (located isolation to alternate in yellow room) liquid waste fill line 3.
                                                                                              /
Ensure one end of hose is installed at WDV-678 4.
Initial /Date Oi r
Ensure the other end of hose is installed at WDV-661
!V i
/
OP-407D                             Rev. 5                                     Page 25
Initial /Date Oi r!V i
OP-407D Rev. 5 Page 25


i:                                                                                                                                         l l
i:
4                                                                                                                                          l l
l 4
4.5 A                          IRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)
l A
  \) -
4.5 IRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)
ACTIONS                                               DETAILS 1
\\)
4.5.3         Place MWST on recirc via WDP-       o IE recirculating via WDP-6A, 6A or WDP-6B.                                 IHEN GO T0 step 4.5.4.
ACTIONS DETAILS 1
4.5.3 Place MWST on recirc via WDP-o IE recirculating via WDP-6A, 6A or WDP-6B.
IHEN GO T0 step 4.5.4.
o If recirculating via WDP-6B, IBEN GO T0 step 4.5.5
o If recirculating via WDP-6B, IBEN GO T0 step 4.5.5
                                                                                                                    /                     ,
/
Initial /Date                       j i                                                                                                                                         ,
Initial /Date j
4.5.4         IE recirculating MWST with           1.               Close/ ensure closed WDV-156,                         l WDP-6A,                                               WDP-6B Suction IHEN perform the following:         2.               Close WDV-159, WDP-6A l
i 4.5.4 IE recirculating MWST with 1.
Discharge Isolation                                   j i                                                                 3.               Close WDV-160, WDP-6B                                 '
Close/ ensure closed WDV-156, l
Discharge Isolation
WDP-6A, WDP-6B Suction IHEN perform the following:
!                                                                  4.               Open WDV-155, WDP-6A Suction                         i j                                                                   5.               Open/ ensure open WDV-157,                           I WDP-6A Recirc.
2.
: 6.               Start WDP-6A
Close WDV-159, WDP-6A Discharge Isolation j
: 7.               GO T0 step 4.5.6
i 3.
                                                                                                                    /
Close WDV-160, WDP-6B Discharge Isolation 4.
Open WDV-155, WDP-6A Suction j
5.
Open/ ensure open WDV-157, WDP-6A Recirc.
6.
Start WDP-6A 7.
GO T0 step 4.5.6
/
Initial /Date t
4.5.5 IE recirculating MWST with 1.
Close/ ensure closed WDV-155, l
WDP-68, WDP-6A Suction IHEN perform the following:
2.
Close WDV-159, WDP-6A Discharge Isolation i
3.
Close WDV-160, WDP-6B Discharge Isolation 4.
Open WDV-156, WDP-6B Suction 5.
Open/ ensure open WDV-158, WDP-6B Recirc.
6.
Start WDP-6B
/
Initial /Date t
Initial /Date t
4.5.5          IE recirculating MWST with          1.              Close/ ensure closed WDV-155, l                              WDP-68,                                              WDP-6A Suction IHEN perform the following:        2.                Close WDV-159, WDP-6A
a OP-407D Rev. 5 Page 26 i
:                                                                                  Discharge Isolation i                                                                  3.                Close WDV-160, WDP-6B Discharge Isolation
: 4.                Open WDV-156, WDP-6B Suction
: 5.                Open/ ensure open WDV-158, WDP-6B Recirc.
: 6.                Start WDP-6B
                                                                                                                    /
t Initial /Date a
OP-407D                                   Rev. 5                                                 Page 26 i


              ~4.5     TRANSFERRING MWST TO WDT-78 (B-CWST) (Cont'd)
~4.5 TRANSFERRING MWST TO WDT-78 (B-CWST) (Cont'd)
ACTIONS                                   DETAILS 4.5.6   Perform the following valve       o Open/ ensure open:
ACTIONS DETAILS 4.5.6 Perform the following valve o Open/ ensure open:
lineup to transfer from MWST             WDV-661, Isolation To to WDT-78                                 Alternate Liquid Waste Fill Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming l                                                               WDV-678, Drumming Station Isolation WDV-220, WDP-128 Discharge WDV-218, WDT-7B Recycle WDV-296, Spray Header
lineup to transfer from MWST WDV-661, Isolation To to WDT-78 Alternate Liquid Waste Fill Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming l
:                                                                Isolation
WDV-678, Drumming Station Isolation WDV-220, WDP-128 Discharge WDV-218, WDT-7B Recycle WDV-296, Spray Header Isolation
                                                                                                  /
/
Initial /Date -
Initial /Date -
O       4.5.7   Determine MWST tank level and     Record MWST level record
O 4.5.7 Determine MWST tank level and Record MWST level record
:                                                                                                /               .
/
Initial /Date 4.5.8   Determine B-CWST (WDT-78)         Record WDT-7B tank level tank level and record
Initial /Date 4.5.8 Determine B-CWST (WDT-78)
                                                                                                  /
Record WDT-7B tank level tank level and record
i                                                                                     Initial /Date i
/
i Initial /Date i
l-l l
l-l l
l
l
      \
\\
i OP-407D                             Rev. 5                                       Page 27
i OP-407D Rev. 5 Page 27


      -                                                                                            1 1
4.5 TRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)
4.5     TRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)
L)
L)                                                                                         '
ACTIONS DETAILS
ACTIONS                                     DETAILS
*******************************e***********************************
                    *******************************e***********************************           !
CAUTION:
CAUTION:     The loop seals will need to be monitored while filling the       '
The loop seals will need to be monitored while filling the tank.
tank.
4.5.9 Open appropriate Waste o
4.5.9   Open appropriate Waste               o     If recirculating via WDP-6A, Transfer pump discharge                     THEN open WDV-159, WDP-6A valve.                                     Discharge Isolation M
If recirculating via WDP-6A, Transfer pump discharge THEN open WDV-159, WDP-6A valve.
o     JE recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation
Discharge Isolation M
                                                                                            /
o JE recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation
Initial /Date t'' 4.5.10 When transfer from MWST to           o     Stop WDP-6A
/
()T         WDT-78 is complete, stop the               Close WDV-155 transfer pump M
Initial /Date t''
o     Stop WDP-6B Close WDV-156
4.5.10 When transfer from MWST to o
                                                                                            /
Stop WDP-6A
Initial /Date 4.5.11 Determine MWST tank level and         Record MWST Tank level record
()T WDT-78 is complete, stop the Close WDV-155 transfer pump M
                                                                                            /
o Stop WDP-6B Close WDV-156
i Initial /Date 4.5.12 Determine B-CWST (WDT-78)             Record WDT-7B tank level tank level and record J
/
                                                                                            /
Initial /Date 4.5.11 Determine MWST tank level and Record MWST Tank level record
i pl d
/
Initial /Date OP-407D                             Rev. 5                                 Page 28
i Initial /Date 4.5.12 Determine B-CWST (WDT-78)
Record WDT-7B tank level tank level and record J
/
pl Initial /Date i
d OP-407D Rev. 5 Page 28


l l
l
.i l
.i 4.5 TRANSFERRING MWST TO WDT-78 (8-CWST) (Cont'd) 7-(/
4.5     TRANSFERRING MWST TO WDT-78 (8-CWST) (Cont'd) 7-(/
ACTIONS DETAILS 4.5.13 Restore the lineup o Close the following:
ACTIONS                                   DETAILS l
4.5.13 Restore the lineup               o Close the following:
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-220, WDP-12B Discharge
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-220, WDP-12B Discharge
                                                                                    /
/
Initial /Date O
Initial /Date O
                                                                              .                            i 4
i 4
I i
I i
O OP-407D                         Rev. 5                                 Page 29
O OP-407D Rev. 5 Page 29


[-
[-
i n   4.6     TRANSFERRING MWST TO WDT-8A (A-CBAST)
i n
U
4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST)
                                                                                          - ' ~
U ACTIONS DETAILS
ACTIONS                                    DETAILS 4.6.1       Perform the following         1. Close/ ensure closed:
- ' ~
valve lineup                         WDV-1134, Isolation To Waste Processing Demins                       ,
4.6.1 Perform the following 1.
.t                                                       WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE
Close/ ensure closed:
,                                                        WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge               i WDV-118, WDT-8A Sample
valve lineup WDV-1134, Isolation To Waste Processing Demins
.                                                        WDV-76, WDT-8A/B Backflush WDV-136, WDT-8A Inlet                     l Isolation WDV-137, WDT-8B Inlet Isolation WDV-138, DW to WDT-8A                     l 4
.t WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge i
WDV-151, Waste Drum Fill WDV-143, WDT-8B Outlet                   1
WDV-118, WDT-8A Sample WDV-76, WDT-8A/B Backflush WDV-136, WDT-8A Inlet Isolation WDV-137, WDT-8B Inlet Isolation WDV-138, DW to WDT-8A 4
]O,                                                       Isolation                                 '
WDV-151, Waste Drum Fill WDV-143, WDT-8B Outlet
WDV-177, WDP-13A/B Discharge to RCBTs WDV-142, WDT-8A Isolation WDV-145, WDP-13A Suction WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet
]O, Isolation WDV-177, WDP-13A/B Discharge to RCBTs WDV-142, WDT-8A Isolation WDV-145, WDP-13A Suction WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDV-878, Conc. Waste Return i
:                                                        WDV-166, WDDM-2B Inlet i
To Evaporator WDV-877, Conc. Boric Acid Return to Evaporators WDV-827, Desuperheater inlet to WDT-8A WDV-218, WDT-7B Recycle WDV-327, WDP Back Flush DWV-123, DW to CBAST Isolation
WDV-878, Conc. Waste Return To Evaporator WDV-877, Conc. Boric Acid Return to Evaporators WDV-827, Desuperheater inlet to WDT-8A WDV-218, WDT-7B Recycle WDV-327, WDP Back Flush DWV-123, DW to CBAST Isolation
/
                                                                                    /
Initial /Date O
Initial /Date O
OP-4070                           Rev. 5                                 Page 30
OP-4070 Rev. 5 Page 30


4 4.6     TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)
4 4.6 TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)
O                                                                                         -
O ACTIONS DETAILS 4.6.2 Ensure hose is installed to 1.
ACTIONS                                   DETAILS 4.6.2   Ensure hose is installed to         1.     Close/ ensure closed WDV-678, connect from the blind                     suction to WDP-27 flange at WDV-678 to the           2.     Close/ ensure closed WDV-blind flange at WDV-661.                   661, isolation to alternate (located in yellow room)                   liquid waste fill line
Close/ ensure closed WDV-678, connect from the blind suction to WDP-27 flange at WDV-678 to the 2.
: 3.     Ensure one end of hose is installed at WDV-678
Close/ ensure closed WDV-blind flange at WDV-661.
: 4.     Ensure the other end of hose is installed at WDV-661
661, isolation to alternate (located in yellow room) liquid waste fill line 3.
                                                                                        /
Ensure one end of hose is installed at WDV-678 4.
Initial /Date 4.6.3   Place HWST on recirc via           o IE recirculating via WDP-6A, WDP-6A or WDP-6B.                     IBfB GO T0 step 4.6.4.
Ensure the other end of hose is installed at WDV-661
o IE recirculating via WDP-68, THEN GO T0 step 4.6.5 Initial /Date 4.6.4   J.E recirculating MWST with         1.     Close/ ensure closed WDV-156,     '
/
WDP-6A,                                     WDP-6B Suction
Initial /Date 4.6.3 Place HWST on recirc via o
_TlffN perform the following       2.     Close WDV-159, WDP-6A valve lineup                               Discharge Isolation
IE recirculating via WDP-6A, WDP-6A or WDP-6B.
: 3.     Close WDV-160, WDP-6B Discharge Isolation
IBfB GO T0 step 4.6.4.
: 4.     Open WDV-155, WDP-6A Suction
o IE recirculating via WDP-68, THEN GO T0 step 4.6.5 Initial /Date 4.6.4 J.E recirculating MWST with 1.
: 5.     Open/ ensure open WDV-157, WDP-6A Recirc.
Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction
: 6.     Start WDP-6A
_TlffN perform the following 2.
: 7.     GO T0 step 4.6.6
Close WDV-159, WDP-6A valve lineup Discharge Isolation 3.
                                                                                        /
Close WDV-160, WDP-6B Discharge Isolation 4.
Open WDV-155, WDP-6A Suction 5.
Open/ ensure open WDV-157, WDP-6A Recirc.
6.
Start WDP-6A 7.
GO T0 step 4.6.6
/
Initial /Date l
Initial /Date l
O OP-407D                             Rev. 5                                 Page 31
O OP-407D Rev. 5 Page 31


