ML20129D551: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:l     i
{{#Wiki_filter:l
t       .                                                                       -
i
  -
t
                                                                          pN /C\             !
.
                                                                                              l
-
                                        September 23, 1996
pN
                                                                                              i
-
                                                                                              l
/C\\
          Mr. W. T. Subalusky, Jr.                                                           l
September 23, 1996
          Site Vice President                                                               )
i
          LaSalle County Station                                                             l
Mr. W. T. Subalusky, Jr.
          Commonwealth Edison Company
Site Vice President
          2601 North 21st Road
)
          Marseilles, IL 61341
LaSalle County Station
                                                                                              l
Commonwealth Edison Company
          SUBJECT: NRC INSPECTION REPORT NOS. 50-373/96007(DRP) & 50-374/96007(DRP)
2601 North 21st Road
                      AND NOTICE OF VIOLATION
Marseilles, IL 61341
          Dear Mr. Subalusky:
SUBJECT: NRC INSPECTION REPORT NOS. 50-373/96007(DRP) & 50-374/96007(DRP)
          From June 23 through August 2, 1996, the NRC performed an integrated team
AND NOTICE OF VIOLATION
          inspection at your LaSalle facility. The enclosed report presents the results
Dear Mr. Subalusky:
          of that inspection.                                                               '
From June 23 through August 2, 1996, the NRC performed an integrated team
                                                                                              )
inspection at your LaSalle facility. The enclosed report presents the results
          Based on the results of this inspection, the NRC has determined that three
of that inspection.
          violations of NRC requirements occurred. These violations are cited in the
'
          enclosed Notice of Violation (Notice) and the circumstances surrounding them
)
          are described in detail in the subject inspection report.                         )
Based on the results of this inspection, the NRC has determined that three
          One violation involved an event in June 1996 which illustrated that previous       l
violations of NRC requirements occurred. These violations are cited in the
          corrective actions had not been fully effective. The event involved a main
enclosed Notice of Violation (Notice) and the circumstances surrounding them
          steam isolation valve closure and reactor scram. NRC is concerned that a           ]
are described in detail in the subject inspection report.
          similar event occurred in 1994, and a problem identification form initiated in
)
          March 1995 outlined a procedural weakness which contributed to the most recent     )
One violation involved an event in June 1996 which illustrated that previous
          event; however, ne'ther resulted in broad enough corrective actions to prevent
corrective actions had not been fully effective. The event involved a main
          the June event. ihe two other violations occurred in the fire protection area
]
          and in conduct of Technical Specification surveillances. The consequences of
steam isolation valve closure and reactor scram.
          these events were less significant.
NRC is concerned that a
          You are required to respond to this letter and should follow the instructions
similar event occurred in 1994, and a problem identification form initiated in
          specified in the enclosed Notice when preparing your response. In your           :
March 1995 outlined a procedural weakness which contributed to the most recent
          response, you should document the specific actions taken and any additional
)
          actions you plan to prevent recurrence. Your response may reference or           .
event; however, ne'ther resulted in broad enough corrective actions to prevent
          include previous docketed correspondence, if the correspondence adequately
the June event. ihe two other violations occurred in the fire protection area
                                                                                            '
and in conduct of Technical Specification surveillances. The consequences of
          addresses the required response. After reviewing your response to this
these events were less significant.
          Notice, including your proposed corrective actions ed the results of future       !
You are required to respond to this letter and should follow the instructions
          inspections, the NRC will determine whether further Nk0 enforcement action is     i
specified in the enclosed Notice when preparing your response.
          necessary to ensure compliance with NRC regulatory requimments.
In your
                                                                                      1
:
    2*I0033
response, you should document the specific actions taken and any additional
                                                                                      1   \
actions you plan to prevent recurrence.
                                    ~
Your response may reference or
    9609300124 960923
.
    PDR   ADOCK 05000373
include previous docketed correspondence, if the correspondence adequately
  .,9 , s -             PDR
'
                  .- ,
addresses the required response. After reviewing your response to this
Notice, including your proposed corrective actions ed the results of future
inspections, the NRC will determine whether further Nk0 enforcement action is
i
necessary to ensure compliance with NRC regulatory requimments.
1
2*I0033
1
\\
9609300124 960923
~
PDR
ADOCK 05000373
.,9 , s -
PDR
.- ,


