ENS 41002: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by Mark Hawes |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
| event date = 08/31/2004 07:18 EDT | | event date = 08/31/2004 07:18 EDT | ||
| last update date = 08/31/2004 | | last update date = 08/31/2004 | ||
| title = Rps Actuation Due | | title = Rps Actuation Due to Fire in 2B Condensate Pump | ||
| event text = At 0718 EDT, the reactor was manually tripped from approximately 95% power following notification to the control room of a fire associated with condensate pump 2B. Initially, upon notification of smoke at the condensate pump, a rapid down power had been commenced, wherein reactor power was reduced from 100% to approximately 95% power. | | event text = At 0718 EDT, the reactor was manually tripped from approximately 95% power following notification to the control room of a fire associated with condensate pump 2B. Initially, upon notification of smoke at the condensate pump, a rapid down power had been commenced, wherein reactor power was reduced from 100% to approximately 95% power. | ||
An automatic actuation of the auxiliary feedwater system also occurred as designed to maintain steam generator water level following the reactor trip. | An automatic actuation of the auxiliary feedwater system also occurred as designed to maintain steam generator water level following the reactor trip. | ||
Latest revision as of 21:22, 1 March 2018
| Where | |
|---|---|
| Palisades Michigan (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+-1.67 h-0.0696 days <br />-0.00994 weeks <br />-0.00229 months <br />) | |
| Opened: | Daniel Malone 09:38 Aug 31, 2004 |
| NRC Officer: | Bill Gott |
| Last Updated: | Aug 31, 2004 |
| 41002 - NRC Website
| |