                                                                                                  }
}
l 4.6     TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)
4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)
    \
\\
ACTIONS                                     DETAILS
ACTIONS DETAILS i
* i 4.6. 5 ~ If recirculating MWST with           1.     Close/ ensure closed WDV-155, WDP-6B,                                     WDP-6A Suction IllEli perform then following       2.     Close WDV-159, WDP-6A               l valve lineup                                 Discharge Isolation
4.6. 5 ~ If recirculating MWST with 1.
: 3.     Close WDV-160, WDP-6B Discharge Isolation
Close/ ensure closed WDV-155, WDP-6B, WDP-6A Suction IllEli perform then following 2.
: 4.     Open WDV-156, WDP-6B Suction       l
Close WDV-159, WDP-6A valve lineup Discharge Isolation 3.
: 5.     Open/ ensure open WDV-158, WDP-6B Recirc.
Close WDV-160, WDP-6B Discharge Isolation 4.
: 6.     Start WDP-6B
Open WDV-156, WDP-6B Suction 5.
                                                                                          /
Open/ ensure open WDV-158, WDP-6B Recirc.
Initial /Date
6.
                                                                                      .          I 4.6.6   Perform the following valve         o Open/ ensure open:
Start WDP-6B
lineup to transfer from MWST                 WDV-149, Waste Drum Fill
/
('           to WDT-8A                                   WDV-147,WDT-8A Recycle
Initial /Date 4.6.6 Perform the following valve o
(                                                         WDV-140, WDT-8A Spray Header       l Isolation WDV-661, isolation to alternate liquid waste fill line WDV-660, isolation to alternate liquid waste fill line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming
Open/ ensure open:
                                                                                          /
lineup to transfer from MWST WDV-149, Waste Drum Fill
Initial /Date 4.6.7   Determine MWST tank level           Record MWST level and record
('
      -                                                                                  /
to WDT-8A WDV-147,WDT-8A Recycle
Initial /Date O
(
V OP-407D'                               Rev. 5                                   Page 32   !
WDV-140, WDT-8A Spray Header Isolation WDV-661, isolation to alternate liquid waste fill line WDV-660, isolation to alternate liquid waste fill line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming
/
Initial /Date 4.6.7 Determine MWST tank level Record MWST level and record
/
Initial /Date OV OP-407D' Rev. 5 Page 32


l ,-
l,-
1 7-~g   4.6     TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)
1 7-~g 4.6 TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)
  .\ )
.\\
ACTIONS                                           DETAILS 1
)
4.6.8   Determine A-CBAST (WDT-8A)               Record WDT-8A tank level tank level and record
ACTIONS DETAILS 4.6.8 Determine A-CBAST (WDT-8A)
                                                                                                    /
Record WDT-8A tank level tank level and record
Initial /Date CAUTION:     The loop seals will need to be monitored while filling the tank.
/
                    ********************************************************************                  l 4.6.9   Open appropriate Waste                   o       IE recirculating via WDP-6A, Transfer pump discharge                         THEN open WDV-159, WDP-6A valve.                                           Discharge Isolation                 !
Initial /Date CAUTION:
08 o       IE recirculating via WDP-6B,
The loop seals will need to be monitored while filling the tank.
4.6.9 Open appropriate Waste o
IE recirculating via WDP-6A, Transfer pump discharge THEN open WDV-159, WDP-6A valve.
Discharge Isolation 08 o
IE recirculating via WDP-6B,
(''
(''
x            ,
IHEN open WDV-160, WDP-6B Discharge Isolation x
IHEN open WDV-160, WDP-6B Discharge Isolation
/
                                                                                                    /
Initial /Date 4.6.10 When transfer from MWST to o
Initial /Date 4.6.10 When transfer from MWST to               o       Stop WDP-6A WDT-8A is completed, stop                       Close WDV-155 the transfer pump OB o       Stop WDP-6B Close WDV-156
Stop WDP-6A WDT-8A is completed, stop Close WDV-155 the transfer pump OB o
                                                                                                    /
Stop WDP-6B Close WDV-156
Initial /Date 4.6.11 Determine MWST tank level                 Record MWST Tank level l
/
_          and record
Initial /Date 4.6.11 Determine MWST tank level Record MWST Tank level l
!                                                                                                  /
and record
    ,                                                                                      Initial /Date j
/
OP-407D                                   Rev. 5                                   Page 33
Initial /Date j
OP-407D Rev. 5 Page 33


l 4.6         TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)                       ;
4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)
O.
O.
ACTIONS                                   DETAILS                 -
ACTIONS DETAILS 4.6.12 Determine A-CBAST (WDT-8A)
I 4.6.12 Determine A-CBAST (WDT-8A)         Record WDT-8A tank level tank level and record
Record WDT-8A tank level tank level and record
                                                                                        /
/
Initial /Date 4.6.13 Restore the lineup                 o   Close the following:
Initial /Date 4.6.13 Restore the lineup o
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to         i Truck Load Zone-                 !
Close the following:
WDV-149, Waste Drum Fill         l
WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to i
()                                                       WDV-147, WDT-8A Recycle
Truck Load Zone-WDV-149, Waste Drum Fill
                                                                                        /
()
Initial /Date   i I
WDV-147, WDT-8A Recycle
l
/
                                                            .                                  I 4
Initial /Date i
I 4
D u
D u
OP-407D                           Rev. 5                               Page 34
OP-407D Rev. 5 Page 34


L 4.7       TRANSFERRING MWST TO WDT-8B (B-CBAST)
L 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST)
ACTIONS                                     DETAILS i
ACTIONS DETAILS i
4.7.1     Perform the following valve       1. .Close/ ensure closed:
4.7.1 Perform the following valve
lineup:                               __ WDV-1134, Isolation To Waste Processing Demins WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge WDV-248, WDT-8B Sample WDV-76, WDT-8A/B Backflush WDV-149, Waste Drum Fill WDV-136, WDT-8A Inlet l                                                             Isolation WDV-137, h9T-8B Inlet
: 1..Close/ ensure closed:
;                                                              Isolatic i WDV-130, DW to WDT-8B i
lineup:
WDV-152, WDP-13B Discharge WDV.146, WDP-13B Suction
__ WDV-1134, Isolation To Waste Processing Demins WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge WDV-248, WDT-8B Sample WDV-76, WDT-8A/B Backflush WDV-149, Waste Drum Fill WDV-136, WDT-8A Inlet l
    's                                                       WDV-143, WDT-8B Outlet Isolation WDV-177, WDP-13A/B Discharge to RCBTs WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDV-878, Conc. Waste Return To Evaporator WDV-877,. Conc. Boric Acid Return to Evaporators WDV-828, Desuperheater inlet to WDT-8B WDV-218, WDT-78 Recycle WDV-327, WDP Back Flush DWV-123,iDW to CBAST Isolation
Isolation WDV-137, h9T-8B Inlet Isolatic i WDV-130, DW to WDT-8B WDV-152, WDP-13B Discharge i
                                                                                        /
WDV.146, WDP-13B Suction
l                                                                               Initial /Date l
's WDV-143, WDT-8B Outlet Isolation WDV-177, WDP-13A/B Discharge to RCBTs WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDV-878, Conc. Waste Return To Evaporator WDV-877,. Conc. Boric Acid Return to Evaporators WDV-828, Desuperheater inlet to WDT-8B WDV-218, WDT-78 Recycle WDV-327, WDP Back Flush DWV-123,iDW to CBAST Isolation
/
l Initial /Date l
;O l
;O l
OP-407D                               Rev. 5                                 Page 35
OP-407D Rev. 5 Page 35


e' 4.7     TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)
e' 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)
ACTIONS                                   DETAILS                 -
ACTIONS DETAILS 4.7.2 Ensure hose is installed to 1.
4.7.2   Ensure hose is installed to       1. Close/ ensure closed WDV-678, connect from the blind                   suction to WDP-27 flange at WDV-678 to the           2. Close/ ensure closed WDV-blind flange at WDV-661.                 661, isolation to alternate (located in yellow room)                 liquid waste fill line
Close/ ensure closed WDV-678, connect from the blind suction to WDP-27 flange at WDV-678 to the 2.
: 3. Ensure one end of hose is
Close/ ensure closed WDV-blind flange at WDV-661.
                          .                              installed at WDV-678             i
661, isolation to alternate (located in yellow room) liquid waste fill line 3.
: 4. Ensure the other end of the       l hose is attached at WDV-661       i
Ensure one end of hose is installed at WDV-678 i
                                                                                    /
4.
Initial /Date 4.7.3   Place MWST on recirc via           o E recirculating via WDP-6A, WDP-6A or WDP-68.                     THEN f0 T0 step 4.7.4.
Ensure the other end of the hose is attached at WDV-661 i
o E recirculating via WDP-68, THEN GO T0 step 4.7.5 Initial /Date 4.7.4   E recirculating MWST with         1. Close/ ensure closed WDV-156, WDP-6A,                                   WDP-6B Suction THEN perform the following:       2. Close WDV-159, WDP-6A Discharge Isolation
/
: 3. Close WDV-160, WDP-6B Discharge Isolation
Initial /Date 4.7.3 Place MWST on recirc via o
: 4. Open WDV-155, WDP-6A Suction
E recirculating via WDP-6A, WDP-6A or WDP-68.
: 5. Open/ ensure open WDV-157, WDP-6A Recirc.
THEN f0 T0 step 4.7.4.
: 6. Start WDP-6A
o E recirculating via WDP-68, THEN GO T0 step 4.7.5 Initial /Date 4.7.4 E recirculating MWST with 1.
: 7. GO T0 step 4.7.6
Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction THEN perform the following:
                                                                                    /
2.
Close WDV-159, WDP-6A Discharge Isolation 3.
Close WDV-160, WDP-6B Discharge Isolation 4.
Open WDV-155, WDP-6A Suction 5.
Open/ ensure open WDV-157, WDP-6A Recirc.
6.
Start WDP-6A 7.
GO T0 step 4.7.6
/
Initial /Date i
Initial /Date i
.(
.(
OP-407D                             Rev. 5                               Page 36
OP-407D Rev. 5 Page 36


4.7     TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)
4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)
V ACTIONS                                     DETAILS                     -
V ACTIONS DETAILS 4.7.5 IE recirculating MWST with 1.
4.7.5   IE recirculating MWST with         1.     Close/ ensure closed WDV-155, WDP-68,                                     WDP-6A Suction THEN perform then following:       2.     Close WDV-159, WDP-6A Discharge Isolation
Close/ ensure closed WDV-155, WDP-68, WDP-6A Suction THEN perform then following:
: 3.     Close WDV-160, WDP-6B Discharge Isolation
2.
: 4.     Open WDV-156, WDP-6B Suction
Close WDV-159, WDP-6A Discharge Isolation 3.
: 5.     Open/ ensure open WDV-158, WDP-6B Recirc.
Close WDV-160, WDP-6B Discharge Isolation 4.
: 6.     Start WDP-6B
Open WDV-156, WDP-6B Suction 5.
                                                                                          /
Open/ ensure open WDV-158, WDP-6B Recirc.
Initial /Date 4.7.6   Perform the following valve         o Open/ ensure open:
6.
lineup to transfer from MWST               WDV-151, Waste Drum Fill to WDT-8B                                   WDV-150, WDT-8B Recycle WDV-141, WDT 8B Spray Header Isolation
Start WDP-6B
/
Initial /Date 4.7.6 Perform the following valve o
Open/ ensure open:
lineup to transfer from MWST WDV-151, Waste Drum Fill to WDT-8B WDV-150, WDT-8B Recycle WDV-141, WDT 8B Spray Header Isolation
('')
('')
  \s /
WDV-661, isolation to
WDV-661, isolation to alternate liquid waste fill line WDV-660, isolation to                 ,
\\s /
alternate liquid waste fill           '
alternate liquid waste fill line WDV-660, isolation to alternate liquid waste fill line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming
line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming
/
                                                                                          /
Initial /Date 4.7.7 Determine MWST tank level MWST level and record
Initial /Date 4.7.7   Determine MWST tank level           MWST level and record
/
                                                                                          /
l Initial /Date (V'')
l                           Initial /Date l
l OP-407D Rev. 5 Page 37
(V'')
OP-407D                             Rev. 5                                 Page 37


4.7     TRANSFERRING NWST TO WDT-88 (B-CBAST) (Cont'd) b ACTIONS                                     DETAILS                 -
4.7 q
4.7.8   Determine B-CBAST (WDT-88)         Record WDT-88 tank level tank level and record I'n'tial Date
TRANSFERRING NWST TO WDT-88 (B-CBAST) (Cont'd) b ACTIONS DETAILS 4.7.8 Determine B-CBAST (WDT-88)
              **************************************************************s*****
Record WDT-88 tank level tank level and record I'n'tial Date
CAUTION:     The loop seals will need to be monitored while fillit 1 the tank.
**************************************************************s*****
4.7.9   Open appropriate Waste             o       IE recirculating via WDP-6A.
CAUTION:
Transfer pump discharge                     It!EH open WDV-159, WDP-6A valve.                                     Discharge Isolation 0.8 o       J1 recirculating via WDP-6B, I!!EN open WDV-160, WDP-6B C                                                       Discharge Isolation
The loop seals will need to be monitored while fillit 1 the tank.
                                                                                      /
4.7.9 Open appropriate Waste o
Initial /Date 4.7.10 When transfer from MWST to           o       Stop WDP-6A WDT-8B is completed, stop                   Close WDV-155 the transfer pump 0_8 o       Stop WDP-6B Close WDV-156
IE recirculating via WDP-6A.
                                                                                      /
Transfer pump discharge It!EH open WDV-159, WDP-6A valve.
Initial /Date 4.7.11 Determine MWST tank level and record                         Record MWST Tank level
Discharge Isolation 0.8 o
    -                                                                                /
J1 recirculating via WDP-6B, I!!EN open WDV-160, WDP-6B C
Initial /Date OP-407D                             Rev. 5                                 Page 38
Discharge Isolation
/
Initial /Date 4.7.10 When transfer from MWST to o
Stop WDP-6A WDT-8B is completed, stop Close WDV-155 the transfer pump 0_8 o
Stop WDP-6B Close WDV-156
/
Initial /Date 4.7.11 Determine MWST tank level and record Record MWST Tank level
/
Initial /Date OP-407D Rev. 5 Page 38