                                      . - - - -                     . _ - - -       - - - . . - -               _ _ - . - -
. - - - -
    *
. _ - - -
                                                                                                                                I
- - - . . - -
e    .
_ _ -
                                                                                                                                l
. - -
  .                                                                                                                             :
*
                                                                                                                                l
e
                                                                                                                                l
.
        W. T. Subalusky                                     -2-                                                                 l
.
        In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of                                           j
W. T. Subalusky
        this letter, its enclosure, and your response will be placed in the NRC Public
-2-
        Document Room (PDR).
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of
                                                  Sincerely,
j
                                                Original signed by J. A. Grobe
this letter, its enclosure, and your response will be placed in the NRC Public
                                                  James L. Caldwell, Acting Director
Document Room (PDR).
                                                  Division of Reactor Projects
Sincerely,
        Docket Nos:         50-373; 50-374
Original signed by
        License Nos:       NPF-11; NPF-18
J. A. Grobe
        Enclosures:
James L. Caldwell, Acting Director
        1.   Notice of Violation                                                                                               i
Division of Reactor Projects
        2.   Inspection Reports                                                                                                 l
Docket Nos:
                No.   50-373/96007(DRP);
50-373; 50-374
                No.   50-374/96007(DRP)
License Nos:
        cc w/ encl:     D. A. Sager, Vice President,
NPF-11; NPF-18
                          Generation Support
Enclosures:
                        H. W. Keiser, Chief Nuclear
1.
                          Operating Officer
Notice of Violation
                        D. J. Ray, Station Manager                                                                             '
i
                        J. Burns, Regulatory Assurance
2.
                          Supervisor                                                                                           l
Inspection Reports
                        D. Farrar, Nuclear Regulatory
No.
                          Services Manager
50-373/96007(DRP);
                        Richard Hubbard
No.
                        Nathan Schloss, Economist
50-374/96007(DRP)
                          Office of the Attorney General
cc w/ encl:
                        State Liaison Officer
D. A. Sager, Vice President,
                        Chairman, Illinois Commerce
Generation Support
                          Commission
H. W. Keiser, Chief Nuclear
                        Document Control Desk-Licensing
Operating Officer
        Distribution:
D. J. Ray, Station Manager
        Docket File w/ encl                               DRP w/ encl
'
        PUBLIC IE-01 w/ enc 1                             RIII PRR w/ enc 1
J. Burns, Regulatory Assurance
        OC/LFDCB w/ encl                                 SRI LaSalle, Dresden,
Supervisor
        CAA1 w/ encl (E-mail)                                 Quad Cities w/ encl
l
        Project Manager, NRR w/ encl                     A. B. Beach, w/ encl
D. Farrar, Nuclear Regulatory
        RACI (E-Mail)                                     W. L. Axelson, w/ encl
Services Manager
        B. L. Burgess, w/ encl
Richard Hubbard
        FILE                          PO
Nathan Schloss, Economist
        g =.NAME:.      R:\.- :.
Office of the Attorney General
                    ,.,u.INSPRPTS\.w..W.ERS\LASA\LAS96007.
State Liaison Officer
                                              . .. u .   -c . c . .           DRP
Chairman, Illinois Commerce
                                                                                .u / i c . c.           .u f o =-
Commission
          0FFICE    RIII _          C         RIII       _
Document Control Desk-Licensing
                                                                [    RIII                           RIII    Ao
Distribution:
          NAME       Joden                     Cree k               Koza[                         Caldweldie
Docket File w/ encl
          DATE       9/liL/9k                 9/1996               9/W/96                         9//J/96f
DRP w/ encl
                                                0FFICIAL RECORD COPY
PUBLIC IE-01 w/ enc 1
                                                                                                                              -
RIII PRR w/ enc 1
OC/LFDCB w/ encl
SRI LaSalle, Dresden,
CAA1 w/ encl (E-mail)
Quad Cities w/ encl
Project Manager, NRR w/ encl
A. B. Beach, w/ encl
RACI (E-Mail)
W. L. Axelson, w/ encl
B. L. Burgess, w/ encl
.
,.,u.INSPRPTS\\.w..W.ERS\\LASA\\LAS96007. DRP
g =.NAME:
FILE
R:\\.-
PO
:.
. .. u .
-c . c . .
.u
/ i c . c.
.u
f o =-
[
RIII
RIII
Ao
C
RIII
_
0FFICE
RIII _
NAME
Joden
Cree k
Koza[
Caldweldie
DATE
9/liL/9k
9/1996
9/W/96
9//J/96f
0FFICIAL RECORD COPY
-
}}
}}

