{{#Wiki_filter:. _ -                   .        ~                   -.                                            .            .
{{#Wiki_filter:. _ -
                      .      . NEDO-32339 Supplement 4                                               PILGRIM TECHNICAL SFECIFICATIONS
~
* 3.2 PbWER         DIST(tlBUTION LIMITS                                         3.11       REACTOR FUEL ASSEMBLY D.         Power / Flow Relatenshio Durina Power Operation 3.2.5         Fracten of Core Boiling Boundary (FCBD)
NEDO-32339 Supplement 4 PILGRIM TECHNICAL SFECIFICATIONS
The power / flow relationship shall not exceed the limiting values LCO 3.2.5                 FCBB shall be s 1.0.                                               specified in Uw CORE OPERATING LIMITS REPORT.
* 3.2 PbWER DIST(tlBUTION LIMITS 3.11 REACTOR FUEL ASSEMBLY D.
APPLICABILITY: THERMAL POWER and core flow in the Restricted Region as specified in the COLR.                                   surveinance thaw hmning value for the power / flow relatonship is MODE 1 when RPS Function 2.b, APRM Flow                             being exceeded, action shall be initiated within 15 minutes to Biased Simulated Thermal Power-High, Allowable                     restore operation to within the prescribed hmits. if the power / flow Value is " Setup" as specified in the COLR.
Power / Flow Relatenshio Durina Power Operation 3.2.5 Fracten of Core Boiling Boundary (FCBD)
relationship is not returned to within the presenbod hmits within two (2) hours, the reactor shall be brought to the Cold Shutdown ACTIONS                                                                                       condition within 36 hours. Surveillance and corresponding action l CONDITION                       REQUIRED ACTION COMPLETION TNE l A. FCB8 not within limit     A.1   Restore FCBS to         2 hours           4.11       REACTOR FUEL ASSEMBLY for reasons other               within limit.
The power / flow relationship shall not exceed the limiting values LCO 3.2.5 FCBB shall be s 1.0.
than unexpected loss                                                       D.         Power / Flow Relationshio Durina Power Operation of feedwater heeting or unexpected Compliance with the power / flow relationship in Section 3.11.D shall be determined daily duLing reactor operation.
specified in Uw CORE OPERATING LIMITS REPORT.
.        B. Gequired Action and         B1 initiate action to exit     immediately associated Completion             the Restricted Region.                             3.6.6. Thermal-Hvdraulic.jtability Time of Condition A 3
APPLICABILITY: THERMAL POWER and core flow in the Restricted Region as specified in the COLR.
not met.
surveinance thaw hmning value for the power / flow relatonship is MODE 1 when RPS Function 2.b, APRM Flow being exceeded, action shall be initiated within 15 minutes to Biased Simulated Thermal Power-High, Allowable restore operation to within the prescribed hmits. if the power / flow Value is " Setup" as specified in the COLR.
g                           6tfD                                                          Core thermal power shall not exceed 25% of rated thermal power NOTE                                                                           without forced recirculation.
relationship is not returned to within the presenbod hmits within two (2) hours, the reactor shall be brought to the Cold Shutdown ACTIONS condition within 36 hours. Surveillance and corresponding action l CONDITION COMPLETION TNE l REQUIRED ACTION A.
Required Action B.1 mediet gn, g;,                         PILGRIM NUCLEAR POWER STATION hahjl         com ed              Simulated Thermal       Restricted Region   PNPS CORE OPERATING LIMITS REPORT n ed                                   ble 'alue to                       3.4         Power / Flow Relationshio) Durina Power Operation t en a
FCB8 not within limit A.1 Restore FCBS to 2 hours 4.11 REACTOR FUEL ASSEMBLY for reasons other within limit.
unexpected loss of                 non-Setup" value, feedwater heating or                                                           Refert     Technical Si-cificuh 3.11.D unexpected reduction in core flow.                                                                 The power / flow relationship shall not exceed the limiting values shown on the Power / Flow Opeinting Map in Figure 3.41.
than unexpected loss D.
FCD8 not within limit                                                                                                                                           I due to en unexpected loss of feedwater heating or unexpected reduction in core flow.
Power / Flow Relationshio Durina Power Operation of feedwater heeting or unexpected Compliance with the power / flow relationship in Section 3.11.D shall be determined daily duLing reactor operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR3.2.5.1                         NOTE Not required to be performed until 15 minutes after entry into the Restricted Region if entry was the result of an unexpected transient.
B.
Verify FCBB s 1.0.                       24 hours AND Once within 15 minutes following l                                                                     unexpected transient.
Gequired Action and B1 initiate action to exit immediately associated Completion the Restricted Region.
9611190107 961107
3.6.6.
,                          PDR       ADOCK 05000293 4
Thermal-Hvdraulic.jtability Time of Condition A not met.
P                                  PDR
3 6tfD g
Core thermal power shall not exceed 25% of rated thermal power NOTE without forced recirculation.
Required Action B.1 mediet gn, g;,
PILGRIM NUCLEAR POWER STATION hahjl Simulated Thermal Restricted Region PNPS CORE OPERATING LIMITS REPORT com ed n ed t en ble 'alue to 3.4 Power / Flow Relationshio) Durina Power Operation unexpected loss of non-Setup" value, a
feedwater heating or Refert Technical Si-cificuh 3.11.D unexpected reduction in core flow.
The power / flow relationship shall not exceed the limiting values shown on the Power / Flow Opeinting Map in Figure 3.41.
FCD8 not within limit due to en unexpected loss of feedwater heating or unexpected reduction in core flow.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR3.2.5.1 NOTE Not required to be performed until 15 minutes after entry into the Restricted Region if entry was the result of an unexpected transient.
Verify FCBB s 1.0.
24 hours AND Once within 15 minutes following l
unexpected transient.
9611190107 961107 PDR ADOCK 05000293 P
PDR 4


