ML20133B356: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
    .
.
.
                                              SEP 171995
.
      Docket Nos. 50-245
SEP 171995
                    50-336
Docket Nos. 50-245
                    50-423
50-336
      Northeast Nuclear Energy Company
50-423
      ATTN: Mr. J. f. Opeka
Northeast Nuclear Energy Company
              Senior Vice President - Nuclear
ATTN: Mr. J. f. Opeka
                  Engineering and Operations Group
Senior Vice President - Nuclear
      P. O. Box 270
Engineering and Operations Group
      Hartford, Connecticut 06141-0270
P. O. Box 270
      Gentlemen:
Hartford, Connecticut 06141-0270
      Subject: Combined Inspection Report Nos. 50-245/85-23; 50-336/85-28;
Gentlemen:
                  50-423/85-47
Subject: Combined Inspection Report Nos. 50-245/85-23; 50-336/85-28;
      A special dosimetry inspection was conducted on August 5-9, 1985, of Millstone
50-423/85-47
      Units 1 and 2. Our inspectors also reviewed the status of planning during the
A special dosimetry inspection was conducted on August 5-9, 1985, of Millstone
      preoperational phase for the dosimetry needs at Unit 3.
Units 1 and 2.
      Within the scope of this review, no violations were identified.,
Our inspectors also reviewed the status of planning during the
      Your cooperation with us is appreciated.
preoperational phase for the dosimetry needs at Unit 3.
                                                  Sincerely.
Within the scope of this review, no violations were identified.,
                                                  Original Signed Ry
Your cooperation with us is appreciated.
                                                              Y.         lLL
Sincerely.
                                                  Thomas T. Hartin, Direc     f
Original Signed Ry
                                                                            r
Y.
                                                  Division of Radiation S< ety
lLL f
                                                    and Safeguards
Thomas T. Hartin, Direc
      Enclosure: Combined NRC Region ! Inspection Report Non:ber 50-245/85-23;
r
                      50-336/85-28; 50-423/85-47
Division of Radiation S< ety
      cc w/ encl:
and Safeguards
      V. Papadopoli, Construction Quality Assurance Supervisor
Enclosure: Combined NRC Region ! Inspection Report Non:ber 50-245/85-23;
      E. R. foster, Director of Generation Construction
50-336/85-28; 50-423/85-47
      E. J. Mroczka, Vice President, fluclear Operations
cc w/ encl:
      W. D. Romberg, Station Superintendent
V. Papadopoli, Construction Quality Assurance Supervisor
      D. O Nordquist Manager of Quality Assurance
E. R. foster, Director of Generation Construction
      R. T. Laudenat Manager, Generation facilities Licensing
E. J. Mroczka, Vice President, fluclear Operations
      Gerald Garfield, Esquire
W. D. Romberg, Station Superintendent
      Public Document Room (PDR)
D. O Nordquist Manager of Quality Assurance
      LocalPublicDocumentRoom(LPDR)
R. T. Laudenat Manager, Generation facilities Licensing
      fluclear Safety Informatinn Center (NSIC)
Gerald Garfield, Esquire
      NRC Resident inspector
Public Document Room (PDR)
      State of Connecticut
LocalPublicDocumentRoom(LPDR)
      hG
fluclear Safety Informatinn Center (NSIC)
              DOC         j5                                                       gy h
NRC Resident inspector
                                      OfflCI AL RECORD COPY                             i\
State of Connecticut
h
h
DOC
j5
g
G
OfflCI AL RECORD COPY
y
i\\
-
-
- -
.


                                      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _           _ _ _ _ _ _ _ _ _ _ _           _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
  Northeast Nuclear Energy Company                                   2
Northeast Nuclear Energy Company
  bec w/ enc 1:
2
  Region I Docket Room (with concurrences)
bec w/ enc 1:
  Senior Operations Officer (w/o enc 1)
Region I Docket Room (with concurrences)
  ORP Section Chief
Senior Operations Officer (w/o enc 1)
  RI:0RSS         RI:DRSS       RI:0RSS
ORP Section Chief
                                                                    &      b
&
                                                                          RI:DRSS                       R * RSS
b
  JCioffi/geb     JJang         MShanbaky                               RBollamy                     I. rtin
RI:0RSS
  (1/q/85         f     85,     $////85                               j/4/85                         8   /85
RI:DRSS
                      [j   OFFICIAL RECORD COPY                                             CIR MILL 85-23/28/47 - 0002,0.0
RI:0RSS
                                                                                              08/27/85
RI:DRSS
R * RSS
JCioffi/geb
JJang
MShanbaky
RBollamy
I. rtin
(1/q/85
f
85,
$////85
j/4/85
8
/85
[j
OFFICIAL RECORD COPY
CIR MILL 85-23/28/47 - 0002,0.0
08/27/85
}}
}}

Latest revision as of 10:07, 12 December 2024

Forwards Special Dosimetry Insp Repts 50-245/85-23, 50-336/85-28 & 50-423/85-47 on 850805-09.Status of Planning During Preoperational Phase for Dosimetry Needs Reviewed.No Violations Noted
ML20133B356
Person / Time
Site: Millstone  
Issue date: 09/17/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133B359 List:
References
NUDOCS 8510030227
Download: ML20133B356 (2)


See also: IR 05000245/1985023

Text

.

.

.

SEP 171995

Docket Nos. 50-245

50-336

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. f. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Combined Inspection Report Nos. 50-245/85-23; 50-336/85-28;

50-423/85-47

A special dosimetry inspection was conducted on August 5-9, 1985, of Millstone

Units 1 and 2.

Our inspectors also reviewed the status of planning during the

preoperational phase for the dosimetry needs at Unit 3.

Within the scope of this review, no violations were identified.,

Your cooperation with us is appreciated.

Sincerely.

Original Signed Ry

Y.

lLL f

Thomas T. Hartin, Direc

r

Division of Radiation S< ety

and Safeguards

Enclosure: Combined NRC Region ! Inspection Report Non:ber 50-245/85-23;

50-336/85-28; 50-423/85-47

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. foster, Director of Generation Construction

E. J. Mroczka, Vice President, fluclear Operations

W. D. Romberg, Station Superintendent

D. O Nordquist Manager of Quality Assurance

R. T. Laudenat Manager, Generation facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

LocalPublicDocumentRoom(LPDR)

fluclear Safety Informatinn Center (NSIC)

NRC Resident inspector

State of Connecticut

h

h

DOC

j5

g

G

OfflCI AL RECORD COPY

y

i\\

-

-

- -

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

Northeast Nuclear Energy Company

2

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

ORP Section Chief

&

b

RI:0RSS

RI:DRSS

RI:0RSS

RI:DRSS

R * RSS

JCioffi/geb

JJang

MShanbaky

RBollamy

I. rtin

(1/q/85

f

85,

$////85

j/4/85

8

/85

[j

OFFICIAL RECORD COPY

CIR MILL 85-23/28/47 - 0002,0.0

08/27/85