      .4 OPERATING DATA REPORT DOCKET NO.         50-286 DATE     3/5/85 COMPLETED BY     L-         Ya11v TELEPHONE (914) 739-8200 OPERATING STATUS
.4 OPERATING DATA REPORT DOCKET NO.
50-286 DATE 3/5/85 COMPLETED BY L-Ya11v TELEPHONE (914) 739-8200 OPERATING STATUS Notes Indi n P int No. 3 Nuclear Power Plant
: 1. Unit Name:
: 1. Unit Name:
Indi n P int No. 3 Nuclear Power Plant Notes
# **"# U
                                    # **"# U ""#
: 2. Reporting Period:
: 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):             3025
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):             1013
3025 1013
          . 5. Design Electrical Rating (Net MWe):
: 4. Nameplate Rating (Gross MWe):
965
. 5. Design Electrical Rating (Net MWe):
1000
: 6. Maximum Dependable Capacity (Gross MWe):
965
965
: 6. Maximum Dependable Capacity (Gross MWe):            1000
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
965
: 8. If Changes Occur in Capac:ty Ratingh (items Number 3 Through 7) Since Lt.st Report. Give Reasons:
: 8. If Changes Occur in Capac:ty Ratingh (items Number 3 Through 7) Since Lt.st Report. Give Reasons:
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
This Month               Yr.-to.Ds.te         Cumulative 672                   1416           _74521
This Month Yr.-to.Ds.te Cumulative 672 1416
: 11. Hours in Reporting Period 672             1387.04               43753.27
_74521
        - 12. Number Of Hours Reaetor Was Critical                             ,
: 11. Hours in Reporting Period 672 1387.04 43753.27
0                     0                    0
- 12. Number Of Hours Reaetor Was Critical 0
: 13. Reactor Reserve Shutdown Hours                                                                 _
0 0
672             1370.74               41218.68
: 13. Reactor Reserve Shutdown Hours 672 1370.74 41218.68
: 14. Hours Generator On.Line 0                     0                   0 1.5 Unit Reserve Shatdown Hours                                                                     109,796,418.54 2,020,135.29         4,091,472.16
: 14. Hours Generator On.Line 0
: 16. Gross Thermal Energy Genereted (MWH) 664220             1,347,340             33,989,655
0 0
: 17. Gross Electrical Energy Genented (M1VH)                                                       32,584,889 640679             1,298,773
1.5 Unit Reserve Shatdown Hours 2,020,135.29 4,091,472.16 109,796,418.54
: 18. Net Electrical Energy Generated (MWH1                                                             55.3 00.o               6.8
: 16. Gross Thermal Energy Genereted (MWH) 664220 1,347,340 33,989,655
: 19. Unit Service Factor 100.0               96.a                   55.3
: 17. Gross Electrical Energy Genented (M1VH) 640679 1,298,773 32,584,889
: 20. Unit Availability Factor 98.8               95.0                   47.6*
: 18. Net Electrical Energy Generated (MWH1 00.o 6.8 55.3
: 21. Unit Capacity Factor (Using MDC Net)
: 19. Unit Service Factor 100.0 96.a 55.3
,                                                                    98.8               95.0                   45.3
: 20. Unit Availability Factor 98.8 95.0 47.6*
: 22. Unit Capacity Factor (Usiig DER Neti 0                   3.2                 21 9
: 21. Unit Capacity Factor (Using MDC Net) 98.8 95.0 45.3
: 22. Unit Capacity Factor (Usiig DER Neti 0
3.2 21 9
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Menths (Type. Date,and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Menths (Type. Date,and Duration of Each1:
* Weighted average Cycle 4/5 Refueling Outage (est. June 1985) 1 l'
* Weighted average Cycle 4/5 Refueling Outage (est. June 1985) 1 l'
25 If Shut Down At End Of Report Period. Estimated Date of Startup:
25 If Shut Down At End Of Report Period. Estimated Date of Startup:
26 Units in Test Status iPrior to Commercial Operationi:                         Forecast             Achieved           )
26 Units in Test Status iPrior to Commercial Operationi:
  ^                                                                                                                               1 INITIAL CRITICALITY INITIAL ELECTRICITY                                       _
Forecast Achieved
COMMERCI AL OPERATION 9503210313 DR 850228 ADOCK 050CO286
)
_.          -.            - _- _ eda _ _                                  .      _.        _          _ _ _ _ _          __
^
1 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 9503210313 850228 DR ADOCK 050CO286 eda