1 1
1 1
    .                                                                                                                                                                                              J e      NEDO-32339 Supplement 1                                                       PILGRIM TECHNICAL SPECIFICATIONS
J NEDO-32339 Supplement 1 PILGRIM TECHNICAL SPECIFICATIONS e
      '3.3           INSTRUMENTATION 3.3.1.1 ReeCtor Pr[dection System instrumentation
'3.3 INSTRUMENTATION 3.3.1.1 ReeCtor Pr[dection System instrumentation
[ Note- There is no change to the LCO, Apphcotwhty. Survedience Requirements or Actens i
[ Note-There is no change to the LCO, Apphcotwhty. Survedience Requirements or Actens i
specmcenon of the Standard improved TechrncW Specencenons ]                                                                                                                                 '
specmcenon of the Standard improved TechrncW Specencenons ]
      - Update me Mowingin TeNo 3 3.1.1 - 1:
- Update me Mowingin TeNo 3 3.1.1 - 1:
REACTOR PROTECTION SYSTEM INSTRUMENTATION                                                                                                                             )
REACTOR PROTECTION SYSTEM INSTRUMENTATION
APPlacAsta                     coNDmoN Moofsom         REG.NRED     REFERENCED omER -         CHAredELS       FRoM sPECIFiED       P*R TRIP       REGARED         SURVEILLAfCE ALLoWA8LE FUNCThoN           CoNDmCNS       SYSTEM         ACTloN o t       REGAREMDn a     VALUE 2 Average Power Range Monaars i
)
: b. Flow Smed                     1           p)           G           SR 3 31.1.1         (b)                                                                                         i Simuisted                                                           SR 3 31.1.2 Thermal Power..                                                     5434444 Hgh                                                                 SR 3.3116                                                                                                       I SR 3.31.1.13                                                                                                     1
APPlacAsta coNDmoN Moofsom REG.NRED REFERENCED omER -
,                                                                                  SR33119                                                                                                         '
CHAredELS FRoM sPECIFiED P*R TRIP REGARED SURVEILLAfCE ALLoWA8LE FUNCThoN CoNDmCNS SYSTEM ACTloN o t REGAREMDn a VALUE 2 Average Power Range Monaars i
SM S.L t.t.f t SR 3 31.1.14 SR 3 311.15 SR 3 311.17 SM 3.3 f.f f 8 to)
: b. Flow Smed 1
()         Anowable Velve spected m COLN lRevowers Note Funcbon 2 b is not essaconted wrarr e Lanubne Syshem softmg Anowebte valuee k Functorr 2 b are derived tom essaconsed cperebng hmste reperend a the COLR The operebng hmits are based on Lkensed operekng domem es6ebhshed Ibr cycle spectfac fuel and core doeten cherectensbes]
p)
1 SR 3 31.11 Perforrn CHANNEL CHECK.                                           12 hours           Station Procedure 2.1.15 - Daily Log Test 810 "APRM Channel Check" Not requered to be             unbl12 hours after APRM High Flux                 Heat Balance                     Once Every 3 Days Venfy the absoluto dfMorence between the everage           7 days                                                                                                     j powar range monitor (APRM) channets and the                                                                                                                             ;
G SR 3 31.1.1 (b) i Simuisted SR 3 31.1.2 Thermal Power..
calculated power is 5 2% RTP [ptus any gam                                                                                                                             l ediustment required by LCO 3 2.4. "Averego Power                                                                                                                         I Range Momtor (APRM) Setpomts") whee operebng at
5434444 Hgh SR 3.3116 SR 3.31.1.13 1
                            & 25% RTP, s44344.3-A4ust4he.shanneweenseemw eenrecedaew                               heys means.
SR33119 SM S.L t.t.f t SR 3 31.1.14 SR 3 311.15 SR 3 311.17 SM 3.3 f.f f 8 to)()
PNPS TABLE 4.1.2               Calibration Test                 Minimum Frequency SR 3 3.1.14 Cohbreto the local power range monitors.                         1 p                                               g exposure PNPS TABLE 4.1.1               Functional Test                 Minimum Frequency (3)
Anowable Velve spected m COLN lRevowers Note Funcbon 2 b is not essaconted wrarr e Lanubne Syshem softmg Anowebte valuee k Functorr 2 b are derived tom essaconsed cperebng hmste reperend a the COLR The operebng hmits are based on Lkensed operekng domem es6ebhshed Ibr cycle spectfac fuel and core doeten cherectensbes]
