ML20134E906: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.~               .-                                    -                                                    -          -      .-          -      .-        -.    - - _ .
{{#Wiki_filter:.~
i         .
i i
i OPERATING DATA REPORT DOCKET NO.               50-269 DATE       8-15-85
OPERATING DATA REPORT DOCKET NO.
  ,                                                                                                                                    COMPLETED BY                 J.A. Reavis TELEPHONE               704-373-7567 OPERATING STATUS 4
50-269 DATE 8-15-85 COMPLETED BY J.A.
: 1. Unit Name:             Oconee 1                                                              Notes I
Reavis TELEPHONE 704-373-7567 OPERATING STATUS 4
: 2. Reporting Period:           July 1. 1985 - Julv 31. 1985                                         Year-to-date and cumulative 2568                            capacity factors are calcu-
Oconee 1 Notes
: 1. Unit Name:
: 2. Reporting Period:
July 1. 1985 - Julv 31. 1985 Year-to-date and cumulative I
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
934                         lated using a weighted
2568 capacity factors are calcu-934 lated using a weighted
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
886                         average for maximum
886 average for maximum
  !                5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
dependable capacity.
dependable capacity.
i                  6. Maximum Dependable Capacity (Gross MWe):                                 899
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):                                   860
899 i
: 7. Maximum Dependable Capacity (Net MWe):
860
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
None
None
: 9. Power Level To Which Restricted. lf Any (Net MWe):                                 Nrm n
: 9. Power Level To Which Restricted. lf Any (Net MWe):
Nrm n
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
j                                                                                               This Month                   Yr..to Date                   Cumulative
j This Month Yr..to Date Cumulative
: 11. Hours in Reporting Period                                                   744.0                   5 087.0                     105 576.0
: 11. Hours in Reporting Period 744.0 5 087.0 105 576.0
  .              .12. Number Of Hours Reactor Was Critical                                         744.0                   5 050.6                       77 043.6
.12. Number Of Hours Reactor Was Critical 744.0 5 050.6 77 043.6
: 13. Reactor Reserve Shutdown Hours                                                                                               -
: 13. Reactor Reserve Shutdown Hours I
I
: 14. Hours Generator On.Line 744.0 5 033.5 73 737.5
: 14. Hours Generator On.Line                                                       744.0                   5 033.5                       73 737.5
: 15. Unit Reserve Shutdown Hours
: 15. Unit Reserve Shutdown Hours                                                 ---                          ---                          ---
: 16. Gross Thermal Energy Generated (MWH) 1 842 180 12 804 735 177 678 499
: 16. Gross Thermal Energy Generated (MWH)                                       1 842 180               12 804 735                       177 678 499 4              .17. Gross Electrical Energy Generated (MWH)                                         638 630                 4 445 970                       61 782 650 1
.17. Gross Electrical Energy Generated (MWH) 638 630 4 445 970 61 782 650 4
: 18. Net Electrical Energy Generated (MWH)                                         608 071                 4 244 713                       58 576 999
: 18. Net Electrical Energy Generated (MWH) 608 071 4 244 713 58 576 999 1
]
]
: 19. Unit Service Factor                                                           100.0                           99.0                         69.8
: 19. Unit Service Factor 100.0 99.0 69.8 100.0 99.0 69.9
: 20. Unit Availability Factor                                                      100.0                           99.0                         69.9
: 20. Unit Availability Factor
: 21. Unit Capacity Factor (Using MDC Net)                                             95.0                         97.0                         64.4~
: 21. Unit Capacity Factor (Using MDC Net) 95.0 97.0 64.4~
: 22. Unit Capacity Factor (Using DER Net)                                             92.3                         94.2                         62.6
: 22. Unit Capacity Factor (Using DER Net) 92.3 94.2 62.6
: 23. Unit Forced Outage Rate                                                           0.0                             1.1                     15.2
: 23. Unit Forced Outage Rate 0.0 1.1 15.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:
None 1
None 1
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status IPrior o Commercial Operation):                                                   Forecast                       Achie$ed j                                           INITIAL CRITICALITY i                                         INITIA L ELECTRICITY I
: 26. Units in Test Status IPrior o Commercial Operation):
COMMERCIAL OPER ATION l
Forecast Achie$ed j
8508200502 8507 1 hDR ADOCK O                                   9                             .-.          g(                                    {yg,)
INITIAL CRITICALITY i
INITIA L ELECTRICITY I
COMMERCIAL OPER ATION 8508200502 8507 1 g(
l hDR ADOCK O 9
{yg,)
M
M
.~


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.                         50-269 UNIT     oconee 1 DATE     08/15/85 COMPLETED BY                                 J.A. Reavis TELEPHONE                     704-373-7567 MONTH                   July.'1985 DAY                 AVERAGE DAILY POWER LEVEL                                       DAY                       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                                                         (MWe-Ne t) 1                                 841                                           17                                                                         636 2                                   841                                           18                                                                         842 3                                   841                                           19                                                                         846 4                                   843                                           20                                                                         846 5                                   842                                           21                                                                         845 6                                   841                                           22                                                                         845 i               7                                   839                                           23                                                                         842 I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
8                                   836                                           24                                                                         843 9                                   836                                         25                                                                           842 10                                     842                                         26                                                                           843 11                                     845                                         27                                                                           843 12                                     844                                         28                                                                           843 13                                     846                                         29                                                                           843 14                                       845                                         30                                                                           842 15                                       679                                         31                                                                           842 16                                       433 1,
50-269 UNIT oconee 1 DATE 08/15/85 COMPLETED BY J.A.
INSTRUCTIONS On'this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reavis TELEPHONE 704-373-7567 MONTH July.'1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) 1 841 17 636 2
841 18 842 3
841 19 846 4
843 20 846 5
842 21 845 6
841 22 845 i
7 839 23 842 I
8 836 24 843 9
836 25 842 10 842 26 843 11 845 27 843 12 844 28 843 13 846 29 843 14 845 30 842 15 679 31 842 16 433 1,
INSTRUCTIONS On'this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i
i


UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET.NO.           50-269 oconee 1-                             - -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET.NO.
UNIT NAME DATE           August 15, 1985 REPORT M) NTH July, 1985               COMPLETED BY           J. A. Reavis TELEPHONE           704-373-7567
50-269 UNIT NAME oconee 1-DATE August 15, 1985 REPORT M) NTH July, 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567
                                                                  %o e            % o,y     License                     y                            Cause & Corrective
%o
                                        ~
% o,y License Cause & Corrective y
27      "co  o"2         Event Action to N3.                       Date     o n.
e27 "c
y5; s- o     e j3,
o"2 h"'
                                                            * :s a h"'
Action to N3.
y, o g
Date y5; j3, Event
N 55         E   E65S       Report #     NO             $oO                         Prevent Recurrence 8-p           85-07-15         F     --
~
A     -
o g
C11     PIMPXX     Low Control Oil Pressure Caused Feed--
on.
water Pump Trip and Runback 9-p           85-07-15         F     --
s-o e
A     -
* :s a y, o N 55 E
Cll     PUMPXX     Investigate Feedwater Pump Control Oil
E65S Report #
;                                                                                                        Problems i
NO
i 10-p           85-07-17         S     --
$oO Prevent Recurrence 8-p 85-07-15 F
F     -
A C11 PIMPXX Low Control Oil Pressure Caused Feed--
CC       VALVEX     Control and Stop Valve Movement PT's l
water Pump Trip and Runback 9-p 85-07-15 F
l i
A Cll PUMPXX Investigate Feedwater Pump Control Oil Problems i
10-p 85-07-17 S
F CC VALVEX Control and Stop Valve Movement PT's i
l l
i i
i i
a f
i a
!        1                            2                                                   3                       4 Reason:                                           Method:                 Exhibit G - Instructions Fo
f 1
'          3S                     led   A-Equipment Failure (Explain)                     1-Manual                 for Preparation of Data B-Maintenance or Test                             2-Manual Scram           Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram       Event Report (LER)
2 3
;                                        D-Regulatory Restriction                         4-Other (Explain)       File (NUREG-0161) i                                         E-Operator Training 4 License Examination
4 Reason:
!                                          F-Adninistrative                                                         5                                                         !
Method:
G-Operational Error (Explain)                                             Exhibit I - Same Source                                 i H-Other (Explain) 9/771
Exhibit G - Instructions Fo 3S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161) i E-Operator Training 4 License Examination F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source i
H-Other (Explain) 9/771


O DOCKET NO: 50-269 UNIT: Oconee 1 DATE: August 15, 1985 NARRATIVE  
O DOCKET NO: 50-269 UNIT: Oconee 1 DATE: August 15, 1985 NARRATIVE  


==SUMMARY==
==SUMMARY==
 
Month:
Month:     ~ July 1985 Oconee Unit 1 operated at 100% power all month except for July 15, when the loss of a Feedwater pump caused a runback to 55%. The unit returned to 100%
~ July 1985 Oconee Unit 1 operated at 100% power all month except for July 15, when the loss of a Feedwater pump caused a runback to 55%. The unit returned to 100%
power on July 17, and operated at that level for the balance of the month.
power on July 17, and operated at that level for the balance of the month.
l
l
        . _ .    - _ . .      . . , . . ~ .._ _ .__ _.,_, ._ _ _                    . _ . _ _._ _ _ _ _ _ _ _ . _ _ _ _ . . _ . _ . _ _
..,.. ~


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name:     oconee Unit 1                                               .
Facility name:
: 2. fcheduled next refueling shutdown: February, 1986                             .
oconee Unit 1 2.
: 3. Scheduled restart following refueling:       April, 1986                     .
fcheduled next refueling shutdown: February, 1986 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?             Yes     .
Scheduled restart following refueling:
If yes, what will these be?       Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?             N/A     .
April, 1986 4.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information:   N/A                                                           .
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating proccdures).
Yes If yes, what will these be?
: 7. Number of fuel assemblies (a) in the core:             177       .
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
(b) in the spent fuel pool:         1026*     .
N/A 5.
: 8. Present licensed fuel pool capacity:       1312                             .
Scheduled date(s) for submitting proposed licensing action and supporting information:
Size of requested or planned increase:                                       .
N/A 6.
: 9. Projected date of last refueling which can be accommodated by present licensed capacity:     August 1991                                           .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating proccdures).
DUKE POWER COMPANY                                   Date: August 15, 1985   .
7.
Name of
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
1026*
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date: August 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis                     Phone: 704-373-7567
J. A. Reavis Phone: 704-373-7567
* Represents the combined total for Units 1 and 2.
* Represents the combined total for Units 1 and 2.


