| event date = 02/05/2013 10:05 CST | | event date = 02/05/2013 10:05 CST | ||
| last update date = 02/05/2013 | | last update date = 02/05/2013 | ||
| title = Technical Support Center Non-Functional Due | | title = Technical Support Center Non-Functional Due to Hvac System Malfunction | ||
| event text = The facility Technical Support Center (TSC) was rendered non-functional due to a malfunction in the TSC HVAC system. A lugged connection on the air conditioning system control power relay became loose causing a loss of contact between the spade and the relay. Repairs have been completed and the air conditioning has been returned to service. However, the out of service time was greater than 30 minutes, which by the station's reporting procedures, is an 8 hour non-emergency report. The out of service time was from 0935 to 1342 CST. | | event text = The facility Technical Support Center (TSC) was rendered non-functional due to a malfunction in the TSC HVAC system. A lugged connection on the air conditioning system control power relay became loose causing a loss of contact between the spade and the relay. Repairs have been completed and the air conditioning has been returned to service. However, the out of service time was greater than 30 minutes, which by the station's reporting procedures, is an 8 hour non-emergency report. The out of service time was from 0935 to 1342 CST. | ||
Compensatory measures per site procedure FNP-0-EIP-6.0 (TSC Setup and Activation) for maintaining emergency assessment, off-site response, and off-site communication capabilities were available. These measures included the conditional relocation of the TSC staff in the event of a declared emergency if the Emergency Director deems the TSC to be uninhabitable. | Compensatory measures per site procedure FNP-0-EIP-6.0 (TSC Setup and Activation) for maintaining emergency assessment, off-site response, and off-site communication capabilities were available. These measures included the conditional relocation of the TSC staff in the event of a declared emergency if the Emergency Director deems the TSC to be uninhabitable. |
Latest revision as of 21:01, 1 March 2018
Where | |
---|---|
Farley Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+1.52 h0.0633 days <br />0.00905 weeks <br />0.00208 months <br />) | |
Opened: | Charles Barefield 17:36 Feb 5, 2013 |
NRC Officer: | Donald Norwood |
Last Updated: | Feb 5, 2013 |