SR 3 31.19 Perform CHANNEL FUNCTIONAL TEST.                                 [92] days         APRM Flow Bias                 Trip Output Relaya (4)           Evevy 3 Months SR 3 3.1.111                             NOTEC                                                                                 Calibration Test
1 SR 3 31.11 Perforrn CHANNEL CHECK.
: 1. Neutron detectors ero excluded                           184 days PNPS TABLE 4.1.2 APRM High Flux Minimum Frequency        )
12 hours Station Procedure 2.1.15 - Daily Log Test 810 "APRM Channel Check" Not requered to be unbl12 hours after APRM High Flux Heat Balance Once Every 3 Days Venfy the absoluto dfMorence between the everage 7 days j
Calibrate Flow Bias signal (1) Every 3 Months
powar range monitor (APRM) channets and the calculated power is 5 2% RTP [ptus any gam l
: 2. For Function 2 e. not required to be performed                             Flow Bias Signal                                                                         1 when entenne MODE 2 from MODE 1 until12                                                                                                                             l hours after entering MODE 2.
ediustment required by LCO 3 2.4. "Averego Power Range Momtor (APRM) Setpomts") whee operebng at
& 25% RTP, s44344.3-A4ust4he.shanneweenseemw eenrecedaew heys means.
PNPS TABLE 4.1.2 Calibration Test Minimum Frequency SR 3 3.1.14 Cohbreto the local power range monitors.
1 p
g exposure PNPS TABLE 4.1.1 Functional Test Minimum Frequency (3)
SR 3 31.19 Perform CHANNEL FUNCTIONAL TEST.
[92] days APRM Flow Bias Trip Output Relaya (4)
Evevy 3 Months SR 3 3.1.111 NOTEC PNPS TABLE 4.1.2 Calibration Test Minimum Frequency
)
: 1. Neutron detectors ero excluded 184 days APRM High Flux Calibrate Flow Bias signal (1) Every 3 Months
: 2. For Function 2 e. not required to be performed Flow Bias Signal 1
when entenne MODE 2 from MODE 1 until12 l
hours after entering MODE 2.
3 For Function 2 b. the dmetal comoonente of the flow ggptrol tre reference cards are exchased.
3 For Function 2 b. the dmetal comoonente of the flow ggptrol tre reference cards are exchased.
Peiform CHANNEL CALIBRATION.
Peiform CHANNEL CALIBRATION.
SR 3 3.1.1.14 Venfy the APRM Flow Biased Simulated Thermal                 [18] months       PNPS TABLE 4.1.2               Calibration Test                 Minimum Frequency Power - High time constant es 5 [7] seconds                                   APRM High Flux                 Calibrate Flow Comparator       At least once every Flow Bias signal               and Flow Bias Network           18 Months SR S 31.1.15 Pwform LOGIC SYSTEM FUNCTIONAL TEST.                           [18] months Response time testing same as LSFT SR 3.31.1.17                         NOTES
SR 3 3.1.1.14 Venfy the APRM Flow Biased Simulated Thermal
: 1. Neutron detectors are excluded                                             Notes for Table 4.1.2
[18] months PNPS TABLE 4.1.2 Calibration Test Minimum Frequency Power - High time constant es 5 [7] seconds APRM High Flux Calibrate Flow Comparator At least once every Flow Bias signal and Flow Bias Network 18 Months SR S 31.1.15 Pwform LOGIC SYSTEM FUNCTIONAL TEST.
: 2. For Funcbon 6"n" equals 4 channels for the                                 5.         Response time is not a part of the routine Instrument channel test, but will purpose of determmmg the the STAGGERED TEST BASIS Frequency                                                                       be checked once per operating cycle.
[18] months Response time testing same as LSFT SR 3.31.1.17 NOTES
                          . Venfy the RPS RESPONSE TIME is wnhm bmits                   [16] months on a STAGOERED TEST BASIS SR S3.1118 Ad           the flow card tnp reference card to conform to           e     m7                             ,
: 1. Neutron detectors are excluded Notes for Table 4.1.2
l (Reviewst's Note Upon complebon of the Enhanced             reaching                       to a calibrated flow signal" is required along with the 3 month celibration Option kA Stabshty solubon this SR supercedes SR           equihbnum 33.1.1.3)                                                   condibons                     of the flow biased signal.
: 2. For Funcbon 6"n" equals 4 channels for the 5.
Response time is not a part of the routine Instrument channel test, but will purpose of determmmg the the STAGGERED TEST BASIS Frequency be checked once per operating cycle.
. Venfy the RPS RESPONSE TIME is wnhm bmits
[16] months on a STAGOERED TEST BASIS SR S3.1118 Ad the flow card tnp reference card to conform to e
m7 (Reviewst's Note Upon complebon of the Enhanced reaching to a calibrated flow signal" is required along with the 3 month celibration Option kA Stabshty solubon this SR supercedes SR equihbnum 33.1.1.3) condibons of the flow biased signal.
followmg refueling outage
followmg refueling outage