OPERATING DATA REPORT 1
OPERATING DATA REPORT 1
DOCKET NO.     50-270 DATE       8-15-85 COSIPLETED BY       J. A. Reavis TELEPilONE _704-373-7567 OPERATING STATUS
DOCKET NO.
: 1. Unit Name:         OC "*
50-270 DATE 8-15-85 COSIPLETED BY J. A.
* 2                                   N ''5
Reavis TELEPilONE _704-373-7567 OPERATING STATUS
: 1. Unit Name:
OC "*
* 2 N
''5
: 2. Reporting Period: -July 1, 1985-July 31, 1985 Year-to-date and cumulative
: 2. Reporting Period: -July 1, 1985-July 31, 1985 Year-to-date and cumulative
: 3. Licensed ThermalPower talWt):         2568                         capacity factors are calcu-
: 3. Licensed ThermalPower talWt):
: 4. Nameplate Rating (Gross 31We):             934                   lated using a weighted
2568 capacity factors are calcu-
: 5. Design Electrical Rating (Net 5tWe):       886                   a m age for ma dm a
: 4. Nameplate Rating (Gross 31We):
: 6. Staximum Dependable Capacity (Gross alWe):     A99               dependable capacity.
934 lated using a weighted
: 7. Slaximum Dependable Capacity (Net alWe):       860
: 5. Design Electrical Rating (Net 5tWe):
886 a m age for ma dm a
: 6. Staximum Dependable Capacity (Gross alWe):
A99 dependable capacity.
: 7. Slaximum Dependable Capacity (Net alWe):
860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas None
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas None
: 9. Power Level To which Restricted.If Any(Net 51We):         Nw
: 9. Power Level To which Restricted.If Any(Net 51We):
Nw
: 10. Reasons For Restrictions. lf Any:
: 10. Reasons For Restrictions. lf Any:
This Stonth         Yr. to Date         Cumulative i1. Flours In Reporting Period                             744.0       5 087.0             95 496.0
This Stonth Yr. to Date Cumulative i1. Flours In Reporting Period 744.0 5 087.0 95 496.0
: 12. Number Of Hours Reactor Was Critical                   553.6         3 106.9           69 204.4
: 12. Number Of Hours Reactor Was Critical 553.6 3 106.9 69 204.4
: 13. Reactor Reserve Shutdown flours                       ---              ---
: 13. Reactor Reserve Shutdown flours 14.11ours Generator On.Line 519.2 3 032.2
14.11ours Generator On.Line                               519.2         3 032.2         __6_7 976.4
__6_7 976.4
: 15. Unit Reserse Shutdown flours                           ---              ---
: 15. Unit Reserse Shutdown flours
: 16. Gross Thermal Energy Generated (.\lWil)             1 249 897       6 531 319         161 299 624
: 16. Gross Thermal Energy Generated (.\\lWil) 1 249 897 6 531 319 161 299 624
: 17. Gross Electrical Energy Generated (.\!WH)             427 660       2 226 716         54 954 632
: 17. Gross Electrical Energy Generated (.\\!WH) 427 660 2 226 716 54 954 632
: 18. Net Electrical Energy Generated (5!Wii)               404 871       2 101 943         52 211 476
: 18. Net Electrical Energy Generated (5!Wii) 404 871 2 101 943 52 211 476
: 19. Unit Service Factor                                       69.8             59.6
: 19. Unit Service Factor 69.8 59.6 71.2
: 20. Unit Availability Factor 71.2 69.8             59.6                 71.2
: 20. Unit Availability Factor 69.8 59.6 71.2
: 21. Unit Capacity Factor (Using .\lDC Net)                   63.3   _
: 21. Unit Capacity Factor (Using.\\lDC Net) 63.3
48.1                63.4
: 22. Unit Capacity Factor (Using DER Net) 61.4 48.1 63.4 46.6 61.7
: 22. Unit Capacity Factor (Using DER Net)                     61.4             46.6
: 23. Unit Forced Outage Rate 30.2 10.9 14.4
: 23. Unit Forced Outage Rate 61.7 30.2             10.9               14.4
: 24. Shutdowns Scheduled Oser Next 6.\\lonths(Type. Date.and Duration of Eachi:
: 24. Shutdowns Scheduled Oser Next 6.\lonths(Type. Date.and Duration of Eachi:
None
None
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operationi:
: 26. Units in Test Status (Prior to Commercial Operationi:
Forecast           Achiesed INITI \ L CRITICA LITY INITIAL ELECTRICITY CO\f stERCIA L OPERATION (0/77)
Forecast Achiesed INITI \\ L CRITICA LITY INITIAL ELECTRICITY CO\\f stERCIA L OPERATION (0/77)


l
l
                                , AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-270 UNIT oconee 2 DATE 08/15/85 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 HONTH   July, 1985 DAY     AVERAGE DAILY POWER LEVEL           DAY     AVERAGE DAILY POWER LEVEL (HWe-Ne t)                                 (MWe-Ne t) 1                 ---
, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
17                 808 2                 ---                      18                 807 3                 ---
50-270 UNIT oconee 2 DATE 08/15/85 COMPLETED BY J.A.
19                 808 4                 ---
Reavis TELEPHONE 704-373-7567 HONTH July, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Ne t)
20                 801 5
(MWe-Ne t) 1 17 808 2
21                 804 6                 ---
18 807 3
22                 804 7                 ---
19 808 4
23                 798 8                 ---
20 801 5
24                 802 9                 ---
21 804 6
25                 802 10                 376                     26                 805 11                 628                     27                 810 12                   6?e,                   28                 810 13                   808                     29                 808 14                   809                     30                 804 15                   809-                   31                 802 16                   808 lNSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
22 804 7
23 798 8
24 802 9
25 802 10 376 26 805 11 628 27 810 12 6?e, 28 810 13 808 29 808 14 809 30 804 15 809-31 802 16 808 lNSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO.     50-270 UNIT NAME     oconee 2 DATE     August 15. 1985 REPORT M) NTH Julv. 1985             COMPLETED BY     J. A. Reavis TELEPHONE     704-373-7567 "s.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
O e              o o,$     License               y                        Cause & Corrective 32          e a5E                    *
50-270 UNIT NAME oconee 2 DATE August 15. 1985 REPORT M) NTH Julv. 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.
* No.           Date   ~.   % 5;       o y           Event     h           h                         Action to               1 o                   S   Report #   hb         bb                     Prevent Recurrence 5B   85-07-01       F   220.62     A     1                   CB       PUMPXX   Reactor Coolant Pump Seal Failure 20-p   85-07-10       F     --
O o o,$
A   -
License Cause & Corrective y
C11     PUMPXX   Loss of Coolant Flow to the (2B) Feed-water Pump Bearings 6     85-07-11       /         4.20   A   3                     IA       INSTRU   Spurious Signal During Control System Test Caused Power Load Imbalance 21-p   85-07-12       F     --
e32 a5E e
A   -
No.
CB       HEATEX   Limited Due to Steam Generator High Level 1                 2                                                 3                       4 Reason:                                         Method:                 Exhibit G - Instructions F ced g   e       ed   A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram           Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram       Event Report (LER)
Date
D-Regulatory Restriction                         4-Other (Explain)       File (NUREG-0161)
~.
E-Operator Training 4 License Examination F-Adninistrative                                                       S G-Operational Error (Explain)                                             Exhibit I - Same Source H-Other (Explain) 4/771
% 5; y
Event h
h Action to 1
o S
Report #
hb bb Prevent Recurrence o
5B 85-07-01 F
220.62 A
1 CB PUMPXX Reactor Coolant Pump Seal Failure 20-p 85-07-10 F
A C11 PUMPXX Loss of Coolant Flow to the (2B) Feed-water Pump Bearings 6
85-07-11
/
4.20 A
3 IA INSTRU Spurious Signal During Control System Test Caused Power Load Imbalance 21-p 85-07-12 F
A CB HEATEX Limited Due to Steam Generator High Level 1
2 3
4 Reason:
Method:
Exhibit G - Instructions F ced g
e ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative S
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain) 4/771