          ;.                                          AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.       50-286 Indian Point UNIT       No. 3 DATE.      3/4/85 COMPLETED BY           L- KellV TELEPilONE       (914) 739-8200 MONTH               e nhvnney DAY       AVERAGE DAILY POh'ER LEVEL                           DAY       AVER AGE DAILY POWER LEVEL (MWe Net)                                                       MWe Net)
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
I                960                                          g7                   949 2
50-286 Indian Point UNIT No. 3 3/4/85 DATE.
957                                          g3                   950 3                 959                                           19                   951 4                 960                                                                950 20 5
COMPLETED BY L-KellV TELEPilONE (914) 739-8200 MONTH nhvnney e
955                                                                950 21 6                 957                                                                950 22 957                                                                 950 7                                                               23
DAY AVERAGE DAILY POh'ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
: g.               944                                                                  950 24 9
MWe Net) 960 I
957                                                                  952 25 10               957                                                                 954 26 gg               956                                           27                   955 g2               959                                            gg                   955 13 949                                                                  -
g7 949 957 2
29 14               952                                            30
g3 950 3
              .15                 951                                                                  -
959 19 951 960 4
31 16 950 INSTRUCTIONS
20 950 955 5
$l             On this format, hst the average daily unit power level in .'. We-Set for each day in the reporting month. Compute to the nearest whole megawatt.
21 950 957 6
22 950 957 7
23 950 944 g.
24 950 957 9
25 952 10 957 26 954 gg 956 27 955 959 g2 gg 955 949 13 29 952 14 30 951
.15 31 950 16 INSTRUCTIONS
$l On this format, hst the average daily unit power level in.'. We-Set for each day in the reporting month. Compute to the nearest whole megawatt.
tot 77 :
tot 77 :


W                                       ;
W i
i
".*4J%o
                                                                                                                                            *       *M),=".                   ".*4J%o D
*M),=".
npQ v .cwde    1Zv 73 3**y Nmoe &dc2m
D npQ v.cwd 1Zv 73 3**y Nmoe &dc2m e
                                                                                                                                              ,. .2aw 2 hem 9            -?' 4 3 $ ,',     !.
-?' 4 3 $,',
w
w
                                                                                                                                                            .pw m      d, NUN (D1 t
,. 2aw 2 hem 9 d, NUN (D1 1
1 U
t U
                                                                                                                ,m#                    OmwE"   W= fyQf T    w z< ? MoHH4                     l mm nM E                         DM4 i
.pw m OmwE" fyQf w z< ? MoHH4 l
:                                  di,,e n,*mb hzm *E J. Ig *C a0 n
W=
o 0e tC-
T i
                                                                                    ,'r-                                         !
,m#
fogt co                                              n n i             3-                                                             e m'
DM4 mm nM E di,,e n,*mb hzm *E J. Ig *C a0 tC-0e n
                                                                            !mtma os               n                       y.SMa                               n$ e    n's.::      Ig m,*.:4-
o
* 7..
,'r-o n
                            . Y e.
n i 3-fogt e
lep y
os n
ir ta r o u        s a
ma y.SMa m'
o h uR t  e        m 3-s t id s
n$
yo O d p
n's.: Ig m,*.:4-c le ir o
o              >e5=       -
!mt e e
T            uH(              e R        Ieh     n       e.ya e             SC               mC O       nF.ee.3 % .P Eg- N.
s t O d u
M   S    w o
s 7..
D
. Y e.
                          .~ ao
p ta y
      -                          is                                                                         m                         J n             .
r o a
Fue:                                                                                 -
h uR m
                                                                                                                                              =,*7
3-id p
                                                                                                                                              =
>e5=
_"._=v *e 5 e.e.c                                                                                       E* y,E .                                                   _.O=*
t syo o
9ac.= ..                      =- =. mu=;, a. mu !!- .:.                                       - EuEE                             J
Ieh n e.ya e SC mC e
T uH S
O nF.ee.3 %.P Eg-N R
M w
(
oD
.~ ao is m
J n
Fue:
E* y,E.
 