  ~       *
~
                        .                NEDO-32339-A                                             PILGRIM TECHNICAL SPECIFICATIONS 3.3         ,1NSTRUhENTATION 3.3.1.3     Period 4msed Dolection System Instrumentation (PSOS)
NEDO-32339-A PILGRIM TECHNICAL SPECIFICATIONS 3.3
LCO 311.3                 One channel of PSOS instrumentation shen be OPERA 8LE..
,1NSTRUhENTATION 3.3.1.3 Period 4msed Dolection System Instrumentation (PSOS)
blG Each OPERA 8LE channel of PSOS instrumentation shall not indicale High-High DR Alarm APPUCABluTY               THERMAL POWEft and core flow in the Restnoted Region as specNied in the COLR.
LCO 311.3 One channel of PSOS instrumentation shen be OPERA 8LE..
THERMAL POWER and core flow in the Monitored Region as       3.11 specWied in the COLR.
blG Each OPERA 8LE channel of PSOS instrumentation shall not indicale High-High DR Alarm APPUCABluTY THERMAL POWEft and core flow in the Restnoted Region as specNied in the COLR.
REACTOR FUEL ASSEMBLY ACTIONS cr#OTION                         REOJtRED ACTION                     COMPLETION TIMfi       g         7gp                           g A. Any OPERA 8LE PSOS             A.1     Place the reactor rnode     Irnmediately channel indicating                    switch in the shutdown specified in the CORE OPERATING LIMITS REPORT.
THERMAL POWER and core flow in the Monitored Region as 3.11 REACTOR FUEL ASSEMBLY specWied in the COLR.
HigMingh DR Alarm.                   posMion B. Required PSDS channel           8.1               N'OTE                                   If at an@ W p operk R k MMW h nonnel inoperable while in the               only applicable if RPS                             surveillance that the hmiting value for the power / flow relationship is estrW Rege                           u p             ',                                  being exceeded, action shall be initiated within 15 minutes to Thermal Power-Hegh,                               restore operation to within the presenbod limits. If the power / flow Vetue l*
ACTIONS cr#OTION REOJtRED ACTION COMPLETION TIMfi g
;                                                                                                  relationship is not returned to within the prescribed tirnits within two (2) hours, the reactor shall be brought to the Cold Shutdown initiale action to exit the immediet*
7gp g
;                                                                                                  condition within 36 hours. Surveillance and corresponding action
A. Any OPERA 8LE PSOS A.1 Place the reactor rnode Irnmediately specified in the CORE OPERATING LIMITS REPORT.
:                                                Restricted Region shall continue until reactor operation is within the prescribed limits.
channel indicating switch in the shutdown HigMingh DR Alarm.
8.2     Piece the reactor mode     immdiately switch in the shutdown position C. Required PSOS channel           C.1     Initiate action to exit the 15 minutes inoperable while in the               Monitored Region Monitored Region SURVElLLANCE REQUIREMENTS                                                                                                                                             q SURVEILLANCE                                                         FREQUENCY S23.3.1.3.1       Verify each OPERABLE channel of PSOS               12 hours instrumentalxwi not in High-High DR Alarm SR 3.3.1.3.2       Perform Channel Check                             12 hours SR 3.3.1.3.3       Perform Channel Functional                       24 months
posMion B. Required PSDS channel 8.1 N'OTE If at an@ W p operk R k MMW h nonnel inoperable while in the only applicable if RPS surveillance that the hmiting value for the power / flow relationship is estrW Rege u
                                                                                                                                                                            )
p being exceeded, action shall be initiated within 15 minutes to Thermal Power-Hegh, restore operation to within the presenbod limits. If the power / flow Vetue l*
relationship is not returned to within the prescribed tirnits within two (2) hours, the reactor shall be brought to the Cold Shutdown initiale action to exit the immediet*
condition within 36 hours. Surveillance and corresponding action Restricted Region shall continue until reactor operation is within the prescribed limits.
8.2 Piece the reactor mode immdiately switch in the shutdown position C. Required PSOS channel C.1 Initiate action to exit the 15 minutes inoperable while in the Monitored Region Monitored Region SURVElLLANCE REQUIREMENTS q
SURVEILLANCE FREQUENCY S23.3.1.3.1 Verify each OPERABLE channel of PSOS 12 hours instrumentalxwi not in High-High DR Alarm SR 3.3.1.3.2 Perform Channel Check 12 hours SR 3.3.1.3.3 Perform Channel Functional 24 months
)
i
i
                                                                                                                                                                            )
)
1 A
1 A
K 1
K 1
l I
l I


