ML20133P596: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:----- ---_------------- -   __
{{#Wiki_filter:----- ---_------------- -
                          ,
__
                            ,
,
,
i
i
                                                                    DCT 2 C 1985
DCT 2 C 1985
                                Docket No. 50-322
Docket No. 50-322
                                Long Island Lighting Company
Long Island Lighting Company
                                ATTN: Mr. John D. Leonard, Jr.
ATTN: Mr. John D. Leonard, Jr.
                                        Vice President - Nuclear
Vice President - Nuclear
                                P. O. Box 618
P. O. Box 618
                                Shoreham Nuclear Power Station
Shoreham Nuclear Power Station
                                Wading River, New York 11792
Wading River, New York 11792
                                Gentlemen:
Gentlemen:
                                Subject:   Inspection No. 50-322/85-36
Subject:
                                This letter refers to the routino resident safety inspect. ion conducted by
Inspection No. 50-322/85-36
                                Messrs. J. Derry and E. Connner on September 1 - 30, 1985 at the Shoreham
This letter refers to the routino resident safety inspect. ion conducted by
                                Nuclear Power Station, Wading River, Now York. The inspection consisted of
Messrs. J. Derry and E. Connner on September 1 - 30, 1985 at the Shoreham
                                observations of activities, interviews with personnel and document reviews.
Nuclear Power Station, Wading River, Now York.
                                The results of the inspection are described in the NRC Region ! Inspection
The inspection consisted of
                                Report enclosed with this letter and were discussed with members of your staff
observations of activities, interviews with personnel and document reviews.
                                at the conclusion of the inspection.
The results of the inspection are described in the NRC Region ! Inspection
                                In accordance with 10 CFR 2.790(a), a copy of this lotter and the enclosures
Report enclosed with this letter and were discussed with members of your staff
                                will be placed in the NRC Pubile Document Room.                 -
at the conclusion of the inspection.
                                Your cooperation with us is appreciated.
In accordance with 10 CFR 2.790(a), a copy of this lotter and the enclosures
                                                                            Sincoroly,
will be placed in the NRC Pubile Document Room.
                                                                              u n .. ._       .j,
-
                                                                            llarry B. Kister, Chief
Your cooperation with us is appreciated.
                                                                            Projects Branch No. 1
Sincoroly,
                                                                            Division of Reactor Projects
u n .. ._
                                                                                                                                r
.j,
                                Enclosure.
llarry B. Kister, Chief
                                NRC Inspection Report 50-322/85-36
Projects Branch No. 1
                                                            2
Division of Reactor Projects
                                    l0    kDOC
r
I                                                           0FFICIAL RECORD COPY       IR Sil0REHAM 85-36 - 0001.0.0
Enclosure.
l                                                                                       10/23/85 7 col
NRC Inspection Report 50-322/85-36
                                                                                                                            0
l
  _ _ _ _ - - _ - - _ - _ _ - -             - - - - -
kDOC
2
0
I
0FFICIAL RECORD COPY
IR Sil0REHAM 85-36 - 0001.0.0
l
10/23/85 7 col
0
- -
- -
-
- -
- - - - -


