ENS 40454: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
| event date = 01/16/2004 11:37 EST | | event date = 01/16/2004 11:37 EST | ||
| last update date = 01/16/2004 | | last update date = 01/16/2004 | ||
| title = Automatic Reactor Trip Due | | title = Automatic Reactor Trip Due to Turbine Trip | ||
| event text = At 1137 hours EST on January 16, 2004, with Watts Bar Unit 1 in Mode 1 at 100 % power, a turbine trip and reactor trip occurred. This is reportable as a 4-hour notification under 10 CFR 50.72 (b)(2)(iv)(B) and an 8-hour notification under 10 CFR 50.72 (b)(3)(iv)(A). In addition, per design, there was auto start of the Auxiliary Feedwater system which is reportable as an 8-hour notification under 10 CFR 50.72 (b)(3)(iv)(A). Plant safety systems performed as designed and the reactor is currently stable in mode 3. | | event text = At 1137 hours EST on January 16, 2004, with Watts Bar Unit 1 in Mode 1 at 100 % power, a turbine trip and reactor trip occurred. This is reportable as a 4-hour notification under 10 CFR 50.72 (b)(2)(iv)(B) and an 8-hour notification under 10 CFR 50.72 (b)(3)(iv)(A). In addition, per design, there was auto start of the Auxiliary Feedwater system which is reportable as an 8-hour notification under 10 CFR 50.72 (b)(3)(iv)(A). Plant safety systems performed as designed and the reactor is currently stable in mode 3. | ||
At the time of the trip, plant personnel were performing scheduled Solid State Protection System (SSPS) surveillance testing on the B Train Reactor Trip Breaker. Plant personnel are currently investigating the cause of the event. | At the time of the trip, plant personnel were performing scheduled Solid State Protection System (SSPS) surveillance testing on the B Train Reactor Trip Breaker. Plant personnel are currently investigating the cause of the event. | ||
Latest revision as of 21:24, 1 March 2018
| Where | |
|---|---|
| Watts Bar Tennessee (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+-2.82 h-0.118 days <br />-0.0168 weeks <br />-0.00386 months <br />) | |
| Opened: | Steve Smith 13:48 Jan 16, 2004 |
| NRC Officer: | Gerry Waig |
| Last Updated: | Jan 16, 2004 |
| 40454 - NRC Website
| |