| event date = 04/25/2005 12:00 EST
| event date = 04/25/2005 12:00 EST
| last update date = 05/04/2005
| last update date = 05/04/2005
| title = The Plant'S Tsc (Technical Support Center) Has Been Taken Out Of Service Due To Planned Maintenance Work
| title = the Plant'S Tsc (Technical Support Center) Has Been Taken Out of Service Due to Planned Maintenance Work
| event text = On 4/2512005 at 12:00 p.m., EDT the Hatch Nuclear Plant's Technical Support Center (TSC) was removed from service for planned maintenance and equipment modifications. The maintenance activities require relocation of the control panel (1X75-C001) which contains the HVAC controls and annunciators as well as the radiation monitoring meter and annunciator.  The loss of this equipment requires taking the TSC out of service. The maintenance activities are scheduled to take five weeks.  The alternate TSC will remain operable and available, so no loss of TSC function will occur due to the maintenance activity.
| event text = On 4/2512005 at 12:00 p.m., EDT the Hatch Nuclear Plant's Technical Support Center (TSC) was removed from service for planned maintenance and equipment modifications. The maintenance activities require relocation of the control panel (1X75-C001) which contains the HVAC controls and annunciators as well as the radiation monitoring meter and annunciator.  The loss of this equipment requires taking the TSC out of service. The maintenance activities are scheduled to take five weeks.  The alternate TSC will remain operable and available, so no loss of TSC function will occur due to the maintenance activity.
This event is reportable per 10CFR50.72 (b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity results in a loss of an emergency response facility for the duration of the evolution.
This event is reportable per 10CFR50.72 (b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity results in a loss of an emergency response facility for the duration of the evolution.

Latest revision as of 22:21, 1 March 2018

ENS 41632 +/-
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.5 h-0.188 days <br />-0.0268 weeks <br />-0.00616 months <br />)
Opened: Frank Gorley
12:30 Apr 25, 2005
NRC Officer: Chauncey Gould
Last Updated: May 4, 2005