Title | Manual Scram at Duane Arnold Due to Hi Coolant Conductivity |
Event Description | Inserted a Manual Reactor Scram due to high reactor coolant conductivity. Source of high reactor coolant conductivity is not certain at this time.
In addition, this report is being made under 50.72(b)(3)(iv)(A), 'Any event or condition that results in valid actuation of any systems listed in paragraph (b)(3)(iv)(B) of this section' due to PCIS groups 2, 3, and 4 being received when reactor water level dropped below 170". All isolations went to completion. The reactor water level drop is normal following a scram from 45% power due to void collapse in the reactor vessel. Reactor water level was restored to normal and the PCIS group isolations were reset. The current plan is to cool down the plant and enter Mode 4, plant cool down is being achieved using the RCIC system until the source of the conductivity transient is identified and isolated. The licensee indicated shortly prior to the scram a coolant chemistry transient was in progress. The limit for reactor coolant conductivity is 5 micro mhos per centimeter and the highest conductivity reading reached was 8 micro mhos per centimeter. The licensee speculates the most likely source of the high conductivity is related to an off service condensate demineralizer. There were no automatic ECCS initiations. No SRVs lifted. All control rods properly inserted. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Duane Arnold ![]() Iowa (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />) | |
Opened: | Tom Gordon 04:15 Nov 7, 2003 |
NRC Officer: | Rich Laura |
Last Updated: | Nov 7, 2003 |
40301 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40301\u003C/a\u003E - \u003Ca href=\"/Duane_Arnold\" title=\"Duane Arnold\"\u003EDuane Arnold\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Scram at Duane Arnold Due to Hi Coolant Conductivity\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40301 - Duane Arnold\n","link":"","lat":42.10089166666667,"lon":-91.77759444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (45 %) |
After | Hot Shutdown (0 %) |
Duane Arnold ![]() | |
![]() Nov 18 Nov 25 Dec 2 Dec 9 Dec 16 Dec 23 Dec 30 Jan 6 Jan 13 Jan 20 Jan 27 Feb 3 Feb 10 Feb 17 Feb 24 Mar 3 Mar 10 Mar 17 Mar 24 Mar 31 Apr 7 Apr 14 Apr 21 Apr 28 May 5 May 12 May 19 May 26 Jun 2 Jun 9 Jun 16 Jun 23 Jun 30 Jul 7 Jul 14 Jul 21 Jul 28 Aug 4 Aug 11 Aug 18 Aug 25 Sep 1 Sep 8 Sep 15 ![]() Jun Jul Aug Sep Oct Nov Dec 2018 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2019 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 Feb 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 ![]() | |