Latest revision as of 11:46, 12 December 2024

Forwards Insp Repts 50-373/96-07 & 50-374/96-07 on 960623-0802
ML20129D551
Person / Time
Site: LaSalle  
Issue date: 09/23/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20129D556 List:
References
NUDOCS 9609300124
Download: ML20129D551 (2)


See also: IR 05000373/1996007

Text

l

i

t

.

-

pN

-

/C\\

September 23, 1996

i

Mr. W. T. Subalusky, Jr.

Site Vice President

)

LaSalle County Station

Commonwealth Edison Company

2601 North 21st Road

Marseilles, IL 61341

SUBJECT: NRC INSPECTION REPORT NOS. 50-373/96007(DRP) & 50-374/96007(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Subalusky:

From June 23 through August 2, 1996, the NRC performed an integrated team

inspection at your LaSalle facility. The enclosed report presents the results

of that inspection.

'

)

Based on the results of this inspection, the NRC has determined that three

violations of NRC requirements occurred. These violations are cited in the

enclosed Notice of Violation (Notice) and the circumstances surrounding them

are described in detail in the subject inspection report.

)

One violation involved an event in June 1996 which illustrated that previous

corrective actions had not been fully effective. The event involved a main

]

steam isolation valve closure and reactor scram.

NRC is concerned that a

similar event occurred in 1994, and a problem identification form initiated in

March 1995 outlined a procedural weakness which contributed to the most recent

)

event; however, ne'ther resulted in broad enough corrective actions to prevent

the June event. ihe two other violations occurred in the fire protection area

and in conduct of Technical Specification surveillances. The consequences of

these events were less significant.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

Your response may reference or

.

include previous docketed correspondence, if the correspondence adequately

'

addresses the required response. After reviewing your response to this

Notice, including your proposed corrective actions ed the results of future

inspections, the NRC will determine whether further Nk0 enforcement action is

i

necessary to ensure compliance with NRC regulatory requimments.

1

2*I0033

1

\\

9609300124 960923

~

PDR

ADOCK 05000373

.,9 , s -

PDR

.- ,

. - - - -

. _ - - -

- - - . . - -

_ _ -

. - -

e

.

.

W. T. Subalusky

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of

j

this letter, its enclosure, and your response will be placed in the NRC Public

Document Room (PDR).

Sincerely,

Original signed by

J. A. Grobe

James L. Caldwell, Acting Director

Division of Reactor Projects

Docket Nos:

50-373; 50-374

License Nos:

NPF-11; NPF-18

Enclosures:

1.

Notice of Violation

i

2.

Inspection Reports

No.

50-373/96007(DRP);

No.

50-374/96007(DRP)

cc w/ encl:

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

D. J. Ray, Station Manager

'

J. Burns, Regulatory Assurance

Supervisor

l

D. Farrar, Nuclear Regulatory

Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

Distribution:

Docket File w/ encl

DRP w/ encl

PUBLIC IE-01 w/ enc 1

RIII PRR w/ enc 1

OC/LFDCB w/ encl

SRI LaSalle, Dresden,

CAA1 w/ encl (E-mail)

Quad Cities w/ encl

Project Manager, NRR w/ encl

A. B. Beach, w/ encl

RACI (E-Mail)

W. L. Axelson, w/ encl

B. L. Burgess, w/ encl

.

,.,u.INSPRPTS\\.w..W.ERS\\LASA\\LAS96007. DRP

g =.NAME:

FILE

R:\\.-

PO

.

. .. u .

-c . c . .

.u

/ i c . c.

.u

f o =-

[

RIII

RIII

Ao

C

RIII

_

0FFICE

RIII _

NAME

Joden

Cree k

Koza[

Caldweldie

DATE

9/liL/9k

9/1996

9/W/96

9//J/96f

0FFICIAL RECORD COPY

-