Created page by program invented by Mark Hawes
 
Created page by program invented by StriderTol
Line 16: Line 16:
| event date = 01/31/2009 01:50 CST
| event date = 01/31/2009 01:50 CST
| last update date = 01/31/2009
| last update date = 01/31/2009
| title = Loss Of Power To Criticality Accident Alarm System Horn  
| title = Loss of Power to Criticality Accident Alarm System Horn  
| event text = At 0150 CST, on 01-31-09 the Plant Shift Superintendent (PSS) was notified that a Criticality Accident Alarm System (CAAS) trouble alarm had actuated for the C-409 (Stabilization Building). The PSS dispatched personnel to investigate and discovered that a circuit breaker had tripped causing a loss of power to the CAAS horn uninterruptible power supply (UPS). Further investigation revealed that the output of the UPS was off. This caused loss of CAAS audibility for C-409 and TSR LCO 2.6.4.1b was immediately entered. There were no fissile material operations in progress and all personnel in the affected area had a radio in constant communication with the Central Communications Facility satisfying the required actions of TSR 2.6.4.1 b. The circuit breaker that tripped was closed, the UPS was turned back on, and TSR 2.6.4.1b was exited at 0317 hours.  
| event text = At 0150 CST, on 01-31-09 the Plant Shift Superintendent (PSS) was notified that a Criticality Accident Alarm System (CAAS) trouble alarm had actuated for the C-409 (Stabilization Building). The PSS dispatched personnel to investigate and discovered that a circuit breaker had tripped causing a loss of power to the CAAS horn uninterruptible power supply (UPS). Further investigation revealed that the output of the UPS was off. This caused loss of CAAS audibility for C-409 and TSR LCO 2.6.4.1b was immediately entered. There were no fissile material operations in progress and all personnel in the affected area had a radio in constant communication with the Central Communications Facility satisfying the required actions of TSR 2.6.4.1 b. The circuit breaker that tripped was closed, the UPS was turned back on, and TSR 2.6.4.1b was exited at 0317 hours.  
This event is reportable as a 24 hour event in accordance with 10CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: a.) the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident; b.) the equipment is required by a TSR to be available and operable and either should have been operating or should have operated on demand, and c.) no redundant equipment is available and operable to perform the required safety function.
This event is reportable as a 24 hour event in accordance with 10CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: a.) the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident; b.) the equipment is required by a TSR to be available and operable and either should have been operating or should have operated on demand, and c.) no redundant equipment is available and operable to perform the required safety function.

Revision as of 21:12, 1 March 2018

ENS 44820 +/-
Where
Paducah Gaseous Diffusion Plant
Paducah, Kentucky (NRC Region 2)
License number: Gdp-1
Reporting
10 CFR 76.120(c)(2)
Time - Person (Reporting Time:+5.53 h0.23 days <br />0.0329 weeks <br />0.00757 months <br />)
Opened: Calvin Pittman
13:22 Jan 31, 2009
NRC Officer: John Knoke
Last Updated: Jan 31, 2009
44820 - NRC Website
Loading map...