          .                                                                ~. .            . - .        .                                        .. _ _ .  .  .-    . -              . -        ..-. .
~.
1 DOCKET NO:                 50-270 UNIT:   Oconee 2 DATE:   August 15, 1985 NARRATIVE  
1 DOCKET NO:
50-270 UNIT:
Oconee 2 DATE:
August 15, 1985 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month:                   July, 1985 Oconee Unit 2 began the month off-line for Reactor Coolant pump seal repairs.
Month:
July, 1985 Oconee Unit 2 began the month off-line for Reactor Coolant pump seal repairs.
The unit returned to service on July 10 and during the power increase was forced to hold for 4 hours to work on the 2B feedpump. The unit tripped on July 11 during an instrumentation check, but returned to service later that day. The unit was limited to 95% power for the rest of the month due to i
The unit returned to service on July 10 and during the power increase was forced to hold for 4 hours to work on the 2B feedpump. The unit tripped on July 11 during an instrumentation check, but returned to service later that day. The unit was limited to 95% power for the rest of the month due to i
high Steam Generator level.
high Steam Generator level.
Line 182: Line 261:
1 i
1 i
i
i
    -      ,,- . _ , . - - , - . - . - . . . _ .      ~,, . , , - - . - - .            _,,__,__.n.._,,,
_,,__,__.n.._,,,
                                                                                          ,               , , . , - , . _ , , - , _ . . . - , , - . -             a n,-  , , , , ,, ,,    ,-._,_.n.1
a n,-
,-._,_.n.1
~,,.,, - -. - -.


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name:     Oconee Unit 2                                           -
Facility name:
: 2. Scheduled next refueling shutdown: October, 1986                         .
Oconee Unit 2 2.
: 3. Scheduled restart following refueling:     December, 1986               .
Scheduled next refueling shutdown: October, 1986 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?     Yes       .
Scheduled restart following refueling:
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?       N/A     .
December, 1986 4.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A                                                         .
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 7. Number of fuel assemblies (a) in the core:       177       .
N/A 5.
(b) in the spent fuel pool:   1026*       .
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
: 8. Present licensed feel pool capacity:     1312                             .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Size of requested or planned increase:                                   .
7.
: 9. Projected date of last refueling which can be accommodated by present licensed capacity:     Aunust 1991                                       .
Number of fuel assemblies (a) in the core:
DUKE POWER COMPANY                             Date:   Aunust 15. 1985   .
177 (b) in the spent fuel pool:
Name of
1026*
8.
Present licensed feel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
Aunust 1991 DUKE POWER COMPANY Date:
Aunust 15. 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis               Phones 704-373-7567
J. A. Reavis Phones 704-373-7567
* Represents the combined total for Units 1 & 2.
* Represents the combined total for Units 1 & 2.


OPERATING DATA REPORT DOCKET NO.       50-287 DATE     8-15-85 CO.\lPLETED BY     J. A. Reavis TELEPilONE       704-373-7567 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                 oconee 3                                 Notes
50-287 DATE 8-15-85 CO.\\lPLETED BY J. A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS
: 2. Reporting Period:       t,,1 7 1_ i os s - T,il v 11_ 1985             Year-to-date and cumulative
: 1. Unit Name:
: 3. Licensed Thermal Power (51Wt):             2568                       capacity factors are calcu-
oconee 3 Notes
: 4. Nameplate Rating (Gross'5fWe):                 934                   lated using a weighted
: 2. Reporting Period:
: 5. Design Electrical Rating (Net 51We):           886                   average for maximum
t,,1 7 1_
: 6. Staximum Dependable Capacity (Gross SlWe):               899           dependable capacity.
i os s - T,il v 11_ 1985 Year-to-date and cumulative
: 7. Staximum Dependable Capacity (Net alwe):                 860
: 3. Licensed Thermal Power (51Wt):
2568 capacity factors are calcu-
: 4. Nameplate Rating (Gross'5fWe):
934 lated using a weighted
: 5. Design Electrical Rating (Net 51We):
886 average for maximum
: 6. Staximum Dependable Capacity (Gross SlWe):
899 dependable capacity.
: 7. Staximum Dependable Capacity (Net alwe):
860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
None
None
: 9. Power Level To which Restricted. If Any (Net >!We):
: 9. Power Level To which Restricted. If Any (Net >!We):
: 10. Reasons For Restrictions. lf Any:
: 10. Reasons For Restrictions. lf Any:
This alonth           Yr..to.Date         Cumulative
This alonth Yr..to.Date Cumulative
: 11. Ilours la Reporting Period                           744.0             5 087.0             93 143.0
: 11. Ilours la Reporting Period 744.0 5 087.0 93 143.0
: 12. Number Of liours Reactor Was Critical                 735.2             4 824.7             68 055.2         .-
: 12. Number Of liours Reactor Was Critical 735.2 4 824.7 68 055.2
: 13. Reactor Reserve Shutdown !!ours                         --
: 13. Reactor Reserve Shutdown !!ours
: 14. Hours Generator On.Line                             720.6             4 805.9             66 864.0
: 14. Hours Generator On.Line 720.6 4 805.9 66 864.0
: 15. Unit Resene Shutdown Hours                           ---                    ---                ---
: 15. Unit Resene Shutdown Hours
: 16. Gross Thermal Energy Generated (SIWH)             1 542 032           11 873 007         163 670 048
: 16. Gross Thermal Energy Generated (SIWH) 1 542 032 11 873 007 163 670 048
: 17. Gross Electrical Energy Generated (.\lWH)             525 230           4 077 710           56 502 644
: 17. Gross Electrical Energy Generated (.\\lWH) 525 230 4 077 710 56 502 644
: 18. Net Electrical Energy Generated (SIWii)               SQOJ.05           3 900 705           _53 822 078
: 18. Net Electrical Energy Generated (SIWii)
: 19. Unit Service Factor                                     96.9                 94.5                 71.8
SQOJ.05 3 900 705
: 20. Unit Availability Factor                                 96.9                 94.5                 71.8
_53 822 078
: 21. Unit Capacity Factor (Using .\lDC Net)                   78.2                 89.?                 67.0
: 19. Unit Service Factor 96.9 94.5 71.8
: 22. Unit Capacity Factor (Using DER Net)                     75.9                 86.6               65.2
: 20. Unit Availability Factor 96.9 94.5 71.8
: 23. Unit Forced Outage Rate                                     3.2                 5.5               13.7
: 21. Unit Capacity Factor (Using.\\lDC Net) 78.2 89.?
: 24. Shutdowns Scheduled Oser Next 6.\lonths (Type. Date, and Duration of Eacht:
67.0
Refuelinn - Aunust 8,         1985 - 8 weeks
: 22. Unit Capacity Factor (Using DER Net) 75.9 86.6 65.2
: 23. Unit Forced Outage Rate 3.2 5.5 13.7
: 24. Shutdowns Scheduled Oser Next 6.\\lonths (Type. Date, and Duration of Eacht:
Refuelinn - Aunust 8, 1985 - 8 weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status tPrior to Commercial Operation):                     Forecast
: 26. Units in Test Status tPrior to Commercial Operation):
* Achiesed INITI \ L CRITICA LITY INITIAL ELECTRICITY C0\l\lLRCIT L OPER A TION (0/77i
Forecast Achiesed INITI \\ L CRITICA LITY INITIAL ELECTRICITY C0\\l\\lLRCIT L OPER A TION (0/77i