==,*7
_"._=v
*e
_.O=*
5 e.e.c m.
9ac.= ac
> m:c =- =. mu=;, a mu ! :.
- EuEE
*" h6 :
J
: ' = a. F~
: ' = a. F~
m.
. =
ac          > m:c . =                                                                                                      *" h6 :
% Eu m o ya.%43-4u5'
                                                                                                                                                        < *d P.3 _ . ~~-; *.:I.P.
< *d P.3 _. ~ ; *.:I.P.
  -                                   % Eu m o            ya.%43-                                                          .
~-
4u5'
WEu Ek 9za7 o 5,
  .                                  9za7 o 5, WEu>c.5z*
~ ~~"" Fl,$ % N =
Ek8 gn2:*
>c.5z* 8 gn2:*
                                                                                                                                                  <e. = % r.",2     -  ~
<e. = % r.",2
                                                                                                                                                                      ~  ~~"" Fl ,$ ~.
~.
                                                                                                                                                                                          %N=
~
O xomc               q xn. :.2 _.2-
O xomc q xn. :.2 _.2-
                                                                                                                +Q.,3 mu: ' ;
+Q.,3 mu ' ;
                                                                                                                                                .~"..
. ~ "..
                                                                          ~
* c K u : a Ee_. 6 > te.O E 7&===~ :-
  --                                *- c K u : a Ee_. 6 > te.O E 7& ===~ :-
~
  -                                    7 >c. =g.. x c-                                                                               e
7 >c. =g.. x c-e
                                      ^. xx u. g.io
^. xx u.
                                                                                                                                                                        ?.=e *-
g.io
                                                  .        . nw..a
. nw..a V, E ;
                                                                      . V, E ;                                                               - ,.Ze5_ , zh-
-,.Ze5_, zh-
                                      = c =n , ^ ....      . =-
?.=e *-
    . : cwy  .
cwy
: 5. .u
= c =n, ^. 5..u = -