II.                                                                                           l O'
II.
4.7         TRANSFERRING NWST TO WDT-8B (B-CBAST) (Cont'd)
l O'
LO ACTIONS                                   DETAILS                 -
4.7 TRANSFERRING NWST TO WDT-8B (B-CBAST) (Cont'd)
4.7.12 Determine B-CBAST (WDT-8B)         Record WDT-8B tank level tank level and record
LO ACTIONS DETAILS 4.7.12 Determine B-CBAST (WDT-8B)
                                                                                      /
Record WDT-8B tank level tank level and record
/
l Initial /Date l
l Initial /Date l
4.7.13 Restore the lineup                 o Close the following:
4.7.13 Restore the lineup o
WDV-678, Drumming Station Isolation l                                                           WDV-661, Isolation to l                                                           Alternate Liquid Waste Fill
Close the following:
:'                                                          Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-151, Waste Drum Fill WDV-150, WDT-8B Recycle       .
WDV-678, Drumming Station Isolation l
('')N Q                                                                                 /       1 1
WDV-661, Isolation to l
Alternate Liquid Waste Fill WDV-660, Isolation to Line to truck load zone Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-151, Waste Drum Fill WDV-150, WDT-8B Recycle
('')N Q
/
1 1
Initial /Date I
Initial /Date I
'r U
'rU l
l r
r OP-4070 Rev. 5 Page 39
OP-4070                           Rev. 5                               Page 39


  .                                                                        1
,i d
  ,i l
d 1
I
I
!4*
!4*
l l
l l
l       5.0     FOLLOW-UP ACTIONS l
l 5.0 FOLLOW-UP ACTIONS l
l                   ACTIONS             DETAILS l
l ACTIONS DETAILS l
l               None 1                                                                           l l
l None 1
l 1
l O
l i
l i\\
l l
O l
i\
i l
i l
l OP-407D                   Rev. 5                   Page 40
l OP-407D Rev. 5 Page 40


- 1; i                                                                                                                                         i i                                                                                                                                         <
i...
k' 6.0     RESTORATION INSTRUCTIONS                                                                                           ;
- 1; i
1 i
i i
l-                             ACTIONS                                             DETAILS                                   *-        '
k' 6.0 RESTORATION INSTRUCTIONS i
2                                                                                                                                          I l-I
l-ACTIONS DETAILS 2
.                                                                                                                                        1
l-I 1
:                    None                                                                                                               1 i't                                                                                                                                       '
None 1
i 1
i't i
1 I
i i
I L
I i
I i
i I
l 1
L I
i l --
i l
1 i
l --
4 4-i-
4 4-i-
l' p
l'p a
a i
i 4
4 u
u 6
6 1
i 1
i i
i i
i i
i i
Line 1,452: Line 1,882:
J 4
J 4
i i
i i
;            iOP-407D                                         Rev. 5                       Page 41 (LAST PAGE) i
iOP-407D Rev. 5 Page 41 (LAST PAGE) i i.
: i.       ._          _  ._ . _      .__ _    . _ _ _ . . . . - _ _ _ . _                - _ __.    .  ~_.. .,- _ ,,,.- -- -}}
~_...,- _,,,.- --
-}}

Latest revision as of 05:25, 13 December 2024

Incorporation of Original PRR 11281 to Rev 5 to Operating Procedure OP-407D, Operation of Miscellaneous Waste Storage Tank
ML20100P765
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/15/1996
From: Fields D
FLORIDA POWER CORP.
To:
References
NUDOCS 9603110346
Download: ML20100P765 (75)


Text

_

y Document Transmittal #: 41827 Date: 3/2/96 Tc:

NRC RES INSPECTOR MAC: NSCC Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

Comment:

INFO CNTL MSTR OP0407D 05 IMMEDIATE ISSUE 03/02/96 8

1 0

0 1

1 1

Instructions to the Addressee:

Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.

The signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated transmittal to Document Control within 20 days at mail code:

NA1C j

Florida Power Corporation Document Control, NA1C AMnnnPt Crystal River Energy Complex 9603110346 960302 15760 W. Power Line St.

PDR ADOCK 05000302 Crystal River, FL 34428-6708 i

P PDR i

Signature of Addressee:

Date:

Independent Verification:

Date:

00 (Control Room documents only)

O\\

.j Rev. 5 Effective Data cP//4/96 S

Document Sectiai NFORM ATION ONL N C. R. Nuclear OPERATING PROCEDURE OP-407D FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l

OPERATION OF THE NISCELLANEOUS WASTE STORAGE TANK THIS PROCEDURE ADDRESSES SAFETY RELATED COMP 0NENTS

\\

APPROVED BY:

Interpretation Contact

$0 (SIGNATURE ON FILE)

DATE:

N/f/T INTERPRETATION CONTACT:

Supervisor, Nuclear Operations Administrative Shift

I h.

i i

O "IMMEDIATE ISSUE" NOTIFICATION Procedure Number:

OP0407D Current Revision:

05 kb Effective Date:

i PRR #:

11323 7pwr?& of

~~7~7//sS ff/CNA6Q

/S,44 A&'53a& W G2/km'< -

f22 ll Z8/

ffSU 6 D 0N 3 ~l~ $ h

l l

Page 1 of 1

! s ORIGINATOR'S CHECKLIST ENCLOSURE 1

^

Current lV; Procedure #:

OPO407D Rev #:

05 PRR #:

11323

Title:

OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK YES N/A 1.

Obtain the current revision of the procedure from Document Control or x

electronically.

For temporary procedure changes, the working copy may be used.

2.

Obtain PRR#, new procedure #, or temporary procedure change (TPC)#

x q

from Document Control or electronically.

For work instructions, use a work request number or use another identifying number.

3.

Write a new procedure, work instruction, or mark the pages applicable x

to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in AI-402B, Procedure Writing (Except for E0P/AP/VP).

  • 4.

Attach changed pages to the cover page of the procedure.

Other pages

  • x g

may be attached so the continuity of the changes will be understood by persons performing further reviews.

For new procedures or work instructions, all pages are included, l

5.

Complete Enclosure 2, Procedure Description, Reasons, and References.

x sg 1

  • 6.

Obtain the Procedure Review Package (PRP) from Nuclear Licensing or

  • x 4

g electroni cally.

For work instructions or new procedures, contact Nuclear Licensing for any related commitments associated with the i

d work instructions or new procedures.

a.

Complete the Procedure Cross Reference sheet.

  • x l

b.

Ensure the NOCS commitments remain satisfied.

  • x 1.

Change the implementing references of the commitments

  • x as necessary.

7.

Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.

x 6

  • 8.

IF a 10 CFR 50.59 Evaluation is required, as determined by the

  • x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59, THEN complete Enclosure 4,10 C-R 50.59 Evaluation.
  • 9.

Complete Enclosure 6,10 CFR 50.54 Evaluation.

  • x de
  • 10. IF this can affect plant safety, the core, reactivity control, the
  • x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test or Evolution _ Checklist.

l e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 1 of 3 AI 400C Rev.17

1 i

ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current i

Procedure #:

OPO407D Rev #:

05 PRR #:

11323 i

Title:

OPERATION OF THE MISCELLANE0uS WASTE STORAGE TANK e-Evo utic-Ched'ist.

l YES N/A

  • 11.

IF any plant equipment tag numbers are being added to or deleted

  • X from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, to the Manager Nuclear Configuration Management.
  • 12.

Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)

  • X wa by determining which Nuclear Operations departments need to be notified of the new procedure / permanent procedure change.
  • 13.

IF this is a SP, new procedure, or an infrequently performed test

  • X or evolution, THEN complete and attach Enclosure 23, Procedure Review Checklist of AI-402B, Procedure Writing (Except for E0P/AP/VP).

14.

Ensure that correction techniques such as " white out," correction X

tape, paste overs, or similar techniques have not been used.

  • 15.

Internal references to data sheets, enclosures, other sections

  • X of the procedure, etc., have been verified to be correct.
  • 16.

Ensure that Non-Quality documents are identified as " Optional

  • X g

Records Non-Quality" within the procedure as par AI-1100, Retention of Plant Operating Records.

  • 17 Forward the original or copies of this document and supporting
  • X enclosures to Qualified Reviewers, as determined from below, using 0, Qualified Review / Technical Review, a.

A Qualified Review, independent of the originator, is

  • x g:

required by the department that the procedure's Interpretation Contact is a member of, b.

IF interfacing departments' actions or procedures

  • x will be impacted, THEN the interfacing departments must perform a Qualified Review.

c.

IF any item on Enclosure 11, Guidelines for Identification

  • [*X of Design Changes, is applicable, THEN Nuclear Engineering Design must perform a Qualified Review.

d.

Nuclear Quality Control must be a Qualified Review for fps, e

  • X MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes to or additions of inspection points to ensure inspection points are appropriate.

O

  • These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 2 of 3 AI 400C Rev.17

s ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current f D Procedure #:

OPO407D Rev #:

05 PRR #:

11323 j

d(

Title:

OPERATION OF THE MISCELLANE305 WASTE STORAGE TANK

  • 17.

Qualified Review (continued)

YES N/A e.

IF this-

  • X
1. Involves a change to an established scheduled i

performance of'a procedure as listed in SP-443, Master Surveillance Plan, OR

2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.

NOTE: EQ equipment is designated in CMIS as QQ.

  • x f.

IF this involves repair, replacement, or alteration of EQ equipment, THEN a Qualified Review is required by Nuclear Configuration Management, EQ Group.

1.

IF this procedure involves repair, replacement, or

  • X alteration of EQ equipment, THEN the cover page of the procedure must be designated

" Environmentally Qualified Related."

  • 18.

Ensure Qualified Reviews are completed and any comments have been

  • X

?@

addressed.

19.

IF this is a temporary procedure change, x

THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.

  • 20.

Forward this enclosure and the preceding package of documentation.

  • X as applicable, to the Interpretation Contact 'for approval of 3. Interpretation Contact's Checklist.-

I have completed this checklist, as applicable, and all appropriate YES or N/A blanks are completed.

Frank Dola 3/2/96 Originator Date O[. e These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 3 of 3 AI 400C Rev.17

3 l

e ENCLOSURE 2 A D..T E T W A.T. n. D.. f r. """"..C M. T..C Proc #: OPO407D, PRR #: 11323 REV #:05 DESCRIN OMNb PROCEDURE OR CHANGE TDetailed) c d ePROCEDURE DESCRIPTION, REAS0NS, See Enclosure 2, Attachment 1 REASON ANO REFERENCES FOR PROCEDURE CHANGE See Enclosure 2, Attachment 1 Check as Appropriate:

Refefjence #:

Other Design Modification FCN Related Item Problem Report Precursor Card C NRC Violation ITS Amendment ITS Bases Change FSAR Change i

')

Page 1 of 1 AI 400C Rev.17

~_.. _ -.

~

ENCLOSURE 2 PROCEDURE DESCRIPTION, REASONS, AND REFERENCES (ATTACHMENT 1)

-u Proc #: OPO407D PRR #: 11323 REV #: 05

1. Description of new procedure or change:

The flow path was changed from the revision that was immediately issued on 3-1-96 due to WDV-217 not being able to be closed. The flow path was changed to fill the CWSTs through the recirc line and spray header instead of through the fill valves on the top of the tank.

Reason and references for procedure change:

WDV-217 is stuck in the open position,

)

l

\\

i Page 1 of 1 AI 400C Rev.17

1 ENCLOSURE 3 Scracning fcr Applicability of 10 CFR 50.59 Procedure #: OPO407D PRR #: 11323 REV#: 05

()/

f YES NO

1. Is this a change to the fat.ility as described in the FSAR7 (Use NOD-11 X

Preparation of Safety. Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).

BECAUSE: (Explain your answer and list FSAR sections reviewed)

This change does not change the intent of the original revision to this procedure. This change represents an ammended change due to a component being out of service. This change does not change any evaluations made in the FSAR. This change will be transmitted with the original change. See attached package with cancelled PRR # 11281.

l

2. Does this affect or change the Improved Technical Specifications o-their x

bases? (If yes, contact the Manager, Nuclear Licensing before proceeding) j i

BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)

There are no changes to Technical Specifications due to this ammended revision. See Attached Package for original Screening.

3. Is this a change to the ODCM7 x
4. A yes answer to any question above requires completion of Enclosure 4 X

)

10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.

V' Are these required?

5. Can this potentially reduce the level of safety of the plant? (If yes.

X provide contingency actions AND PRC/DNPO reviews are required prior to impl ementation)

BECAUSE: (Support Yes or No answers here)

This ammended change will not reduce the safety of the plant. See Attached package.

6. Review Enclosure 5, Examples of Events Which Impact Plant Operations.

X Can this possibly lead to an event that would impact plant operation?

(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)

BECAUSE: (Support Yes or No answers here)

This ammeded change will not lead to an event that will impact plant operation. See attached package.