l .
l
(*       e.
(*
    .      . .          NEDC-32339 Supplement 4                                     PILGRIM TECHNICAL SPECIFICATIONS I
e.
3.4         REACTOR COOLANT SYSTEM (RCS) 3.4.1   Recirculation Loops Operating
NEDC-32339 Supplement 4 PILGRIM TECHNICAL SPECIFICATIONS I
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating
[ Reviewer's Note: The only change to the RCS section is the LCO for Recirculation Loops Operating. The unchanged sections are not repeated herein.]
[ Reviewer's Note: The only change to the RCS section is the LCO for Recirculation Loops Operating. The unchanged sections are not repeated herein.]
LCO 3.4.1             Two recirculation loops with rnatched flows shall be in operation,                                                                 FACILITY OPERATING LICENSE QB                                                                                 Docket No. 50.293 One recirculation loop may be in operation provided the E. Tim reactor shall not be operated with one recirculation loop out of following limits are applied when the associated LCO is       service for rnore than 24 hours. With the reactor operating, if one applicable:                                                   recirculation loop is out of service, the plant shall be placed in the hot shutdown condition within 24 hours unless the loop is sooner
LCO 3.4.1 Two recirculation loops with rnatched flows shall be in operation, FACILITY OPERATING LICENSE QB Docket No. 50.293 One recirculation loop may be in operation provided the E.
: a.         [no changeJ                                       returned to service.
Tim reactor shall not be operated with one recirculation loop out of following limits are applied when the associated LCO is service for rnore than 24 hours. With the reactor operating, if one applicable:
: b.         [no change]
recirculation loop is out of service, the plant shall be placed in the hot shutdown condition within 24 hours unless the loop is sooner a.
C.         LCO 3.3.1.1," Reactor Protection System (RPS)
[no changeJ returned to service.
Instrumentation, Function 2.b (Average Power                                                                               I Range Monitor Flow                                                                                                         '
b.
Biased Simulated Thermal Power-High)                                                                                       ,
[no change]
Allowable Value for Single-loop operation as                                                                               i specified in the COLR
C.
                                                                                                                                                                  )
LCO 3.3.1.1," Reactor Protection System (RPS)
l l
Instrumentation, Function 2.b (Average Power Range Monitor Flow Biased Simulated Thermal Power-High)
1 l
Allowable Value for Single-loop operation as i
4 l
specified in the COLR
)
1 4
l l
l l
l}}
l}}