E MONTHLY I & C REPORT February 1984     *" q MONTH-WR# DATE   EQUIPMENT                     MALFUNCTION                       CORRECTIVE ACTION 3845 2/6/85 Weld Channel Zone #3         Integrator not registering flow   Replaced transistor in Integrator                                                     integrator.
E MONTHLY I & C REPORT February 1984 q
3866 2/6/85 Reactor Protection Racks     Sticky relay                     Replaced r'e lay.
MONTH-WR#
Reactor Protection Trip Relay RT-9 3870 2/7/85 Weld Channel Zones #1         Integrators not registering flow Replaced integrator in and 4 Integrators                                               Zone #1. Zone #4
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3845 2/6/85 Weld Channel Zone #3 Integrator not registering flow Replaced transistor in Integrator integrator.
                                                                              ' lubricated.
3866 2/6/85 Reactor Protection Racks Sticky relay Replaced r' lay.
3785 2/8/85 Containment Building Fan     Detector failure                 Replaced with new detector.
e Reactor Protection Trip Relay RT-9 3870 2/7/85 Weld Channel Zones #1 Integrators not registering flow Replaced integrator in and 4 Integrators Zone #1.
Cooler Unit Radiation Monitor R-23 3266 2/14/85 Wide Range Gas Monitor       Pump failed to automatically     Installed new prom chip.
Zone #4
Radiation Monitor             start 3671 2/15/85 Primary Auxiliary Building   Lights <nt without power         Replaced transistor in Piping Penetration Room       failure                           control circuit.
' lubricated.
Emergency Lighting Unit 3825 2/19/85 Diesel Generator #33         Gauge inoperative                 Replaced with new gauge.
3785 2/8/85 Containment Building Fan Detector failure Replaced with new detector.
Service Water Pressure Gauge 3941 2/26/85 Component Cooling System     Does not respond to signal       Replaced with new Temperature Control Valve     from current to pneumatic         controller.
Cooler Unit Radiation Monitor R-23 3266 2/14/85 Wide Range Gas Monitor Pump failed to automatically Installed new prom chip.
130.                         controller 3931 2/27/85 Reactor Coolant System       M-12 pegged low                   Replaced isolation amplifier-Flight Panel Indicator                                         on circuit card.
Radiation Monitor start 3671 2/15/85 Primary Auxiliary Building Lights <nt without power Replaced transistor in Piping Penetration Room failure control circuit.
M-12 3942 2/27/85 Condensate Storage Tank       No level indication               Replaced amplifier in Level Indicator 1128-                                           level transmitter.
Emergency Lighting Unit 3825 2/19/85 Diesel Generator #33 Gauge inoperative Replaced with new gauge.
Service Water Pressure Gauge 3941 2/26/85 Component Cooling System Does not respond to signal Replaced with new Temperature Control Valve from current to pneumatic controller.
130.
controller 3931 2/27/85 Reactor Coolant System M-12 pegged low Replaced isolation amplifier-Flight Panel Indicator on circuit card.
M-12 3942 2/27/85 Condensate Storage Tank No level indication Replaced amplifier in Level Indicator 1128-level transmitter.


                    ;-        _                ;          -                  L   -                    e               ,
L e
MONTHLY' MAINTENANCE ~ REPORT.                                         ,,
MONTHLY' MAINTENANCE ~ REPORT.
FEBRUARY 1985' MONTH-WRf DATE             EQUIPMENT                       MALFUNCTION-                   CORRECTIVE ACTION 6065 2/13/85   Radiation Monitor R-13         Pump will not operate                 Replaced' inboard and           -
FEBRUARY 1985' MONTH-WRf DATE EQUIPMENT MALFUNCTION-CORRECTIVE ACTION 6065 2/13/85 Radiation Monitor R-13 Pump will not operate Replaced' inboard and outboard bearings 5907 2/19/85 Radiation Monitor RE-101 Valve will not'open
outboard bearings 5907 2/19/85   Radiation Monitor RE-101       Valve will not'open                 ' Tightened fuse-clips for-
' Tightened fuse-clips for-
                      . Sampler, valve RM-102                                               valve RM-102 6060 2/19/85   CVCS Valve 382, Mixed Bed     . Diaphragm Leaks                     Replaced bonnet and Drain                                                                 diaphragm assembly 6103 2/20/85   Charging Pump #33               Pinhole' leak at discharge valve     Rewelded pinhole in flange-6003 2/21/85   Fuel Storage Building Door     Seal leaks                           Replaced seal for Fuel 319 Seal                                                             Storage Building Door 319 6117 2/25/85-   Fan Cooler Unit #32 Motor       Motor Cooler leaks                   Re-solder leak in motor-Cooler                                                               cooler 4834 2/27/85   PAB/VC Exhaust Fan #31         Fan will not' operate                 Replaced worn shaft bearing and belts 6127 2/27/85   Fuel Storage Building Door . Valve will not operate               Rewired door seal circuit 319 Seal Vent Solenoid h
. Sampler, valve RM-102 valve RM-102 6060 2/19/85 CVCS Valve 382, Mixed Bed
. Diaphragm Leaks Replaced bonnet and Drain diaphragm assembly 6103 2/20/85 Charging Pump #33 Pinhole' leak at discharge valve Rewelded pinhole in flange-6003 2/21/85 Fuel Storage Building Door Seal leaks Replaced seal for Fuel 319 Seal Storage Building Door 319 6117 2/25/85-Fan Cooler Unit #32 Motor Motor Cooler leaks Re-solder leak in motor-Cooler cooler 4834 2/27/85 PAB/VC Exhaust Fan #31 Fan will not' operate Replaced worn shaft bearing and belts 6127 2/27/85 Fuel Storage Building Door.
Valve will not operate Rewired door seal circuit 319 Seal Vent Solenoid h


