APR 4       1974 i
APR 4 1974 i
i f
i f
: 11. D. Thornburg, Chief, Field Support and Enforcenent Branch F0 i 342 - C&O #314 The enclosure to the subject document reconnended issuance of a Dulletin relative to failure of components in the main steam isolation valve control systaa at honticello. The affected components were installed as part of a modification made in early 1973. The licensee, in reporting the failure, stated its belief that such failure might be generic. We
: 11. D. Thornburg, Chief, Field Support and Enforcenent Branch F0 i 342 - C&O #314 The enclosure to the subject document reconnended issuance of a Dulletin relative to failure of components in the main steam isolation valve control systaa at honticello.
      ;                          concur.
The affected components were installed as part of a modification made in early 1973.
The licensee, in reporting the failure, stated its belief that such failure might be generic. We concur.
General Electric Company has reported the lionticello modification to Licensing in the form of Supplement I to APED-5750, with the statement that it is recouaending this modification to all its customers, and will routinely supply the modified design on all future facilities.
General Electric Company has reported the lionticello modification to Licensing in the form of Supplement I to APED-5750, with the statement that it is recouaending this modification to all its customers, and will routinely supply the modified design on all future facilities.
Licensing is currently evaluating the acceptability of this modification with a target date for decision of liay 1,1974. The llonticello occurrence is being considered in this evaluation.
Licensing is currently evaluating the acceptability of this modification with a target date for decision of liay 1,1974.
The llonticello occurrence is being considered in this evaluation.
To our knowledge, the only other facility which has made the Monticello modification is Cooper (we do not have information on H111 stone 1 and VermontYankee1).
To our knowledge, the only other facility which has made the Monticello modification is Cooper (we do not have information on H111 stone 1 and VermontYankee1).
I Under the circulastances, we do not believe that a Bulletin is warranted.
I Under the circulastances, we do not believe that a Bulletin is warranted.
14e will keep you and the Regions infonned of the results of Licensing's evaluation.
14e will keep you and the Regions infonned of the results of Licensing's evaluation.
i l
i l
i O. H. Grier. Assistant Director for Construction & Operation i
O. H. Grier. Assistant Director i
Directorate of Regulatory Operations cc:   G. Fiore111. RO:III D. L. Ziemann, L R. W. Reid L i
for Construction & Operation i
Directorate of Regulatory Operations cc:
G. Fiore111. RO:III D. L. Ziemann, L R. W. Reid L i
or c'u
or c'u
* J k
* k J
erson:bs . KVSeyfrit_
erson:bs. KVSeyfrit_
[                  . . . . . .
BHGriet _
BHGriet _
4 /74 l                      , , , , ,                      4/3/74       4/3/74 i.,an AIC-)W ( Rt. 9 9 3) AICM ONO                     s.o ces to s t .o s. : ss. se.
[
9212070435 740404 gDR     ADOCK0500g3
l 4 /74 4/3/74 4/3/74 i.,an AIC-)W ( Rt. 9 9 3) AICM ONO s.o ces to s t.o s. : ss. se.
9212070435 740404 gDR ADOCK0500g3


70:             D. H. Grier, R0 ISI.I.h ACT10j CONTR01, POP 4 A.       Action Code             F0il342         bYh '                                                                                                  f Narne of Licensee and haellity _               BilR racilities Docket No. or License No.
70:
Title       Failure of MSIV Pilo.LValves Origin .. Letter thver to O't eerv 2/25/74                                 Date Rec'd B.       FS6ED Dranch Coordinator Bryan       .X             Dreher               11. D. Thornburg Ellis                       Pattluo C.       Action Requested of ADRDT               ,
D. H. Grier, R0 ISI.I.h ACT10j CONTR01, POP 4 bYh '
M6PPOD           EPB                     RPB                               ADC0               X OB             s         _
f A.
TAB           00E                                   REGION Date Requested                 3/19/74       Completion Requested by                                           3/27/74 Reference             Memorandum. Fiorelli to Thornburg dated 3/13/74.
Action Code F0il342 Narne of Licensee and haellity _
D.       Action Requested:               Please evaluate the licensees findings in the abnornal occurrence report as to whether or not they are generic and whether or not issuance of a bulletin is warranted.                                                                                                  .
BilR racilities Docket No. or License No.
E.       Date Action Completed Close-out (Date & Method)
Title Failure of MSIV Pilo.LValves Origin.. Letter thver to O't eerv 2/25/74 Date Rec'd B.
Comments:       If completion date is not consistent with your work schedule, please let us know.
FS6ED Dranch Coordinator Bryan
l J
.X Dreher
Lf                                                    LW th liarold D. biornburg, Chief                                                       (
: 11. D. Thornburg Ellis Pattluo C.
l                                                                                                                             Field Support 5 Enforcement Branch i
Action Requested of ADRDT M6PPOD EPB RPB ADC0 X
Directorate of' Regulatory Operations l                                                     cc: J. C. Davis y       p--sF     m -
OB s
ap-i :2-y--#--9     ysy   twewww             w,-4     -y     +--         g   -w       -rmy3 y g-   .i p g yy+   -#-g-*-9-wws----   wy gy- ---wg --WT - +--   M prg*=7-ye-   m}}
TAB 00E REGION Date Requested 3/19/74 Completion Requested by 3/27/74 Reference Memorandum. Fiorelli to Thornburg dated 3/13/74.
D.
Action Requested:
Please evaluate the licensees findings in the abnornal occurrence report as to whether or not they are generic and whether or not issuance of a bulletin is warranted.
E.
Date Action Completed Close-out (Date & Method)
Comments:
If completion date is not consistent with your work schedule, please let us know.
l JLf LW th liarold D. biornburg, Chief
(
l Field Support 5 Enforcement Branch i
Directorate of' Regulatory Operations l
cc: J. C. Davis y
p--sF m
ap-i
:2-y--#--9 ysy twewww w,-4
-y 9
+--
g
-w
-rmy3 y g-
.i p g yy+
-#-g-*-9-wws----
wy gy-
---wg
--WT
- +--
M prg*=7-ye-m}}