AVERAGE DAILY UNIT POWER LEVEL s
AVERAGE DAILY UNIT POWER LEVEL s
DOCKET NO. 50-287 UNIT oconee 3 DATE 08/15/85 COMPLETED BY   J.A. Reavis TELEPHONE 704-373-7567 MONTH     July, 1985 DAY     AVERAGE DAILY POWER LEVEL         DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                                   (MWe-Ne t) 1               842                       17                 601 2               581                       18                 598 3               437                       19                 604           _
DOCKET NO.
4              838                       20                 612 5               840                       21                 614 6               840                       22                 615 7               840                       23                 135 8               840                       24                 586 9               840                       25                 608 10               840                     26                 608 11               839                     27                 609 12               837                     28     _
50-287 UNIT oconee 3 DATE 08/15/85 COMPLETED BY J.A.
608 13               839                     29                 608 14               759                     30                 608 15               613                     31                 607 16               606 l
Reavis TELEPHONE 704-373-7567 MONTH July, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for'each day in the reporting month. Compute to the nearest whole megawatt.
(MWe-Ne t) 1 842 17 601 2
581 18 598 3
437 19 604 4
838 20 612 5
840 21 614 6
840 22 615 7
840 23 135 8
840 24 586 9
840 25 608 10 840 26 608 11 839 27 609 12 837 28 608 13 839 29 608 14 759 30 608 15 613 31 607 16 606 l
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for'each day in the reporting month.
Compute to the nearest whole megawatt.


UNIT SHUTDOWIS AND POWER REDUCTIONS                           DOCKET NO.     50-287                 ,
UNIT SHUTDOWIS AND POWER REDUCTIONS DOCKET NO.
!                                                                                                                              UNIT NAME     Oconee 3             -
50-287 UNIT NAME Oconee 3 DATE August 15, 1985 i
DATE     August 15, 1985 REPORT PONTH July, 1985                       COMPLETED BY ,     J. A. Reavis i
REPORT PONTH July, 1985 COMPLETED BY,
TELEPHONE       704-373-7567           l 3
J. A. Reavis TELEPHONE 704-373-7567 l
m 3                                                                                           ;
3 m
e            gg               License                     y                           cause & Corrective S7     "c     v52                               *
3 cause & Corrective gg License y
* Action to j       No.       Date                         gj;     g     gg               Event            Be                                                                  j w       sz     e     emo                               wo         8 l
e S7 "c
1 H         a-     a:   Emo             Report i         mu       aO                          Prevent Recurrence            l I
v52 Event Be Action to j
l       17-p     85-07-02           F           -
No.
A         -                              CB     PUMPXX       Low Oil Level in the (3B2) Reactor Coolant Pump Motor                           [
Date gj; g
2   85-07-02           F             8.30 A         1                             CB     PUMPXX       Low Oil Level in the (3B2) Reactor Coolant Pump Motor                           ;
gg j
i 1
w sz e
18-p     85-07-14           F           -
emo wo 8aO Prevent Recurrence l
A         -
H a-a:
CB     PUMPXX       Low Oil Level in the (3b2) Reactor Coolant Pump Motor                           ,
Emo Report i mu l
3    85-07-23           F           15.15   A         3                             CH     INSTRU       Loss of Feedwater Flow Indication 19-p     85-07-23             F           --
1 I
A         -
l 17-p 85-07-02 F
CH     VALVES       Perform Repairs on (3B2) Heater Level         ,
A CB PUMPXX Low Oil Level in the (3B2) Reactor Coolant Pump Motor
Control Valve 20-p     85-07-24             F           -
[
A         -
2 85-07-02 F
CB     PUMFXX       Low 011 Level in the (3B2) Reactor i                                                                                                                       Coolant Pump Motor                           ;
8.30 A
i I
1 CB PUMPXX Low Oil Level in the (3B2) Reactor Coolant Pump Motor i
l 1
1 18-p 85-07-14 F
  !        1                        2                                                                 3                           4 Reason:                                                         Method:                     Exhibit G - Instructions       ,
A CB PUMPXX Low Oil Level in the (3b2) Reactor Coolant Pump Motor 3
S      led             A-Equipment Failure (Explain)                                   1-Manual                     for Preparation of Data         '
85-07-23 F
:                                      B-Maintenance or Test                                           2-Manual Scram               Entry Sheets for Licensee l                                     C-Refueling                                                     3-Automatic Scram           Event Report (LER)             l
15.15 A
  !                                      D-Regulatory Restriction                                       4-Other (Explain)           File (NtREG-0161)               l l                                     E-Operator Training 4 License Examination i                                     F-Administrative       .                                                                  5                                 -
3 CH INSTRU Loss of Feedwater Flow Indication 19-p 85-07-23 F
G-Operational Error (Explain)                                                               Exhibit I - Same Source
A CH VALVES Perform Repairs on (3B2) Heater Level Control Valve 20-p 85-07-24 F
  !                                    H-Other (Explain)                                                                                                             '
A CB PUMFXX Low 011 Level in the (3B2) Reactor i
  ]O/771 _ - -              _ - -
Coolant Pump Motor i
I l
1 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S
led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee l
C-Refueling 3-Automatic Scram Event Report (LER) l D-Regulatory Restriction 4-Other (Explain)
File (NtREG-0161) l l
E-Operator Training 4 License Examination i
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
]O/771


h DOCKET NO:   50-287 UNIT:   Oconee 3 DATE:   August 15. 1985 NARRATIVE  
h DOCKET NO:
50-287 UNIT:
Oconee 3 DATE:
August 15. 1985 NARRATIVE  


==SUMMARY==
==SUMMARY==
Month:
July 1985 Oconee Unit 3 began the month at 100% power but was forced to reduce power on July 2 when the 382 Reactor Coolant pump indicated a low oil level. Oil was added and the unit returned to 100% on July 4.
On July 14 the unit was forced to reduce power again because of low oil level on 3B2 Reactor Coolant pump.
The decision was made to leave this pump out of service and operate with 3 loops instead of 4.
The unit reached 74% power on July 15'and operated at that level until July 23 when a defective circuit in the Integrated Control system caused a runback, feedpump trip and then a Reactor trip. The unit returned to service that day and operated at 74% power for the balance of the month.


