Line 16: | Line 16: | ||
| event date = 04/28/2011 23:38 CDT | | event date = 04/28/2011 23:38 CDT | ||
| last update date = 04/29/2011 | | last update date = 04/29/2011 | ||
| title = Primary Containment Isolation System Actuation Due | | title = Primary Containment Isolation System Actuation Due to Loss of Power from a Diesel Generator | ||
| event text = At 2338 [CDT] on 04/28/2011, with Browns Ferry Nuclear Unit 1 and Unit 2 in Mode 4, Browns Ferry Nuclear Plant, performed a shutdown of the Unit 1/2 Emergency Diesel Generator 'C,' due to an oil leak coming from its governor causing voltage and frequency fluctuations. Following securing of the Unit 1/2 Diesel Generator 'C,' the 4kV Shutdown Board 'C,' which was being powered by DG 'C,' de-energized. This resulted in a loss of power to the 1B RPS, causing a Primary Containment Isolation System (PCIS) actuation and the automatic initiation of the three trains of Standby Gas and 1 train of CREV [Control Room Emergency Ventilation System]. The PCIS isolation (Group 2) also caused a loss of Shutdown Cooling on Unit 1 which was restored at 0025 [CDT] 04/29/2011 . | | event text = At 2338 [CDT] on 04/28/2011, with Browns Ferry Nuclear Unit 1 and Unit 2 in Mode 4, Browns Ferry Nuclear Plant, performed a shutdown of the Unit 1/2 Emergency Diesel Generator 'C,' due to an oil leak coming from its governor causing voltage and frequency fluctuations. Following securing of the Unit 1/2 Diesel Generator 'C,' the 4kV Shutdown Board 'C,' which was being powered by DG 'C,' de-energized. This resulted in a loss of power to the 1B RPS, causing a Primary Containment Isolation System (PCIS) actuation and the automatic initiation of the three trains of Standby Gas and 1 train of CREV [Control Room Emergency Ventilation System]. The PCIS isolation (Group 2) also caused a loss of Shutdown Cooling on Unit 1 which was restored at 0025 [CDT] 04/29/2011 . | ||
In addition, the loss of power to the 4kV Shutdown Board 'C.' also caused the loss of 2B RHR Pump, leading to a momentary suspension of shutdown cooling to Unit 2. Shutdown cooling was immediately restored to Unit 2 using the 2D RHR Pump at 2342 [CDT]. | In addition, the loss of power to the 4kV Shutdown Board 'C.' also caused the loss of 2B RHR Pump, leading to a momentary suspension of shutdown cooling to Unit 2. Shutdown cooling was immediately restored to Unit 2 using the 2D RHR Pump at 2342 [CDT]. |
Latest revision as of 22:07, 1 March 2018
Where | |
---|---|
Browns Ferry ![]() Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+2.8 h0.117 days <br />0.0167 weeks <br />0.00384 months <br />) | |
Opened: | William Baker 07:26 Apr 29, 2011 |
NRC Officer: | Dong Park |
Last Updated: | Apr 29, 2011 |