Latest revision as of 14:18, 12 December 2024

Informs That Encl Recommended Issuance of Bulletin Re Failure of Components in MSIV Control Sys at Plant.Believes That Bulletin Unwarranted
ML20128D967
Person / Time
Site: Monticello 
Issue date: 04/04/1974
From: Grier B
US ATOMIC ENERGY COMMISSION (AEC)
To: Thornburg H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20128D972 List:
References
NUDOCS 9212070435
Download: ML20128D967 (2)


Text

,

/

APR 4 1974 i

i f

11. D. Thornburg, Chief, Field Support and Enforcenent Branch F0 i 342 - C&O #314 The enclosure to the subject document reconnended issuance of a Dulletin relative to failure of components in the main steam isolation valve control systaa at honticello.

The affected components were installed as part of a modification made in early 1973.

The licensee, in reporting the failure, stated its belief that such failure might be generic. We concur.

General Electric Company has reported the lionticello modification to Licensing in the form of Supplement I to APED-5750, with the statement that it is recouaending this modification to all its customers, and will routinely supply the modified design on all future facilities.

Licensing is currently evaluating the acceptability of this modification with a target date for decision of liay 1,1974.

The llonticello occurrence is being considered in this evaluation.

To our knowledge, the only other facility which has made the Monticello modification is Cooper (we do not have information on H111 stone 1 and VermontYankee1).

I Under the circulastances, we do not believe that a Bulletin is warranted.

14e will keep you and the Regions infonned of the results of Licensing's evaluation.

i l

O. H. Grier. Assistant Director i

for Construction & Operation i

Directorate of Regulatory Operations cc:

G. Fiore111. RO:III D. L. Ziemann, L R. W. Reid L i

or c'u

  • k J

erson:bs. KVSeyfrit_

BHGriet _

[

l 4 /74 4/3/74 4/3/74 i.,an AIC-)W ( Rt. 9 9 3) AICM ONO s.o ces to s t.o s. : ss. se.

9212070435 740404 gDR ADOCK0500g3

70:

D. H. Grier, R0 ISI.I.h ACT10j CONTR01, POP 4 bYh '

f A.

Action Code F0il342 Narne of Licensee and haellity _

BilR racilities Docket No. or License No.

Title Failure of MSIV Pilo.LValves Origin.. Letter thver to O't eerv 2/25/74 Date Rec'd B.

FS6ED Dranch Coordinator Bryan

.X Dreher

11. D. Thornburg Ellis Pattluo C.

Action Requested of ADRDT M6PPOD EPB RPB ADC0 X

OB s

TAB 00E REGION Date Requested 3/19/74 Completion Requested by 3/27/74 Reference Memorandum. Fiorelli to Thornburg dated 3/13/74.

D.

Action Requested:

Please evaluate the licensees findings in the abnornal occurrence report as to whether or not they are generic and whether or not issuance of a bulletin is warranted.

E.

Date Action Completed Close-out (Date & Method)

Comments:

If completion date is not consistent with your work schedule, please let us know.

l JLf LW th liarold D. biornburg, Chief

(

l Field Support 5 Enforcement Branch i

Directorate of' Regulatory Operations l

cc: J. C. Davis y

p--sF m

ap-i

2-y--#--9 ysy twewww w,-4

-y 9

+--

g

-w

-rmy3 y g-

.i p g yy+

-#-g-*-9-wws----

wy gy-

---wg

--WT

- +--

M prg*=7-ye-m