Month:    July 1985 Oconee Unit 3 began the month at 100% power but was forced to reduce power on July 2 when the 382 Reactor Coolant pump indicated a low oil level. Oil was added and the unit returned to 100% on July 4. On July 14 the unit was forced to reduce power again because of low oil level on 3B2 Reactor Coolant pump.
. -.. _ = _ -
The decision was made to leave this pump out of service and operate with 3 loops instead of 4. The unit reached 74% power on July 15'and operated at that level until July 23 when a defective circuit in the Integrated Control system caused a runback, feedpump trip and then a Reactor trip. The unit returned to service that day and operated at 74% power for the balance of the month.
 
_ . . . _ .. . - . -                        .          . - . . _ = _ -                                   - _ _ _ . - . _ _ .      _ _ _ - .
l MONTHLY REFUELING INFORMATION RFQUEST i
l MONTHLY REFUELING INFORMATION RFQUEST i
: 1.         Facility name:         Oconee Unit 3                                                                                                                 .
1.
: 2.          Scheduled next refueling shutdown: August. 1985                                                                                                       .
Facility name:
                - 3.         Scheduled restart following refueling:                                             Oc tober. 1985                                                     .
Oconee Unit 3 2.
: 4.        Will' refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes                                                                               .
Scheduled next refueling shutdown: August. 1985
If yes, what will these be? Technical Specification Revision l
- 3.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?                                                                       N/A                 .
Scheduled restart following refueling:
: 5.          Scheduled date(s) for submitting proposed licensing action and supporting information:       N/A                                                                                                                             .            r
Oc tober. 1985 4.
: 6.         Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Will' refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision l
: 7.         Number of fuel assemblies (a) in the core                                                         177                       .
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
(b) in the spent fuel pool:                                         295                   .
N/A 5.
: 8.        Present licensed fuel pool capacity:                                         875                                                                     .
Scheduled date(s) for submitting proposed licensing action and supporting information:
Size of requested or planned increase:                                                                                                               .
N/A r
: 9.         Projected date of last refueling which can be accommodated by present licensed capacity:                 Aunust 1991                                                                                                       .
6.
l DUKE POWER COMPANY                                                                           Date:                     August 15, 1985               .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Name of
7.
Number of fuel assemblies (a) in the core 177 (b) in the spent fuel pool:
295 8.
Present licensed fuel pool capacity:
875 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
Aunust 1991 l
DUKE POWER COMPANY Date:
August 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis                                                     Phone: 704-373-7567 t
J. A. Reavis Phone: 704-373-7567 t
l l
l l
h
h


OCONEE NUCLEAR STATION Monthly Operating Status Report
OCONEE NUCLEAR STATION Monthly Operating Status Report 1.
: 1. Personnel Exposure For the month of June, 4 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.510 Rem, which represents approximately 12.6% of that person's allowable annual limit.
Personnel Exposure For the month of June, 4 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.510 Rem, which represents approximately 12.6% of that person's allowable annual limit.
: 2. The total station liquid release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.
2.
The total station liquid release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.
The total station gaseous release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.
The total station gaseous release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.
l 1
l 1
I t
I t
l I'
l I'
s             --
s


T DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE, N.C. 28242 MALB. TUCKER                                 >
T DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE, N.C. 28242 MALB. TUCKER
      . E .", C o=                         August 15, 1985                           " " " '
. E.", C o=
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Docume.nt Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287
August 15, 1985 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Docume.nt Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of July, 1985.
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of July, 1985.
Very truly yours, Hal B. Tucker JAR: sib Attachments cc: Regional Administrator                         American Nuclear Insurers U. S. Nuclear Regulatory Commission           c/o Dottie Sherman, ANI Library Region II                                     The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900           270 Farmington Avenue Atlanta, Georgia 30323                       Farmington, Connecticut 06032 Mr. Phil Ross                                 INPO Records Center U. S. Nuclear Regulatory Commission           Suite 1500 MNBB-5715                                     1100 Circle 75 Parkway Washington, D. C. 20555                   Atlanta, Georgia 30339 Ms. Helen Nicolaras, Project Manager         Senior Resident Inspector Office of Nuclear Reactor Regulation         Oconee Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ZE14
Very truly yours, Hal B. Tucker JAR: sib Attachments cc: Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.
                                                                                              'I a}}
20555 Atlanta, Georgia 30339 Ms. Helen Nicolaras, Project Manager Senior Resident Inspector Office of Nuclear Reactor Regulation Oconee Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ZE14
'I a}}

Latest revision as of 04:50, 12 December 2024

Monthly Operating Repts for Jul 1985
ML20134E906
Person / Time
Site: Oconee  
Issue date: 07/31/1985
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8508200582
Download: ML20134E906 (17)


Text

.~

i i

OPERATING DATA REPORT DOCKET NO.

50-269 DATE 8-15-85 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 OPERATING STATUS 4

Oconee 1 Notes

1. Unit Name:
2. Reporting Period:

July 1. 1985 - Julv 31. 1985 Year-to-date and cumulative I

3. Licensed Thermal Power (MWt):

2568 capacity factors are calcu-934 lated using a weighted

4. Nameplate Rating (Gross MWe):

886 average for maximum

5. Design Electrical Rating (Net MWe):

dependable capacity.

6. Maximum Dependable Capacity (Gross MWe):

899 i

7. Maximum Dependable Capacity (Net MWe):

860

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWe):

Nrm n

10. Reasons For Restrictions.If Any:

j This Month Yr..to Date Cumulative

11. Hours in Reporting Period 744.0 5 087.0 105 576.0

.12. Number Of Hours Reactor Was Critical 744.0 5 050.6 77 043.6

13. Reactor Reserve Shutdown Hours I
14. Hours Generator On.Line 744.0 5 033.5 73 737.5
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 842 180 12 804 735 177 678 499

.17. Gross Electrical Energy Generated (MWH) 638 630 4 445 970 61 782 650 4

18. Net Electrical Energy Generated (MWH) 608 071 4 244 713 58 576 999 1

]

19. Unit Service Factor 100.0 99.0 69.8 100.0 99.0 69.9
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 95.0 97.0 64.4~
22. Unit Capacity Factor (Using DER Net) 92.3 94.2 62.6
23. Unit Forced Outage Rate 0.0 1.1 15.2
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

None 1

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior o Commercial Operation):

Forecast Achie$ed j

INITIAL CRITICALITY i

INITIA L ELECTRICITY I

COMMERCIAL OPER ATION 8508200502 8507 1 g(

l hDR ADOCK O 9

{yg,)

M

.~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-269 UNIT oconee 1 DATE 08/15/85 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 MONTH July.'1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 841 17 636 2

841 18 842 3

841 19 846 4

843 20 846 5

842 21 845 6

841 22 845 i

7 839 23 842 I

8 836 24 843 9

836 25 842 10 842 26 843 11 845 27 843 12 844 28 843 13 846 29 843 14 845 30 842 15 679 31 842 16 433 1,

INSTRUCTIONS On'this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET.NO.

