ML20132D486: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_       _-                     -   .     -         .__
{{#Wiki_filter:_
    -
_-
-
.
-
.__
-
.
,
,
  .
l
l
                                                  December 10, 1996
December 10, 1996
        Mr. John K. Wood
Mr. John K. Wood
,      Vice President - Nuclear
Vice President - Nuclear
,
!
!
        Davis-Besse Nuclear Power Station
Davis-Besse Nuclear Power Station
        Centerior Service Company
Centerior Service Company
        5501 North State - Route 2
5501 North State - Route 2
        Oak Harbor, OH 43449
Oak Harbor, OH 43449
        SUBJECT:       NRC INSPECTION REPORT NO. 50-346/96012(DRS)
SUBJECT:
        Dear Mr. Wood:
NRC INSPECTION REPORT NO. 50-346/96012(DRS)
        On November 8,1996, the NRC completed a-           ,pection at your Davis Besse Nuclear
Dear Mr. Wood:
        Power Station. The enclosed report presents ti.e results of that inspection.
On November 8,1996, the NRC completed a-
        The pulpose of the inspection was to assess the licensed operator requalification program.
,pection at your Davis Besse Nuclear
        The inspection consisted of reviews of training administrative procedures, medical records,
Power Station. The enclosed report presents ti.e results of that inspection.
The pulpose of the inspection was to assess the licensed operator requalification program.
The inspection consisted of reviews of training administrative procedures, medical records,
requalification training attendance records, and requalification training materials. The
,
,
        requalification training attendance records, and requalification training materials. The
l
l      inspection included observation of certified evaluators and licensed operators during
inspection included observation of certified evaluators and licensed operators during
        administration of the requalification examination. Additionally, interviews were conducted
administration of the requalification examination. Additionally, interviews were conducted
        with members of the operations and training staffs.
with members of the operations and training staffs.
l       It was determined the licensed operator requalification program was being implemented in
l
        accordance with 10 CFR Part 55 requirements. The inspectors determined that adequate
It was determined the licensed operator requalification program was being implemented in
        training was being provided for ~y our licensed operators to operate the Davis Besse Nuclear
accordance with 10 CFR Part 55 requirements. The inspectors determined that adequate
        Power Station. The feedback process used to update the licensed operator requalification
training was being provided for ~ our licensed operators to operate the Davis Besse Nuclear
        training program was not completely implemented and was identified as a significant
y
        weakness. Details of this weakness are in Section 05.4, Requalificatioc Training Program
Power Station. The feedback process used to update the licensed operator requalification
        Feedback System. This weakness should be addressed in an expeditious manner, as it is
training program was not completely implemented and was identified as a significant
        an integral part of the Systematic Approach to Training (SAT) program used by your
weakness. Details of this weakness are in Section 05.4, Requalificatioc Training Program
        training department to plan licensed operator training. No written response to this letter is
Feedback System. This weakness should be addressed in an expeditious manner, as it is
        required concerning this weakness.
an integral part of the Systematic Approach to Training (SAT) program used by your
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
training department to plan licensed operator training. No written response to this letter is
        and the enclosed report will be placed in the NRC Public Document Room.
required concerning this weakness.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enclosed report will be placed in the NRC Public Document Room.
i
i
        190020                                                                                         r
190020
                                                                                                      \
r
                                                                                                          \
\\
                                    '
\\
    9612190407 961210                                                                        g_ g
9612190407 961210
l   PDR   ADOCK 05000346
'
l   0                     PDR
g_ g
l
PDR
ADOCK 05000346
l
0
PDR