O%

Page 1 of 1 AI 400C Rev.17

l ENCLOSURE 6 10 CFR 50.54 EVALUATION Procedure #:

OPO407D PRR #:

11323 REV #:

05 A. Does this change what is described in any of the following plans / programs?

YES NO Quality Program Description (FSAR Section 1.7)

X Licensed Operator Requalification Program (FSAR 12.2.3.4)

[

]

Physical Security Plan X

Safeguards Contingency Plan

]

X Radiological Emergency Response Plin X

Fire Protection Plan X

Offsite Dose Calculation Manual

]

[

Primary Coolant Sources Outside Containment Program X

Post Accident Sampling Program

[

'X Containment Tendon Surveillance Program

]

Inservice Inspection Program X

Steam Generator Tube Surveillance Program X

i Inservice Testing Program X

V Secondary Water Chemistry Program X

Ventilation Filter Testing Program

]

]

Explosive Gas and Storage Tank Radioactivity Monitoring Program X

Diesel Fuel Oil Testing Program

]

]

Safety Function Determination Program

]

l Improved Technical Specifications Bases Control Program X

l Core Operating Limits Report

]

[

Reactor Coolant System Pressure Temperature Limits Report X

l' IF any of the above are yes, THEN:

YES N/A o

Contact the appropriate person (Attachment E of NOD-11, Preparation of X

Safety, Regulatory, and Environmental Compliance Reviews) to perform an evaluation and attach.

Evaluation Complete and attached:

o NRC approval received if needed and attached.

]

X 1

J V

Page 1 of 2 AI 400C Rev.17 l

1

ENCLO W E 6 10 CFR 50.54 EVALUATION

(~'gProcedure#:

OPO407D PRR #:

11323 REV #:

05

' \\w.,)

l B. Environmental Protection Plan Review:

Could this change affect:

YES NO

1. 'The environment in a non-radiological way?

x 2.

An increase in licensed power level?

X 3.

An increase in non-radiological effluents (Volume or chemicals -

X liquid or gas)?

4.

A change in Circulating or Raw Water flows?

X 5.

Dredging, filling, or new construction on previously undisturbed areas?

X YES N/A If yes to any of the above, x

l THEN contact the Manager, Nuclear Licensing to perform an evaluation and attach. Evaluation Complete and attached:

C. Review for Change to Radioactive Waste System (10 CFR 50.34a and Appendix I)

YES NO l

Is this a change to a radioactive waste system Oiquid, gaseous, or solid) x that could result in an increase of radioactive material released to the environment?

NOTE:

The following is for reporting evaluation only and is not part of the approval process for the change.

YES N/A IF the above is yes, x

THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements.

Submitted:

~

l I'

l

\\

O Page 2 of 2 AI 400C Rev.17

1 1

i NOTIFICATION OF NEW/ REVISED PROCEDURE ENCLOSURE 9 This procedure has been approved and issued for use. It is your responsibility to advise personnel in your organization affected by this new/ revised i

procedure of its contents.

Attached is a copy of the Procedure Description, l

Reasons, and References (Enclosure 2).

Procedure #: OPO407D PRR #: 11323 REV #:05 l CHECK TO:

Manager, Nuclear Radiation Protection Manager, Nuclear Chemistry f

Manager, Nuclear Plant Operations l

Manager, Nuclear Configuration Management Manager, Nuclear Plant Technical Support Manager, Nuclear Security l

Supervisor, Nuclear Document Control Supervisor, Nuclear Records Management Manager, Nuclear Plant Maintenance Manager, Nuclear Quality Assessments Manager, Nuclear Engineering Design i

Manager, Site Nuclear Services l

Manager, Radiological Emergency Planning Manager, Nuclear Licensing l

Procedure Interpretation Contact b. k yb j

If this affects most personnel of Nuclear Operations besides your department (for example: AI-413, Fitness for Duty Callout Procedure),

i THEN notify applicable personnel by describing the new procedure or describing the major changes made to the procedure.

o This can be done using electronic mail (everyone) or other means.

NOTE: For others below, state their name and address Other:

Other:

O I

Other:

l

<l V i

I Other:

i Page 1 of 1 AI 400C Rev.17

t s

ENCLOSURE 10 Qualified Review /Techr.ical ww 1

Procedure #: OPO4070 PRR :: 11323 REV: 05 I

. Conenents '

No QUALIFIED REVIEWERS Reviewed By Date l Attached j Consnents

@ Nuclear Operations Department l

Q i

Nuclear Security Department l

j i

Nuclear Quality Control Nuclear Radiation Protection l

I j

Nuclear Chemistry l

Nuclear Maintenance Dept.

l Nuclear Configuration Management 1

l (EQ Croup)

I i

w/

l Nuclear Engineering Design l

i Nuclear Plant Technical Support j

l Other:

i l

l Other:

TECHNICAL REVIEW g

,g e

Other:

]

Other:

l i

I Raturn to: Frank Dola (Originator) t

/~h.

I V

I l

Ptge 1 of 1 AI 400C Rev.17

l ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST

O Procedure #

OPO407D Rev #:

05 PRR #:

11323 V

YES N/A 1.

Originator's Checklist, Enclosure 1, is adequately completed, n

2.

IF this is a new SP, a procedure that has received a major technical rewrite, or a procedure identified as an infrequent test or evolution.

THEN ensure a simulation, walk through (no manipulation of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.

3.

IF this is a new SP, or is an SP that has received a major technical

]

rewrite, THEN notify the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling that the procedure must be walk through validated with an end-user on the next scheduled performance after the procedure is issued.

4.

IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),

THEN ensure adequate aministrative controls are in place to control the component positions.

5.

IF the Procedure Cross Reference sheet had any questions answered yes,

{

THEN forward the Procedure Cross Reference sheet to Records g

Management.

V 6.

IF any commitments of the NOCS have any changes to the implementation

]

section, THEN forward the applicable commitments to Nuclear Licensing.

7.

IF inspection planning is required per CP-113C, Inspection Planning, THEN ensure inspection planning methods are incorporated within this procedure or work instruction.

\\

l l

i l

t s n v

Page 1 of 2 AI 400C Rev.17

l l

l INTERPRETATION CONTACT'S CHECKLIST ENCLOSURE 13 i

Procedure #:

OPO4070 Rev #:

05 PRR #:

11323 v

l NOTE: The Interpretation Contacts can send any item to the PRC to review prior to inplementation, especially if the Interpretation Contact has a plant operation or safety concern.

1. Check ONE of the following:

All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are answered "No."

PRC or DNPO review is not required, procedure can be issued.

I am forwarding all applicable completed enclosures to Document Control.

Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.

1

\\

2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:

Obtain PRR# from Document Control or electronically.

PRR#

The activities as designated on Enclosure 1, Originator's Checklist, including those on Enclosure 1 with an asterisk, have been completed and

{n}

are attached.

I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.

This and other applicable enclosures have been properly completed and are being forwarded as stated above.

4

+ l Elf S

b

( ' Int [rprgfation' Contact Date l

4 PRC and DNPO Review

  • l PRC Chairman Date PRC Mtg No.

DNPO Date

-

  • If required f3

, O l

l Page 2 of 2 AI 400C Rev.17 I

o O

IMMEDIATE ISSUE" NOTIFICATION

~

Procedure Number:

OfkO1 5

Current Revision:

3!I kk Effective Date:

/

/

ll1b l PRR #:

'O i

i i

6 O

~

i 1

ORIGINATOR'S CHECKLIST ENCLOSURE 1 q

Current Procedure #:

OP0407D Rev #:

05 PRR #:.

11281

Title:

OPERATION OF THE MISCELLANEDUS WASTE STORAGE TANK YES N/A 1.

Obtain the current revision of the procedure from Document Control or

[

electronically.

For temporary procedure changes, the working copy may be used.

2.

Obtain PRR#, new procedure #, or temporary procedure change (TPC)#

x g

from Document Control or electronically.

For work instructions, use a work request number or use another identifying nu,mber.

3.

Write a new procedure, work instruction, or mark the pages applicable x

g to any changes by using red ink or electronic red line/ strikeout methods. For procedures, use the appropriate procedure format in AI-402B, Procedure Writing (Except for EOP/AP/VP).

  • 4.

Attach changed pages to the cover page of the procedure. Other pages

  • x g

may be attached so the continuity of the changes will be understood by persons performing further reviews.

For new procedures or work instructions, all pages are included.

5.

Complete Enclosure 2, Procedure Description, Reasons, and References.

X

  • 6.

Obtain the Procedure Review Package (PRP) from Nuclear Licensing or

  • x a

electronically.

For work instructions or new procedures, contact Nuclear Licensing for any related commitments associated with the work instructions or new procedures.

i a.

Complete the Procedure Cross Reference sheet.

  • x b.

Ensure the NOCS commitments remain satisfied.

  • x 1.

Change the implementing references of the. commitments

  • x as necessary.

7.

Complete Enclosure 3, Screening for Applicability of 10 CFR 50.59.

X

  • 8.

IF a 10 CFR 50.59 Evaluation is required, as determined by the

  • x completion of Enclosure 3, Screening for Applicability of 10 CFR 50.59, i

THEN complete Enclosure 4,10 CFR 50.59 Evaluation.

  • 9.

Complete Enclosure 6,10 CFR 50.54 Evaluation.

  • x W
  • 10. IF this can affect plant safety, the core, reactivity control, the
  • x Reactor Protection System, the engineered safeguards systems, or the plant design basis, THEN complete and comply with Enclosure 7, Infrequently Performed Test or EvolutiorLCitecklist.

O

+ These steps should not be performed and the YES or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 1 of 3 AI 400C Rev.17

1 l

i ORIGINATOR'S CHECKLIST ENCLOSURE 1 Current OProcedure#:

OPO407D Rev #:

05 PRR #:

I1281

Title:

' OPERATION oF THE MISCELLANEOUS WASTE STORAcE TANK e-Eve'utier Check'ist YES N/A

  • 11.

IF any plant equipment tag numbers are being added to or deleted

  • x from this procedure, THEN complete and mail Enclosure 8, CMIS Database Update Request Form, -to the Manager Nuclear Configuration Management.
  • 12.

Complete Enclosure 9, Notification of New/ Revised Procedure (NORP)

  • x 4

by determining which Nuclear Operations departments need to be notified of the new procedure / permanent procedure change.

  • 13. ' IF this is a SP, new procedure, or an inf rec.:antly performed test
  • x or evolution, THEN complete and attach Enclosure 23, Procedue u Review i

Checklist of AI-402B, Procedure Writing (Except for E0P/AP/VP).

1 14.

Ensure that correction techniques such as " white out," correction x

g tape,. paste overs, or similar techniques have not been used.

  • 15.

Internal references to data sheets, enclosures, other sections

  • x of the procedure, etc., have been verified to be correct.
  • 16.

Ensure that Non-Quality documents are identified as " Optional

  • x Records Non-Quality" within the procedure as per AI-1100, j

(n]

Retention of Plant Operating Records.

  • 17 Forward the original or copies of this document and supporting
  • x 34 enclosures to Qualified Reviewers, as determined from below, using l 0, Qualified Review / Technical Review, a.

A Qualified Review, independent of the originator, is

  • x g

required by the department that the procedure's Interpretation Contact is a member of, b.

IF interfacing departments' actions or procedures

  • x
  • ]

will be impacted, THEN the interfacing departments must perform a Qualified Review.

I c.

IF any item on Enclosure 11, Guidelines for Identification

  • [*

l of Design Changes, is applicable, THEN Nuclear Engineering Design must perform a Qualified Review.

d.

Nuclear Quality Control must be a Qualified Review for fps,

  • x MPs, PMs, pts, SPs, WP-101, and WP-102 that contain changes i

l to or additions of inspection points to ensure inspection points are appropriate.

I OU e These steps should not be performed and the YE5 or N/A blanks should not be checked for a temporary procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 2 of 3 AI 400C Rev.17 l

r 1

ORIGINATOR'S CHECKLIST ENCLOSURE 1 l=

i.G Current Procedure #:

-OPO407D g y g:

05 PRR #:

11281

Title:

- OPERATION OF THE NIsCELLANE005 WASTE STORAGE TANK

  • 17.

Qualified Review (continued)

YES N/A l

e.

IF this-

  • X i

l

1. Involves a change to an established scheduled j

performance of a procedure as listed in SP-443, Master l

Surveillance Plan, OR

2. Is related to a change to the Improved Technical Specification (ITS) or the ITS bases, THEN the Senior Nuclear Scheduling Coordinator responsible for surveillance scheduling must be a Technical Reviewer.

NOTE: EQ equipment is designated in CMIS as QQ.

  • x f.

IF this involves repair, replacement, or alteration of EQ equipment, THEN a Qualified Review is required by Nuclear Configuration l

Management, EQ Group.

]

1.

IF this procedure involves repair, replacement, or

  • x i

alteration of EQ equipment, l

THEN.the cover page of the procedure must be designated

" Environmentally Qualified Related."

  • 18.

Ensure Qualified Reviews are completed and any comments have been

  • 4 addressed.

19.

IF this is a temporary procedure change, x

THEN complete Enclosure 12, Authorization of a Temporary Procedure Change.

l

- *20.

Forward this. enclosure and the preceding package of. documentation, 2

l as applicable, to the Interpretation Contact for approval of

l. 3, Interpretation Contact's Checklist.

I have completed this checklist, as applicable,. and all appropriate YES or l

N/A blanks are. completed.

~

$s

=s;% A 3 j-fj l

~

Or'i gi nator -

.Date O

  • These steps should not be performed and the YES or N/A blanks should not be checked for a temporary 1

procedure change. These steps are required to be performed and checked YES or N/A at a later time if the temporary change is to become permanent.

