ENS 47600: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/17/2012 18:14 EST | | event date = 01/17/2012 18:14 EST | ||
| last update date = 01/17/2012 | | last update date = 01/17/2012 | ||
| title = Unit 2 Commenced | | title = Unit 2 Commenced a Tech Spec Required Shutdown After Declaring Station Battery "B" Inoperable | ||
| event text = At approximately 1814 hours (EST) on January 17, 2012, H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, personnel confirmed that the Station Battery Performance Capacity Test (Five Year Interval), for station battery 'B' was not completed within its required periodicity plus grace period. Based upon this information, plant Operations personnel declared the 'B' battery inoperable and entered the required action for Improved Technical Specifications (ITS) 3.8.4, Condition 'A', which requires that the DC electrical power subsystem be restored to operable status in 2 hours. At 2014 hours (EST), Operations personnel entered the required action for ITS 3.8.4, Condition 'B' due to required actions and associated completion time for Condition 'A' not met. Condition 'B' requires the unit to be in Mode 3 within 6 hours AND be in Mode 5 within 36 hours. | | event text = At approximately 1814 hours (EST) on January 17, 2012, H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, personnel confirmed that the Station Battery Performance Capacity Test (Five Year Interval), for station battery 'B' was not completed within its required periodicity plus grace period. Based upon this information, plant Operations personnel declared the 'B' battery inoperable and entered the required action for Improved Technical Specifications (ITS) 3.8.4, Condition 'A', which requires that the DC electrical power subsystem be restored to operable status in 2 hours. At 2014 hours (EST), Operations personnel entered the required action for ITS 3.8.4, Condition 'B' due to required actions and associated completion time for Condition 'A' not met. Condition 'B' requires the unit to be in Mode 3 within 6 hours AND be in Mode 5 within 36 hours. | ||
This report is being made in accordance with 10 CFR 50.72(b)(2)(i) based on the initiation of a plant shutdown required by the Technical Specifications. Following the shutdown, the unit will commence a refueling outage that was originally scheduled to begin at 0000 hours (EST) on January 21, 2012. | This report is being made in accordance with 10 CFR 50.72(b)(2)(i) based on the initiation of a plant shutdown required by the Technical Specifications. Following the shutdown, the unit will commence a refueling outage that was originally scheduled to begin at 0000 hours (EST) on January 21, 2012. |
Latest revision as of 22:05, 1 March 2018
Where | |
---|---|
Robinson South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-0.65 h-0.0271 days <br />-0.00387 weeks <br />-8.9037e-4 months <br />) | |
Opened: | Joseph Todd 22:35 Jan 17, 2012 |
NRC Officer: | Steve Sandin |
Last Updated: | Jan 17, 2012 |
47600 - NRC Website
| |