ENS 43817: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/01/2007 14:35 CST
| event date = 12/01/2007 14:35 CST
| last update date = 12/01/2007
| last update date = 12/01/2007
| title = Automatic Edg Starts On 161 Kv Line Transient
| title = Automatic Edg Starts on 161 Kv Line Transient
| event text = This report is being made under 10CFR50.72(b)(3)(iv)(A), 'Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B) of this section' due to the Auto Start of the 'A' and 'B' Standby Diesel Generators.
| event text = This report is being made under 10CFR50.72(b)(3)(iv)(A), 'Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B) of this section' due to the Auto Start of the 'A' and 'B' Standby Diesel Generators.
The Auto start of the 'A' and 'B' Standby Diesel Generators occurred on a valid bus undervoltage condition caused by a transient on the 161 kV Fairfax line.  The Standby Diesel Generator Feeder Breakers did not close onto their respective Essential buses.  The Essential buses were not required to load onto either diesel as they remained powered from the 1X003 Start-up Transformer during and after the event.  Offsite power remained fully operable during and following the event.  The Standby Diesel Generators have been returned to the standby/ready condition.
The Auto start of the 'A' and 'B' Standby Diesel Generators occurred on a valid bus undervoltage condition caused by a transient on the 161 kV Fairfax line.  The Standby Diesel Generator Feeder Breakers did not close onto their respective Essential buses.  The Essential buses were not required to load onto either diesel as they remained powered from the 1X003 Start-up Transformer during and after the event.  Offsite power remained fully operable during and following the event.  The Standby Diesel Generators have been returned to the standby/ready condition.

Latest revision as of 22:15, 1 March 2018

ENS 43817 +/-
Where
Duane Arnold NextEra Energy icon.png
Iowa (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000331/LER-2007-011
Time - Person (Reporting Time:+-2.17 h-0.0904 days <br />-0.0129 weeks <br />-0.00297 months <br />)
Opened: Hans Olson
18:25 Dec 1, 2007
NRC Officer: Jeff Rotton
Last Updated: Dec 1, 2007
43817 - NRC Website
Loading map...