ML20133B356

From kanterella
Jump to navigation Jump to search
Forwards Special Dosimetry Insp Repts 50-245/85-23, 50-336/85-28 & 50-423/85-47 on 850805-09.Status of Planning During Preoperational Phase for Dosimetry Needs Reviewed.No Violations Noted
ML20133B356
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/17/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133B359 List:
References
NUDOCS 8510030227
Download: ML20133B356 (2)


See also: IR 05000245/1985023

Text

.

.

.

SEP 171995

Docket Nos. 50-245

50-336

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. f. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Combined Inspection Report Nos. 50-245/85-23; 50-336/85-28;

50-423/85-47

A special dosimetry inspection was conducted on August 5-9, 1985, of Millstone

Units 1 and 2. Our inspectors also reviewed the status of planning during the

preoperational phase for the dosimetry needs at Unit 3.

Within the scope of this review, no violations were identified.,

Your cooperation with us is appreciated.

Sincerely.

Original Signed Ry

Y. lLL

Thomas T. Hartin, Direc f

r

Division of Radiation S< ety

and Safeguards

Enclosure: Combined NRC Region ! Inspection Report Non:ber 50-245/85-23;

50-336/85-28; 50-423/85-47

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. foster, Director of Generation Construction

E. J. Mroczka, Vice President, fluclear Operations

W. D. Romberg, Station Superintendent

D. O Nordquist Manager of Quality Assurance

R. T. Laudenat Manager, Generation facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

LocalPublicDocumentRoom(LPDR)

fluclear Safety Informatinn Center (NSIC)

NRC Resident inspector

State of Connecticut

hG

DOC j5 gy h

OfflCI AL RECORD COPY i\

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

Northeast Nuclear Energy Company 2

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

ORP Section Chief

RI:0RSS RI:DRSS RI:0RSS

& b

RI:DRSS R * RSS

JCioffi/geb JJang MShanbaky RBollamy I. rtin

(1/q/85 f 85, $////85 j/4/85 8 /85

[j OFFICIAL RECORD COPY CIR MILL 85-23/28/47 - 0002,0.0

08/27/85