50-269 UNIT NAME oconee 1-DATE August 15, 1985 REPORT M) NTH July, 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567

%o

% o,y License Cause & Corrective y

e27 "c

o"2 h"'

Action to N3.

Date y5; j3, Event

~

o g

on.

s-o e

  • :s a y, o N 55 E

E65S Report #

NO

$oO Prevent Recurrence 8-p 85-07-15 F

A C11 PIMPXX Low Control Oil Pressure Caused Feed--

water Pump Trip and Runback 9-p 85-07-15 F

A Cll PUMPXX Investigate Feedwater Pump Control Oil Problems i

10-p 85-07-17 S

F CC VALVEX Control and Stop Valve Movement PT's i

l l

i i

i a

f 1

2 3

4 Reason:

Method:

Exhibit G - Instructions Fo 3S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161) i E-Operator Training 4 License Examination F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Same Source i

H-Other (Explain) 9/771

O DOCKET NO: 50-269 UNIT: Oconee 1 DATE: August 15, 1985 NARRATIVE

SUMMARY

Month:

~ July 1985 Oconee Unit 1 operated at 100% power all month except for July 15, when the loss of a Feedwater pump caused a runback to 55%. The unit returned to 100%

power on July 17, and operated at that level for the balance of the month.

l

..,.. ~

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

oconee Unit 1 2.

fcheduled next refueling shutdown: February, 1986 3.

Scheduled restart following refueling:

April, 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating proccdures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1026*

8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date: August 15, 1985 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 and 2.

OPERATING DATA REPORT 1

DOCKET NO.

50-270 DATE 8-15-85 COSIPLETED BY J. A.

Reavis TELEPilONE _704-373-7567 OPERATING STATUS

1. Unit Name:

OC "*

  • 2 N

5

2. Reporting Period: -July 1, 1985-July 31, 1985 Year-to-date and cumulative
3. Licensed ThermalPower talWt):

2568 capacity factors are calcu-

4. Nameplate Rating (Gross 31We):

934 lated using a weighted

5. Design Electrical Rating (Net 5tWe):

886 a m age for ma dm a

6. Staximum Dependable Capacity (Gross alWe):

A99 dependable capacity.

7. Slaximum Dependable Capacity (Net alWe):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas None
9. Power Level To which Restricted.If Any(Net 51We):

Nw

10. Reasons For Restrictions. lf Any:

This Stonth Yr. to Date Cumulative i1. Flours In Reporting Period 744.0 5 087.0 95 496.0

12. Number Of Hours Reactor Was Critical 553.6 3 106.9 69 204.4
13. Reactor Reserve Shutdown flours 14.11ours Generator On.Line 519.2 3 032.2

__6_7 976.4

15. Unit Reserse Shutdown flours
16. Gross Thermal Energy Generated (.\\lWil) 1 249 897 6 531 319 161 299 624
17. Gross Electrical Energy Generated (.\\!WH) 427 660 2 226 716 54 954 632
18. Net Electrical Energy Generated (5!Wii) 404 871 2 101 943 52 211 476
19. Unit Service Factor 69.8 59.6 71.2
20. Unit Availability Factor 69.8 59.6 71.2
21. Unit Capacity Factor (Using.\\lDC Net) 63.3
22. Unit Capacity Factor (Using DER Net) 61.4 48.1 63.4 46.6 61.7
23. Unit Forced Outage Rate 30.2 10.9 14.4
24. Shutdowns Scheduled Oser Next 6.\\lonths(Type. Date.and Duration of Eachi:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed INITI \\ L CRITICA LITY INITIAL ELECTRICITY CO\\f stERCIA L OPERATION (0/77)

l

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-270 UNIT oconee 2 DATE 08/15/85 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 HONTH July, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Ne t)

(MWe-Ne t) 1 17 808 2

18 807 3

19 808 4

20 801 5

21 804 6

22 804 7

23 798 8

24 802 9

25 802 10 376 26 805 11 628 27 810 12 6?e, 28 810 13 808 29 808 14 809 30 804 15 809-31 802 16 808 lNSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-270 UNIT NAME oconee 2 DATE August 15. 1985 REPORT M) NTH Julv. 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.

O o o,$

License Cause & Corrective y

e32 a5E e

No.

Date

~.

% 5; y

Event h

h Action to 1

o S

Report #

hb bb Prevent Recurrence o

5B 85-07-01 F

220.62 A

1 CB PUMPXX Reactor Coolant Pump Seal Failure 20-p 85-07-10 F

A C11 PUMPXX Loss of Coolant Flow to the (2B) Feed-water Pump Bearings 6

85-07-11

/

4.20 A

3 IA INSTRU Spurious Signal During Control System Test Caused Power Load Imbalance 21-p 85-07-12 F

A CB HEATEX Limited Due to Steam Generator High Level 1

2 3

4 Reason:

Method:

Exhibit G - Instructions F ced g

e ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 4 License Examination F-Adninistrative S

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain) 4/771

~.

1 DOCKET NO:

50-270 UNIT:

Oconee 2 DATE:

August 15, 1985 NARRATIVE

SUMMARY

Month:

July, 1985 Oconee Unit 2 began the month off-line for Reactor Coolant pump seal repairs.

The unit returned to service on July 10 and during the power increase was forced to hold for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to work on the 2B feedpump. The unit tripped on July 11 during an instrumentation check, but returned to service later that day. The unit was limited to 95% power for the rest of the month due to i

high Steam Generator level.

4 i

1 i

i

_,,__,__.n.._,,,

a n,-

,-._,_.n.1

~,,.,, - -. - -.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 2 2.

Scheduled next refueling shutdown: October, 1986 3.

Scheduled restart following refueling:

December, 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1026*

8.

