ML20134M218: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:NCllen)
      .                                                                               NCllen)
.
*
.
.
._
._
                                            f,UG E 71985
f,UG E 71985
      Carolina Power and Light Company
Carolina Power and Light Company
    t/ ATTN: Mr. E. E. Utley
t/ ATTN: Mr. E. E. Utley
                Senior Executive Vice President
Senior Executive Vice President
                Power Supply and Engineering
Power Supply and Engineering
                  and Construction
and Construction
      P. O. Box 1551
P. O. Box 1551
      Raleigh, NC 27602
Raleigh, NC 27602
      Gentlemen:
Gentlemen:
      SUBJECT:   REPORT NOS. 50-324/85-24 AND 50-325/85-24
SUBJECT:
      On July 22-26, 1985, NRC inspected activities authorized by NRC Operating License
REPORT NOS. 50-324/85-24 AND 50-325/85-24
      Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the
On July 22-26, 1985, NRC inspected activities authorized by NRC Operating License
      inspection, the findings were discussed with those members of your staff
Nos. DPR-71 and DPR-62 for your Brunswick facility.
      identified in the enclosed inspection report.
At the conclusion of the
      Areas examined during the inspection are identified in the report. Within these
inspection, the findings were discussed with those members of your staff
      areas, the inspection consisted of selective examinations of procedures and
identified in the enclosed inspection report.
      representative records, interviews with personnel, and observation of activities
Areas examined during the inspection are identified in the report. Within these
        in progress.
areas, the inspection consisted of selective examinations of procedures and
      The inspection findings indicate that certain activities violated NRC require-
representative records, interviews with personnel, and observation of activities
      ments.   The violation, references to pertinent requirements, and elements to be
in progress.
        included in your response are presented in the enclosed Notice of Violation.
The inspection findings indicate that certain activities violated NRC require-
      The responses directed by this letter and the enclosures are not subject to the
ments.
      clearance procedures of the Office of Management and Budget issued under the
The violation, references to pertinent requirements, and elements to be
      Paperwork Reduction Act of 1980, PL 96-511.
included in your response are presented in the enclosed Notice of Violation.
      Should you have any questions concerning this letter, please contact us.
The responses directed by this letter and the enclosures are not subject to the
                                                  Sincerely,
clearance procedures of the Office of Management and Budget issued under the
                                                  (Original Signed By)
Paperwork Reduction Act of 1980, PL 96-511.
                                                  Roger D. Walker, Director
Should you have any questions concerning this letter, please contact us.
                                                  Division of Reactor Projects
Sincerely,
      Enclosures:
(Original Signed By)
      1.   Notice of Violation
Roger D. Walker, Director
      2.     Inspection Report Nos. 50-324/85-24
Division of Reactor Projects
                and 50-325/85-24
Enclosures:
      cc w/encls:
1.
      vp. W. Howe, Vice President
Notice of Violation
          Brunswick Nuclear Project
2.
      g R. Dietz, Plant General Manager
Inspection Report Nos. 50-324/85-24
      bec w/encis: (See page 2)
and 50-325/85-24
            8509040026 050827 4
cc w/encls:
            PDR   ADOCK 050
vp. W. Howe, Vice President
            o                                                                    ,h
Brunswick Nuclear Project
                                                                                        7E01
g R. Dietz, Plant General Manager
bec w/encis:
(See page 2)
8509040026 050827
PDR
ADOCK 050
4
,h
o
7E01


      _                   .
_
          -
.
    .
-
        *
.
  .       .
*
  .
.
          Carolina Power and Light Company       2                 AUG 2 71985
.
          hccw/encls:
.
        W RC Resident Inspector
Carolina Power and Light Company
          Document Control Desk
2
          State of North Carolina
AUG 2 71985
          RI               RII         RIIp      RII     RII ,
hccw/encls:
          PWagner:lb       KPoertner   BDebs     CJnifan AGMiqb'
W RC Resident Inspector
          08/20/85         08/to/85   08/a /85   08/zy85 08/ G 85
Document Control Desk
          RI     [         Ri!   /
State of North Carolina
RIIp
RI
RII
RII
RII
,
PWagner:lb
KPoertner
BDebs
CJnifan
AGMiqb'
08/20/85
08/to/85
08/a /85
08/zy85
08/ G 85
RI
[
Ri!
/
t
t
l         PF    r
l
                  l
9/
                    ekson
l
                              9/
PF
                            DVerrelli
r ekson
          08/1 /85         08/1 7/85
DVerrelli
                                                                                ]
08/1 /85
08/1 7/85
]
}}
}}

Latest revision as of 03:41, 12 December 2024

Forwards Insp Repts 50-324/85-24 & 50-325/85-24 on 850722-26 & Notice of Violation
ML20134M218
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/27/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20134M222 List:
References
NUDOCS 8509040026
Download: ML20134M218 (2)


See also: IR 05000324/1985024

Text

NCllen)

.

.

._

f,UG E 71985

Carolina Power and Light Company

t/ ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NOS. 50-324/85-24 AND 50-325/85-24

On July 22-26, 1985, NRC inspected activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for your Brunswick facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violation, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original Signed By)

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-324/85-24

and 50-325/85-24

cc w/encls:

vp. W. Howe, Vice President

Brunswick Nuclear Project

g R. Dietz, Plant General Manager

bec w/encis:

(See page 2)

8509040026 050827

PDR

ADOCK 050

4

,h

o

7E01

_

.

-

.

.

.

.

Carolina Power and Light Company

2

AUG 2 71985

hccw/encls:

W RC Resident Inspector

Document Control Desk

State of North Carolina

RIIp

RI

RII

RII

RII

,

PWagner:lb

KPoertner

BDebs

CJnifan

AGMiqb'

08/20/85

08/to/85

08/a /85

08/zy85

08/ G 85

RI

[

Ri!

/

t

l

9/

l

PF

r ekson

DVerrelli

08/1 /85

08/1 7/85

]