            _ _ _ _ _ _ _ _ _ _ _ _ _         ___   . _ _ _ _ _ .         _ . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _                 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _ _ _ _ _ _
  .
___
      Long Island Liftia3 Ce pany                                                         2
. _ _ _ _ _ .
      cc w/ encl:
_ . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
      W. Steiger, Plant Manager
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
      J. Smith, Manager, Nuclear Operations Support
.
      R. Kubinak, Director, QA, Safety and Compliance
Long Island Liftia3 Ce pany
      E. Youngling, Manager, Nuclear Engineering
2
      A. Earley, General Counsel
cc w/ encl:
      J. Futter, Esq.
W. Steiger, Plant Manager
      J. Notaro, Manager, QA Department
J. Smith, Manager, Nuclear Operations Support
      Shoreham Hearing Service List
R. Kubinak, Director, QA, Safety and Compliance
      PublicDocumentRoom(PDR)
E. Youngling, Manager, Nuclear Engineering
      local Public Document Room (LPDR)
A. Earley, General Counsel
      Nuclear Safety Information Center (NSIC)
J. Futter, Esq.
      NRC Resident Inspector
J. Notaro, Manager, QA Department
      State of New York
Shoreham Hearing Service List
        bec w/ enc 1:
PublicDocumentRoom(PDR)
        RegionIDocketRoom(withconcurrences)
local Public Document Room (LPDR)
        ManagementAssistant,DRMA(w/oenc1)
Nuclear Safety Information Center (NSIC)
        Director, DRSS
NRC Resident Inspector
        Director DRS
State of New York
        DRP Section Chief
bec w/ enc 1:
        B. Bordenick, ELD
RegionIDocketRoom(withconcurrences)
        R. Goddard, ELD
ManagementAssistant,DRMA(w/oenc1)
      bRP:RI                                                         DRP:RI                                       h
Director, DRSS
    / J0erry                         h'7DRP:RI
Director DRS
                                          Econner                 /} JStrosnider                                   HKister
DRP Section Chief
B. Bordenick, ELD
R. Goddard, ELD
bRP:RI
h'7
DRP:RI
DRP:RI
h
/
J0erry
Econner
/} JStrosnider
HKister
I /10/:4/85
(/ 10/Ft/85
10/p[/85
p10/pl/05
Jg
,
,
    p10/pl/05                        IJg/10/:4/85                (/ 10/Ft/85                                      10/p[/85
0FFICIAL RECORD COPY
                                                    0FFICIAL RECORD COPY                                                 IR SHOREHAM 85-36 - 0002.0.0
IR SHOREHAM 85-36 - 0002.0.0
                                                                                                                        10/23/85 I Eo l
10/23/85 I Eo l
------ - ---
.
}}
}}

Latest revision as of 08:12, 12 December 2024

Forwards Safety Insp Rept 50-322/85-36 on 850901-30.No Noncompliance Noted
ML20133P596
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/28/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
LONG ISLAND LIGHTING CO.
Shared Package
ML20133P599 List:
References
NUDOCS 8511010077
Download: ML20133P596 (2)


See also: IR 05000322/1985036

Text


---_------------- -

__

,

,

i

DCT 2 C 1985

Docket No. 50-322

Long Island Lighting Company

ATTN: Mr. John D. Leonard, Jr.

Vice President - Nuclear

P. O. Box 618

Shoreham Nuclear Power Station

Wading River, New York 11792

Gentlemen:

Subject:

Inspection No. 50-322/85-36

This letter refers to the routino resident safety inspect. ion conducted by

Messrs. J. Derry and E. Connner on September 1 - 30, 1985 at the Shoreham

Nuclear Power Station, Wading River, Now York.

The inspection consisted of

observations of activities, interviews with personnel and document reviews.

The results of the inspection are described in the NRC Region ! Inspection

Report enclosed with this letter and were discussed with members of your staff

at the conclusion of the inspection.

In accordance with 10 CFR 2.790(a), a copy of this lotter and the enclosures

will be placed in the NRC Pubile Document Room.

-

Your cooperation with us is appreciated.

Sincoroly,

u n .. ._

.j,

llarry B. Kister, Chief

Projects Branch No. 1

Division of Reactor Projects

r

Enclosure.

NRC Inspection Report 50-322/85-36

l

kDOC

2

0

I

0FFICIAL RECORD COPY

IR Sil0REHAM 85-36 - 0001.0.0

l

10/23/85 7 col

0

- -

- -

-

- -

- - - - -

_ _ _ _ _ _ _ _ _ _ _ _ _

___

. _ _ _ _ _ .

_ . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.

Long Island Liftia3 Ce pany

2

cc w/ encl:

W. Steiger, Plant Manager

J. Smith, Manager, Nuclear Operations Support

R. Kubinak, Director, QA, Safety and Compliance

E. Youngling, Manager, Nuclear Engineering

A. Earley, General Counsel

J. Futter, Esq.

J. Notaro, Manager, QA Department

Shoreham Hearing Service List

PublicDocumentRoom(PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

RegionIDocketRoom(withconcurrences)

ManagementAssistant,DRMA(w/oenc1)

Director, DRSS

Director DRS

DRP Section Chief

B. Bordenick, ELD

R. Goddard, ELD

bRP:RI

h'7

DRP:RI

DRP:RI

h

/

J0erry

Econner

/} JStrosnider

HKister

I /10/:4/85

(/ 10/Ft/85

10/p[/85

p10/pl/05

Jg

,

0FFICIAL RECORD COPY

IR SHOREHAM 85-36 - 0002.0.0

10/23/85 I Eo l


- ---

.