Page 3 of 3 AI 400C Rev.17 r

lr l

l l

ENCLOSURE 2 PROCEDURE DESCRIPTION, REASONS, AND REFERENCES l-Proc #: OPO407D PRR #: 11281 REV #:05 t

1 DESCRIPTION OF NEW PROCEDURE OR CHANGE (Detailed)

See Enclosure 2, Attachment 1 REASON AND REFERENCES FOR PROCEDURE CHANGE See Enclosure 2, Attachment 1 j

Check as Appropriate:

Reference #:

Other Design Modi fi cation FCN Related Item i

I Problem Report Precursor Card NRC Violation ITS Amendment ITS Bases Change FSAR Change l

! C e

l 1

i t

l 1

l i

l

~

i 1

Page 1 of 1 AI 400C Rev 17 l

g-'s ENCLOSURE 2 j

PROCEDURE DESCRIPTION, REASONS, AND REFERENCES (ATTACHMENT 1)

Proc #: OPO407D PRR #: 11281 REV #:05

1. Description of new procedure or change:

Coversheet - remove statement pertaining to safety related equipment.

- Change the title of the Interpretation Contact.

Reason and references for procedure change:

The statement for safety related equipment is no longer required.

NOCS commitment 40027 which pertained to the statement has been deleted.

The title of the Interpretation Contact has changed due to department i

reorganization.

2. Description of new procedure or change:

Added four new sections to the table of contents.

Reason and references for procedure change:

The new sections were written to move the water from the MWST to the CWSTs and the CBASTs for storage of highly contaminated water. This will provide

(

storage for the water to allow for decay before releasing.

V}

3. Description of new procedure or change:

Four new sections were added to this procedure.

Each section is written to transfer water to a specific tank.

Reason and references for procedure change:

The flow path provided by this procedure will reduce the time required for transferring water from the MWST to the CWSTs and the CBASTs. The original flow path used transferred water from the MWST to the Evaporator. Then the water was transferred from the Evaporator to the desired tank. This flow path will be directly from the MWST to the desired tank.

This flow path will use a hose connecting two flanges in the yellow room to create the desired flow path.

A I

(V Page 1 of 1 AI 400C Rev.17

~. _. _. _ _... _ _ _ _. _ _ _ _ _ _ -. _ _ _.

I

\\

ORIGINATOR COMMENTS 1

i PRR # 11281 Procedure: OP0407D Rev#: 05

\\

Originator: Frank Dola coments:

t i

4 5

s l

Page 1 of 1.

AI 400C Rev.17 l

a i

ENCLOSURE 3 Scrc:ning fcr ApplicCbility cf 10 CFR 50.59 Procedure #: OPO407D PRR #: 11281 REVf: 05

(

)

\\~~/

YES NO

1. Is this a change to the facility as described in the FSAR7 (Use NOD-11, X

Preparation of Safety, Regulatory, and Evironmental Compliance Reviews-Attachment A, as guidance to adequately answer this question).

BECAUSE: (Explain your answer and list FSAR sections reviewed)

The changes made to OP-407D will not change any evaluations made in the FSAR. Four new sections have been added to this procedure to allow for i

the temporary storage of contaminated liquid to decay prior to release to the discharge canal. These sections move water from the Miscellaneous Waste Storage Tank (MWST, WDT-4) to the Concentrated Waste Storage Tanks (CWST, WDT-7A/B) and the Concentrated Boric Acid Storage Tanks (CBAST WDT-8A/B). These evolutions have been performed j

in the past by pumping the MWST to the Evaporator Feedtanks and then pumping the Evaporator Feedtanks to the CBASTs and CWSTs. The instructions provided by this procedure will not require the use of the abandon Evaporators. The lineup will require the use of a temporary hose in the yellow room similar to the one presently used for processing the MWST through the NUS Demins. The hose will connect the downstream side of the MWST to a header which can be aligned to direct flow to the CBASTs or the CWSTs as needed. The flanges used for this connection already exist on the piping. There will be no need to modify any plant equipment for the use of the new sections being added to this procedure. The hose to connect the systems will be installed by Maintenance. The use of the hose will not affect any evaluations

,-w made in the FSAR. The hose will connect two nonsafety related systems s

(

)

which are not required for the safe shutdown of this plant. FSAR

'- /

sections reviewed:

4.2, 9.2, 9.4, 9.5, 11.2, 11.4, 11.5, 11.6 and 11.14

2. Does this affect or change the Improved Technical Specifications or their X

bases? (If yes, contact the Manager, Nuclear Licensing before proceeding)

BECAUSE: (Explain your answer and list Improved Technical Specifications reviewed)

The changes made to OP-407D will not affect or require the change to any Technical Specifications. Nor will these changes affect the ODCM.

The changes made to this procedure do not release any radioactive liquid to the environment. The changes allow for storage of liquid to allow the liquid to decay prior to being released. Technical Specifications reviewed:

5.0 and the ODCM.

3. Is this a change to the ODCM7 X
4. A yes answer to any question above requires completion of Enclosure 4, X

10 CFR 50.59 Evaluation and PRC/DNPO reviews prior to implementation.

Are these required?

3. Can this potentially reduce the level of safety of the plant? (If yes, X

provide contingency actions AND PRC/DNPO reviews are required prior to implementation)

{)

BECAUSE: (Support Yes or No answers here) g The changes made to this procedure do not affect any systems required for accident mitigation. The changes provide a flow path from the MWST to the CBASTs and the CWSTs. If a failure were to occur in any Page 1 of 2 AI 400C Rev.17

s

/

Scr;;ning for Applicchility of 10 CFR 50.59 ENCLOSURE 3 l

Procedure #: OPO407D PRR #: 11281 REV#: 05 0

(

associated equipment used for this evolution, the safety of the plant would not be jepordized.

6. Review Enclosure 5. Examples of Events Which Impact Plant Operations.

X Can this possibly lead to an event that would impact plant operation?

(If yes, provide contingency actions AND PRC/DNPO reviews are required prior to implementation)

BECAUSE: (Support Yes or No answers here)

The use of this procedure will not impact plant operations. The normal use of this procedure will not affect any safety related equipment. If a compt.sent in the system were to fail it would not jepordize the operation of the plant. The use of the temporary hose is in a location where other hoses are currently used for transferring liquid. If a leak were to occur the liquid could easily be contained and there are floor drains in the room which go to the Auxiliary Building Sump.

l OV l

l v

Page 2 of 2 AI 400C Rev.17

?

ENCLO%RE 6 l

10 CFR 50.54 EVALUATION j

Procedure #:

OPO407D PRR #:

.11281 REV #:

05 A.' Does this change what'is described in any of the following plans / programs?

YES NO Quality Program Description (FSAR Section 1.7)

X

Licensed Operator Requalification Program (FSAR 12.2.3.4)

]

l Physical Security Plan -

] ]

Safeguards Contingency Plan X

Radiological Emergency Response Plan X

i Fire. Protection Plan

].

Offsite Dose Calculation Manual

]

]

Primary Coolant Sources Outside Containment Program X

i Post Accident Sampling Program

]

Containment Tendon Surveillance Program X

Inservice Inspection Program

[

Steam Generator Tube Surveillance Program

]

)

Inservice Testing Program X

Secondary Water Chemistry Program X

Ventilation Filter Testing Program

]-

Explosive Gas.and Storage Tank Radioactivity' Monitoring Program X

Diesel Fuel Oil Testing Program X

Safety Function Determination Program

]

Improved Technical Specifications Bases Control Program

[

X Core Operating Limits Report

[

Reactor Coolant System Pressure Temperature Limits Report X

IF any of the above are yes, THEN:

YES N/A I

o ' Contact the appropriate person (Attachment E of NOD-11, Preparation of X

, Safety, Regulatory, and Environmental Compliance Reviews) to perform i

.an evaluation and attach.

Evaluation Complete and attached:

~

..o NRC' approval received if needed and attached.

X

\\

l LO Page.1 of 2 AI 400C Rev.17-

--w-r

- +,,-

b-ep

.. ~

ENCLOSURE 6 10 CFR 50.54 EVALUATION (h

(,7rocedure'#:

OPO407D-PRR #:

11281 REV #:

05 j

8. Environmental Protection Plan Review:

Could this change' affect:

YES NO 1.

The environment in a non-radiological way?

x 2.

An increase in licensed power level?

X 3.

An' increase in non-radiological effluents (Volume or chemicals -

X liquid or gas)?

]

)

4.

A change in Circulating or Raw Water flows?

X 5.

Dredging, filling, or new construction on previously undisturbed areas?

X YES N/A If yes to any of the above, x

THEN contact the Manager, Nuclear Licensing to perform an evaluation 4

and attach. Evaluation Complete and attached:

p )C. Review for Change to Radioactive Waste System l

(10 CFR 50.34a and Appendix I)

YES NO Is this a change to a radioactive waste system (liquid, gaseous, or solid) x that could result in an increase of radioactive material released to the environment?

i NOTE:

The following is for reporting evaluation only and is not i

part of the approval process for the change.

YES N/A

?

IF the above is yes, x

l THEN submit a copy of the change to the Manager, Nuclear Licensing to evaluate reporting requirements.

Submitted:

i

\\

Q kJ Page 2 of 2 AI 400C Rev.17 l

O A

NOH FICATION OF NEW/ REVISED PROCEDURE ENCLO5URE 9 U

This procedure has been approved and issued for use. It is your responsibility to advise personnel in your organization affected by this new/ revised procedure of its contents. Attached is a copy of the Procedure Description, Reasons, and References (Enclosure 2).

Procedure #: OPO407D PRR #: 11281 REV #:05 jCHECK Manager, Nuclear Radiation Protection TO:

Manager, Nuclear Chemistry L

Manager, Nuclear Plant Operations Manager, Nuclear Configuration Management I C Manager, Nuclear Plant Technical Support Manager, Nuclear Security Supervisor, Nuclear Document Control i

l Supervisor, Nuclear Records Management f

Manager, Nuclear Plant Maintenance f

Manager, Nuclear Quality Assessments l

Manager, Nuclear Engineering Design Manager, Site Nuclear Services Manager, Radiological Emergency Planning f

Manager, Nuclear Licensing Procedure Interpretation Contact h, kh IE this affects most personnel of Nuclear Operations besides your department (for example: AI-413, Fitness for Duty Callout Procedure),

TliEN notify applicable personnel by describing the new procedure or describing the major changes made to the procedure.

o This can be done using electronic mail (everyone) or other means.

I i

' NOTE: For others below, state their name and address 1

Other:

l Other:

l l

l Other:

\\.

l Other:

l Page 1 of 1 AI 400C Rev.17

/3 ENCLOSURE 10 Qualified Review / Technical Review Procedure #: OPO407D PRR #: 11281 REY: 05 Conments No QUALIFIED REVIEWERS Reviewed By Date Attached :Conments Nuclear Operations Department Nuclear Security Department l

Nuclear Quality Control l

Nuclear Radiation Protection r

[ Nuclear Chemistry i

+

g il/29/yg

/

\\

O Nuclear Maintenance Dept.

I

! p

] Nuclear Configuration Management (EQ Group) l I

Nuclear Engineering Design

]

i l

l Nuclear Plant Technical Support i

l l

4 l

Other:

Other*

1 l

TECHNICAL REVIEW l

l k;d q h n -7, d n M Y2MV4

\\

l Other:

l

[

l Return to: Frank Dola I

(originator) l l

l l

Page 1 of 1 AI 400C Rev.17

ENCLOSURE Qualified Review / Technical Review Procedure #: OPO407D PRR #: 11281 REV: 05 Consnents No QUALIFIED REVIEWERS Reviewed By Date

, Attached conenent s Nuclear Operations Department Nuclear Security Department i

Nuclear Quality Control

)

] Nuclear Radiation Protection Nuclear Chemistry Nuclear Maintenance Dept.

Nuclear Configuration Management O

(EQ Group)

NO T bu/

9 Nuclear Engineering Design 2 79 G

es G

V Nuclear Plant Technical Support g-g, j' y g/y9f 9g S

~

6 Other:

Other:

i i

TECHNICAL REVIEW Other:

Other:

hk Return to: Frank Dola (Originator) h b

h6 M w w-asewa vse -run u 3 -i-94 4.// M W#4Ae

]

Q @ Mt

    • f
  • s-2-91 I

mp w pv.s.47 T at

  • Srv64 M

'd g g 7.a m w w/7W t. ass,c 3 bg

[

  1. " c""**

e,+jg, g.,,

Page 1 of 1 AI 400C Rev.17

i i

/

ENCLOSURE 10 k

Qualified Review / Technical Review Procedure #: OP0407D PRR #: 11281 REV: 05 f

I l Conenents j No QUALIFIED REVIEWERS j

Reviewed By l

Date j Attached ; Consnents geift q) j

[NuclearOperationsDepartment j

, A_.,

24 n

Nuclear Security Department I

Nuclear Quality Control Nuclear Radiation Protection I

Nuclear Chemistry Nuclear Maintenance Dept.