                    __                     _ .-       _               _   __     _ . - _ . _
__
  ,   .
_ .-
          '
_
_
__
_ . - _ . _
,
.
'
,
,
1
1
            J. K. Wood                                                           -2-                             December 10, 1996
J. K. Wood
            The NRC will gladly discuss any questions you may have concerning this inspection.
-2-
l                                                                             Sincerely,
December 10, 1996
                                                                  original signed by B. Clayton
The NRC will gladly discuss any questions you may have concerning this inspection.
                                                                                                                    Mor
l
                                                                              Geoffrey E. Grant, Director
Sincerely,
                                                                              Division of Reactor Safety
original signed by B. ClaytonMor
Geoffrey E. Grant, Director
Division of Reactor Safety
l
Docket No. 50-346
Enclosure:
NRC Inspection Report
No. 50-346/96012(DRS)
cc w/ encl:
John P. Stetz, Senior
Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager,
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
Distribution:
Docket Fileg/enci
DRS w/ encl
A. B. Beach, Rlli w/enct
PUBLIC IE-@rw/enct
Rlli PRR w/enct
Enf. Coordinator, Rlli w/ encl
OC/LFDCB w/enct
SRI, Davis-Besse w/ encl
CAA1 w/enct (E-mail)
DRP w/enct
LPM, NRR w/enci
W. L. Axelson, Rlll w/enci
M. Bies, Rlll w/enct
S. Richards, HOLB w/ encl
)
DOCUMENT NAME: G:\\DAV96012.DRS
To receive a copy of this document, Indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N"
l
l
            Docket No. 50-346
= No copy
            Enclosure:            NRC Inspection Report
411
                                    No. 50-346/96012(DRS)
g
            cc w/ encl:          John P. Stetz, Senior
1
                                    Vice President - Nuclear
OFFICE
                                  J. H. Lash, Plant Manager
Rlll
                                  J. L. Freels, Manager,
N
                                    Regulatory Affairs
Rlll
                                  State Liaison Officer, State
v
                                    of Ohio
Rlil
                                  Robert E. Owen, Ohio
7 ~
                                    Department of Health
                                  C. A. Glazer, State of Ohio
                                    Public Utilities Commission
            Distribution:
            Docket Fileg/enci                          DRS w/ encl                                A. B. Beach, Rlli w/enct
            PUBLIC IE-@rw/enct                          Rlli PRR w/enct                            Enf. Coordinator, Rlli w/ encl
            OC/LFDCB w/enct                            SRI, Davis-Besse w/ encl                  CAA1 w/enct (E-mail)
            DRP w/enct                                  LPM, NRR w/enci                            W. L. Axelson, Rlll w/enci
            M. Bies, Rlll w/enct                        S. Richards, HOLB w/ encl                                                                      )
                                                                                                                                                        !
                                                                                                                                                        l
            DOCUMENT NAME: G:\DAV96012.DRS                                                                                                              l
            To receive a copy of this document, Indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N" l
              = No copy                                                                                                                                  l
,
,
                OFFICE        Rlll                        N Rlll                    v        Rlil            7  ~    411          g                  1
'
'
                                                                                                                                                        '
'
                NAME         DMcNeil:nh W                     MLeach pyjv4                   JJacohsofi   $t         HClayton/GGrant
NAME
            ji DATE           11/29/96                         11/.tr /96                     11M/q6 j        /       1Uto/96
DMcNeil:nh W
                                                                OFFICIAL RECORD COPYV U
MLeach pyjv4
l-__________-____.
JJacohsofi $t
HClayton/GGrant
ji DATE
11/29/96
11/.tr /96
11M/q6
/
1Uto/96
j
OFFICIAL RECORD COPYV U
l -
-
.
}}
}}

Latest revision as of 11:00, 12 December 2024

Forwards Insp Rept 50-346/96-12 on 961108.No Violations Noted
ML20132D486
Person / Time
Site: Davis Besse 
Issue date: 12/10/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20132D490 List:
References
NUDOCS 9612190407
Download: ML20132D486 (2)


See also: IR 05000346/1996012

Text

_

_-

-

.

-

.__

-

.

,

l

December 10, 1996

Mr. John K. Wood

Vice President - Nuclear

,

!

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State - Route 2

Oak Harbor, OH 43449

SUBJECT:

NRC INSPECTION REPORT NO. 50-346/96012(DRS)

Dear Mr. Wood:

On November 8,1996, the NRC completed a-

,pection at your Davis Besse Nuclear

Power Station. The enclosed report presents ti.e results of that inspection.

The pulpose of the inspection was to assess the licensed operator requalification program.

The inspection consisted of reviews of training administrative procedures, medical records,

requalification training attendance records, and requalification training materials. The

,

l

inspection included observation of certified evaluators and licensed operators during

administration of the requalification examination. Additionally, interviews were conducted

with members of the operations and training staffs.

l

It was determined the licensed operator requalification program was being implemented in

accordance with 10 CFR Part 55 requirements. The inspectors determined that adequate

training was being provided for ~ our licensed operators to operate the Davis Besse Nuclear

y

Power Station. The feedback process used to update the licensed operator requalification

training program was not completely implemented and was identified as a significant

weakness. Details of this weakness are in Section 05.4, Requalificatioc Training Program

Feedback System. This weakness should be addressed in an expeditious manner, as it is

an integral part of the Systematic Approach to Training (SAT) program used by your

training department to plan licensed operator training. No written response to this letter is

required concerning this weakness.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosed report will be placed in the NRC Public Document Room.

i

190020

r

\\

\\

9612190407 961210

'

g_ g

l

PDR

ADOCK 05000346

l

0

PDR

__

_ .-

_

_

__

_ . - _ . _

,

.

'

,

1

J. K. Wood

-2-

December 10, 1996

The NRC will gladly discuss any questions you may have concerning this inspection.

l

Sincerely,

original signed by B. ClaytonMor

Geoffrey E. Grant, Director

Division of Reactor Safety

l

Docket No. 50-346

Enclosure:

NRC Inspection Report

No. 50-346/96012(DRS)

cc w/ encl:

John P. Stetz, Senior

Vice President - Nuclear

J. H. Lash, Plant Manager

J. L. Freels, Manager,

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Distribution:

Docket Fileg/enci

DRS w/ encl

A. B. Beach, Rlli w/enct

PUBLIC IE-@rw/enct

Rlli PRR w/enct

Enf. Coordinator, Rlli w/ encl

OC/LFDCB w/enct

SRI, Davis-Besse w/ encl

CAA1 w/enct (E-mail)

DRP w/enct

LPM, NRR w/enci

W. L. Axelson, Rlll w/enci

M. Bies, Rlll w/enct

S. Richards, HOLB w/ encl

)

DOCUMENT NAME: G:\\DAV96012.DRS

To receive a copy of this document, Indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N"

l

= No copy

411

g

1

OFFICE

Rlll

N

Rlll

v

Rlil

7 ~

,

'

'

NAME

DMcNeil:nh W

MLeach pyjv4

JJacohsofi $t

HClayton/GGrant

ji DATE

11/29/96

11/.tr /96

11M/q6

/

1Uto/96

j

OFFICIAL RECORD COPYV U

l -

-

.