{{#Wiki_filter:,. I.
{{#Wiki_filter:,.
                        ' Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant                                                               (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0270                                             .
I.
December 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
' Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0270 December 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DO_CKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT 13EACH NUCLEAR PLANT. UNITS 1 AND 2                                                               .
DO_CKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT 13EACH NUCLEAR PLANT. UNITS 1 AND 2 l
l Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the         !
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November 1996.
calendar month of November 1996.
Sincerely, b
I Sincerely, b
. /4.
            . /4.           3 S. A. Patulski General Manager Nuclear Operations smb Attachments cc:       L. L. Smith, PSCW NRC Regional Administrator, Region III
3 S. A. Patulski General Manager Nuclear Operations smb Attachments
                                                                                                              /!
/!
NRC Resident Inspector                                                               -
cc:
Ok 9612180073 961205 PDR       ADOCK 05000266               '
L. L. Smith, PSCW NRC Regional Administrator, Region III Ok NRC Resident Inspector 9612180073 961205 PDR ADOCK 05000266 R
R                          PDR Asubstan ofHisvnshiExyGepativi}}
PDR Asubstan ofHisvnshiExyGepativi}}

Latest revision as of 10:17, 12 December 2024

Forwards Monthly Operating Rept for Point Beach Nuclear Plant,Units 1 & 2 for Nov 1996 & Revised Rept for Oct 1996
ML20132C029
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/05/1996
From: Patulski S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132C032 List:
References
PBL-96-0270, PBL-96-270, NUDOCS 9612180073
Download: ML20132C029 (1)


Text

,.

I.

' Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0270 December 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DO_CKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT 13EACH NUCLEAR PLANT. UNITS 1 AND 2 l

Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November 1996.

Sincerely, b

. /4.

3 S. A. Patulski General Manager Nuclear Operations smb Attachments

/!

cc:

L. L. Smith, PSCW NRC Regional Administrator, Region III Ok NRC Resident Inspector 9612180073 961205 PDR ADOCK 05000266 R