Latest revision as of 04:01, 12 December 2024

Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A
ML20134K436
Person / Time
Site: Pilgrim
Issue date: 11/07/1996
From:
BOSTON EDISON CO.
To:
Shared Package
ML20134K430 List:
References
NUDOCS 9611190107
Download: ML20134K436 (4)


Text

. _ -

~

NEDO-32339 Supplement 4 PILGRIM TECHNICAL SFECIFICATIONS

  • 3.2 PbWER DIST(tlBUTION LIMITS 3.11 REACTOR FUEL ASSEMBLY D.

Power / Flow Relatenshio Durina Power Operation 3.2.5 Fracten of Core Boiling Boundary (FCBD)

The power / flow relationship shall not exceed the limiting values LCO 3.2.5 FCBB shall be s 1.0.

specified in Uw CORE OPERATING LIMITS REPORT.

APPLICABILITY: THERMAL POWER and core flow in the Restricted Region as specified in the COLR.

surveinance thaw hmning value for the power / flow relatonship is MODE 1 when RPS Function 2.b, APRM Flow being exceeded, action shall be initiated within 15 minutes to Biased Simulated Thermal Power-High, Allowable restore operation to within the prescribed hmits. if the power / flow Value is " Setup" as specified in the COLR.

relationship is not returned to within the presenbod hmits within two (2) hours, the reactor shall be brought to the Cold Shutdown ACTIONS condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Surveillance and corresponding action l CONDITION COMPLETION TNE l REQUIRED ACTION A.

FCB8 not within limit A.1 Restore FCBS to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 4.11 REACTOR FUEL ASSEMBLY for reasons other within limit.

than unexpected loss D.

Power / Flow Relationshio Durina Power Operation of feedwater heeting or unexpected Compliance with the power / flow relationship in Section 3.11.D shall be determined daily duLing reactor operation.

B.

Gequired Action and B1 initiate action to exit immediately associated Completion the Restricted Region.

3.6.6.

Thermal-Hvdraulic.jtability Time of Condition A not met.

3 6tfD g

Core thermal power shall not exceed 25% of rated thermal power NOTE without forced recirculation.

Required Action B.1 mediet gn, g;,

PILGRIM NUCLEAR POWER STATION hahjl Simulated Thermal Restricted Region PNPS CORE OPERATING LIMITS REPORT com ed n ed t en ble 'alue to 3.4 Power / Flow Relationshio) Durina Power Operation unexpected loss of non-Setup" value, a

feedwater heating or Refert Technical Si-cificuh 3.11.D unexpected reduction in core flow.

