ENS 40453: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/15/2004 EST | | event date = 01/15/2004 EST | ||
| last update date = 01/16/2004 | | last update date = 01/16/2004 | ||
| title = Part 21 Report Involving | | title = Part 21 Report Involving an Undersized Emergency Feedwater Pump Shaft | ||
| event text = FPL Energy Seabrook has determined that a Substantial Safety Hazard could exist regarding an undersized Emergency Feedwater Pump shaft in accordance with the requirements of 10CFR21. Therefore, FPL Energy Seabrook is reporting this deficiency to the NRC in accordance with 10CFR21. This Part 21 evaluation documents a deficiency in a rotating assembly for an Emergency Feedwater Pump refurbished at the Flowserve Charlotte Service Center - Charlotte, NC. | | event text = FPL Energy Seabrook has determined that a Substantial Safety Hazard could exist regarding an undersized Emergency Feedwater Pump shaft in accordance with the requirements of 10CFR21. Therefore, FPL Energy Seabrook is reporting this deficiency to the NRC in accordance with 10CFR21. This Part 21 evaluation documents a deficiency in a rotating assembly for an Emergency Feedwater Pump refurbished at the Flowserve Charlotte Service Center - Charlotte, NC. | ||
The defect was an undersized shaft that was .001 inches smaller than the minimum diameter specified by the vendor. The shaft dimensions are considered to be proprietary by the vendor, so the undersized condition could not be identified by FPL Energy Seabrook personnel prior to installation. | The defect was an undersized shaft that was .001 inches smaller than the minimum diameter specified by the vendor. The shaft dimensions are considered to be proprietary by the vendor, so the undersized condition could not be identified by FPL Energy Seabrook personnel prior to installation. |
Latest revision as of 22:24, 1 March 2018
Where | |
---|---|
Seabrook ![]() New Hampshire (NRC Region 1) | |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+27.1 h1.129 days <br />0.161 weeks <br />0.0371 months <br />) | |
Opened: | Mike Okeeth 08:06 Jan 16, 2004 |
NRC Officer: | Chauncey Gould |
Last Updated: | Jan 16, 2004 |
40453 - NRC Website
| |