ENS 49314: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by Mark Hawes
 
Created page by program invented by StriderTol
 
Line 16: Line 16:
| event date = 08/29/2013 11:00 CDT
| event date = 08/29/2013 11:00 CDT
| last update date = 08/29/2013
| last update date = 08/29/2013
| title = Failure To Address All The Effects Of External Flooding Scenarios
| title = Failure to Address All the Effects of External Flooding Scenarios
| event text = On August 28, 2013, Monticello Nuclear Generating Plant (MNGP) was notified of the NRC's final significance determination for a finding involving the failure to maintain a procedure addressing all of the effects of an external flooding scenario on the plant.  Specifically, MNGP failed to maintain flood Procedure A.6, 'Acts of Nature,' such that it could support the timely implementation of flood protection activities within the 12 day timeframe credited in the design basis as stated in the updated safety analysis report.
| event text = On August 28, 2013, Monticello Nuclear Generating Plant (MNGP) was notified of the NRC's final significance determination for a finding involving the failure to maintain a procedure addressing all of the effects of an external flooding scenario on the plant.  Specifically, MNGP failed to maintain flood Procedure A.6, 'Acts of Nature,' such that it could support the timely implementation of flood protection activities within the 12 day timeframe credited in the design basis as stated in the updated safety analysis report.
The finding is not a current safety concern.  On February 15, 2013, actions were completed to reduce the flood mitigation plan timeline to less than 12 days by developing an alternate plan for flood protection features, pre-staging equipment and materials, improving the quality of the A.6 procedure, and preplanning work orders necessary to carry out Procedure A.6 actions.
The finding is not a current safety concern.  On February 15, 2013, actions were completed to reduce the flood mitigation plan timeline to less than 12 days by developing an alternate plan for flood protection features, pre-staging equipment and materials, improving the quality of the A.6 procedure, and preplanning work orders necessary to carry out Procedure A.6 actions.

Latest revision as of 21:00, 1 March 2018

ENS 49314 +/-
Where
Monticello 
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+2.58 h0.108 days <br />0.0154 weeks <br />0.00353 months <br />)
Opened: Mark Ihlenfeldt
18:35 Aug 29, 2013
NRC Officer: Vince Klco
Last Updated: Aug 29, 2013
49314 - NRC Website