| event date = 12/26/2004 09:04 EST
| event date = 12/26/2004 09:04 EST
| last update date = 12/26/2004
| last update date = 12/26/2004
| title = Loss Of Communications/Response Capability
| title = Loss of Communications/Response Capability
| event text = At 0804 hours EST, on December 26, 2004, at the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, a partial loss of non-vital offsite power occurred causing the inoperability of the Emergency Response Facility Information (ERFIS) computer system for greater than one hour.  The ERFIS computer system provides monitoring and communications capability for plant data systems including the Emergency Response Data System (ERDS), among others.  At 0852, the remaining non-vital offsite power was lost resulting in the disabling of the primary Emergency Operating Facility (EOF).  The off-site alternate EOF remained operational.  Power to the primary EOF was restored at 0913 and the ERFIS computer system was restored to operable status at 1010 hours on December 26, 2004.
| event text = At 0804 hours EST, on December 26, 2004, at the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, a partial loss of non-vital offsite power occurred causing the inoperability of the Emergency Response Facility Information (ERFIS) computer system for greater than one hour.  The ERFIS computer system provides monitoring and communications capability for plant data systems including the Emergency Response Data System (ERDS), among others.  At 0852, the remaining non-vital offsite power was lost resulting in the disabling of the primary Emergency Operating Facility (EOF).  The off-site alternate EOF remained operational.  Power to the primary EOF was restored at 0913 and the ERFIS computer system was restored to operable status at 1010 hours on December 26, 2004.
As required by plant procedures, appropriate assessment of plant conditions, notifications, and communications could still have been made through alternate methods during the time that the ERFIS computer system was inoperable.  This report is being made in accordance with 10 CFR 50.72(b)(3)(xiii), which is any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability.  As previously stated, alternate means remained available to assess plant conditions, make notifications, and accomplish required communications, as necessary.
As required by plant procedures, appropriate assessment of plant conditions, notifications, and communications could still have been made through alternate methods during the time that the ERFIS computer system was inoperable.  This report is being made in accordance with 10 CFR 50.72(b)(3)(xiii), which is any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability.  As previously stated, alternate means remained available to assess plant conditions, make notifications, and accomplish required communications, as necessary.

Latest revision as of 22:22, 1 March 2018

ENS 41295 +/-
Where
Robinson Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-1.27 h-0.0529 days <br />-0.00756 weeks <br />-0.00174 months <br />)
Opened: Henry Curry
12:48 Dec 26, 2004
NRC Officer: Janelle Battiste
Last Updated: Dec 26, 2004