ML20129B045: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
        .            DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED                                             ;
DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED The information on this page is considered appropriate for public disclosure pursuant to 10 CFR 2.790(d)
I The information on this page is considered appropriate for public disclosure pursuant to 10 CFR 2.790(d)
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Report No.:
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Report No.:                 70-1201/96-201 License No.:                 SNM-1168 Safeguards Group:           lli Licensee:                   Framatome Cogema Fuels Lynchburg, VA Inspection Conducted:       August 19-21,1996 Inspectors:             '        A                                   OI      6 L.D.Y. Ong, MC&A Physical Scientist               Date Signed Inspection Section, Operations Branch J.
70-1201/96-201 License No.:
i8'      '\
SNM-1168 Safeguards Group:
II, S'edtion Chief 9/    $b d/te 5igned in   etion Section, Operations Branch
lli Licensee:
Framatome Cogema Fuels Lynchburg, VA Inspection Conducted:
August 19-21,1996 OI 6
Inspectors:
A L.D.Y. Ong, MC&A Physical Scientist Date Signed Inspection Section, Operations Branch i 8 '
9/
$b
'\\
J.
II, S'edtion Chief d/te 5igned in etion Section, Operations Branch


==SUMMARY==
==SUMMARY==
 
Scope:
Scope:             The areas examined during this routine material control and           ;
The areas examined during this routine material control and accounting (MC&A) safeguards inspection included Resolution, Measurements, Measurement Control, Inventory, Assessment, Management Structure, and Record keeping. The thrust of the inspection plan was to examine the adequacy of specific systems capabilities that are necessary to satisfy two performance objectives of 10 CFR 74.31(a) and affirmations in Chapter 1.0 of the licensee's Fundamental Nuclear Material Control (FNMC) Plan. Previously identified inspector follow-up items (IFI) were also addressed during the inspection.
accounting (MC&A) safeguards inspection included Resolution,           1 Measurements, Measurement Control, Inventory, Assessment,             l Management Structure, and Record keeping. The thrust of the           !
Results:
inspection plan was to examine the adequacy of specific systems       l capabilities that are necessary to satisfy two performance objectives of 10 CFR 74.31(a) and affirmations in Chapter 1.0 of the licensee's Fundamental Nuclear Material Control (FNMC) Plan. Previously identified inspector follow-up items (IFI) were also addressed during the inspection.                                                       '
Within the scope of the inspection, no violations were identified; however, one non-cited violation, one unresolved item, and four new IFis were opened, while four IFis from previous inspections were closed.
Results:           Within the scope of the inspection, no violations were identified; however, one non-cited violation, one unresolved item, and four new   ,
9609200112 960906 PDR ADOCK 07001201 C
IFis were opened, while four IFis from previous inspections were closed.
pon DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED}}
Enclosure 1 9609200112 960906 PDR C
ADOCK 07001201 pon DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED}}

Latest revision as of 12:11, 12 December 2024

Partially Withheld Insp Rept 70-1201/96-201 on 960819-21. One Noncited Violation,One Unresolved Item & Four New Ifis Opened.Major Areas Inspected:Resolution,Measurement Control, Inventory & Recordkeeping.Details Withheld (Ref 10CFR2.790)
ML20129B045
Person / Time
Site: 07001201
Issue date: 09/06/1996
From: Ong L, Roth J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19355E380 List:
References
70-1201-96-201, NUDOCS 9609200112
Download: ML20129B045 (1)


Text

'

DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED The information on this page is considered appropriate for public disclosure pursuant to 10 CFR 2.790(d)

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Report No.:

70-1201/96-201 License No.:

SNM-1168 Safeguards Group:

lli Licensee:

Framatome Cogema Fuels Lynchburg, VA Inspection Conducted:

August 19-21,1996 OI 6

Inspectors:

A L.D.Y. Ong, MC&A Physical Scientist Date Signed Inspection Section, Operations Branch i 8 '

9/

$b

'\\

J.

II, S'edtion Chief d/te 5igned in etion Section, Operations Branch

SUMMARY

Scope:

The areas examined during this routine material control and accounting (MC&A) safeguards inspection included Resolution, Measurements, Measurement Control, Inventory, Assessment, Management Structure, and Record keeping. The thrust of the inspection plan was to examine the adequacy of specific systems capabilities that are necessary to satisfy two performance objectives of 10 CFR 74.31(a) and affirmations in Chapter 1.0 of the licensee's Fundamental Nuclear Material Control (FNMC) Plan. Previously identified inspector follow-up items (IFI) were also addressed during the inspection.

Results:

Within the scope of the inspection, no violations were identified; however, one non-cited violation, one unresolved item, and four new IFis were opened, while four IFis from previous inspections were closed.

9609200112 960906 PDR ADOCK 07001201 C

pon DECONTROLLED WHEN 2.790 INFORMATION ENCLOSURES ARE REMOVED