(s Nuclear Configuration Management (EQ Group)

Nuclear Engineering Design l

l i

i Nuclear Plant Technical Support l

l Other:

l i

Other:

l TECHNICAL REVIEW 7

Other:

l I

l f

Other:

l I

l Return to: Frank Dola (Originator) b O MME41 950 IV t 2 -zm pA

/06Yt. &

'720t Mt. M c-thmedsk & 3-2-96 &

1~e su b v-E/ *7 srud eM uvr-rw wou. u nut s v+*0 rae Rseau som

-mn em l

w% %sw%% w/ >~. Wo**W/P 7tR YtA c&. He, p Md fAee9M**.?

was von t. M. 3-J'!L g Page 1 of 1 AI 400C Rev.17

.s INTERPRETATION CONTACT'S CHECKLIST ENCLOSURE 13 O

Q Procedure #:

OPO407D Rev #:

05 PRR #:

11281 YES N/A 1.

Originator's Checklist. Enclosure 1, is adequately completed.

tr 2.

IF this is a new SP, a procedure that has received a m;or technical y

rewrite, or a procedure identified as an infrequent test or evolution, THEN ensure a simulation, walk through (no manipula. tion of plant equipment), table talk, or comparison validation has been performed before the procedure is approved by the Interpretation Contact.

3.

IF this is a new SP, or is an SP that has received a major technical.

rewri te,

i THEN notify the Senior Nuclear Scheduling Coordinator j

responsible for surveillance scheduling that the procedure must be walk through validated with an end-user on the next scheduled performance after the procedure is issued.

4.

IF this is an OP that involves component positioning changes (valves, breakers, dampers, etc..),

THEN ensure adequate aministrative controls are in place to control the component positions.

5.

IF the Procedure Cross Reference sheet had any questions answered yes,

[

THEN forward the Procedure Cross Reference sheet to Records O

Management.

O 6.

IF any comniitments of the NOCS have any changes to the implementation

]

section.

THEN forward the applicable commitments to Nuclear Licensing.

7.

IF inspection planning is required per CP-113C, Inspection Planning,

[

THEN ensure inspection planning methods are incorporated within this procedure or work instruction.

I i

1 A

I l

~

l' Page 1 of 2 AI 400C Rev.17

r i

ENCLOWRE 13 INTERPRETATION CONTACT'S CHECKLIST j

{OjProcedure #:

OPO407D Rev #:

05 PRR #:

11281 NOTE: The Interpretation Contacts can send any item to the PRC to review prior to ing,lementation, especially if the Interpretation Contact has a plant operation or safety concern.

1

1. Check ONE of the following:

All questions of Enclosure 3, Screening for Applicability of 10 CFR 50.59 are answered "No."

PRC or DNPO review is not required, procedure can be issued.

I am forwarding all applicable completed enclosures to Document Control.

Any question of Enclosure 3, Screening for Applicability or 10 CFR 50.59, was answered "Yes" or the Interpretation contact desires a PRC and DNPO review. PRC or DNPO review is required prior to implementation. I am forwarding all applicable completed enclosures to the PRC.

2. Complete ALL of the following ONLY for temporary procedure changes to become permanent:

Obtain PRR# from Document Control or electronically.

PRR#

The activities as designated on Enclosure 1, Originator's Checklist, Q

including those on Enclosure 1 with an asterisk, have been completed and V

are attached.

i I am forwarding the applicable completed enclosures to Document Control for issuance of this temporary procedure change as a permanent procedure revision.

This and other applicable enclosures have been properly completed and are being forwarded as stated above.

O)f I e7pretat' Ton Contact Date j c z>,n w w. c. m e.u s s 1 m w s/ /f+ 'PM "'W ~ WW yueg sm.a. mas m ms w e:w nP<a ~rtucw w s-a-u -go PRC and DNPO Review

DNPO Date

~

  • If required

'\\

l Page 2 of 2 AI 400C Rev.17 1

_ ~.

1

\\

Rev. 5 V

Effective Date 02/16/95 l

\\

f OPERATING PROCEDURE OP-407D FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 OPERATION OF THE MISCELLANEOUS WASTE STORAGE TANK

\\

APPROVED BY:

Interpretation Contact

~

(SIGNATURE ON FILE)

DATE:

(

INTERPRETATION CONTACT:

Superviscr, Nuclecr Operctiona l

A tir.istrctive Shift Manager, Nuclear Operations Support

e 1

l l

?

l TABLE OF CONTENTS

\\

SECTION PAGE 1.0 PURPOSE............................

1

2.0 REFERENCES

2 2.1 IMPLEMENTING REFERENCES...............

2 2.2 DEVELOPMENTAL REFERENCES 2

3.0 PERSONNEL INDOCiRINATION 3

3.1 S ET PO I NIS......................

3 3.2 LIMITS AND PRECAUTIONS 4

4.0 INSTRUCTIONS 5

4.1 MWST PRE-FILTER OPERATION..............

5 l

l 4.2 SYSTEM OPERATION 7

4.3 NWST RECIRC FOR SAMPLING 18 l

4.4 TRANSFERRING MWST TO WDT-7A (A-CWST)...

20 4.5 TRANSFERRING MWST TO WDT-7B (B-CWST)...

25 4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST)..

30 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST)..

35 5.0 FOLLOW-UP ACTIONS..........

20 l

6.0 RESTORATION INSTRUCTIONS 21 1

i i

l i

1

\\

l l

l

\\

OP-407D Rev. 5 Page i l

l

1 1 :

1.0 PURPOSE 1.1 The purpose of this procedure is to control the disposition of liquid contained in the MWST.

l l

l j

i O

OP-407D Rev. 5 Page 1

1t.!.-

l

2.0 REFERENCES

1t i

2.1 INPLENENTING REFERENCES 1

j-i None l

l 2.2 DEVELOPNENTAL REFERENCES 1

2.2.1 FD-302-681, Liquid Waste Disposal Spent Resin Transfer System i

l' l

3 a

4 i

i i

i i

i 4

e.

i e

]

1 4i f

l 4

i i

4 s

L 1

l 4

i 4

i OP-407D Rev. 5 Page 2

_..__....-..._._____________._..___._.__....._.-___._._.e.__._

3.0 PERSONNEL INDOCTRINATION DESCRIPTION VALUE 3.1 SETPOINTS l

None 1

l l

l l

O l

O OP-407D Rev. 5 Page 3

1 3.2 LINITS AND PRECAUTIONS LIMIT BASIS

~

3.2.1 For Work located in Radiation Personnel Protection Controlled Areas, due consideration must be given to the ALARA program l

l O

l

\\

l l

I lo j

OP-407D Rev. 5 Page 4 l.

.~

l 4.0 INSTRUCTIONS ACTIONS DETAILS 4.1 NWST PRE-FILTER OPERATION 4.1.1 E desired to align MWST o E WDFL-3A, influent thru a Prefilter, THEN perform following valve JJHiIH perform the associated alignment:

valve lineup, Close WDV-1004, WDFL-3B Vent Otherwise NA this step Valve Close WDV-1002, WDFL-38 Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent Valve Close WDV-996, Filter Bypass Close WDV-999, WDFL-38 Inlet Close WDV-1000, WDFL-3B Outlet Open WDV-997, WDFL-3A Inlet Open WDV-998,'WDFL-3A Outlet o E WDFL-38,

(

THEN perform following valve alignment:

Close WDV-1004, WDFL-3B Vent Valve Close WDV-1002, WDFL-3B Drain Valve Close WDV-1005, WDFL-3A Drain Valve Close WDV-1007, WDFL-3A Vent Valve Close WDV-996, Filter Bypass Close WDV-997, WDFL-3A' Inlet Close WDV-998, WDFL-3A Outlet Open WDV-999, WDFL-3B Inlet Open WDV-1000, WDFL-3B Outlet

/

Initial /Date OP-407D Rev. 5 Page 5

4.1 MWST PRE-FILTER OPERATION (Cont'd)

O ACTIONS DETAILS i

4-4.1.2 If desired to bypass MWST o

Open WDV-996, Filter Bypass pre-filters, Close WDV-997, WDFL-3A Inlet IBEN perform the associated Close WDV-998, WDFL-3A

-l valve lineup, Outlet Otherwise NA this step Close WDV-999, WDFL-3B Inlet Close WDV-1000, WDFL-3B l

Outlet i

/

4 Initial /Date 4

4 4-i t

I d

~.G iO i

O OP-407D Rev. 5 Page 6

1 4.2 SYSTEM OPERATION ACTIONS DETAILS 4.2.1 If desired to transfer MWST

1. Close the following:

to Neutralizer Tank via WDV-164, Cation Demin 3A WDP-6A, Inlet Isolation THEN perform required Valve WDV-166, Cation Demin 3B Alignment Inlet Isolation 4

Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation

2. Open the following:

WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge Valve 4

WDV-129, Neutralizer Tank Inlet Isolation WDV-157, WDP-6A Recirc 4

Isolation

~

3. GO TO Step 4.2.9

/

Initial /Date 1

a j

1 t

O OP-407D Rev. 5 Page 7 r

- ~, -

ii 4.2 SYSTEM OPERATION (Cont'd) l U ACTIONS DETAILS 1

4.2.2 E desired to transfer MWST

1. Close the following:

to Neutralizer Tank via WDV-164, Cation Demin 3A 20P-68,.

Inlet Isolation THEN perform required Valve WDV-166, Cation Demin 3B Alignment Inlet Isolation Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation i

WDV-680, Nuclear Waste Demins Isolation

2. Open the following:

WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-129, Neutralizer Tank Inlet Isolation WDV-158, WDP-6B Recirc Isolation

3. GO TO Step 4.2.9 C

/

Initial /Date 4.2.3 E desired to transfer MWST

1. Close the following:

directly to MW Evap via WDV-164, Cation Demin 3A WDP-6A, Inlet Isolation

_THfB perform required Valve WDV-166, Cation Demin 3B H

Alignment Inlet Isolation Otherwise N/A this step WDV-154, RC Evap Inlet Isolation WDV-680, Nuclear Waste Demins Isolation WDV-129, Neutralizer Tank Inlet Isolation

2. Open the following:

WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge Valve WDV-172, MW Evap Inlet Isolation

~

WDV-157, WDP-6A Recirc Isolation

3. GO TO Step 4.2.9

/

\\

Initial /Date OP-407D Rev. 5 Page 8

1 4.2 SYSTEM OPERATION (Cont'd)

ACTIONS DETAILS.

4.2.4 IE desired to transfer MWST

1. Close the following:

to MW Evap via WDP-6B,

.WDV-164, Cation Demin 3A ItB perform required Valve Inlet Isolation Alignment WDV-166, Cation Demin 3B Otherwise N/A this step Inlet Isolation WDV-154, RC Evap Inlet i

Isolation WDV-680, Nuclear Waste Demins Isolation WDV-129, Neutralizer Tank Inlet Isolation

2. Open the following:

WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-172, MW Evap Inlet j

Isolation 1

WDV-158, WDP-6B Recirc Isolation

3. GO TO Step 4.2.9 Initial /Date OP-407D Rev. 5 Page 9 F

m

4.2 SYSTEM OPERATION (Cont'd) f-ACTIONS DETAILS 4.2.5 J.E desired to transfer MWST

1. Close the following:

to MW Evap thru Cation "A" WDV-680, Nuclear Waste Demin via WDP-6A, Demins Isolation IllEN perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation WDV-44, Cation Demin 3A Inlet Isolation from CBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A i

Drain Valve WDV-366, Cation Demin 3A Drain Valve Q

WDV-170, Cation Demin 3A Q

Outlet to MWST i

WDV-49, Cation Demin 3A Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System WDV-55, Cation Demins Outlet to RC Evap WDV-58, MW Evap Inlet from RCBT's WDV-173, MW Evap Inlet from Neutralizer Tank O

OP-4070 Rev. 5 Page 10

()

4.2 SYSTEM OPERATION (Cont'd)

\\

ACTIONS DETAILS I

i 4.2.5 (Continued)

2. Open the following:

WDV-155, WDP-6A Suction Valve l

WDV-159, WDP-6A Discharge l

Valve WDV-164, Cation Demin 3A Inlet Isolation l

WDV-57, Cation Demins Outlet 1

to MW Evap l

WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A l

Outlet WDV-54, Cation Demins Outlet X-tie

-WDV-157, WDP-6A Recirc Isolation

3. GO TO Step 4.2.9

)

Initial /Date

\\

'I l

f I

OP-407D Rev. 5 Page 11

~

4.2 SYSTEM OPERATION (Cont'd)

. (g' s

\\

i ACTIONS DETAILS

]

4.2,6 1E desired to transfer MWST

1. Close the following:

to MW Evap thru Cation "A" WDV-680, Nuclear Waste Demin via WDP-68, Demins Isolation IHfH perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-166, Cation Demin 3B Inlet Isolation WDV-172, MW Evap Inlet 4

Isolation WDV-154, RC Evap Inlet 2

Isolation WDV-44, Cation Demin 3A Inlet Isolation from RCBT's WDV-116, Cation Demin 3A Inlet Isolation from MU System WDV-107, Cation Demin 3A Drain Valve WDV-366, Cation Demin 3A Drain Valve J

<-'s WDV-170, Cation Demin 3A f

Outlet to MWST WDV-49, Cation Demin 3A Outlet to RCBT's WDV-50, Cation Demin 3A Outlet to MU System WDV-55, Cation Demins Outlet to RC Evap WDV-58, MW Evap Inlet from RCBT's WDV-173, MW Evap Inlet from Neutralizer Tank e

d OP-4070 Rev. 5 Page 12

.r 4.2 SYSTEM OPERATION (Cont'd)