9.;g                           =c g             ,                                          .
9.;g
                                                                                                                                                                                    ~ 1.1 llI t h, _ ,.. ~ . .. +;-   - . -
=c g
: ir 7..                                                                  .                                                                                    ..
~ 1.1 llI t
h,.... +;-
, _. ~
: ir 7..
4 a
4 a
n,                 %
n, l.L Summary of-Operating Experience. February 1985 L
l.
L                                       '
Summary of-Operating Experience. February 1985 L
T
T
                                  .' Indian Point-Unit'3,was synchronized to the bus for a total of 672 hours
.' Indian Point-Unit'3,was synchronized to the bus for a total of 672 hours
_ producing a-gross generation of 664,220 MWe for:this reporting period.
_ producing a-gross generation of 664,220 MWe for:this reporting period.
: v. .      .
v.
                        -            The unit' remained on.-line for the entire' reporting period without experiencing any trips or reportable loa'd reductions.                                                                   '
The unit' remained on.-line for the entire' reporting period without experiencing any trips or reportable loa'd reductions.
                                      -n
-n F
                                                >                                    F                                                                                              .s v                                                                                                                                                     n   s v
. s v
1 L
n s
                                                                                                                                                                              ,        t s
v 1
                .                                                  c .                                           rW m a it     ,
L t
3                                                                                                 $
s c.
a
rW m a it 3
                                                                                                                                    , *' I             #
, *' I a
E k
E k
4
4
                                                                                                                                                                              ?
?
r F
r F
                                                                                                                                                    ...*                          k; I                                                                                                                                                     & -
k; I
i
i
                                                                                                                                                  '. g a             , -
'. g a
P t-r                      ;f                       .
P t-
;f r
4
4
                                                                                                                          ?
?
s b
s b
                                                                                                                                                                                        }
}
                                          ' Y L                 ._                                                                                                                                    , .
' Y L


Indien Point 3
Indien Point 3 Nuclear Power Plant P.O. Box 215 Buchanan. NewWrk 10511 914 739.8200
  *.          Nuclear Power Plant
#> NewWrkPbwer
    .          P.O. Box 215 Buchanan. NewWrk 10511 914 739.8200
& Authority N
          #> NewWrkPbwer
March 11, 1985 IP-LK-541 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk
          & Authority N                                 March 11, 1985 IP-LK-541 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk


==Dear Sir:==
==Dear Sir:==
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of February, 1985.
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of February, 1985.
V   truly yours IOf           bC John C. Brons Resident Manager LK/bam Enclosures (12 Copies) cc:   Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO C. A. McNeill, WPO J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NY0 INFO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 p5g f i
V truly yours IOf bC John C. Brons Resident Manager LK/bam Enclosures (12 Copies) cc:
I}}
Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO C. A. McNeill, WPO J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NY0 INFO Records Center p5g Suite 1500 f
1100 Circle 75 Parkway Atlanta, Georgia 30339 I
i}}

Latest revision as of 01:08, 13 December 2024

Monthly Operating Rept for Feb 1985
ML20112C076
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/28/1985
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-541, NUDOCS 8503210313
Download: ML20112C076 (7)


Text

-

j.

l

.4 OPERATING DATA REPORT DOCKET NO.

