| event date = 10/05/2009 11:58 EDT | | event date = 10/05/2009 11:58 EDT | ||
| last update date = 10/05/2009 | | last update date = 10/05/2009 | ||
| title = Manual Scram | | title = Manual Scram and High Pressure Coolant Injection Following a Loss of Feedwater Level Control | ||
| event text = At 1158 on Monday, October 5, 2009, Nine Mile Point Unit One was manually scrammed from approximately 100% rated power due to failure of the Feedwater Level Control System, in anticipation of a reactor scram. Following the manual scram insertion at 11:58, High Pressure Coolant Injection (HPCI) System automatically initiated on low Reactor Vessel (RPV) level. At 11:59, RPV level was restored above the HPCI System low level actuation setpoint, and the HPCI System initiation signal was reset. At Nine Mile Point Unit One, a HPCI System actuation signal on low RPV level is normally received following a reactor scram, due to level shrink. | | event text = At 1158 on Monday, October 5, 2009, Nine Mile Point Unit One was manually scrammed from approximately 100% rated power due to failure of the Feedwater Level Control System, in anticipation of a reactor scram. Following the manual scram insertion at 11:58, High Pressure Coolant Injection (HPCI) System automatically initiated on low Reactor Vessel (RPV) level. At 11:59, RPV level was restored above the HPCI System low level actuation setpoint, and the HPCI System initiation signal was reset. At Nine Mile Point Unit One, a HPCI System actuation signal on low RPV level is normally received following a reactor scram, due to level shrink. | ||
Unit 1 has commenced cooldown, in preparation for the forced outage to commence repairs. Reactor water level is being controlled in the normal operating band; reactor temperature is 450?F and reactor pressure is approximately 500 psig. | Unit 1 has commenced cooldown, in preparation for the forced outage to commence repairs. Reactor water level is being controlled in the normal operating band; reactor temperature is 450?F and reactor pressure is approximately 500 psig. |
Latest revision as of 21:11, 1 March 2018
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.28 h-0.0533 days <br />-0.00762 weeks <br />-0.00175 months <br />) | |
Opened: | John Driscoll 14:41 Oct 5, 2009 |
NRC Officer: | Donald Norwood |
Last Updated: | Oct 5, 2009 |
45412 - NRC Website
| |