ACTIONS DETAILS 4.2.6 (Continued)

2. Open the following:

WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-164, Cation Demin 3A Inlet Isolation WDV-57, Cation Demins Outlet to MW Evap WDV-368, Cation Demin 3A Outlet Isolation WDV-48, Cation Demin 3A Outlet WDV-54, Cation Demins Outlet X-tie WDV-158, WDP-6B Recirc Isolation

3. GO TO Step 4.2.9

/

Initial /Date O

OP-4070 Rev. 5 Page 13

e 4.2 SYSTEM OPERATION (Cont'd) v ACTIONS DETAILS 4.2.7 IE desired to transfer MWST

1. Close the following:

to MW Evap thru Cation "B" WDV-680, Nuclear Waste Demin via WDP-6A, Demins Isolation JHEN perform required Valve WDV-129, Neutralizer Tank H

Alignment Inlet Isolation Otherwise N/A this step WDV-172, NW Evap Inlet Isolation I

WDV-154, RC Evap Inlet Isolation WDV-173, MW Evap Inlet from Neutralizer Tank q

WDV-164, Cation Demin 3A Inlet Isolation WDV-45, Cation Demin 38 Inlet Isolation from RCBT's WDV-117, Cation Demin 38 Inlet Isolation from MU System WDV-108, Cation Demin 3B Drain Valve (3

WDV-367, Cation Demin 3B U

Drain Valve WDV-171, Cation Demin 3B Outlet to MWST WDV-51, Cation Demin 3B l

Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's O

OP-407D Rev. 5 Page 14

9 4.2 SYSTEM OPERATION (Cont'd)

ACTIONS DETAILS 1

i 4.2.7 (Continued)

2. Open the following:

4 WDV-155, WDP-6A Suction Valve WDV-159, WDP-6A Discharge

+

i Valve WDV-166, Cation Demin 3B L

Inlet Isolation i

WDV-57, Cation Demins Outlet to MW Evap WDV-369, Cation Demin 3B Outlet Isolation WDV-53, Cation Demin 3B Outlet WDV-157, WDP-6A Recirc Isolation

3. GO TO Step 4.2.9 l

/

Initial /Date

!O i

4 I

i 4

l j

i

!o 4

OP-407D Rev. 5 Page 15

l5 I

I 4.2 SYSTEM OPERATION (Cont'd)

O ACTIONS DETAILS 4.2.8 IE desired to transfer MWST

1. Close the following:

to MW Evap thru Cation "B" WDV-680, Nuclear Waste Demin via WDP-6B, Demins Isolation TJiB perform required Valve WDV-129, Neutralizer Tank Alignment Inlet Isolation Otherwise N/A this step WDV-172, MW Evap Inlet Isolation WDV-154, RC Evap Inlet Isolation l

WDV-173, MW Evap Inlet from l

Neutralizer Tank WDV-164, Cation Demin 3A Inlet Isolation l

WDV-45, Cation Demin 3B l

Inlet Isolation from RCBT's WDV-117, Cation Demin 3B l

Inlet Isolation from MU System WDV-108, Cation Demin 3B Drain Valve l

f-WDV-367, Cation Demin 3B

i Drain Valve WDV-171, Cation Demin 3B Outlet to MWST l

WDV-51, Cation Demin 3B Outlet to MU System WDV-52, Cation Demin 3B Outlet to RCBT's WDV-54, Cation Demins Outlet X-tie WDV-58, MW Evap Inlet from RCBT's l

1

{

l

~

O i

0P-407D Rev. 5 Page 16 l

l l

~

1 4.2 SYSTEM OPERATION (Cont'd)

ACTIONS DETAILS 4.2.8 (Continued)

2. Open the following:

WDV-156, WDP-6B Suction Valve WDV-160, WDP-6B Discharge Valve WDV-166, Cation Demin 3B Inlet Isolation WDV-57,. Cation Demins Outlet to MW Evap WDV-369,. Cation Demin 3B Outlet Isolation WDV-53, Cation Demin 3B Outlet WDV-158, WDP-6B Recirc.

Isolation

/

\\

Initial /Date 3

4.2.9 Start transfer of MWST

1. Start Aligned WDP WDP-6A 0_B WDP-6B 2.

Throttle WDV-157 (158),

WDP-6A (6B) recirc.

isolation valves, as required, to obtain a discharge pressure of approximately 55 psig

/

Initial /Date

]

i 4.2.10 WHEN transfer of MWST is 1.

Stop WDP-6A/6B completed,

2. Close the following as required:

THEN stop MWST Transfer Pump, WDV-155 WDV-156 AND restore system to Standby WDV-159 WDV-160 Condition WDV-129 WDV-164 WDV-166 WDV-172 WDV-57 WDV-48 WDV-368 WDV-369 WDV-53 WDV-54 i

O

/

O Initial /Date OP-4070 Rev. 5 Page 17

1-'

lO 4.3 MWST RECIRC FOR SAMPLING l

ACTIONS DETAILS i

4.3.1 E recirculating MWST with 1.

Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction I!iB perform the following-2.

Close WDV-159, WDP-6A l

valve lineup Discharge Isolation Otherwise N/A this step 3.

Close WDV-160, WDP-6B f

' Discharge Isolation i

.4.

Open WDV-155, WDP-6A Suction 5.

Open/ ensure open WDV-157, WDP-6A Recirc.

^

/

Initial /Date 4

l j

4.3.2 E recirculating MWST with 1.

Close/ ensure closed WDV-155, j

WDP-68, WDP-6A Suction Ili$ perform the following 2.

Close WDV-159, WDP-6A valve lineup Discharg'e Isolation Otherwise N/A this step 3.

Close WDV-160, WDP-6B T

Discharge Isolation 4.

Open WDV-156, WDP-6B Suction 5.

Open/ ensure open WDV-158, WDP-6B Recire.

/

Initial /Date 4.3.3 Determine MWST tank level and o Record MWST level-reco.rd

/

Initial /Date 4.3.4 Start required Misc. Rad o

Start WDP-6A Waste Transfer Pump OE o

Start WDP-6B o

Record start time

/

Initial /Date OP-407D Rev. 5 Page 18

4.3 NWST RECIRC FOR SAMPLING (Cont'd)

ACTIONS DETAILS l

l NOTE: Chemistry will draw periodic samples from the MWST. A sample request form and sample due time are not needed.

i 4.3.5 Notify Chemistry that MWST is o

Chemistry Technician l

on recirc for sampling notified:

i

/

l Initial /Date 4.3.6 WHEN Chemistry notifies 1.

Stop WDP-6A Operations that sample is Close WDV-155

complete, Ili@ restore the lineup 08 2.

Stop WDP-6B Close WDV-156 l

/

Initial /Date i

l i

i l

l lO l

0P-407D Rev. 5 page 19

f 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST)

ACTIONS DETAILS l

4.4.1 Perform the following valve

1. Close/ ensure closed:

l lineup WDV-1134, Isolation to Waste l

Processing Demineralizers WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill i

l Shut 0ff WDV-327, WDP Back Flush WDV-220, WDP-12B Discharge WDV-206, WDT-7A Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-28 Inlet WDV-218, WDT-78 Recycle l

WDV-212, WDT-7A Outlet WDV-215, WDT-7B Outlet WDV-210, WDT-7A Demin Water

(

Inlet WDV-129, WDT-9 Isolation l

WDV-153, Misc Waste Evap Isolation WDV-829, Inlet to WDT-7A From the Desuperheater WDV-878, CW Return to Evaporator

/

Initial /Date 4.4.2 Ensure hose is installed that 1.

Close/ ensure closed WDV-678, connects the blind flange at suction to WDP-27 WDV-678 to the blind flange 2.

Close/ ensure closed WDV-661, at WDV-661. (located in isolation to alternate yellow room) liquid waste fill line 3.

Ensure one end of hose is installed at WDV-678 i

4.

Ensure the other end of hose i

is installed at WDV-661

/

Initial /Date I'

OP-407D Rev. 5 Page 20

I 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd)

ACTIONS DETAILS-i

~

4.4.3 Place MWST on recirc via WDP-o E recirculating via WDP-6A, 6A or WDP-68.

M GO T0 step 4.4.4.

l o E recirculating via WDP-68, l

M GO T0 step 4.4.5 l

/

l Initial /Date l

4.4.4 E recirculating MWST with 1.

Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction THEN perform the following:

2.

Close WDV-159, WDP-6A Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-155, WDP-6A Suction 5.

Open/ ensure open WDV-157, j

WDP-6A Recirc.

1 6.

Start WDP-6A 7.

GO T0 step 4.4.6 D(V

/

l Initial /Date l

4.4.5 E recirculating MWST with 1.

Close/ ensure closed WDV-155, WDP-68, WDP-6A Suction THEN perform the following:

2.

Close WDV-159, WDP-6A Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-156, WDP-6B Suction 5.

Open/ ensure open WDV-158, WDP-6B Recirc.

6.

Start WDP-6B

/

Initial /Date l

t i

0P-407D Rev. 5 Page 21

p.

I 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) bv i

ACTIONS DETAILS l

i 4,4,6 Perform the following valve o Open/ ensure open:

i lineup to transfer from MWST WDV-219, WDP-12A Discharge to WDT-7A WDV-661, Isolation'To l

Alternate Liquid Waste Fill l

Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming WDV-678, Drumming Station Isolation l

WDV-217, WDT-7A Recycle WDV-295, Spray Header Isolation

/

Initial /Date

. h.

s/

I l

4.4.7 Determine MWST tank level and Record MWST level record

/

Initial /Date 4.4.8 Determine A-CWST (WDT-7A)

Record WDT-7A tank level tank level and record

/

Initial /Date l

l l

O l

OP-4070 Rev. 5 Page 22 1.

i 4.4 TRANSFERRING MWST TO WDT-7A (A-CWST) (Cont'd) l 3(V ACTIONS DETAILS CAUTION:

The loop seals will need to be monitored while filling the tank.

4.4.9 Open appropriate Waste o

J1 recirculating via WDP-6A, l

Transfer pump discharge THEN open WDV-159, WDP-6A valve.

Discharge Isolation M

o J1 recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation

/

Initial /Date 4.4.10 When transfer from MWST to o

Stop WDP-6A WDT-7A is complete, stop the Close WDV-155 transfer pump M

o Stop WDP-6B Close WDV-156

/

Initial /Date 4.4.11 Determine MWST tank level and Record MWST Tank level record

/

Initial /Date l

4.4.12 Determine A-CWST (WDT-7A)

Record WDT-7A tank level i

tank level and record l

/

'p Initial /Date OP-407D Rev. 5 Page 23

1:

l I

i 4.4 TRANSFERRING MWST TO WDT-7A (A-CWSTl (Cont'd)

ACTIONS DETAILS 4.4.13 Restore the lineup o Close the follolwing: -

WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-219, WDP-12A Discharge

/

Initial /Date I

i

()%

u l

i l

i OP-4070 Rev. 5 Page 24 I,

4 4.5 TRANSFERRING MWST TO WDT-7B (B-CWST)

-s

. (O

\\

ACTIONS DETAILS 4.5.1 Perform the following valve

1. Close/ ensure closed:

lineup WDV-1134, Isolation to Waste Processing Demineralizers WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-327, WDP Back Flush WDV-208, WDT-7B Inlet WDV-76, WDT-8A/B Backflush WDV-149, WDT-8A Fill WDV-151, WDT-8B Fill WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDT-211, WDT-7B DW Isolation WDV-212, WDT-7A Outlet WDV-215, WDT-7B Outlet WDV-129, WDT-9 Isolation WDV-153, MW Evap Isolation WDV-830, Inlet to WDT-7B x _,)g From the Desuperheater WDV-219, WDP-12A Discharge

/

Initial /Date 4.5.2 Ensure hose is installed to 1.

Close/ ensure closed WDV-678, connect from the blind flange suction to WDP-27 at WDV-678 to the blind 2.

Close/ ensure closed WDV-661, flange at WDV-661. (located isolation to alternate in yellow room) liquid waste fill line 3.

Ensure one end of hose is installed at WDV-678 4.

Ensure the other end of hose is installed at WDV-661

/

Initial /Date Oi r!V i

OP-407D Rev. 5 Page 25

i:

l 4

l A

4.5 IRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)

\\)

ACTIONS DETAILS 1

4.5.3 Place MWST on recirc via WDP-o IE recirculating via WDP-6A, 6A or WDP-6B.

IHEN GO T0 step 4.5.4.

o If recirculating via WDP-6B, IBEN GO T0 step 4.5.5

/

Initial /Date j

i 4.5.4 IE recirculating MWST with 1.

Close/ ensure closed WDV-156, l

WDP-6A, WDP-6B Suction IHEN perform the following:

2.

Close WDV-159, WDP-6A Discharge Isolation j

i 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-155, WDP-6A Suction j

5.

Open/ ensure open WDV-157, WDP-6A Recirc.

6.

Start WDP-6A 7.

GO T0 step 4.5.6

/

Initial /Date t

4.5.5 IE recirculating MWST with 1.

Close/ ensure closed WDV-155, l

WDP-68, WDP-6A Suction IHEN perform the following:

2.

Close WDV-159, WDP-6A Discharge Isolation i

3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-156, WDP-6B Suction 5.

Open/ ensure open WDV-158, WDP-6B Recirc.