50-286 DATE 3/5/85 COMPLETED BY L-Ya11v TELEPHONE (914) 739-8200 OPERATING STATUS Notes Indi n P int No. 3 Nuclear Power Plant

1. Unit Name:
  1. **"# U
2. Reporting Period:
3. Licensed Thermal Power (MWt):

3025 1013

4. Nameplate Rating (Gross MWe):

965

. 5. Design Electrical Rating (Net MWe):

1000

6. Maximum Dependable Capacity (Gross MWe):

965

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capac:ty Ratingh (items Number 3 Through 7) Since Lt.st Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr.-to.Ds.te Cumulative 672 1416

_74521

11. Hours in Reporting Period 672 1387.04 43753.27

- 12. Number Of Hours Reaetor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 672 1370.74 41218.68
14. Hours Generator On.Line 0

0 0

1.5 Unit Reserve Shatdown Hours 2,020,135.29 4,091,472.16 109,796,418.54

16. Gross Thermal Energy Genereted (MWH) 664220 1,347,340 33,989,655
17. Gross Electrical Energy Genented (M1VH) 640679 1,298,773 32,584,889
18. Net Electrical Energy Generated (MWH1 00.o 6.8 55.3
19. Unit Service Factor 100.0 96.a 55.3
20. Unit Availability Factor 98.8 95.0 47.6*
21. Unit Capacity Factor (Using MDC Net) 98.8 95.0 45.3
22. Unit Capacity Factor (Usiig DER Neti 0

3.2 21 9

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Menths (Type. Date,and Duration of Each1:
  • Weighted average Cycle 4/5 Refueling Outage (est. June 1985) 1 l'

25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units in Test Status iPrior to Commercial Operationi:

Forecast Achieved

)

^

1 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 9503210313 850228 DR ADOCK 050CO286 eda

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 Indian Point UNIT No. 3 3/4/85 DATE.

COMPLETED BY L-KellV TELEPilONE (914) 739-8200 MONTH nhvnney e

DAY AVERAGE DAILY POh'ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

MWe Net) 960 I

g7 949 957 2

g3 950 3

959 19 951 960 4

20 950 955 5

21 950 957 6

22 950 957 7

23 950 944 g.

24 950 957 9

25 952 10 957 26 954 gg 956 27 955 959 g2 gg 955 949 13 29 952 14 30 951

.15 31 950 16 INSTRUCTIONS

$l On this format, hst the average daily unit power level in.'. We-Set for each day in the reporting month. Compute to the nearest whole megawatt.

tot 77 :

W i

".*4J%o

  • M),=".

D npQ v.cwd 1Zv 73 3**y Nmoe &dc2m e

-?' 4 3 $,',

w

,. 2aw 2 hem 9 d, NUN (D1 1

t U

.pw m OmwE" fyQf w z< ? MoHH4 l

W=

T i

,m#

DM4 mm nM E di,,e n,*mb hzm *E J. Ig *C a0 tC-0e n

o

,'r-o n

n i 3-fogt e

os n

ma y.SMa m'

n$

n's.: Ig m,*.:4-c le ir o

!mt e e

s t O d u

s 7..

. Y e.

p ta y

r o a

h uR m

3-id p

>e5=

t syo o

Ieh n e.ya e SC mC e

T uH S

O nF.ee.3 %.P Eg-N R

M w

(

oD

.~ ao is m

J n

Fue:

E* y,E.

==,*7

_"._=v

  • e

_.O=*

5 e.e.c m.

9ac.= ac

> m:c =- =. mu=;, a mu ! :.

- EuEE

  • " h6 :

J

' = a. F~

. =

% Eu m o ya.%43-4u5'

< *d P.3 _. ~ ; *.:I.P.

~-

WEu Ek 9za7 o 5,

~ ~~"" Fl,$ % N =

>c.5z* 8 gn2:*

<e. = % r.",2

~.

~

O xomc q xn. :.2 _.2-

+Q.,3 mu ' ;

. ~ "..

  • c K u : a Ee_. 6 > te.O E 7&===~ :-

~

7 >c. =g.. x c-e

^. xx u.

g.io

. nw..a V, E ;

-,.Ze5_, zh-

?.=e *-

cwy

= c =n, ^. 5..u = -

E MONTHLY I & C REPORT February 1984 q

MONTH-WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3845 2/6/85 Weld Channel Zone #3 Integrator not registering flow Replaced transistor in Integrator integrator.