Present licensed feel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

Aunust 1991 DUKE POWER COMPANY Date:

Aunust 15. 1985 Name of

Contact:

J. A. Reavis Phones 704-373-7567

  • Represents the combined total for Units 1 & 2.

OPERATING DATA REPORT DOCKET NO.

50-287 DATE 8-15-85 CO.\\lPLETED BY J. A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS

1. Unit Name:

oconee 3 Notes

2. Reporting Period:

t,,1 7 1_

i os s - T,il v 11_ 1985 Year-to-date and cumulative

3. Licensed Thermal Power (51Wt):

2568 capacity factors are calcu-

4. Nameplate Rating (Gross'5fWe):

934 lated using a weighted

5. Design Electrical Rating (Net 51We):

886 average for maximum

6. Staximum Dependable Capacity (Gross SlWe):

899 dependable capacity.

7. Staximum Dependable Capacity (Net alwe):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Level To which Restricted. If Any (Net >!We):
10. Reasons For Restrictions. lf Any:

This alonth Yr..to.Date Cumulative

11. Ilours la Reporting Period 744.0 5 087.0 93 143.0
12. Number Of liours Reactor Was Critical 735.2 4 824.7 68 055.2
13. Reactor Reserve Shutdown !!ours
14. Hours Generator On.Line 720.6 4 805.9 66 864.0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (SIWH) 1 542 032 11 873 007 163 670 048
17. Gross Electrical Energy Generated (.\\lWH) 525 230 4 077 710 56 502 644
18. Net Electrical Energy Generated (SIWii)

SQOJ.05 3 900 705

_53 822 078

19. Unit Service Factor 96.9 94.5 71.8
20. Unit Availability Factor 96.9 94.5 71.8
21. Unit Capacity Factor (Using.\\lDC Net) 78.2 89.?

67.0

22. Unit Capacity Factor (Using DER Net) 75.9 86.6 65.2
23. Unit Forced Outage Rate 3.2 5.5 13.7
24. Shutdowns Scheduled Oser Next 6.\\lonths (Type. Date, and Duration of Eacht:

Refuelinn - Aunust 8, 1985 - 8 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed INITI \\ L CRITICA LITY INITIAL ELECTRICITY C0\\l\\lLRCIT L OPER A TION (0/77i

AVERAGE DAILY UNIT POWER LEVEL s

DOCKET NO.

50-287 UNIT oconee 3 DATE 08/15/85 COMPLETED BY J.A.

Reavis TELEPHONE 704-373-7567 MONTH July, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 842 17 601 2

581 18 598 3

437 19 604 4

838 20 612 5

840 21 614 6

840 22 615 7

840 23 135 8

840 24 586 9

840 25 608 10 840 26 608 11 839 27 609 12 837 28 608 13 839 29 608 14 759 30 608 15 613 31 607 16 606 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for'each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWIS AND POWER REDUCTIONS DOCKET NO.

50-287 UNIT NAME Oconee 3 DATE August 15, 1985 i

REPORT PONTH July, 1985 COMPLETED BY,

J. A. Reavis TELEPHONE 704-373-7567 l

3 m

3 cause & Corrective gg License y

e S7 "c

v52 Event Be Action to j

No.

Date gj; g

gg j

w sz e

emo wo 8aO Prevent Recurrence l

H a-a:

Emo Report i mu l

1 I

l 17-p 85-07-02 F

A CB PUMPXX Low Oil Level in the (3B2) Reactor Coolant Pump Motor

[

2 85-07-02 F

8.30 A

1 CB PUMPXX Low Oil Level in the (3B2) Reactor Coolant Pump Motor i

1 18-p 85-07-14 F

A CB PUMPXX Low Oil Level in the (3b2) Reactor Coolant Pump Motor 3

85-07-23 F

15.15 A

3 CH INSTRU Loss of Feedwater Flow Indication 19-p 85-07-23 F

A CH VALVES Perform Repairs on (3B2) Heater Level Control Valve 20-p 85-07-24 F

A CB PUMFXX Low 011 Level in the (3B2) Reactor i

Coolant Pump Motor i

I l

1 1

2 3

4 Reason:

Method:

Exhibit G - Instructions S

led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee l

C-Refueling 3-Automatic Scram Event Report (LER) l D-Regulatory Restriction 4-Other (Explain)

File (NtREG-0161) l l

E-Operator Training 4 License Examination i

F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

]O/771

h DOCKET NO:

50-287 UNIT:

Oconee 3 DATE:

August 15. 1985 NARRATIVE

SUMMARY

Month:

July 1985 Oconee Unit 3 began the month at 100% power but was forced to reduce power on July 2 when the 382 Reactor Coolant pump indicated a low oil level. Oil was added and the unit returned to 100% on July 4.

On July 14 the unit was forced to reduce power again because of low oil level on 3B2 Reactor Coolant pump.

The decision was made to leave this pump out of service and operate with 3 loops instead of 4.

The unit reached 74% power on July 15'and operated at that level until July 23 when a defective circuit in the Integrated Control system caused a runback, feedpump trip and then a Reactor trip. The unit returned to service that day and operated at 74% power for the balance of the month.

. -.. _ = _ -

l MONTHLY REFUELING INFORMATION RFQUEST i

1.

Facility name:

Oconee Unit 3 2.

Scheduled next refueling shutdown: August. 1985

- 3.

Scheduled restart following refueling:

Oc tober. 1985 4.

Will' refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision l

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A r

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core 177 (b) in the spent fuel pool:

295 8.

Present licensed fuel pool capacity:

875 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

Aunust 1991 l

DUKE POWER COMPANY Date:

August 15, 1985 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 t

l l

h

OCONEE NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the month of June, 4 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.510 Rem, which represents approximately 12.6% of that person's allowable annual limit.

2.

The total station liquid release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.

The total station gaseous release for June has been compared with the Technical Specifications maximum annual dose commit-ment and was less than 10 percent of this limit.

l 1

I t

l I'

s

T DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE, N.C. 28242 MALB. TUCKER

. E.", C o=

August 15, 1985 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Docume.nt Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of July, 1985.

Very truly yours, Hal B. Tucker JAR: sib Attachments cc: Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.

20555 Atlanta, Georgia 30339 Ms. Helen Nicolaras, Project Manager Senior Resident Inspector Office of Nuclear Reactor Regulation Oconee Nuclear Station U. S. Nuclear Regulatory Commission Washington, D. C.

20555 ZE14

'I a