6.

Start WDP-6B

/

Initial /Date t

a OP-407D Rev. 5 Page 26 i

~4.5 TRANSFERRING MWST TO WDT-78 (B-CWST) (Cont'd)

ACTIONS DETAILS 4.5.6 Perform the following valve o Open/ ensure open:

lineup to transfer from MWST WDV-661, Isolation To to WDT-78 Alternate Liquid Waste Fill Line WDV-660, Isolation To Alternate Liquid Waste Fill Line WDV-658, Liquid Waste to Truck Load Zone WDV-680, Waste Transfer to Waste Drumming l

WDV-678, Drumming Station Isolation WDV-220, WDP-128 Discharge WDV-218, WDT-7B Recycle WDV-296, Spray Header Isolation

/

Initial /Date -

O 4.5.7 Determine MWST tank level and Record MWST level record

/

Initial /Date 4.5.8 Determine B-CWST (WDT-78)

Record WDT-7B tank level tank level and record

/

i Initial /Date i

l-l l

l

\\

i OP-407D Rev. 5 Page 27

4.5 TRANSFERRING NWST TO WDT-78 (B-CWST) (Cont'd)

L)

ACTIONS DETAILS

                                                              • e***********************************

CAUTION:

The loop seals will need to be monitored while filling the tank.

4.5.9 Open appropriate Waste o

If recirculating via WDP-6A, Transfer pump discharge THEN open WDV-159, WDP-6A valve.

Discharge Isolation M

o JE recirculating via WDP-6B, THEN open WDV-160, WDP-6B Discharge Isolation

/

Initial /Date t

4.5.10 When transfer from MWST to o

Stop WDP-6A

()T WDT-78 is complete, stop the Close WDV-155 transfer pump M

o Stop WDP-6B Close WDV-156

/

Initial /Date 4.5.11 Determine MWST tank level and Record MWST Tank level record

/

i Initial /Date 4.5.12 Determine B-CWST (WDT-78)

Record WDT-7B tank level tank level and record J

/

pl Initial /Date i

d OP-407D Rev. 5 Page 28

l

.i 4.5 TRANSFERRING MWST TO WDT-78 (8-CWST) (Cont'd) 7-(/

ACTIONS DETAILS 4.5.13 Restore the lineup o Close the following:

WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-220, WDP-12B Discharge

/

Initial /Date O

i 4

I i

O OP-407D Rev. 5 Page 29

[-

i n

4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST)

U ACTIONS DETAILS

- ' ~

4.6.1 Perform the following 1.

Close/ ensure closed:

valve lineup WDV-1134, Isolation To Waste Processing Demins

.t WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge i

WDV-118, WDT-8A Sample WDV-76, WDT-8A/B Backflush WDV-136, WDT-8A Inlet Isolation WDV-137, WDT-8B Inlet Isolation WDV-138, DW to WDT-8A 4

WDV-151, Waste Drum Fill WDV-143, WDT-8B Outlet

]O, Isolation WDV-177, WDP-13A/B Discharge to RCBTs WDV-142, WDT-8A Isolation WDV-145, WDP-13A Suction WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDV-878, Conc. Waste Return i

To Evaporator WDV-877, Conc. Boric Acid Return to Evaporators WDV-827, Desuperheater inlet to WDT-8A WDV-218, WDT-7B Recycle WDV-327, WDP Back Flush DWV-123, DW to CBAST Isolation

/

Initial /Date O

OP-4070 Rev. 5 Page 30

4 4.6 TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)

O ACTIONS DETAILS 4.6.2 Ensure hose is installed to 1.

Close/ ensure closed WDV-678, connect from the blind suction to WDP-27 flange at WDV-678 to the 2.

Close/ ensure closed WDV-blind flange at WDV-661.

661, isolation to alternate (located in yellow room) liquid waste fill line 3.

Ensure one end of hose is installed at WDV-678 4.

Ensure the other end of hose is installed at WDV-661

/

Initial /Date 4.6.3 Place HWST on recirc via o

IE recirculating via WDP-6A, WDP-6A or WDP-6B.

IBfB GO T0 step 4.6.4.

o IE recirculating via WDP-68, THEN GO T0 step 4.6.5 Initial /Date 4.6.4 J.E recirculating MWST with 1.

Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction

_TlffN perform the following 2.

Close WDV-159, WDP-6A valve lineup Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-155, WDP-6A Suction 5.

Open/ ensure open WDV-157, WDP-6A Recirc.

6.

Start WDP-6A 7.

GO T0 step 4.6.6

/

Initial /Date l

O OP-407D Rev. 5 Page 31

}

4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)

\\

ACTIONS DETAILS i

4.6. 5 ~ If recirculating MWST with 1.

Close/ ensure closed WDV-155, WDP-6B, WDP-6A Suction IllEli perform then following 2.

Close WDV-159, WDP-6A valve lineup Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-156, WDP-6B Suction 5.

Open/ ensure open WDV-158, WDP-6B Recirc.

6.

Start WDP-6B

/

Initial /Date 4.6.6 Perform the following valve o

Open/ ensure open:

lineup to transfer from MWST WDV-149, Waste Drum Fill

('

to WDT-8A WDV-147,WDT-8A Recycle

(

WDV-140, WDT-8A Spray Header Isolation WDV-661, isolation to alternate liquid waste fill line WDV-660, isolation to alternate liquid waste fill line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming

/

Initial /Date 4.6.7 Determine MWST tank level Record MWST level and record

/

Initial /Date OV OP-407D' Rev. 5 Page 32

l,-

1 7-~g 4.6 TRANSFERRING NWST TO WDT-8A (A-CBAST) (Cont'd)

.\\

)

ACTIONS DETAILS 4.6.8 Determine A-CBAST (WDT-8A)

Record WDT-8A tank level tank level and record

/

Initial /Date CAUTION:

The loop seals will need to be monitored while filling the tank.

4.6.9 Open appropriate Waste o

IE recirculating via WDP-6A, Transfer pump discharge THEN open WDV-159, WDP-6A valve.

Discharge Isolation 08 o

IE recirculating via WDP-6B,

(

IHEN open WDV-160, WDP-6B Discharge Isolation x

/

Initial /Date 4.6.10 When transfer from MWST to o

Stop WDP-6A WDT-8A is completed, stop Close WDV-155 the transfer pump OB o

Stop WDP-6B Close WDV-156

/

Initial /Date 4.6.11 Determine MWST tank level Record MWST Tank level l

and record

/

Initial /Date j

OP-407D Rev. 5 Page 33

4.6 TRANSFERRING MWST TO WDT-8A (A-CBAST) (Cont'd)

O.

ACTIONS DETAILS 4.6.12 Determine A-CBAST (WDT-8A)

Record WDT-8A tank level tank level and record

/

Initial /Date 4.6.13 Restore the lineup o

Close the following:

WDV-678, Drumming Station Isolation WDV-661, Isolation to Alternate Liquid Waste Fill Line to truck load zone WDV-660, Isolation to Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to i

Truck Load Zone-WDV-149, Waste Drum Fill

()

WDV-147, WDT-8A Recycle

/

Initial /Date i

I 4

D u

OP-407D Rev. 5 Page 34

L 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST)

ACTIONS DETAILS i

4.7.1 Perform the following valve

1..Close/ ensure closed:

lineup:

__ WDV-1134, Isolation To Waste Processing Demins WDV-657, Waste Drum Fill WDV-655, Waste Drum Fill WDV-656, Bypass around WD-143-FE WDV-653, Drum Waste Fill Shut 0ff WDV-219, WDP-12A Discharge WDV-220, WDP-12B Discharge WDV-248, WDT-8B Sample WDV-76, WDT-8A/B Backflush WDV-149, Waste Drum Fill WDV-136, WDT-8A Inlet l

Isolation WDV-137, h9T-8B Inlet Isolatic i WDV-130, DW to WDT-8B WDV-152, WDP-13B Discharge i

WDV.146, WDP-13B Suction

's WDV-143, WDT-8B Outlet Isolation WDV-177, WDP-13A/B Discharge to RCBTs WDV-148, WDP-13A Discharge WDV-144, CBASTs Crosstie WDV-164, WDDM-2A Inlet WDV-166, WDDM-2B Inlet WDV-878, Conc. Waste Return To Evaporator WDV-877,. Conc. Boric Acid Return to Evaporators WDV-828, Desuperheater inlet to WDT-8B WDV-218, WDT-78 Recycle WDV-327, WDP Back Flush DWV-123,iDW to CBAST Isolation

/

l Initial /Date l

O l

OP-407D Rev. 5 Page 35

e' 4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)

ACTIONS DETAILS 4.7.2 Ensure hose is installed to 1.

Close/ ensure closed WDV-678, connect from the blind suction to WDP-27 flange at WDV-678 to the 2.

Close/ ensure closed WDV-blind flange at WDV-661.

661, isolation to alternate (located in yellow room) liquid waste fill line 3.

Ensure one end of hose is installed at WDV-678 i

4.

Ensure the other end of the hose is attached at WDV-661 i

/

Initial /Date 4.7.3 Place MWST on recirc via o

E recirculating via WDP-6A, WDP-6A or WDP-68.

THEN f0 T0 step 4.7.4.

o E recirculating via WDP-68, THEN GO T0 step 4.7.5 Initial /Date 4.7.4 E recirculating MWST with 1.

Close/ ensure closed WDV-156, WDP-6A, WDP-6B Suction THEN perform the following:

2.

Close WDV-159, WDP-6A Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-155, WDP-6A Suction 5.

Open/ ensure open WDV-157, WDP-6A Recirc.

6.

Start WDP-6A 7.

GO T0 step 4.7.6

/

Initial /Date i

.(

OP-407D Rev. 5 Page 36

4.7 TRANSFERRING MWST TO WDT-8B (B-CBAST) (Cont'd)

V ACTIONS DETAILS 4.7.5 IE recirculating MWST with 1.

Close/ ensure closed WDV-155, WDP-68, WDP-6A Suction THEN perform then following:

2.

Close WDV-159, WDP-6A Discharge Isolation 3.

Close WDV-160, WDP-6B Discharge Isolation 4.

Open WDV-156, WDP-6B Suction 5.

Open/ ensure open WDV-158, WDP-6B Recirc.

6.

Start WDP-6B

/

Initial /Date 4.7.6 Perform the following valve o

Open/ ensure open:

lineup to transfer from MWST WDV-151, Waste Drum Fill to WDT-8B WDV-150, WDT-8B Recycle WDV-141, WDT 8B Spray Header Isolation

()

WDV-661, isolation to

\\s /

alternate liquid waste fill line WDV-660, isolation to alternate liquid waste fill line WDV-658, Liquid Waste to Truck Load Zone WDV-678, Drumming Station Isolation WDV-680, Waste Transfer to Waste Drumming

/

Initial /Date 4.7.7 Determine MWST tank level MWST level and record

/

l Initial /Date (V)

l OP-407D Rev. 5 Page 37

4.7 q

TRANSFERRING NWST TO WDT-88 (B-CBAST) (Cont'd) b ACTIONS DETAILS 4.7.8 Determine B-CBAST (WDT-88)

Record WDT-88 tank level tank level and record I'n'tial Date

                                                                                                                            • s*****

CAUTION:

The loop seals will need to be monitored while fillit 1 the tank.

4.7.9 Open appropriate Waste o

IE recirculating via WDP-6A.

Transfer pump discharge It!EH open WDV-159, WDP-6A valve.

Discharge Isolation 0.8 o

J1 recirculating via WDP-6B, I!!EN open WDV-160, WDP-6B C

Discharge Isolation

/

Initial /Date 4.7.10 When transfer from MWST to o

Stop WDP-6A WDT-8B is completed, stop Close WDV-155 the transfer pump 0_8 o

Stop WDP-6B Close WDV-156

/

Initial /Date 4.7.11 Determine MWST tank level and record Record MWST Tank level

/

Initial /Date OP-407D Rev. 5 Page 38

II.

l O'

4.7 TRANSFERRING NWST TO WDT-8B (B-CBAST) (Cont'd)

LO ACTIONS DETAILS 4.7.12 Determine B-CBAST (WDT-8B)

Record WDT-8B tank level tank level and record

/

l Initial /Date l

4.7.13 Restore the lineup o

Close the following:

WDV-678, Drumming Station Isolation l

WDV-661, Isolation to l

Alternate Liquid Waste Fill WDV-660, Isolation to Line to truck load zone Alternate Liquid Waste Fill Line to Truck Load Zone WDV-658, Liquid Waste to Truck Load Zone WDV-151, Waste Drum Fill WDV-150, WDT-8B Recycle

()N Q

/

1 1

Initial /Date I

'rU l

r OP-4070 Rev. 5 Page 39

,i d

I

!4*

l l

l 5.0 FOLLOW-UP ACTIONS l

l ACTIONS DETAILS l

l None 1

l O

l i\\

i l

l OP-407D Rev. 5 Page 40

i...

- 1; i

i i

k' 6.0 RESTORATION INSTRUCTIONS i

l-ACTIONS DETAILS 2

l-I 1

None 1

i't i

1 I

i i

I L

I i

l 1

i l --

4 4-i-

l'p a

i 4

u 6

i 1

i i

i i

1 is 1

j-1 l'

J 4

i i

iOP-407D Rev. 5 Page 41 (LAST PAGE) i i.

~_...,- _,,,.- --

-