3866 2/6/85 Reactor Protection Racks Sticky relay Replaced r' lay.

e Reactor Protection Trip Relay RT-9 3870 2/7/85 Weld Channel Zones #1 Integrators not registering flow Replaced integrator in and 4 Integrators Zone #1.

Zone #4

' lubricated.

3785 2/8/85 Containment Building Fan Detector failure Replaced with new detector.

Cooler Unit Radiation Monitor R-23 3266 2/14/85 Wide Range Gas Monitor Pump failed to automatically Installed new prom chip.

Radiation Monitor start 3671 2/15/85 Primary Auxiliary Building Lights <nt without power Replaced transistor in Piping Penetration Room failure control circuit.

Emergency Lighting Unit 3825 2/19/85 Diesel Generator #33 Gauge inoperative Replaced with new gauge.

Service Water Pressure Gauge 3941 2/26/85 Component Cooling System Does not respond to signal Replaced with new Temperature Control Valve from current to pneumatic controller.

130.

controller 3931 2/27/85 Reactor Coolant System M-12 pegged low Replaced isolation amplifier-Flight Panel Indicator on circuit card.

M-12 3942 2/27/85 Condensate Storage Tank No level indication Replaced amplifier in Level Indicator 1128-level transmitter.

L e

MONTHLY' MAINTENANCE ~ REPORT.

FEBRUARY 1985' MONTH-WRf DATE EQUIPMENT MALFUNCTION-CORRECTIVE ACTION 6065 2/13/85 Radiation Monitor R-13 Pump will not operate Replaced' inboard and outboard bearings 5907 2/19/85 Radiation Monitor RE-101 Valve will not'open

' Tightened fuse-clips for-

. Sampler, valve RM-102 valve RM-102 6060 2/19/85 CVCS Valve 382, Mixed Bed

. Diaphragm Leaks Replaced bonnet and Drain diaphragm assembly 6103 2/20/85 Charging Pump #33 Pinhole' leak at discharge valve Rewelded pinhole in flange-6003 2/21/85 Fuel Storage Building Door Seal leaks Replaced seal for Fuel 319 Seal Storage Building Door 319 6117 2/25/85-Fan Cooler Unit #32 Motor Motor Cooler leaks Re-solder leak in motor-Cooler cooler 4834 2/27/85 PAB/VC Exhaust Fan #31 Fan will not' operate Replaced worn shaft bearing and belts 6127 2/27/85 Fuel Storage Building Door.

Valve will not operate Rewired door seal circuit 319 Seal Vent Solenoid h

9.;g

=c g

~ 1.1 llI t

h,.... +;-

, _. ~

ir 7..

4 a

n, l.L Summary of-Operating Experience. February 1985 L

T

.' Indian Point-Unit'3,was synchronized to the bus for a total of 672 hours0.00778 days <br />0.187 hours <br />0.00111 weeks <br />2.55696e-4 months <br />

_ producing a-gross generation of 664,220 MWe for:this reporting period.

v.

The unit' remained on.-line for the entire' reporting period without experiencing any trips or reportable loa'd reductions.

-n F

. s v

n s

v 1

L t

s c.

rW m a it 3

, *' I a

E k

4

?

r F

k; I

i

'. g a

P t-

f r

4

?

s b

}

' Y L

Indien Point 3 Nuclear Power Plant P.O. Box 215 Buchanan. NewWrk 10511 914 739.8200

  1. > NewWrkPbwer

& Authority N

March 11, 1985 IP-LK-541 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of February, 1985.

V truly yours IOf bC John C. Brons Resident Manager LK/bam Enclosures (12 Copies) cc:

Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO C. A. McNeill, WPO J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NY0 INFO Records Center p5g Suite 1500 f

1100 Circle 75 Parkway Atlanta, Georgia 30339 I

i