The power / flow relationship shall not exceed the limiting values shown on the Power / Flow Opeinting Map in Figure 3.41.

FCD8 not within limit due to en unexpected loss of feedwater heating or unexpected reduction in core flow.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR3.2.5.1 NOTE Not required to be performed until 15 minutes after entry into the Restricted Region if entry was the result of an unexpected transient.

Verify FCBB s 1.0.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND Once within 15 minutes following l

unexpected transient.

9611190107 961107 PDR ADOCK 05000293 P

PDR 4

1 1

J NEDO-32339 Supplement 1 PILGRIM TECHNICAL SPECIFICATIONS e

'3.3 INSTRUMENTATION 3.3.1.1 ReeCtor Pr[dection System instrumentation

[ Note-There is no change to the LCO, Apphcotwhty. Survedience Requirements or Actens i

specmcenon of the Standard improved TechrncW Specencenons ]

- Update me Mowingin TeNo 3 3.1.1 - 1:

REACTOR PROTECTION SYSTEM INSTRUMENTATION

)

APPlacAsta coNDmoN Moofsom REG.NRED REFERENCED omER -

CHAredELS FRoM sPECIFiED P*R TRIP REGARED SURVEILLAfCE ALLoWA8LE FUNCThoN CoNDmCNS SYSTEM ACTloN o t REGAREMDn a VALUE 2 Average Power Range Monaars i

b. Flow Smed 1

p)

G SR 3 31.1.1 (b) i Simuisted SR 3 31.1.2 Thermal Power..

5434444 Hgh SR 3.3116 SR 3.31.1.13 1

SR33119 SM S.L t.t.f t SR 3 31.1.14 SR 3 311.15 SR 3 311.17 SM 3.3 f.f f 8 to)()

Anowable Velve spected m COLN lRevowers Note Funcbon 2 b is not essaconted wrarr e Lanubne Syshem softmg Anowebte valuee k Functorr 2 b are derived tom essaconsed cperebng hmste reperend a the COLR The operebng hmits are based on Lkensed operekng domem es6ebhshed Ibr cycle spectfac fuel and core doeten cherectensbes]

1 SR 3 31.11 Perforrn CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Station Procedure 2.1.15 - Daily Log Test 810 "APRM Channel Check" Not requered to be unbl12 hours after APRM High Flux Heat Balance Once Every 3 Days Venfy the absoluto dfMorence between the everage 7 days j

powar range monitor (APRM) channets and the calculated power is 5 2% RTP [ptus any gam l

ediustment required by LCO 3 2.4. "Averego Power Range Momtor (APRM) Setpomts") whee operebng at

& 25% RTP, s44344.3-A4ust4he.shanneweenseemw eenrecedaew heys means.

PNPS TABLE 4.1.2 Calibration Test Minimum Frequency SR 3 3.1.14 Cohbreto the local power range monitors.

1 p

g exposure PNPS TABLE 4.1.1 Functional Test Minimum Frequency (3)

SR 3 31.19 Perform CHANNEL FUNCTIONAL TEST.

[92] days APRM Flow Bias Trip Output Relaya (4)

Evevy 3 Months SR 3 3.1.111 NOTEC PNPS TABLE 4.1.2 Calibration Test Minimum Frequency

)

1. Neutron detectors ero excluded 184 days APRM High Flux Calibrate Flow Bias signal (1) Every 3 Months
2. For Function 2 e. not required to be performed Flow Bias Signal 1

when entenne MODE 2 from MODE 1 until12 l

hours after entering MODE 2.

3 For Function 2 b. the dmetal comoonente of the flow ggptrol tre reference cards are exchased.

Peiform CHANNEL CALIBRATION.

SR 3 3.1.1.14 Venfy the APRM Flow Biased Simulated Thermal

[18] months PNPS TABLE 4.1.2 Calibration Test Minimum Frequency Power - High time constant es 5 [7] seconds APRM High Flux Calibrate Flow Comparator At least once every Flow Bias signal and Flow Bias Network 18 Months SR S 31.1.15 Pwform LOGIC SYSTEM FUNCTIONAL TEST.

