TXX-4599, Interim Deficiency Rept SDAR-192 Re Possible Impact of Previously Unconsidered Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Evaluation Continuing.Next Rept Anticipated by 860122: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:Log e TXX-4599 TENAS UTILITIES GENERATING CO31PANY File # 10110
{{#Wiki_filter:Log e TXX-4599 TENAS UTILITIES GENERATING CO31PANY File # 10110
                        %KY W AY TOWER e etMD NON TH OLI% E NI'M EET. E El M t . ED A B. LAM, T E 4 A M T S2H B anS^,7,?c&f,"d5                                         October 16, 1985 Mr. R. P. Denise, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission Region IV                                                                                                           i 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 O U 2 1 19 3
%KY W AY TOWER e etMD NON TH OLI% E NI'M EET. E El M t. ED A B. LAM, T E 4 A M T S2H B anS^,7,?c&f,"d5 October 16, 1985 Mr. R. P. Denise, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission Region IV i
                                                                                                              ~  ~~
611 Ryan Plaza Drive, Suite 1000 O U 2 1 19 3 Arlington, Texas 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-445 ELECTRICAL RACEWAY SUPPORT SYSTEM QA FILE:         CP-85-31, SDAR-192
COMANCHE PEAK STEAM ELECTRIC STATION
~
~~
DOCKET NO. 50-445 ELECTRICAL RACEWAY SUPPORT SYSTEM QA FILE:
CP-85-31, SDAR-192


==Dear Mr. Denise:==
==Dear Mr. Denise:==
 
On August 27, 1985, we verbally notified your Mr. D. Hunnicutt of a deficiency regarding the possible impact of previously unconsidered weight on the electrical raceway support system imposed by the installation of separation barrier and radiant energy shield material. We have submitted an interim report logged TXX-4564, dated September 19, 1985.
1 On August 27, 1985, we verbally notified your Mr. D. Hunnicutt of a deficiency regarding the possible impact of previously unconsidered weight on the electrical raceway support system imposed by the installation of separation barrier and radiant energy shield material. We have submitted an interim report logged TXX-4564, dated September 19, 1985.
We are continuing our evaluation and anticipate completion by January 22, 1986.
l We are continuing our evaluation and anticipate completion by January 22,                                           l 1986.                                                                                                               '
Very truly yours, MM W. G. Counsil ByN ktkd'$f J. S. Mbrshall Licensing Supervisor c-NRC Region IV (0 + 1 copy)
i Very truly yours, MM W. G. Counsil ByN J. S. Mbrshall ktkd'$f        l Licensing Supervisor c-     NRC Region IV (0 + 1 copy)
Director, inspection & Enforcement (15 copies)
Director, inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8510280487 851016 PDR S
U. S. Nuclear Regulatory Commission Washington, D.C.
ADOCK 05000445 PDR
20555 8510280487 851016 PDR ADOCK 05000445 S
  ,. < ,,% 4                                                                                                           j f-a ,,,, ,,,,,, ,,e re n, ama.m :~ e,.ecra.sc . .,,,,.m lp l}}
PDR
,. <,,% 4 j f-lp a,,,,,,,,,,,,e re n, ama.m :~ e,.ecra.sc..,,,,.m l}}

Latest revision as of 07:24, 12 December 2024

Interim Deficiency Rept SDAR-192 Re Possible Impact of Previously Unconsidered Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Evaluation Continuing.Next Rept Anticipated by 860122
ML20133N291
Person / Time
Site: Comanche Peak 
Issue date: 10/16/1985
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-192, TXX-4599, NUDOCS 8510280487
Download: ML20133N291 (1)


Text

Log e TXX-4599 TENAS UTILITIES GENERATING CO31PANY File # 10110

%KY W AY TOWER e etMD NON TH OLI% E NI'M EET. E El M t. ED A B. LAM, T E 4 A M T S2H B anS^,7,?c&f,"d5 October 16, 1985 Mr. R. P. Denise, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission Region IV i

611 Ryan Plaza Drive, Suite 1000 O U 2 1 19 3 Arlington, Texas 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION

~

~~

DOCKET NO. 50-445 ELECTRICAL RACEWAY SUPPORT SYSTEM QA FILE:

CP-85-31, SDAR-192

Dear Mr. Denise:

On August 27, 1985, we verbally notified your Mr. D. Hunnicutt of a deficiency regarding the possible impact of previously unconsidered weight on the electrical raceway support system imposed by the installation of separation barrier and radiant energy shield material. We have submitted an interim report logged TXX-4564, dated September 19, 1985.

We are continuing our evaluation and anticipate completion by January 22, 1986.

Very truly yours, MM W. G. Counsil ByN ktkd'$f J. S. Mbrshall Licensing Supervisor c-NRC Region IV (0 + 1 copy)

Director, inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8510280487 851016 PDR ADOCK 05000445 S

PDR

,. <,,% 4 j f-lp a,,,,,,,,,,,,e re n, ama.m :~ e,.ecra.sc..,,,,.m l