| event date = 10/05/2009 11:58 EDT
| event date = 10/05/2009 11:58 EDT
| last update date = 10/05/2009
| last update date = 10/05/2009
| title = Manual Scram And High Pressure Coolant Injection Following A Loss Of Feedwater Level Control
| title = Manual Scram and High Pressure Coolant Injection Following a Loss of Feedwater Level Control
| event text = At 1158 on Monday, October 5, 2009, Nine Mile Point Unit One was manually scrammed from approximately 100% rated power due to failure of the Feedwater Level Control System, in anticipation of a reactor scram.  Following the manual scram insertion at 11:58, High Pressure Coolant Injection (HPCI) System automatically initiated on low Reactor Vessel (RPV) level.  At 11:59, RPV level was restored above the HPCI System low level actuation setpoint, and the HPCI System initiation signal was reset.  At Nine Mile Point Unit One, a HPCI System actuation signal on low RPV level is normally received following a reactor scram, due to level shrink.
| event text = At 1158 on Monday, October 5, 2009, Nine Mile Point Unit One was manually scrammed from approximately 100% rated power due to failure of the Feedwater Level Control System, in anticipation of a reactor scram.  Following the manual scram insertion at 11:58, High Pressure Coolant Injection (HPCI) System automatically initiated on low Reactor Vessel (RPV) level.  At 11:59, RPV level was restored above the HPCI System low level actuation setpoint, and the HPCI System initiation signal was reset.  At Nine Mile Point Unit One, a HPCI System actuation signal on low RPV level is normally received following a reactor scram, due to level shrink.
Unit 1 has commenced cooldown, in preparation for the forced outage to commence repairs.  Reactor water level is being controlled in the normal operating band; reactor temperature is 450?F and reactor pressure is approximately 500 psig.
Unit 1 has commenced cooldown, in preparation for the forced outage to commence repairs.  Reactor water level is being controlled in the normal operating band; reactor temperature is 450?F and reactor pressure is approximately 500 psig.

Latest revision as of 21:11, 1 March 2018

ENS 45412 +/-
Where
Nine Mile Point Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.28 h-0.0533 days <br />-0.00762 weeks <br />-0.00175 months <br />)
Opened: John Driscoll
14:41 Oct 5, 2009
NRC Officer: Donald Norwood
Last Updated: Oct 5, 2009