[18] months Response time testing same as LSFT SR 3.31.1.17 NOTES

1. Neutron detectors are excluded Notes for Table 4.1.2
2. For Funcbon 6"n" equals 4 channels for the 5.

Response time is not a part of the routine Instrument channel test, but will purpose of determmmg the the STAGGERED TEST BASIS Frequency be checked once per operating cycle.

. Venfy the RPS RESPONSE TIME is wnhm bmits

[16] months on a STAGOERED TEST BASIS SR S3.1118 Ad the flow card tnp reference card to conform to e

m7 (Reviewst's Note Upon complebon of the Enhanced reaching to a calibrated flow signal" is required along with the 3 month celibration Option kA Stabshty solubon this SR supercedes SR equihbnum 33.1.1.3) condibons of the flow biased signal.

followmg refueling outage

~

NEDO-32339-A PILGRIM TECHNICAL SPECIFICATIONS 3.3

,1NSTRUhENTATION 3.3.1.3 Period 4msed Dolection System Instrumentation (PSOS)

LCO 311.3 One channel of PSOS instrumentation shen be OPERA 8LE..

blG Each OPERA 8LE channel of PSOS instrumentation shall not indicale High-High DR Alarm APPUCABluTY THERMAL POWEft and core flow in the Restnoted Region as specNied in the COLR.

THERMAL POWER and core flow in the Monitored Region as 3.11 REACTOR FUEL ASSEMBLY specWied in the COLR.

ACTIONS cr#OTION REOJtRED ACTION COMPLETION TIMfi g

7gp g

A. Any OPERA 8LE PSOS A.1 Place the reactor rnode Irnmediately specified in the CORE OPERATING LIMITS REPORT.

channel indicating switch in the shutdown HigMingh DR Alarm.

posMion B. Required PSDS channel 8.1 N'OTE If at an@ W p operk R k MMW h nonnel inoperable while in the only applicable if RPS surveillance that the hmiting value for the power / flow relationship is estrW Rege u

p being exceeded, action shall be initiated within 15 minutes to Thermal Power-Hegh, restore operation to within the presenbod limits. If the power / flow Vetue l*

relationship is not returned to within the prescribed tirnits within two (2) hours, the reactor shall be brought to the Cold Shutdown initiale action to exit the immediet*

condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Surveillance and corresponding action Restricted Region shall continue until reactor operation is within the prescribed limits.

8.2 Piece the reactor mode immdiately switch in the shutdown position C. Required PSOS channel C.1 Initiate action to exit the 15 minutes inoperable while in the Monitored Region Monitored Region SURVElLLANCE REQUIREMENTS q

SURVEILLANCE FREQUENCY S23.3.1.3.1 Verify each OPERABLE channel of PSOS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> instrumentalxwi not in High-High DR Alarm SR 3.3.1.3.2 Perform Channel Check 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.1.3.3 Perform Channel Functional 24 months

)

i

)

1 A

K 1

l I

l

(*

e.

NEDC-32339 Supplement 4 PILGRIM TECHNICAL SPECIFICATIONS I

3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating

[ Reviewer's Note: The only change to the RCS section is the LCO for Recirculation Loops Operating. The unchanged sections are not repeated herein.]

LCO 3.4.1 Two recirculation loops with rnatched flows shall be in operation, FACILITY OPERATING LICENSE QB Docket No. 50.293 One recirculation loop may be in operation provided the E.

Tim reactor shall not be operated with one recirculation loop out of following limits are applied when the associated LCO is service for rnore than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With the reactor operating, if one applicable:

recirculation loop is out of service, the plant shall be placed in the hot shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the loop is sooner a.

[no changeJ returned to service.

b.

[no change]

C.

LCO 3.3.1.1," Reactor Protection System (RPS)

Instrumentation, Function 2.b (Average Power Range Monitor Flow Biased Simulated Thermal Power-High)

Allowable Value for Single-loop operation as i

specified in the COLR

)